- Structural Improvements to Building 42 Project Number 657-343 Federal contract opportunity
- Solicitation number
- 36C25518R0049
About this file
36C25518R0049 Drawings 657-343 Architect (7 pages).pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25518C0148-000.docx | DOCX document | |
| 36C25518R0049-00004005.docx | DOCX document | |
| 36C25518R0049-00003000.docx | DOCX document | |
| 36C25518R0049-00002000.docx | DOCX document | |
| 36C25518R0049-00002001.pdf | ||
| 36C25518R0049-00001000.docx | DOCX document | |
| 36C25518R0049-011.pdf | ||
| 36C25518R0049-008.pdf | ||
| 36C25518R0049-001.docx | DOCX document | |
| 36C25518R0049-006.pdf | ||
| 36C25518R0049-007.pdf | ||
| 36C25518R0049-002.pdf | ||
| 36C25518R0049-010.pdf | ||
| 36C25518R0049-005.pdf | ||
| 36C25518R0049-009.pdf | ||
| 36C25518R0049-004.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPIRES 11-30-18
N
T
C E
I L
TA
S SHEILA
001-016606
BAYSINGER
CD A R
S E
L.
T C
H I
T E
ILOF I L
E NO
I S
INTEGRATED PROJECT TEAM APPROVAL SIGNATURES
COR, MARION VAMC DATE
SAFETY, MARION VAMC DATE
VA POLICE, MARION VAMC DATE
INFECTION PREVENTION, MARION VAMC DATE
PATIENT SAFETY, MARION VAMC DATE
MENTAL HEALTH, MARION VAMC DATE
WOMEN VETERANS PROGRAM MANAGER, MARION VAMC DATE
INFORMATION SECURITY OFFICER, MARION VAMC DATE
PRIVACY OFFICER DATE
ENERGY ENGINEER, MARION VAMC DATE
STRATEGIC PLANNER, MARION VAMC DATE
ENVIRONMENTAL MANAGEMENT, MARION VAMC DATE
OFFICE OF INFORMATION AND TECHNOLOGY, MARION VAMC DATE
LOGISTICS, MARION VAMC DATE
NURSING SERVICE, MARION VAMC DATE
CHIEF OF ENGINEERING, MARION VAMC DATE
ASSOCIATE DIRECTOR PATIENT CARE SERVICES, MARION VAMC DATE
CHIEF OF STAFF, MARION VAMC DATE
ASSOCIATE DIRECTOR, MARION VAMC DATE
DIRECTOR, MARION VAMC DATE
Baysinger Design Group, Inc.
Marion, Illinois 62959 4501 West DeYoung Street, Suite 100B
Fax: 618.998.8032 Phone: 618.998.8015 www.BaysingerDesignGroup.com Illinois Design Firm No. 184-004212
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
MARION VAMC
MARION, IL, 62959
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER: Project Number Scale
16-198 ADD STRUCTURAL
IMPROVEMENTS TO BUILDING
657-343AS INDICATED
100% BID DOCUMENTS
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
09/06/17
Baysinger Design Group, Inc.
Marion, Illinois 62959 4501 West DeYoung Street, Suite 100B
Fax: 618.998.8032 Phone: 618.998.8015 www.BaysingerDesignGroup.com Illinois Design Firm No. 184-004212
DEPT. OF VETERAN AFFAIRS MEDICAL CENTER
MARION, ILLINOIS
MARION VA MEDICAL CENTER
2401 W MAIN ST.
MARION, ILLINOIS 62959
MECHANICAL, ELECTRICAL, PLUMBING
ARCHITECTURAL
STRUCTURAL
/3
1/
:1 7:
AM
GI001
COVER SHEET
HKG SPH
ADD STRUCTURAL IMPROVEMENTS TO BUILDING 42
1 81
T
C E
I L
TA
S SHEILA
001-016606
BAYSINGER
CD A R
S E
L.
T C
H I
T E
ILOF I L
E NO
I S
DEPT. VA
MEDICAL CENTER
ILLINOIS
EastWest
South
North
MARION
STATE LOCATION MAP
MARION LOCATION MAP
2000 FEET
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
PLANS REFLECT INFORMATION GATHERED FROM EXISTING CONDITIONS, DRAWINGS & ARCHITECT'S FIELD VERIFICATION. CONTRACTOR SHALL VERIFY ACCURACY OF INFORMATION PRIOR TO COMMENCEMENT OF DEMOLITION AND /OR CONSTRUCTION ACTIVITIES AND REPORT ANY DISCREPANCIES TO COR.
CONTRACTORS SHALL VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE EXISTING CONDITIONS OF ALL BUILDING TRADES AND INCLUDE THE WORK NECESSARY TO COMPLY WITH THE SCOPE OF THE WORK. ADDITIONAL COMPENSATION WILL NOT BE CONSIDERED FOR EXTRA WORK WHEN SUCH WORK COULD HAVE BEEN REASONABLY ASCERTAINED FROM THE PRE BID SITE VISIT REVIEW OF THE EXISTING CONDITIONS AND THE WORK SCOPE DESCRIBED IN THE DOCUMENTS.
ALL NEW VERTICAL AND HORIZONTAL DUCTS, PIPES, CONDUITS, ETC., IN FINISHED ROOMS OR AREAS THROUGHOUT BUILDING, NOT ENCASED IN MASONRY OR CONCRETE CONSTRUCTION, SHALL BE ENCLOSED IN METAL STUDS AND DRYWALL CHASE WALLS AS DETAILED IN THE DRAWINGS AND FINISHED TO MATCH THE ROOM FINISH.
THE PRODUCTS AND MANUFACTURERS LISTED IN THE FINISH SCHEDULE ARE TO BE USED AS A "BASIS OF DESIGN". EQUAL PRODUCTS BY OTHER MANUFACTURERS MAY BE CONSIDERED GIVEN THE PRODUCT MEETS THE SALIENT CHARACTERISTICS INDICATED IN THE SPECIFICATIONS AND IS SIMILAR IN COLOR, PATTERN, AND DESIGN.
EXISTING FIRE SUPPRESSION SYSTEM TO REMAIN IN SERVICE THROUGHOUT PERFORMANCE OF THE PROJECT. OUTAGES OF THE FIRE SUPPRESSION SYSTEM LESS THAN 10 HOURS DURING ACTIVE PERFORMANCE OF THE WORK ARE PERMISSIBLE. THE FIRE SUPRESSION SYSTEM SHALL REMAIN IN SERVICE AT ALL TIMES WHEN THE CONSTRUCTION SITE IS UNOCCUPIED. IF FIRE SUPPRESSION SYSTEM CANNOT BE RESTORED WITHIN 10 HOURS, THE CONTRACTOR SHALL PROVIDE A MANNED FIRE WATCH DURING THE TIME THE FIRE SUPPRESSION SYSTEM IS OUT OF SERVICE AND THE AREA IS UNOCCUPIED. ALTERNATIVELY, A MANNED FIRE WATCH IS NOT REQUIRED IF THE PERIMETER OF THE PROJECT PHASE AREA (NOT COVERED BY AN IN-SERVICE FIRE SUPPRESSION SYSTEM) IS CONTAINED WITHIN A 1 HOUR FIRE/SMOKE RATED PARTITION (FLOOR TO UNDERSIDE
OF STRUCTURE ABOVE).
AT LEAST ONE FIRE/SMOKE DETECTOR IS REQUIRED TO BE HARD WIRED INTO THE MEDICAL CENTER'S FIRE ALARM SYSTEM AND ACTIVATED DURING UNOCCUPIED TIMES.
LOCATIONS OF NEW EQUIPMENT, PIPING, AND ASSOCIATED ITEMS ARE SHOWN ON THE DRAWINGS. PRIOR TO THE COMMENCEMENT OF DEMOLITION OR CONSTRUCTION, THE CONTRACTOR SHALL FIELD COORDINATE LOCATIONS AND ELEVATIONS FOR THE WORK, INCLUDING CONNECTIONS TO EXISTING WORK. REQUIRED OFFSETS, FITTINGS, BOXES, TRANSITIONS, EXTENSIONS, AND ACCESSORIES, ETC. TO HAVE A COMPLETE AND FUNCTIONAL SYSTEM ARE INCLUDED IN THE SCOPE OF THE WORK. NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE IMMEDIATELY IF SIGNIFICANT DISCREPANCIES OR OMISSIONS ARE DISCOVERED THAT AFFECT PERFORMANCE OF THE WORK.
EXISTING DUCTWORK, ELECTRICAL, MECHANICAL, PIPING, CABLE TRAYS, ETC., ARE NOT NECESSARILY SHOWN OR NOT SHOWN ACCURATELY ON THE DRAWINGS. FIELD VERIFY THE LOCATIONS OF EXISTING EQUIPMENT, DUCTWORK, PIPING, ETC. AFFECTING THE PERFORMANCE OF THE WORK. NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE IMMEDIATELY IF SIGNIFICANT DISCREPANCIES OR OMISSIONS ARE DISCOVERED THAT AFFECT PERFORMANCE OF THE WORK.
MINOR CHANGES IN LAYOUT OR LOCATION MAY BE REQUIRED TO AVOID INTERFERENCES, OBSTRUCTIONS, ETC. AND ARE INCLUDED IN THE WORK. NOTIFY THE CONTRACTING OFFICER'S REPRESENTATIVE IMMEDIATELY IF SIGNIFICANT INTERFERENCES OR OBSTRUCTIONS ARE DISCOVERED THAT AFFECT PERFORMANCE OF THE WORK.
CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL EXISTING ADJACENT CONSTRUCTION FROM DUST AND DAMAGE. REPAIR, REPLACE, OR PATCH ANY EXISTING CONSTRUCTION DAMAGED DURING THE CONSTRUCTION PROCESS AT NO ADDITIONAL EXPENSE TO THE GOVERNMENT. ANY DAMAGED AREAS SHALL BE RETURNED TO EQUAL
OR BETTER CONDITION THAN THAT OF THE EXISTING CONSTRUCTION PRIOR TO DAMAGE.
A CLEAN SITE SHALL BE MAINTAINED AT ALL TIMES. EACH TRADE SHALL BE RESPONSIBLE FOR CLEANING ITS OWN DEBRIS FROM THE SITE.
CONTRACTOR SHALL PROVIDE TEMPORARY PARTITIONS AND SEAL OFF ALL DOORWAYS LEADING TO AREAS OUT OF SCOPE FOR INFECTION CONTROL. VERIFY EXACT
LOCATIONS AND REQUIREMENTS WITH THE VA MEDICAL CENTER INFECTION CONTROL POLICY.
WORK MAY NEED TO BE PHASED AND/OR LIMITED TO OFF HOURS TO ACCOMMODATE CONTINUOUS NORMAL OPERATION OF THE FACILITY.
CONSTRUCTION MATERIALS AND INSTALLATION METHODS PROVIDED AND PERFORMED BY ALL CONTRACTORS SHALL BE IN COMPLIANCE WITH VAMC FACILITY OPERATIONS, NFPA, ICRA, ILSM, VA SPECIFICATIONS, AND AS FURTHER DESCRIBED IN THIS SCOPE.
RECORD SITE AND UTILITY DRAWINGS PROVIDED BY THE VAMC ARE FOR REFERENCE ONLY.
IF THE PROJECT AREA AND AREAS AFFECTED BY THE PROJECT INCLUDE EXISTING EQUIPMENT, SURFACES, FINISHES, MATERIALS, ETC., NOT TO BE REMOVED, PROTECT THIS EQUIPMENT FROM DUST, DEBRIS, DAMAGE, ETC. CLEAN THESE ITEMS/SURFACES TO THE ORIGINAL CONDITION FOUND AT THE START OF THE PROJECT PRIOR TO FINAL
INSPECTION.
CONTRACTOR SHALL NOT INSTALL CONDUIT, PIPING, LIGHTING, OR OTHER OBSTRUCTIONS UNDER ADJACENT HVAC EQUIPMENT THAT WILL ELIMINATE OR OBSTRUCT ACCESS TO
COILS, MOTORS, VALVES, SWITCHES, PANELS, ETC.
THE CONTRACTOR WILL BE RESPONSIBLE FOR MAINTAINING ALL EXISTING ACCESS DOORS TO CONSTRUCTION AREAS, EXISTING MECHANICAL AND ELECTRICAL AREAS, ASSIGNED STORAGE AREAS, EQUIPMENT ACCESS AREAS, ETC. DOORS MUST BE RESTORED TO THE CONDITION ENCOUNTERED AT BEGINNING OF PROJECT. THIS INCLUDES
DOOR REPLACEMENT, HARDWARE REPLACEMENT, HARDWARE REPAIR, DOOR REPAIR, ETC.
CONTRACTOR PARKING IS LIMITED. CONTRACTOR TO COORDINATE VEHICLE PARKING WITH COR PRIOR TO CONSTRUCTION. NO VEHICLE PARKING WITHIN 25 FEET OF OXYGEN
TANKS OR SMOKING SHELTER.
STAGING AREAS WILL BE DESIGNATED BY THE VA. CONTRACTOR TO COORDINATE WITH THE COR PRIOR TO CONSTRUCTON.
CONTRACTOR MUST PROVIDE HIS OWN EQUIPMENT FOR MOVING OF MATERIALS, EQUIPMENT AND TRASH. THIS INCLUDES CARTS FOR REMOVAL OF DEMOLITION MATERIALS, PALLET JACKS FOR EQUIPMENT MOVING, TWO OR FOUR WHEEL CARTS FOR EQUIPMENT TRANSFER, ETC. CONTRACTOR MAY NOT BORROW VA OWNED EQUIPMENT FOR THIS
PURPOSE.
IF THERE IS ANY WORK TO BE DONE ON EXISTING ROOFS, SUCH AS ROOF PENETRATIONS OR STANDS, OR ANYTHING THAT DAMAGES THE INTEGRITY OF THE ROOF, THIS WORK MUST BE DONE BY A CONTRACTOR LICENSED BY THE ROOFING MEMBRANE MANUFACTURER. HE/SHE MUST BE APPROVED BY THE MEMBRANE MANUFACTURER SO AS TO NOT
VOID OR INTERRUPT EXISTING SINGLE PLY MEMBRANE ROOF WARRANTIES.
SPACE FOR CONSTRUCTION MATERIAL DUMPSTERS ON SITE IS LIMITED. THE VA DOES NOT PROVIDE A DUMPSTER FOR THIS MATERIAL. THE DUMPSTER MUST BE LOCATED A MINIMUM OF 25 FEET AWAY FROM THE OXYGEN TANK STORAGE. COORDINATE WITH COR FOR APPROVED DUMPSTER LOCATION.
IF ASBESTOS INSULATION IS REMOVED ON THIS PROJECT ALL PIPING AND OTHER MECHANICAL ITEMS THAT HAD THE ASBESTOS INSULATION REMOVED MUST BE RE-INSULATED
WITH MATERIALS ACCORDING TO THE SPECIFICATIONS.
LIVE ELECTRICAL CIRCUITS ARE BURIED WITHIN THE CONCRETE FLOOR SLABS AND THERE IS NO RECORD OF THE EXACT LOCATIONS. THE CONTRACTOR SHALL X-RAY THE FLOOR WHEREVER THE CONTRACTOR PLANS ON DRILLING THROUGH THE CONCRETE FLOOR SLABS. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO IMMEDIATELY REPAIR
ANY CIRCUIT THAT HAS BEEN CUT OR DAMAGED.
NAME BRANDS USED WITHIN THE CONTRACT DOCUMENTS ARE NOT MEANT TO BE RESTRICTIVE, BUT ONLY TO INDICATE A BRAND THAT REFLECTS THE CHARACTERISTICS AND LEVEL OF QUALITY THAT WILL SATISFY THE GOVERNMENT'S NEEDS THE SALIENT PHYSICAL, FUNCTIONAL, OR PERFORMANCE CHARACTERISTICS THAT "EQUAL PRODUCTS"
MUST MEET ARE IDENTIFIED IN THE CONTRACT DOCUMENTS.
GROUND FLOOR FOR DRAWING PURPOSES HAS BEEN SET TO 100'-0". 100'-0" PROJECT BASE POINT= USGS 469.70'.
NORTH PERIPHERY ROAD
SOUTH PERIPHERY ROAD
W E S T
P E R
IP
H E R Y
O A D
E A S T
P E R
IP
H E
Y
O A D
QUONSET STRUCTURES
T105 T106 T107 T108 T109
SWITCHGEAR
STATION
COOLING
TOWER
PAVILION
YARD
D O C K
WATER TOWER
P A V
IL
IO
N
8 82
MOD 6
MOD 5
MOD 1
MOD 4
16 15
MOD 3LIQ.
OXYG.
STOR.
x x x x xx
SIDEWALK
S
ID
EW
AL
K
SIDEWALK
PATIO
RAMP
SIDEWALK
SIDEWALK
S
ID
EW
AL
K
WALK/STAIRS
S
ID
EW
AL
K
CONCRETE
TRASH
SIDEWALK
SIDEWALK
SIDEWALK
CONCRETE
WHEELCHAIR
RAMP
ENTRY
SIDEWALK
W H
EE
LC
H
AI
R
P
AT
IE
N T/
VI
ST
O R
P
AT
IE
N T/
VI
ST
O R
P
AT
IE
N T/
VI
SI
TO
R
P
AT
IE
N T/
VI
SI
TO
R
O P
EN
P
AR
K
IN
G
O P
EN
P
AR
K
IN
G
VO
L.
VO
L.
VO
L.
VO
L.
VO
L.VOL.
VOL.
VOL.
VOL.
VOL.
W H
EE
LC
H
AI
R
W H
EE
LC
H
AI
R
W H
EE
LC
H
AI
R
GOV.CO
NS
ULT
GOV.
DAV
DAV
DAV
OR
C
LER
GY
CO
NS
ULT
OR
C
LER
GY
CO
NS
ULT
OR
C
LER
GY
CO
NS
ULT
OR
C
LER
GY
CO
NS
ULT
OR
C
LER
GY
VISITOR
VISITOR
VISITOR
VISITOR
VISITOR
O P
EN
P
AR
K
IN
G
O P
EN
P
AR
K
IN
G
GO
V.
VIS
ITO
R
VIS
ITO
R
W H
EE
LC
H
AI
R
OPEN PARKING
C O M M
AN
DE
R D R
IV
E
AS
PH
AL
T
PA
VE
ME
NT
BLDG. 8 DRIVE
ED
U C B
LD
G
SE
RV
IC
E D R.
P U
LL
O
FF
AP
R O N
NHCU STAFF PARKING LOT
WAREHOUSE/SHOPS PARKING
ENGIN./SAFETY
CONCRETE
ASPHALT
GRAVEL
G R
AV
EL
C O M M
AN
DE
R D R
IV
E
M O B
IL
E C
AT
SC
AN
P
AR
K
IN
G
SP
AC
E
NHCU
LOADING
DOCK
PARKING
CONCRETE
ENGIN./SAFETY
FUEL TRUCK APRON
NHCU SERVICE DRIVE
STAFF PARKING
LOADING DOCK APRON
STAFF PARKING
STAFF PARKING
CUSHMAN
PARKING
CUSHMAN
PARKING
PARKING
ASPHALT
ENGIN./SAFETY
PARKING
STAFF PARKING
STAFF PARKING
STAFF PARKING
x x xxxx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x xxx x x x x x x x x x
NORTH
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
MARION VAMC
MARION, IL, 62959
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER: Project Number Scale
16-198 ADD STRUCTURAL
IMPROVEMENTS TO BUILDING
657-343AS INDICATED
100% BID DOCUMENTS
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
09/06/17
Baysinger Design Group, Inc.
Marion, Illinois 62959 4501 West DeYoung Street, Suite 100B
Fax: 618.998.8032 Phone: 618.998.8015 www.BaysingerDesignGroup.com Illinois Design Firm No. 184-004212
LOCATION MAP
SCALE: N.T.S.
/3
1/
:1 7:
AM
GI002
DRAWING INDEX AND PROJECT
INFORMATION
HKG SPH
DRAWING INDEX
ARCHITECTURAL
AD000 ARCHITECTURAL GENERAL NOTES, ABBREVIATIONS, AND SYMBOLS
AD001 EXISTING FLOOR PLAN
AD100 GROUND FLOOR AREA A FLOOR PLAN - DEMOLITION
AD101 GROUND FLOOR AREA B FLOOR PLAN - DEMOLITION
AD200 ENLARGED ROOF PLAN - DEMOLITION
AD420 PIPE BASEMENT ENLARGED PLANS - DEMOLITION
AE100 GROUND FLOOR AREA A FLOOR PLAN - RENOVATION
AE101 GROUND FLOOR AREA B FLOOR PLAN - RENOVATION
AE200 EXTERIOR BUILDING ELEVATIONS
AI400 ENLARGED PLANS AND INTERIOR ELEVATIONS - EXG. CONDITIONS
AI401 ENLARGED PLANS AND INTERIOR ELEVATIONS - EXG. CONDITIONS
AI402 ENLARGED PLANS AND INTERIOR ELEVATIONS - EXG. CONDITIONS
AI410 ENLARGED PLANS AND INTERIOR ELEVATIONS - RENOVATION
AI411 ENLARGED PLANS AND INTERIOR ELEVATIONS - RENOVATION
AI412 ENLARGED PLANS AND ELEVATIONS - RENOVATION
AI420 ENLARGED ELEVATOR PLANS AND SECTIONS
AI421 BUILDING AND WALL SECTIONS
AI500 ENLARGED ROOF PLAN - RENOVATION
AI600 SCHEDULES, WINDOW TYPES, AND PARTITION TYPES
AI601 MISCELLANEOUS DETAILS
GENERAL
GI001 COVER SHEET
GI002 DRAWING INDEX AND PROJECT INFORMATION
GI100 LIFE SAFETY PLAN
GI101 PHASING AND INFECTION CONTROL PLANS
GI102 PHASING AND INFECTION CONTROL PLANS - DEDUCTIVE BID OPTION
GI103 COURTYARD PLAN AND PHOTOGRAPHS
NORTH
OXYGEN STORAGE
TANKS
STRUCTURAL
S001 ABBREVIATIONS AND SYMBOLS
S002 GENERAL NOTES
S003 SPECIAL INSPECTION REQUIRMENTS
S004 SCHEDULES
SD110 FOUNDATION DEMOLITION PLAN
SD111 FOUNDATION DEMOLITION PLAN
SD210 GROUND FLOOR FRAMING DEMOLITION PLAN
SD211 GROUND FLOOR FRAMING DEMOLITION PLAN
SD212 2ND FLOOR FRAMING DEMOLITION PLAN
SD213 2ND FLOOR FRAMING DEMOLITION PLAN
S100 OVERALL FOUNDATION PLAN
S101 OVERALL GROUND FLOOR FRAMING PLAN
S102 OVERALL 2ND/ROOF FRAMING PLAN
S110 FOUNDATION PLAN
S111 FOUNDATION PLAN
S210 GROUND FLOOR FRAMING PLAN
S211 GROUND FLOOR FRAMING PLAN
S212 2ND/ROOF FRAMING PLAN
S213 2ND/ROOF FRAMING PLAN
S300 SUBSTRUCTURE SECTIONS AND DETAILS
S301 SUBSTRUCTURE SECTIONS AND DETAILS
S400 SUPERSTRUCTURE SECTIONS AND DETAILS
S401 SUPERSTRUCTURE SECTIONS AND DETAILS
S500 COLUMN SCHEDULE
S600 BRACED FRAME
S601 BRACED FRAME
S602 BRACED FRAME
S603 BRACED FRAME DETAILS
MECHANICAL
M001 MECHANICAL, PLUMBING AND FIRE PROTECTION LEGEND, ABBREVIATIONS AND GENERAL NOTES
M002 BRACE LOCATION MAP
MD101 BASEMENT AREA A DEMOLITION PLAN
MD102 BASEMENT AREA B DEMOLITION PLAN
MD103 GROUND FLOOR AREA A DEMOLITION PLAN
MD104 GROUND FLOOR AREA B DEMOLITION PLAN
MD105 BUILDING CONNECTOR AREA DEMOLITION PLANS
MH101 BASEMENT AREA A NEW WORK PLAN
MH102 BASEMENT AREA B NEW WORK PLAN
MH103 GROUND FLOOR AREA A NEW WORK PLAN
MH104 GROUND FLOOR AREA B NEW WORK PLAN
MH105 BUILDING CONNECTOR AREA NEW WORK PLANS
MI201 BRACE SECTIONS NEW WORK
MD401 BRACE M DEMOLITION PLANS
MH401 BRACE M NEW WORK PLANS
MH501 MECHANICAL DETAILS
ELECTRICAL
E001 ELECTRICAL NOTES, LEGENDS AND ABBREVIATIONS
ED101 BASEMENT AREA A DEMOLITION PLAN
ED102 BASEMENT AREA B DEMOLITION PLAN
ED103 GROUND FLOOR AREA A DEMOLITION PLAN
ED104 GROUND FLOOR AREA B DEMOLITION PLAN
ED105 BUILDING CONNECTOR AREA DEMOLITION PLAN
EP101 BASEMENT AREA A NEW WORK PLAN
EP102 BASEMENT AREA B NEW WORK PLAN
EP103 GROUND FLOOR AREA A NEW WORK PLAN
EP104 GROUND FLOOR AREA B NEW WORK PLAN
EP105 BUILDING CONNECTOR AREA NEW WORK PLAN
2 81
CONTRACTOR LAY
DOWN AREA
T
C E
I L
TA
S SHEILA
001-016606
BAYSINGER
CD A R
S E
L.
T C
H I
T E
ILOF I L
E NO
I S
UP
DN
UP
UP
DN
DN
A C ED G H I KBD BB
22.1
BA JB
B
F F.1BC
10.7
23.2
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
FEC
EX
BUILDING 2 BUSINESS
OCCUPANCY
BUILDING 42 AMBULATORY
HEALTH CARE OCCUPANCY
HE
BU
IL
D
IN
G
BU
SI
N
ES
S
O C
C U
PA
N
C Y
BU
IL
D
IN
G
B U
SI
N
ES
S
O C
C U
PA
N
C Y
BU
IL
D
IN
G
B U
SI
N
ES
S
O C
C U
PA
N
C Y
BU
IL
D
IN
G
BU
SI
N
ES
S
O C
C U
PA
N
C Y
BUILDING 1 BUSINESS
OCCUPANCY
BUILDING 42 AMBULATORY
HEALTH CARE OCCUPANCY
EX
EX
EX
EX
HE
EX
BRACE Q
BRACE B
BRACE C
BRACE K
BRACE A
BRACE MBRACE N
BRACE L
ELEVATOR
WORK
ELEVATOR/CONNECTION
BRACE B
BRACE A
AD.1 AA.5
2-HOUR FIRE BARRIER
LIFE SAFETY LEGEND
1-HOUR FIRE BARRIER
1-HOUR FIRE/SMOKE BARRIER
SMOKE RESISTIVE HAZARDOUS AREA
SUITE DESIGNATIONS
SUITE NUMBER1
FIRE EXTINGUISHER CABINETFEC
EXIT SIGN
HE HORIZONTAL EXIT PASSAGEWAY
EX EXIT
AREAS AFFECTED BY CONSTRUCTION
SUITE DESCRIPTIONS
SUITE NUMBER SUITE NAME SUITE SIZE NO. OF EXITS TYPE OF SUITE
2. NUCLEAR MED SUITE 3117 SQ FT 2 NON SLEEPING PATIENT CARE
3. CLINIC 6 SUITE 2200 SQ FT 2 NON SLEEPING PATIENT CARE
4. CANTEEN SUITE 4600 SQ FT 3 NON PATIENT CARE
8. SPINAL CLINIC SUITE 955 SQ FT 2 NON SLEEPING PATIENT CARE
9. FUTURE AUDIOLOGY SUITE 3000 SQ FT 2 NON SLEEPING PATIENT CARE
10. MRI SUITE 4111 SQ FT 1 NON SLEEPING PATIENT CARE
KEY PLAN
NORTH
AREAS AFFECTED BY
CONSTRUCTION
LIFE SAFETY GENERAL NOTES
1.
2.
3.
4.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES AND THE REQUIREMENTS IDENTIFIED IN THE DIVISION 01 SPECIFICATION "GENERAL CONDITIONS."
THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS, INCLUDING THE BUILDING AND MAINTENANCE OF DUST TIGHT PARTITIONS, DAILY VACUUMING, SWEEPING, AND PROVISION OF CLEAN FLOOR MATS AT THE PROJECT ENTRANCES, TO PREVENT THE INFILTRATION OF DIRT AND DUST FROM THE CONSTRUCTION AREAS INTO
THE OWNER OCCUPIED AREAS.
IF ANY EXISTING WALL IS TO BE USED AS A DUST OR SMOKE BARRIER SEPARATING THE CONSTRUCTION AREA FROM THE MEDICAL CENTER, THE CONTRACTOR IS RESPONSIBLE FOR SEALING ALL EXISTING PENETRATIONS IN THIS WALL, EXTENDING WALL TO CEILING SLAB, AND ANY OTHER WORK TO ENSURE THE WALL MEETS THE REQUIREMENTS IN THE GENERAL REQUIREMENTS SPECIFICATIONS FOR CONSTRUCTION BARRIERS.
COMPLETE ALL WORK IN ACCORDANCE WITH ILSM PERMIT. DO NOT BLOCK EXITS WITHOUT APPROVED ILSM PERMIT AND PLACE TEMPORARY SIGNAGE AND BARRIERS IN ACCORDANCE WITH APPROVED ILSM PERMIT.
COORDINATE PHASING OF ALL STRUCTURAL CONSTRUCTION WITH OTHER
DISCIPLINES AS NECESSARY TO MAINTAIN AND PROTECT MEP EQUIPMENT AND LINES
IN SERVICE THROUGHOUT DURATION OF CONSTRUCTION. CONTRACTOR TO PROVIDE
COORDINATION/PHASING DOCUMENTS FOR APPROVAL BY THE COR.
COORDINATION NOTE:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
MARION VAMC
MARION, IL, 62959
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER: Project Number Scale
16-198 ADD STRUCTURAL
IMPROVEMENTS TO BUILDING
657-343AS INDICATED
100% BID DOCUMENTS
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
09/06/17
Baysinger Design Group, Inc.
Marion, Illinois 62959 4501 West DeYoung Street, Suite 100B
Fax: 618.998.8032 Phone: 618.998.8015 www.BaysingerDesignGroup.com Illinois Design Firm No. 184-004212
/3
1/
:1 7:
AM
GI100
LIFE SAFETY PLAN
HKG SPH
NORTH
1/16" = 1'-0"1 GROUND FLOOR LIFE SAFETY PLAN
3 81
T
C E
I L
TA
S SHEILA
001-016606
BAYSINGER
CD A R
S E
L.
T C
H I
T E
ILOF I L
E NO
I S
UP
UP
DN
DN
DN
DN
DN
UP
M
UP
A C ED G H I KBD BB
22.1
BA JB
B
F F.1BC
23.2
BRACE Q
BRACE B
BRACE C
BRACE K
BRACE A
BRACE MBRACE N
BRACE L
MIN.
4' - 0"
M
IN
4'
0"
MIN.
3' - 0"
M
IN
3'
0"
NEGATIVE AIR MACHINE
WITH HEPA FILTRATION
EXHAUSTING OUT
PERIMETER LOCATION
NEGATIVE AIR MACHINE
WITH HEPA FILTRATION
EXHAUSTING OUT
PERIMETER LOCATION
NEGATIVE AIR MACHINES WITH HEPA
FILTRATION. EXHAUST OVERHEAD
THROUGH CORRIDOR AND
OUT EXISTING WINDOW/ DOOR
NEGATIVE AIR MACHINE
WITH HEPA FILTRATION
EXHAUSTING OUT
EXISTING DOOR.
NEGATIVE AIR MACHINE WITH HEPA
FILTRATION EXHAUSTING OUT
EXISTING DOOR OR MECHANICAL
LOUVER OPENING.
NEGATIVE AIR MACHINE WITH HEPA
FILTRATION EXHAUSTING OUT
OPENING CUT INTO EXTERIOR WALL.
NEGATIVE AIR MACHINE WITH HEPA
FILTERS. EXHAUST OVERHEAD
THROUGH CORRIDOR AND OUT
NEAREST WINDOW OR DOOR.
CONTRACTOR DAILY ACCESS
DOOR TO BE
INSTALLED BY
VA PRIOR TO
CONSTRUCTION.
PHARMACY OCCUPIED
EXISTING WAITING AREA
TEMP.
RECEPT.
MATERIAL DELIVERY TO
BRACE B PRIOR TO TEMP.
PARTITION CONST.
TEMPORARY CONSTRUCTION
BARRIER AT PHARMACY WILL
REQUIRE EXPANDED MESH UNDER
THE GYPSUM BOARD.
RE: PARTITION TYPES FOR
ADDITIONAL INFORMATION
ELEVATOR/BUILDING
CONNECTION WORK
HORIZONTAL TIE
LOCATIONS
CONTRACTOR DAILY ACCESS
TEMPORARY
RECEPTION
TEMPORARY
WAITING AREA
HORIZONTAL TIE
LOCATIONS
NEGATIVE AIR MACHINE WITH HEPA
FILTERS. EXHAUST OVERHEAD THROUGH
CORRIDOR AND OUT NEAREST WINDOW
OR DOOR.
AD.1
A
4'
0" 1'
6"
A
3/G I10
AA.5
3/G I10
PHASING GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES AND THE REQUIREMENTS IDENTIFIED IN
THE DIVISION 1 SPECIFICATION "GENERAL CONDITIONS."
WHEN WORKING IN OCCUPIED AREAS OF THE MEDICAL CENTER, THE CONTRACTOR CANNOT LEAVE TOOLS, EQUIPMENT, LADDERS, ETC., UNATTENDED AT ANY TIME.THE CONTRACTOR CANNOT LEAVE CEILING AREA INCLUDING CEILING TILES AND CEILING ACCESS PANELS UNATTENDED AT ANY TIME.
UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE SHALL BE DONE AT TIMES OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST
TO THE GOVERNMENT. WORK MUST BE SCHEDULED WITH THE COR.
HEAVY NOISE AND VIBRATION PRODUCING WORK IS TO BE COMPLETED OUTSIDE NORMAL WORKING HOURS. WORK MUST BE SCHEDULED WITH THE VA COR.
THERE IS A DESIGNATED LAY DOWN YARD FOR CONTRACTOR USE IN TEH SOUTHEAST CORNER OF THE VA CAMPUS. COORDINATE WITH VA COR FOR EXACT LOCATION
AND RESTRAINTS.
CONCRETE TRUCKS WILL BE REQUIRED TO STAGE FROM THE SOUTH SIDE OF THE BUILDING. THERE WILL BE NO ACCESS FROM THE NORTH SIDE OF THE BUILDING FOR
CONCRETE OR MATERIAL DELIVERY, STAGING, OR INSTALLATION.
IN AREAS WHERE CONSTRUCTION ACTIVITIES EXPOSE THE BUILDING INTERIOR TO THE EXTERIOR ENVIRONMENT, CONTRACTOR SHALL CONSTRUCT TEMPORARY BARRIERS AND WEATHERPROOF ENCLOSURES AS REQUIRED TO MEET INFECTION CONTROL REQUIREMENTS AND PROTECT THE BUILDING INTERIOR (FINISHES, BUILDING SYSTEMS, ETC.) FROM DAMAGE.
INFECTION CONTROL GENERAL NOTES
1.
2.
3.
4.
5.
6.
CONSTRUCTION BARRIERS: CONSTRUCTION AREA TO BE SEPARATED FROM OTHER AREAS BY FIRE RESISTIVE BARRIERS THAT KEEP THE DIRT AND DUST INSIDE THE WORKSITE AND PROVIDE A COMPLETE SEAL OF THE CONSTRUCTION AREA FROM ADJACENT AREAS. THE BARRIER IS TO BE CONSTRUCTED OF RIGID CONSTRUCTION.
WALLS MUST BE DUSTPROOF WITH AIRTIGHT SEALS MAINTAINED AT THE FULL PERIMETER OF THE WALLS AS WELL AS ALL PENETRATIONS. ALL AIR VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE PRESSURE
SYSTEMS.. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR TO DECK.
TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES. THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL AREAS MUST BE COMPLETELY COVERD TO CONTAIN DUST DURING TRANSPORT. DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES IF POSSIBLE. ALL CART WHEELS MUST BE CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.
CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE. PROVIDE PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND
N95 RESPIRATORS REQUIRED BY TEH SAFETY SPECIFICATION.
INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR SHALL APPLY FOR AND ASSIST VA COR THROUGH THE REQUIRED INFECTION CONTROL CONSTRUCTION
PERMIT.
STAGING AREAS WILL BE DESIGNATED BY THE VA. CONTRACTOR TO COORDINATE WITH THE COR PRIOR TO CONSTRUCTON.
CONTAINMENT BARRIERS, ILSM, AND ICRA ENCLOSURES HAVE BEEN SHOWN FOR REFERENCE ONLY. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT
DOCUMENTATION AND THE COR PRIOR TO IMPLEMENTATION.
KEY PLAN
NORTH
AREAS AFFECTED BY
CONSTRUCTION
A C ED G H I K
BD
BB
22.1
BA JB
B
F F.1BC
16.3
15.8
AA
15.9
15.2
15.3
15.5
AB
10.7
23.2
AD
BRACE Q
BRACE B
BRACE C
BRACE K
BRACE A
BRACE MBRACE N
BRACE L
NEGATIVE AIR MACHINE(S)
WITH HEPA FILTRATION
EXHAUSTING OUT
PERIMETER LOCATION
ELEVATOR
WORK
HORIZONTAL TIE
LOCATIONS
LOCATION OF TEMPORARY
CONSTRUCTION TO BE
COORDINATED IN FIELD WITH
VA COR.
CONTINUE
CONTAINMENT BARRIERS
AND ILSM MEASURES
FOR ENTIRE FOOTPRINT
OF PIPE BASEMENT.
CONTINUE
CONTAINMENT BARRIERS
AND ILSM MEASURES
FOR ENTIRE FOOTPRINT
OF PIPE BASEMENT.
CONTINUE
CONTAINMENT BARRIERS
AND ILSM MEASURES
FOR ENTIRE FOOTPRINT
OF PIPE BASEMENT.
HORIZONTAL TIE
LOCATIONS
P
P
P
A
H
AD.1 AA.5
AI402
AI402
5 3
PHASING SEQUENCING NOTES
1.
2.
3.
4.
5.
6.
PHASES HAVE BEEN IDENTIFIED BY BRACE LETTERS. EACH BRACE IS EQUAL TO ONE PHASE.
UNLESS NOTED OTHERWISE, PHASES CAN BE COMPLETED IN ANY ORDER.
PHASES AT THE FOUNDATION LEVEL MAY BE COMPLETED IN ANY COMBINATION AT ANY TIME DURING THE CONSTRUCTION DURATION, UNLESS SPECIFICALLY NOTED
OTHERWISE.
PHASES AT THE GROUND FLOOR LEVEL ARE LIMITED AS FOLLOWS:
·NO MORE THAN TWO PHASES CAN BE UNDER CONSTRUCTION SIMULTANEOUSLY.
·WORK AT BRACES A, C, K, AND Q CANNOT OCCUR SIMULTANEOUSLY.
·WORK AT BRACES A AND L CANNOT OCCUR SIMULTANEOUSLY.
·WORK AT BRACES M AND L CAN BE COMPLETED SIMULTANEOUSLY.
·WORK AT BRACES B AND Q CANNOT OCCUR SIMULTANEOUSLY.
·WORK HOURS FOR THE BRACE B (PHARMACY) PHASE ARE LIMITED TO NORMAL WORK HOURS BETWEEN 7:00 A.M. AND 4:30 P.M.
WORK AT BRACE A, BRACE B, AND THE ELEVATOR/BUILDING CONNECTION ARE CONSIDERED SUB-PARTS OF ONE OVERALL PHASE AND SHALL BE COMPLETED
SIMULTANEOUSLY AND AS NOTED BELOW.
BRACE B (PHARMACY) ADDITIONAL REQUIREMENTS:
·CONTRACTORS ENTERING THROUGH THE MAIN PHARMACY DOORS WILL REQUIRE ESCORTS FROM PHARMACY PERSONNEL. THIS
ACCESS SHOULD BE LIMITED TO MATERIAL DELIVERY TIMES ONLY.
·ACCESS TO THE PHARMACY THROUGH THE CONSTRUCTION ZONE AND TEMPORARY MODIFICATIONS TO THE EXISTING CONSTRUCTION
MUST BE SECURE AND TIED INTO THE PHARMACY’S SECURITY SYSTEM.
·DUST CONTROL, SPECIFICALLY AT THE IV ROOM WITHIN THE PHARMACY, IS OF HIGH IMPORTANCE. CONTRACTOR TO COMPLETE DUST PREVENTATIVE
MEASURES PRIOR TO TEMPORARY PARTITION CONSTRUCTION.
ELEVATOR/BUILDING CONNECTION ADDITIONAL REQUIREMENTS:
·WORK AT THIS LOCATION TO BE COMPLETED DURING SUMMER MONTHS.
·COURTYARD IMMEDIATELY NORTH OF THE ELEVATOR/BUILDING CONNECTOR TO BE PHOTGRAPHICALLY DOCUMENTED BY THE CONTRACTOR PRIOR TO ANY CONSTRUCTION ACTIVITIES AND RETURNED TO ORIGINAL CONDITION UPON COMPLETION OF
CONSTRUCTION.
·COURTYARD WILL BE CLOSED DURING THIS PORTION OF WORK. COORDINATE CLOSURE REQUIREMENTS AND EXIT SIGNAGE WITH THE VA COR.
HORIZONTAL TIES AT CT AREA ARE CONSIDERED ONE PHASE AND SHALL BE COMPLETED SIMULTANEOUSLY. THE CT AREA WILL BE SHUT DOWN FOR THE DURATION OF
THIS PHASE. COORDINATE TIME FRAME FOR CT CLOSURE WITH THE VA COR.
KEYED NOTES
INFILL EXISTING PARTIAL HEIGHT WALL TO CREATE TEMPORARY RECEPTION AREA. RE: PARTITION TYPES FOR TEMPORARY WALL CONSTRUCTION. PROVIDE A SLIDING GLASS WINDOW AND COUNTER BETWEEN THE RECEPTION AREA AND EXISTING WAITING ROOM. RETURN WAITING ROOM TO ORIGINAL CONDITION UPON COMPLETION
OF RENOVATION WORK.
PROVIDE 20 MINUTE RATED DOOR AND FRAME, WITH A BORED ENTRY LOCKSET, KEYED TO GOVERNMENT'S REQUIREMENTS. REMOVE DOOR AND TEMPORARY CONSTRUCTION UPON COMPLETION OF RENOVATION WORK. RESTORE SPACES TO ORGINAL CONDITION.
WHEN OPENING IS CUT, THE ADJACENT RESTROOM WILL BE CLOSED AND A TEMPORARY CONSTRUCTION BARRIER WILL BE REQUIRED. CONTRACTOR TO ARRANGE CONTAINMENT BARRIERS IN MANNER WHICH ALLOWS RESTROOM TO REMAIN OPEN AS LONG AS POSSIBLE.
SECONDARY PHARMACY EXIT INSTALLED BY CONTRACTOR AND REMOVED AFTER BRACE A, BRACE B, AND ELEVATOR/BUILDING CONNECTION WORK IS COMPLETE.
RESTORE SPACES TO ORIGINAL CONDITION UPON REMOVAL OF TEMPORARY CONSTRUCTION.
TEMPORARY CONSTRUCTION PARTITION WITH 20 MINUTE RATED DOOR AND FRAME, WITH A BORED ENTRY LOCKSET, KEYED TO GOVERNMENT'S REQUIREMENTS.
TEMPORARY CONSTRUCTION TO BE INSTALLED FOR DURATION OF WORK AT BRACE A, BRACE B, AND ELEVATOR/BUILDING CONNECTION. REMOVE DOOR AND TEMPORARY CONSTRUCTION UPON COMPLETION OF RENOVATION WORK. RESTORE CORRIDOR TO ORIGINAL CONDITION UPON COMPLETION.
HORIZONTAL TIES TO BE INSTALLED FROM MECHANICAL ROOM SIDE. DO NOT DISTURB ADJACENT PHARMACY SPACES.
EXIT CLOSED DURING ELEVATOR/BUILDING CONNECTOR WORK.
PROVIDE A SLIDING GLASS WINDOW IN THE EXISTING WALL BETWEEN THE TEMPORARY RECEPTION AND TEMPORARY WAITING ROOMS. RESTORE SPACES TO ORIGINAL
CONDITION UPON REMOVAL OF TEMPORARY CONSTRUCTION.
LEGEND
CONSTRUCTION FOOTPRINT WITH CONTAINMENT BARRIERS AND ILSM MEASURES
TEMPORARY CONSTRUCTION PARTITION. RE: PARTITION TYPES
NEGATIVE AIR MACHINE EXHAUSTING TO THE OUTSIDE.
4' - 0"
4'
0" 2'
6"
GI101
LOBBY SIDERECEPTION
2' - 0" 1' - 0"
A
COORDINATE PHASING OF ALL STRUCTURAL CONSTRUCTION WITH OTHER
DISCIPLINES AS NECESSARY TO MAINTAIN AND PROTECT MEP EQUIPMENT AND LINES
IN SERVICE THROUGHOUT DURATION OF CONSTRUCTION. CONTRACTOR TO PROVIDE
COORDINATION/PHASING DOCUMENTS FOR APPROVAL BY THE COR.
COORDINATION NOTE:
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
MARION VAMC
MARION, IL, 62959
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER: Project Number Scale
16-198 ADD STRUCTURAL
IMPROVEMENTS TO BUILDING
657-343AS INDICATED
100% BID DOCUMENTS
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
09/06/17
Baysinger Design Group, Inc.
Marion, Illinois 62959 4501 West DeYoung Street, Suite 100B
Fax: 618.998.8032 Phone: 618.998.8015 www.BaysingerDesignGroup.com Illinois Design Firm No. 184-004212
/3
1/
:1 7:
AM
GI101
PHASING AND INFECTION CONTROL
PLANS
HKG SPH
1/16" = 1'-0"2 GROUND FLOOR PHASING PLAN
NORTH
1/16" = 1'-0"1 PIPE BASEMENT PHASING PLAN
NORTH
3/8" = 1'-0"3 WINDOW TYPES
A TEMPORARY SLIDING WINDOW
3/8" = 1'-0"4 WINDOW SECTION AT TEMPORARY RECEPTION
4 81
T
C E
I L
TA
S SHEILA
001-016606
BAYSINGER
CD A R
S E
L.
T C
H I
T E
ILOF I L
E NO
I S
DN
DN
DN
UP
M
UP
UP
UP
DN
DN
A C ED G H I K
BD
BB
22.1
BA JB
B
F F.1BC
16.3
15.8
AA
15.9
15.2
15.3
15.5
AB
10.7
23.2
ADAD.1 AA.5
AI402
AI402
5 3
BRACE Q
BRACE B
BRACE C
BRACE K
BRACE A
BRACE MBRACE N
BRACE L
NEGATIVE AIR MACHINE(S)
WITH HEPA FILTRATION
EXHAUSTING OUT
PERIMETER LOCATION
HORIZONTAL TIE
LOCATIONS
LOCATION OF TEMPORARY
CONSTRUCTION TO BE
COORDINATED IN FIELD WITH
VA COR.
CONTINUE
CONTAINMENT BARRIERS
AND ILSM MEASURES
FOR ENTIRE FOOTPRINT
OF PIPE BASEMENT.
CONTINUE
CONTAINMENT BARRIERS
AND ILSM MEASURES
FOR ENTIRE FOOTPRINT
OF PIPE BASEMENT.
CONTINUE
CONTAINMENT BARRIERS
AND ILSM MEASURES
FOR ENTIRE FOOTPRINT
OF PIPE BASEMENT.
HORIZONTAL TIE
LOCATIONS
A
H
A C ED G H I KBD BB
22.1
BA JB
B
F F.1BC
23.2
AD.1 AA.5
BRACE Q
BRACE B
BRACE C
BRACE K
BRACE A
BRACE MBRACE N
BRACE L
MIN.
4' - 0"
M
IN
4'
0"
MIN.
3' - 0"
M
IN
3'
0"
NEGATIVE AIR MACHINE
WITH HEPA FILTRATION
EXHAUSTING OUT
PERIMETER LOCATION
NEGATIVE AIR MACHINE
WITH HEPA FILTRATION
EXHAUSTING OUT
PERIMETER LOCATION
NEGATIVE AIR MACHINES WITH HEPA
FILTRATION. EXHAUST OVERHEAD
THROUGH CORRIDOR AND
OUT EXISTING WINDOW/ DOOR
NEGATIVE AIR MACHINE
WITH HEPA FILTRATION
EXHAUSTING OUT
EXISTING DOOR.
NEGATIVE AIR MACHINE WITH HEPA
FILTRATION EXHAUSTING OUT
EXISTING DOOR OR MECHANICAL
LOUVER OPENING.
NEGATIVE AIR MACHINE WITH HEPA
FILTRATION EXHAUSTING OUT
OPENING CUT INTO EXTERIOR WALL.
NEGATIVE AIR MACHINE WITH HEPA
FILTERS. EXHAUST OVERHEAD
THROUGH CORRIDOR AND OUT
NEAREST WINDOW OR DOOR.
CONTRACTOR DAILY ACCESS
DOOR TO BE
INSTALLED BY
VA PRIOR TO
CONSTRUCTION.
PHARMACY OCCUPIED
EXISTING WAITING AREA
TEMP.
RECEPT.
MATERIAL DELIVERY TO
BRACE B PRIOR TO TEMP.
PARTITION CONST.
TEMPORARY CONSTRUCTION
BARRIER AT PHARMACY WILL
REQUIRE EXPANDED MESH UNDER
THE GYPSUM BOARD.
RE: PARTITION TYPES FOR
ADDITIONAL INFORMATION
HORIZONTAL TIE
LOCATIONS
CONTRACTOR DAILY ACCESS
HORIZONTAL TIE
LOCATIONS
NEGATIVE AIR MACHINE WITH HEPA
FILTERS. EXHAUST OVERHEAD THROUGH
CORRIDOR AND OUT NEAREST WINDOW
OR DOOR.
A
3/G I10
DEDUCTIVE BID OPTION
UNDER THE DEDUCT ALTERNATE, OMIT ALL MODIFICATIONS NOTED AS PART OF THE BUILDING CONNECTOR AND ELEVATOR SUB-PHASE. DEDUCT INCLUDES BUT IS
NOT LIMITED TO THE OMITTANCE OF MODIFICATIONS TO THE FOLLOWING ITEMS:
·EXISTING ROOF SYSTEM, ROOF DECK, ROOF STRUCTURE
·FLOOR SLAB, FLOOR DECK, FLOOR STRUCTURE
·STAIRS AND STAIR TOWER
·ELEVATOR AND ELEVATOR SHAFT
·EXTERIOR WALL SYSTEM
·INCIDENTAL INTERIOR FINISH WORK LOCATED IN THE AREA OF THE BUILDING CONNECTOR AND ELEVATOR ·INCIDENTAL PLUMBING, MECHANICAL, ELECTRICAL AND FIRE PROTECTION WORK LOCATED IN THE ARE OF THE BUILDING CONNECTOR AND ELEVATOR
WORK REQUIRED TO INSTALL BRACED FRAME A AND BRACED FRAME B, INCLUDING INCIDENTAL INTERIOR FINISHES AND PLUMBING, MECHANICAL, ELECTRICAL, AND FIRE PROTECTION WORK, SHALL REMAIN IN THE CONTRACT.
KEY PLAN
NORTH
AREAS AFFECTED BY
CONSTRUCTION
PHASING GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SUBCONTRACTORS ARE FAMILIAR WITH THESE NOTES AND THE REQUIREMENTS IDENTIFIED IN
THE DIVISION 1 SPECIFICATION "GENERAL CONDITIONS."
WHEN WORKING IN OCCUPIED AREAS OF THE MEDICAL CENTER, THE CONTRACTOR CANNOT LEAVE TOOLS, EQUIPMENT, LADDERS, ETC., UNATTENDED AT ANY TIME.THE CONTRACTOR CANNOT LEAVE CEILING AREA INCLUDING CEILING TILES AND CEILING ACCESS PANELS UNATTENDED AT ANY TIME.
UTILITY WORK THAT WILL REQUIRE A SHUTDOWN OF EXISTING SERVICE SHALL BE DONE AT TIMES OTHER THAN NORMAL WORKING HOURS AT NO ADDITIONAL COST
TO THE GOVERNMENT. WORK MUST BE SCHEDULED WITH THE COR.
HEAVY NOISE AND VIBRATION PRODUCING WORK IS TO BE COMPLETED OUTSIDE NORMAL WORKING HOURS. WORK MUST BE SCHEDULED WITH THE VA COR.
THERE IS A DESIGNATED LAY DOWN YARD FOR CONTRACTOR USE IN TEH SOUTHEAST CORNER OF THE VA CAMPUS. COORDINATE WITH VA COR FOR EXACT LOCATION
AND RESTRAINTS.
CONCRETE TRUCKS WILL BE REQUIRED TO STAGE FROM THE SOUTH SIDE OF THE BUILDING. THERE WILL BE NO ACCESS FROM THE NORTH SIDE OF THE BUILDING FOR
CONCRETE OR MATERIAL DELIVERY, STAGING, OR INSTALLATION.
IN AREAS WHERE CONSTRUCTION ACTIVITIES EXPOSE THE BUILDING INTERIOR TO THE EXTERIOR ENVIRONMENT, CONTRACTOR SHALL CONSTRUCT TEMPORARY BARRIERS AND WEATHERPROOF ENCLOSURES AS REQUIRED TO MEET INFECTION CONTROL REQUIREMENTS AND PROTECT THE BUILDING INTERIOR (FINISHES, BUILDING SYSTEMS, ETC.) FROM DAMAGE.
INFECTION CONTROL GENERAL NOTES
1.
2.
3.
4.
5.
6.
CONSTRUCTION BARRIERS: CONSTRUCTION AREA TO BE SEPARATED FROM OTHER AREAS BY FIRE RESISTIVE BARRIERS THAT KEEP THE DIRT AND DUST INSIDE THE WORKSITE AND PROVIDE A COMPLETE SEAL OF THE CONSTRUCTION AREA FROM ADJACENT AREAS. THE BARRIER IS TO BE CONSTRUCTED OF RIGID CONSTRUCTION.
WALLS MUST BE DUSTPROOF WITH AIRTIGHT SEALS MAINTAINED AT THE FULL PERIMETER OF THE WALLS AS WELL AS ALL PENETRATIONS. ALL AIR VENTS MUST BE SEALED OFF NEAR THE CONSTRUCTION AREA AS REQUIRED AFTER COORDINATION WITH COR TO ENSURE NON-INTERFERENCE WITH HVAC AND NEGATIVE PRESSURE
SYSTEMS.. DUST TO BE CONTROLLED WITHIN THE WORK SITE FROM FLOOR TO DECK.
TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES WILL BE DEFINED AND CLEARLY ARTICULATED WITH CONSTRUCTION SIGNAGE TO BE PROVIDED BY THE CONTRACTOR. ALL EGRESS WAYS MUST BE MAINTAINED FREE OF DEBRIS AT ALL TIMES. THEY MUST BE UTILIZED AT SCHEDULED TIMES ONLY AS COORDINATED WITH COR. DUST MATS MUST BE PLACED AT ENTRANCES/EXITS OF WORK AREA AND REPLACED DAILY OR MORE FREQUENTLY IF NECESSARY. DEBRIS WHEN TRANSPORTED THROUGH HOSPITAL AREAS MUST BE COMPLETELY COVERD TO CONTAIN DUST DURING TRANSPORT. DEBRIS SHALL BE REMOVED IN EVENINGS OR NON-DUTY TIMES IF POSSIBLE. ALL CART WHEELS MUST BE CLEANED BEFORE LEAVING THE CONSTRUCTION AREA.
CLEANING: THE CONSTRUCTION ZONE AND ADJACENT ENTRY AREA SHALL BE MAINTAINED IN A CLEAN AND SANITARY MANNER BY THE CONTRACTOR AND WILL BE HIGH EFFICIENCY PARTICULATE AIR (HEPA) VACUUMED AND WET MOPPED DAILY OR MORE FREQUENTLY AS NEEDED TO MINIMIZE DUST GENERATION. CLOTHING SHALL BE FREE OF LOOSE SOIL AND DEBRIS UPON EXITING THE CONSTRUCTION ZONE. PROVIDE PERSONAL PROTECTIVE EQUIPMENT, INCLUDING FACE SHIELDS, GLOVES, AND
N95 RESPIRATORS REQUIRED BY TEH SAFETY SPECIFICATION.
INFECTION CONTROL CONSTRUCTION PERMIT: CONTRACTOR SHALL APPLY FOR AND ASSIST VA COR THROUGH THE REQUIRED INFECTION CONTROL CONSTRUCTION
PERMIT.
STAGING AREAS WILL BE DESIGNATED BY THE VA. CONTRACTOR TO COORDINATE WITH THE COR PRIOR TO CONSTRUCTON.
CONTAINMENT BARRIERS, ILSM, AND ICRA ENCLOSURES HAVE BEEN SHOWN FOR REFERENCE ONLY. THE CONTRACTOR SHALL COORDINATE WITH RISK ASSESSMENT
DOCUMENTATION AND THE COR PRIOR TO IMPLEMENTATION.
PHASING SEQUENCING NOTES - DEDUCTIVE BID OPTION
1.
2.
3.
4.
5.
6.
PHASES HAVE BEEN IDENTIFIED BY BRACE LETTERS. EACH BRACE IS EQUAL TO ONE PHASE.
UNLESS NOTED OTHERWISE, PHASES CAN BE COMPLETED IN ANY ORDER.
PHASES AT THE FOUNDATION LEVEL MAY BE COMPLETED IN ANY COMBINATION AT ANY TIME DURING THE CONSTRUCTION DURATION, UNLESS SPECIFICALLY NOTED
OTHERWISE.
PHASES AT THE GROUND FLOOR LEVEL ARE LIMITED AS FOLLOWS:
·NO MORE THAN TWO PHASES CAN BE UNDER CONSTRUCTION SIMULTANEOUSLY.
·WORK AT BRACES A, C, K, AND Q CANNOT OCCUR SIMULTANEOUSLY.
·WORK AT BRACES A AND L CANNOT OCCUR SIMULTANEOUSLY.
·WORK AT BRACES M AND L CAN BE COMPLETED SIMULTANEOUSLY.
·WORK AT BRACES B AND Q CANNOT OCCUR SIMULTANEOUSLY.
·WORK HOURS FOR THE BRACE B (PHARMACY) PHASE ARE LIMITED TO NORMAL WORK HOURS BETWEEN 7:00 A.M. AND 4:30 P.M.
BRACE B (PHARMACY) ADDITIONAL REQUIREMENTS:
·CONTRACTORS ENTERING THROUGH THE MAIN PHARMACY DOORS WILL REQUIRE ESCORTS FROM PHARMACY PERSONNEL. THIS
ACCESS SHOULD BE LIMITED TO MATERIAL DELIVERY TIMES ONLY.
·ACCESS TO THE PHARMACY THROUGH THE CONSTRUCTION ZONE AND TEMPORARY MODIFICATIONS TO THE EXISTING CONSTRUCTION
MUST BE SECURE AND TIED INTO THE PHARMACY’S SECURITY SYSTEM.
·DUST CONTROL, SPECIFICALLY AT THE IV ROOM WITHIN THE PHARMACY, IS OF HIGH IMPORTANCE. CONTRACTOR TO COMPLETE DUST PREVENTATIVE
MEASURES PRIOR TO TEMPORARY PARTITION CONSTRUCTION.
HORIZONTAL TIES AT CT AREA ARE CONSIDERED ONE PHASE AND SHALL BE COMPLETED SIMULTANEOUSLY. THE CT AREA WILL BE SHUT DOWN FOR THE DURATION OF
THIS PHASE. COORDINATE TIME FRAME FOR CT CLOSURE WITH THE VA COR.
KEYED NOTES
INFILL EXISTING PARTIAL HEIGHT WALL TO CREATE TEMPORARY RECEPTION AREA. RE: PARTITION TYPES FOR TEMPORARY WALL CONSTRUCTION. PROVIDE A SLIDING GLASS WINDOW AND COUNTER BETWEEN THE RECEPTION AREA AND EXISTING WAITING ROOM. RETURN WAITING ROOM TO ORIGINAL CONDITION UPON COMPLETION OF
RENOVATION WORK.
PROVIDE TEMPORARY CONSTRUCTION PARTITION WITH 20 MINUTE RATED DOOR AND FRAME, WITH A BORED ENTRY LOCKSET, KEYED TO GOVERNMENT'S REQUIREMENTS. REMOVE DOOR AND TEMPORARY CONSTRUCTION UPON COMPLETION OF RENOVATION WORK. RESTORE SPACES TO ORGINAL CONDITION.
WHEN OPENING IS CUT, THE ADJACENT RESTROOM WILL BE CLOSED AND A TEMPORARY CONSTRUCTION BARRIER WILL BE REQUIRED. CONTRACTOR TO ARRANGE CONTAINMENT BARRIERS IN MANNER WHICH ALLOWS RESTROOM TO REMAIN OPEN AS LONG AS POSSIBLE.
SECONDARY PHARMACY EXIT INSTALLED BY CONTRACTOR AND REMOVED AFTER BRACE A, BRACE B, AND ELEVATOR/BUILDING CONNECTION WORK IS COMPLETE.
RESTORE SPACES TO ORIGINAL CONDITION UPON REMOVAL OF TEMPORARY CONSTRUCTION.
HORIZONTAL TIES TO BE INSTALLED FROM MECHANICAL ROOM SIDE. DO NOT DISTURB ADJACENT PHARMACY SPACES.
LEGEND
CONSTRUCTION FOOTPRINT WITH CONTAINMENT BARRIERS AND ILSM MEASURES
TEMPORARY CONSTRUCTION PARTITION. RE: PARTITION TYPES
NEGATIVE AIR MACHINE EXHAUSTING TO THE OUTSIDE.
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
MARION VAMC
MARION, IL, 62959
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER: Project Number Scale
16-198 ADD STRUCTURAL
IMPROVEMENTS TO BUILDING
657-343AS INDICATED
100% BID DOCUMENTS
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
09/06/17
Baysinger Design Group, Inc.
Marion, Illinois 62959 4501 West DeYoung Street, Suite 100B
Fax: 618.998.8032 Phone: 618.998.8015 www.BaysingerDesignGroup.com Illinois Design Firm No. 184-004212
/3
1/
:1 8:
AM
GI102
PHASING AND INFECTION CONTROL
PLANS - DEDUCTIVE BID OPTION
HKG MNH
1/16" = 1'-0"1 PIPE BASEMENT PHASING PLAN - DEDUCTIVE BID OPTION
1/16" = 1'-0"2 GROUND FLOOR PHASING PLAN - DEDUCTIVE BID OPTION
NORTH
NORTH
5 81
T
C E
I L
TA
S SHEILA
001-016606
BAYSINGER
CD A R
S E
L.
T C
H I
T E
ILOF I L
E NO
I S
A
A
BD BB BABC
AHAJAKAL
BUILDING 1
BUILDING
T
T
(ROOF)
(ROOF)
(ROOF)
AD.1 AA.5
KEY PLAN
NORTH
AREAS AFFECTED BY
CONSTRUCTION
Revisions: Date
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
VA FORM 08-6231
MARION VAMC
MARION, IL, 62959
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER: Project Number Scale
16-198 ADD STRUCTURAL
IMPROVEMENTS TO BUILDING
657-343AS INDICATED
100% BID DOCUMENTS
E
D C
B A
2 3 4 5 6 7
E D
C B
A
1 2 3 4 5 6 7
Date Checked Drawn
09/06/17
Baysinger Design Group, Inc.
Marion, Illinois 62959 4501 West DeYoung Street, Suite 100B
Fax: 618.998.8032 Phone: 618.998.8015 www.BaysingerDesignGroup.com Illinois Design Firm No. 184-004212
/3
1/
:1 8:
AM
GI103
COURTYARD PLAN AND PHOTOGRAPHS
HKG MNH
1/8" = 1'-0"1 COURTYARD PLAN
1. VIEW OF SHRUB IN NORTHEAST CORNER 2. VIEW OF SEATING AND TRASH CAN ON NORTHEAST SIDE 3. VIEW OF SOUTHEAST CORNER.
4. VIEW OF MEMORIAL BENCH 5. VIEW TO EASTERN SIDE FROM ROOF 6. VIEW TO SOUTHEAST CORNER FROM ROOF
8. VIEW OF PLANTINGS ON EASTERN SIDE OF SOUTHERN ENTRANCE 9. VIEW OF PLANTINGS ON WESTERN SIDE OF SOUTHERN ENTRANCE
10. VIEW OF BENCH ON WEST SIDE
13. VIEW TOWARDS BUILDING 38 14. VIEW OF BUILDING 38 15. VIEW TO WESTERN SIDE FROM ROOF
11. VIEW OF PLANTINGS ON WESTERN SIDE 12. VIEW TO SOUTH SIDE OF BUILDING 1
7. VIEW TO SOUTHEAST CORNER FROM SOUTHWESTNOTES:
1. WORK REQUIRED TO COMPLETE THE BUILDING CONNECTION STRUCTURAL IMPROVEMENTS AND ELEVATOR REPLACEMENT WILL IMPACT THE COURTYARD.
2. THE PLAN AND PHOTOGRAPHS HAVE BEEN PROVIDED TO GIVE THE CONTRACTOR A GENERAL UNDERSTANDING OF THE SIZE AND LAYOUT OF THE EXISTING COURTYARD. EXACT DIMENSIONS, MATERIALS, AND PLANT TYPES HAVE NOT BEEN IDENTIFIED.
3. PRIOR TO ANY CONSTRUCTION ACTIVITIES BEGINNING, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO FIELD VERIFY AND PHOGRAPHICALLY DOCUMENT ALL EXISTING CONDITIONS. THIS INCLUDES, BUT IS NOT LIMITED TO: DIMENSIONS, MATERIALS, FIXED EQUIPMENT, FURNITURE, PLANT SPECIES AND SIZES OF EXISTING PLANTS.
4. THE COURTYARD SHALL BE RETURNED TO EXISTING CONDITION UPON COMPLETION OF CONSTRUCTION ACTIVITIES.
5. COORDINATE COURTYARD CLOSURE REQUIREMENTS, INCLUDING EXIT SIGNAGE AND TEMPORARY CONSTRUCTION BARRIERS, WITH THE VA COR.
NORTH
6 81