6530--VISN15 - TeleICU Equipment Federal contract opportunity
Solicitation number
36C25520Q0285
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 15

About this file

This document summarizes a federal solicitation for TeleICU equipment. The Department of Veterans Affairs Network Contracting Office 15 is seeking quotes for TeleICU equipment that must interface with existing Philips ecaremanager systems. Quotes are due by March 27, 2020 with award expected shortly thereafter. The solicitation will provide full specifications. Interested parties should monitor the FedBizOpps website for the solicitation release and any amendments. Non-OEM firms must include an authorized distributor letter. The point of contact is provided for any questions by March 25.

36C25520Q0285 0001 36C25520Q0285 0001.docx

View the file

Other files for this federal contract opportunity

Other files attached to 6530--VISN15 - TeleICU Equipment, newest first.
File Type Posted
36C25520Q0285-002.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 3/25/2020 None 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 36C255 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth

KS

66048 To all Offerors/Bidders

36C25520Q0285 03-24-2020

X X X

The purpose of this Solicitation Amendment is to:

1) Provide Questions and Answers - See Continuation Page for details

All Terms and Condition of Solicitation 36C25520Q0285 remain the same.

Solicitation response due date is 03/27/2020, 11:00am EST

Emilio Ballentos Contracting Officer

CONTINUATION PAGE

Questions and Answers

Question 1

E.7 VAAR 852.215-72 NOTICE OF INTENT TO RE-SOLICIT (OCT 2019)

This solicitation provides offerors fewer than 30 days to submit proposals. In the event that only one offer is received in response to this solicitation, the Contracting Officer may cancel the solicitation and resolicit for an additional period of at least 30 days in accordance with 815.370–2.

Answer: Discretion of the Contracting Officer, based on quote received.

Question 2 Is the Government expecting the Prime contractor to provide a subcontracting plan that utilizes SDVOSBs or VOSBs for this work per C.9?

Answer: Contractor is expected to submit their Subcontracting Plan as applicable. We will evaluate the plan received.

Question 3 Is the VA willing to consider a solution that does not satisfy all requirements?

Answer: Contractor is expected to meet the requirements. If unable to meet certain requirements, those must be HIGHLIGHTED in the quote/proposal for clarity. We will evaluate the quote and make our determination.

Question 4 With respect to implementation, we have to understand what the protective measures are before we can answer the question in table 4 and provide impact on installation timeline.

Answer: VA understands there is some uncertainty with regard to room access during this time. Depending upon how quickly contractor can get the equipment on site, the VA will provide unoccupied rooms, but may not be able to provide all of the rooms at the same time due to the current pandemic. The contractor should provide a schedule or schedules and pricing that reflect the inability to access rooms based on patients occupying the beds. Worst case scenario should be one room per day. VA understands that the schedule will be impacted based upon the number of positive COVID-19 cases that are admitted to the hospital, contractor should provide pricing if contractor must make multiple trips to the VA to complete the install. ICU rooms will be cleaned according to medical center policy prior to the contractor arriving on site. Contractor should supply their own PPE, VA will inform the Contractor if PPE is required.

Question 5 MO has Shelter-in-place orders. Will the VA provide access to the rooms and allow installation within 30 days of award as required by the RFP if our team is designated as Essential Personnel?

Answer: Clarification, the contract states that only the first site (St. Louis is preferred) will be expected to be installed within 30 days with the rest of the sites to follow. If the contractor can install faster than 30 days, please include that in the reply regarding schedules. VA will provide letters to the contracting employees that they are essential personnel. Contractor will supply names of employees to the COR so that these letters can be created. Contractors will be required to follow all existing building access requirements at each site, which includes screening each person before they enter the hospital. If the VA is unable to provide access to the rooms, VA assumes responsibility for not meeting the timeline. Contractor should provide pricing for a prolonged timeline and will be part of the evaluation.