36C25222B0006 0002.docx
DOCX document 40 KB Posted
- Attached to
- Z2DA--Upgrade Paging System 695-20-101 Federal contract opportunity
- Solicitation number
- 36C25222B0006
About this file
This document contains questions and answers regarding a solicitation for upgrading an overhead paging system at the Clement J. Zablocki Medical Center in Milwaukee, Wisconsin. The solicitation seeks to upgrade overhead paging systems across 12 buildings on the medical center's campus, replacing outdated equipment with a new integrated system. Key project details include a performance period of 534 calendar days from notice to proceed, work to be conducted during standard business hours with some ceiling work after hours, and the use of existing conduits where possible. The Department of Veterans Affairs is the contracting agency, and questions covered technical requirements, specifications, drawings, and clarification around infection control measures, staging areas, and the scope of minor demolition and electrical work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Paging Site Visit Roster.pdf | ||
| 3 - 695-20-101 Firestop_SingleSourceJustification_MPT-SAT Amed 1.doc | DOC document | |
| 09 29 00 Gypsum Board.pdf | ||
| 36C25222B0006 0001.docx | DOCX document | |
| P01 6b - 695-22-101 Specs.pdf | ||
| 36C25222B0006.docx | DOCX document | |
| P07 Wage Decision.pdf | ||
| P01 6a - 695-20-101 Drawings.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLEMENT J. ZABLOCKI MEDICAL CENTER DEPARTMENT OF VETERANS AFFAIRS MILWAUKEE, WI
PROJECT NAME: UPGRADE OVERHEAD PAGING SYSTEM
VA PROJECT NO: 695-20-101
05/17/2017 6:17 AM
CLEMENT J. ZABLOCKI MEDICAL CENTER DEPARTMENT OF VETERANS AFFAIRS MILWAUKEE, WI
PROJECT NAME: 111 Expand Urgent Care
VA PROJECT NO: 695-402
A/E PO NO: ____________________
Construction PO No.: _____________
CLEMENT J. ZABLOCKI MEDICAL CENTER DEPARTMENT OF VETERANS AFFAIRS MILWAUKEE, WI
PROJECT NAME: UPGRADE OVERHEAD PAGING SYSTEM
VA PROJECT NO: 695-20-101
CONTINUATION PAGE
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 695-22-101 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee
WI
53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee
WI
53214-1476 To all Offerors/Bidders
36C25222B0006 03-01-2022
X X
03/10/2022 10:00AM CST
X Amendment to this solicitation is to answer RFI's submitted and to include the following attachments: Gypsum Board, Firestop Sole Source and Site Visit Roster. On continuation pages are the answers to the RFI's submitted.
Solicitation IFB bid due/opening date is 03/10/2022 at 10:00AM CST at Great Lakes Acquisition Center, 115 S. 84th St.
1st Floor, Milwaukee, WI 53214-1476. Social distancing and make wearing indoors will be mandated for the bid opening.
The Contracting Officer will open the S. door of the GLAC at 0950 that morning to allow entrance for those wishing to attend the bid opening. Offerors are also welcome to mail/drop off their bids at the GLAC front desk.
End of Amendment
RYAN MCMILLIN
CONTRACTING OFFICER
AMENDMENT NO. 1
DATE: 3/2/2022 6:42 AM
RE: RFI’s for IFB 36C25222B0006 VA Medical Center 5000 West National Avenue Milwaukee, WI 53295
PROJECT NAME: Upgrade Overhead Paging System
PROJECT NUMBER: 695-20-101
This Addendum consists of:
Narrative - (1) Pages
2. Sole source Justification – (1) Sole source Justification were ADDED
The following changes regarding the contract specifications and drawings are hereby provided by amendment. The amendment consists of deletions, additional work, and clarifications as follows:
CHANGES TO DRAWINGS (see attached full size sheets):
1. NONE
CHANGES TO SPECIFICATIONS (see attached specification sections):
1. 09 29 00 GYPSUM BOARD. Revision Date: 1-8-20
a. ADDED specification 09 29 00 Gypsum Board
The following questions and answers provide clarification to the contract documents:
General Questions:
1. Question: Please confirm personnel requirements for this project. Can (1) superintendent fulfill SSHO requirements? Or does (1) superintendent and (1) SSHO need to be on site full-time?
Response: Yes; Site Superintendent can be the SSHO and must be onsite during any and all work.
2. Question: Please provide an abatement report. Per drawing page G-002, contaminated material is within the scope of work in Building 124. If this is the case, please provide a specification section and quantities.
Response: There is no hazardous material survey in the scope of work for this project.
3. Question: Please confirm if contract has material staging location at facility. If so, where is it? Is prime contractor responsible for any costs associated with staging?
Response: See specification 01 00 00-13 1.13
4. Question: Please provide a specification section for gypsum board assemblies Response: Specification 09 29 00 ADDED this Amendment
5. Question: Due to the nature of this project, a full-height gypsum infection control barrier is not recommended at each location. Constructing gypsum infection control barriers at each work location, would take up more time and cost than the actual work. Is Edgeguard an acceptable infection control barrier instead?
Response: The use of temporary barriers as ICRA barriers may be approved if they comply with required fire rating requirements and must be submitted for review and acceptance.
6. Question: Is conduit required for the entire length of all cable runs, or only in areas with exposed ceilings?
Response: In all exposed areas that does not have a drop ceiling.
7. Question: Will all 12 buildings for the paging upgrade be geared towards one contractor?
Response: If awarded there will be one award.
8. Question: What is the start date, and duration/length of the intended project? (All Buildings) Response: All work shall be completed within 534 calendar days after receiving Notice to Proceed.
9. Question: I see the spec recommendations call for all low voltage wiring in RMC/EMT conduit, but the prints say the cable can be plenum and in a J-hook/cable tray assembly except for where areas are exposed such as garages, unfinished areas, boiler rooms, electrical rooms, etc. then those are required to be in raceway. Do the detailed description sheet notes (G. and H.) pertain to all buildings, including 111?
Response: Conduits and boxes with supports shall be provided in all exposed areas without drop ceiling.
10. Question: Will all work be done after normal working hours (7-3:30pm), or only in building 111 that interferes with normal working hours or conditions of the main hospital?
Response: Yes, intent is for most work to be completed during business hours. See specification 01 01 10SN 3.20 (7:30am - 4:30pm). Ceiling work to be done after business hours. See phasing notes. Work that interferes with operations must be done on off hours.
11. Question: The bid submission is currently called out to be submitted via USPS. Due to the current “Covid-19” situation and being that this project is an “IFB” can we submit the total proposal via email with the ‘bond” being submitted via USPS prior to the bid due date.
Response: We need original bid; they can be mailed via USPS however they need to have original signatures. You do not need to be present the time of your bid, but an original bid document need to be. No emails will be accepted.
12. Question: Is the project tax exempt or taxable?
Response: Taxable
13. Question: The project scope includes work in 12 different buildings located all around the campus. Please, provide specific phasing of work to be completed. Is there any sequencing on what building, or floor has to be completed first?
Response: See sheet T-001 “Paging System Phasing”
14. Question: Are there areas withing the building where work can only be confirmed off hours? If there are, please list the areas/building/floors and time GC are available to work on.
Response: See Question #10
15. Question: The project site map does not show a GC laydown area. Can the VA confirm if certain area is proposed for laydown?
Response: See specification 01 00 00-13 1.13
16. Question: Can we use the existing raceways and conduit to run any new cabling and wires?
Response: Yes.
17. Question: How many speakers in total do you require?
Response: speakers are shown on the drawings.
18. Question: Do you want a one for one replacement of speakers (existing and new speakers)?
Response: Drawings indicate existing speakers and new speakers that is required.
19. Question: Are the "S" speaker icons the existing speakers that are already installed or represent the new speaker points?
Response: Drawings indicate existing speakers and new speakers that is required.
20. Question: Do you want the paging activation from only Bldg. 111 or from all Bldgs out to other buildings as well?
Response: Paging activation is as shown on the drawings.
21. Question: With the current COVID-19 situation, will the Government allow for an extension to the due date to ensure the vendor can submit the best proposal possible.
Response: Amendment has bee complete to extend “Bid Opening” to
22. Question: Can the Government identify the type of ceiling (sealed, drop down, etc.) and the height of the ceiling from the floor?
Response: the ceiling type and height is indicated on the drawings, see ceiling table legend on T001.
23. Question: How is this integration currently connectioned (API, I/O, custom integrations module, etc.)? Where is this current integration executed (building and room)?
Response: As shown on the drawings, in the main paging cabinet.
24. Question: As the Vendor can install indoor alert panels (wall mounted 7" and 10" color displays) that are ADA compliant to support the visually impaired with the paging alerts. Would the Government be interested in the Vendor offering these ADA compliant paging panels?
Response: Bid per contract documents
25. Question: As the Vendor can integrate in any networked Televisions into the Paging System, would the Government be interested in the Vendor offering the networked TV integration?
Response: Bid per contract documents
26. Question: As the Vendor can integrate in any outdoor digital signs, would the Government be interested in the Vendor integrating in the Digital signs? If so, how many digital signs are there to be integrated that are networked (Brand and Model).
Response: Bid per contract documents
27. Question: As the Vendor can integrate in any outdoor warning sirens, or speakers, are there any outdoor warning sirens or speakers that the Government desires to be integrated into the paging system?
Response: Only the parking garages Talk a Phone as shown on the drawing and specified
28. Question: The Vendor can provide a FEMA certified IPAWS integrated paging system that can receive automatic alerts to warn and alert the staff and patients of FEMA identified emergencies. Would the Government desire this capability?
Response: Bid per contract documents
29. Question: The Vendor can provide a paging system with a text to speech foreign language and English paging capability. Would the Government be interested in this capability?
Response: Bid per contract documents
30. Question: What is the Brand and Model of the current overhead paging system?
Response: Existing old Bogen system.
31. Question: Can the Government please provide the total number of current existing speakers are currently installed?
Response: quantity of speakers is shown on the drawings.
32. Question: How many of the existing speakers are currently fully operational? What is the Brand and Model of the speakers (watts and amps) Response: quantity of speakers is shown on the drawings, contractor to verify.
33. Question: If the speakers are nonfunctioning, does the Government desire the vendor to replace a one for one in the exact location?
Response: quantity of speakers is shown on the drawings.
34. Question: Could the Government provide a picture of the current speakers as they are installed so that the Vendor can plan for the size of drop down or surface mounting for materials planning.
Response: the speakers is round as shown, and the new speakers matches the existing as specified. The contractor is responsible for verifying the existing conditions.
35. Question: Is the Vendor authorized to utilize the current raceways, conduit, and other available wire and cable management solutions on site? This could save the Government significant costs and time to complete the project.
Response: Existing conduit can be used. All new wring to all new and existing speakers as shown on the drawings.
36. Question: Does the Government desired to have zoning capabilities into each floor of the zoned buildings to further focus the paging to the right department to reduce interruptions?
Response: paging zones are shown on the drawings.
37. Question: Does the Government desire the new equipment to be rack or desk mounted? Is there adequate space on the rack or the desk? Is there adequate power outlets to support the new system being installed?
Response: Rack mounted equipment’s as shown on the drawings.
38. Question: Where are the desired Paging Activation points in each building? Vendor understands that Building 111 will be the installation point for the paging headend and amplifiers. However, if the Government desires to have the ability to activate the paging systems from each building, the Vendor would like to know which room these activation points will be.
Response: Provide paging equipment as shown on the drawings.
39. Question: Does the Government desire to have a simple activation systems which would be microphone with the ability to choose the zones to activate. The Vendor has the capability to tie in the Government's VoIP phones into the activation capabilities to allow the staff to page from the VoIP phones. This is ideal during emergencies when alerting from the emergency incident point is desired.
Response: Provide activation system as shown on the drawings and as specified.
Drawing Questions:
Sheet G-002 Questions:
40. Question: General Notes #13 calls out that GC is responsible for relocation of medical equipment and store in designated areas. Provide identification of specific equipment to be relocated, and locations of storage. Also identify if specific vendors are required to be involved in any specific relocations
| Response: Equipment inside spaces where work is being performed must be identified |
| and coordinated with the COR for removal and reinstallation by contractor. |
41. Question: Abatement and Contaminated Note indicated that there is ACM, Lead materials, however there is no report of drawing reflecting location of materials and quantity of materials to be removed. Provide report and information reflecting extent of Abatement required and specific locations.
Response: Hazardous material survey and abatement not in Scope of Work.
42. Question: Provide drawing(s) / information reflecting ICRA enclosure(s) and specific locations of Anti-room locations.
Response: The basic information is provided for ICRA barrier requirements. The installation and location of barriers is Means and Methods and the responsibility of the Contractor. The use of temporary barriers as ICRA barriers may be approved if they comply with required fire rating requirements and must be submitted for review and acceptance.
43. Question: In locations of ICRA barricades, provide specific floor to structure vertical heights for type A & C walls that are required.
Response: Typical Main Hospital Floors Deck to Deck 11’ 6” and basement deck to deck 13’ 9” Sheet TS101 Question:
44. Question: Provide / identify location of GC trailer and lay down area. Will trailer be adjacent to an existing building and allow for connection to existing electrical power. Connection by GC at no cost to VA.
Response: See specification 01 00 00-13 1.13 Sheet 108T-101 Questions:
45. Question: Building 108 – Second Floor: Coded note 4:
a. Provide floor construction for new sleeve penetration Response: Concrete
b. What is fire rating at floor construction?
Response: 2-hour fire rated.
Sheet 111T-100A Question:
46. Question: Warehouse B0625: Verify existing ceiling type. Being warehouse is area exposed, coded note ceiling type 5?
Response: Conduits and boxes with supports shall be provided in all exposed areas without ceiling, mount speakers at 8 ft AFF.
Sheet 111T-100B Question:
47. Question: Transformer Room B0255: Verify that speaker shown on West wall is wall mounted? Symbol is not defined in Symbol Legend. If wall mounted what is mounting hgt?
Response: Wall mounted 12”x12’ steel speaker with baffle, mounted at 8 ft AFF.
Sheet 111T-101A Question:
48. Question: Coded note 4: confirm that existing to be removed is within brindle rings system or raceway?
Response: Confirmed; there are both types of low voltage pathways (Open and closed)
49. Question: Coded note 11:
a. What are floor thicknesses / construction to be penetrated?
Response: Typical 4”
b. What is rating to be sealed?
Response: 2 hours rated.
Sheet 111T-101B Question:
50. Question: Coded note 1:
a. Microphone specification?
Response: Bogen DDU 250nDynamic Desk Type gooseneck Microphone or equal.
b. Microphone accessories?
Response: Bogen DDU 250nDynamic Desk Type gooseneck Microphone or equal.
Sheet 111T-102 Question:
51. Question: Coded note 4:
a. What is sleeve rating?
Response: 2 hours rating.
Sheet 111T-104 Question:
52. Question: Coded note 5:
a. What is sleeve rating and is new core drilling required?
Response: 2 Hours rating
b. Verify coded note 1 throughout and if this is the correct designation.
Response: yes Sheet 111T-105 Question:
53. Question: Coded note 5:
a. What is sleeve rating and is new core drilling required?
Response: 2 hours rating
b. Confirm new speaker in Lounge 5436?
Response: Yes, new speaker with back box, baffle and cabling.
Sheet 111T-106 Question:
54. Question: Coded note 3:
a. What is sleeve rating. Is new core drilling required?
Response: 2 hours rated.
Sheet 111T-107 Questions:
55. Question: Coded note 6:
a. What is sleeve rating?
Response: 2 hours rated
b. Is new core drilling required?
Response: Yes Sheet 111T-108 Question:
56. Question: Coded note 6:
a. What is sleeve rating?
b. Is new core drilling required?
Response: See question 31 Sheet 111T-109 Question:
57. Question: Coded note 3:
a. What is sleeve rating?
b. Is new core drilling required?
Response: See question 31 Sheet 111T-110 Question:
58. Coded note 5:
a. What is sleeve rating?
b. Is new core drilling required?
Response: See question 31
59. Coded note 3:
a. Clarify UL listing for correct penetration rating Response: a. 2 hours rated, b. yes. 2a. 2 hours rated Sheet 123T-101A Question:
60. Coded note 1:
a. Clarify UL listing for correct penetration rating Response: See question 31 Sheet 123T-101B Question:
61. Question: Coded note 2:
a. note and symbol do not correspond.
Response: See Sheet 123T-101B KEY notes
b. No dashed line or does coded note 2 to control area in Wing A, Hallway CA1-4?
Response: Control the area within the boundary which includes Wing A corridor CA1-4.
· Sheet T-401 Question:
62. Question: Coded note 1:
a. Provide rating for sleeve. Typical Response: See question 31
63. Question: Coded note 6:
a. Provide rating for sleeve. Typical
b. Response: See question 31 Sheet T-402 Question:
64. Question: Coded note 2:
a. Provide rating for sleeve. Typical Response: See question 31
65. Question: Coded note 3:
a. Provide existing rating for sleeve. Typical
b. Response: See question 31 Specifications Question:
66. Question: Specification Section 07 84 00 / 2.1 Firestop Systems: calls out HILTI systems.
a. Provide specific product information Response: Hilti is the manufacture for basis of design, and a sole soured item. See Sole Source Justification this amendment
67. Question: Specification 01 01 10SN:
Provide designation and locations of Ante room construction (1 hour rated barrier) and Ante room (ICRA only) 3.2 Asbestos Response: See question #17
68. Question: Specification Section 01 91 00 General Commissioning Requirements.
a. Section is missing.
Response: No 3rd party commissioning required, See section 27 08 00 for communications commissioning requirements.
69. Question: Specification Section 02 41 00 Demolition:
Can Electrical / Communication contractor utilize HEPA carts when working in corridors within facility?
Response: The Contractor must comply with the ICRA requirements. How that is maintained is Means and Methods.
70. Question: Specification sections 02 82 11 or 02 82 13 (series) for Traditional or Glove bag Asbestos Abatement.
a. Sections are missing Response: No known ACM in work areas
71. Question: Specification 06 10 00 Rough Carpentry:
a. Provide clarification of carpentry scope of work?
Response: The wood is for backing and the plywood is if a backer sheet is required to mount equipment.
72. Question: Specification 09 51 00 Acoustical Ceiling:
a. Provide specifications for acoustical ceiling tiles (2x2 and 2x4) where replacement tiles are called out or required.
Response: Basis of design: Armstrong 2’x2’ Dune square white. See Specification 09 51 00 The documents call out the replacement of damaged ceilings and ceiling tile and to match the existing. The spec is the basic requirements for ceiling material and installation. The replacement and repair include ceilings damaged during installation of the paging system.
73. Question: Specification Section 09 91 00 Painting:
a. Clarify specification is for repair of areas where renovation work takes place and painting may be required? No finish schedule can be located in drawings.
Response: There is no reference to a Finish Schedule since the painting is patching to match existing conditions only. Sherman Williams Color will be provided based on the area requiring touch up.
74. Question: Specification Section 26 05 36 Wireways for Radiology Equipment.
a. Provide identification of specific work related to Radiology Equipment.
Response: Not required.
75. Question: Specification Sections 26 24 16 Panelboards, 26 27 26 Wiring Devices and 26 29 21 Enclosed Switches and Circuit Breakers.
a. Specific electrical work not shown on Bid Drawings. Provide clarification and extent of work.
Response: the work is shown on the drawings. Example Drawing T401 note 6.
76. Question: Specification 27 08 00 Commissioning of Communications Systems.
a. Clarify if Commissioning is GC responsibility or if VA responsible for this SOW?
Response: See question #44
77. Question: Does the Government desire the Vendor to place a speaker at each speaker icon point or can the Vendor propose a new ideal installation point if after commencing the installation that there is an issue that may hinder the coverage plan.
Response: existing and new speaker locations are shown on the drawings..
78. Question: Drawing T601 Detail 2 shows New Paging Stations. We cannon locate these on the floor plans. Please provide locations on the floor plans. (see highlighted on attached document).
Response: The new paging stations are shown on the drawings.
79. Question: Drawing T601 Detail 2 shows new feeds coming from “New Paging Equip.” to either a speaker or volume control as a tie-in point. We cannot locate these on the floor plans. Could you please provide the location of these tie-in points on the floor plans? (see highlighted on attached document) Response: New paging equipment are shown with plan notes on the drawings for each building.
80. Question: Drawing 111T-101A note 6 states “Existing Bogen amplifier to be replaced with new. Interconnect amplifier with new system”. We cannot locate this room/amplifier on drawing T601. Please provide details on how this is to be connected. Will this require a CAT 6 cable to it like the other amplifiers on T601?
Response: New paging equipment are shown with plan notes on the drawing, connections is a means and methods for the paging integrator to provide.
81. Question: Drawing T-601 paging system zones at top right of the page lists zones 31, 32 and 33 for parking garage and lot. We cannot locate a riser diagram on T-602 for the parking garage or lots. Could clarification be provided on what is required for head end equipment for zones 31, 32 and 33?
Response: Parking garages are shown on the site plan.
82. Question: Drawing T-601 details 5 and 6 show typical paging data racks.
a. For the new racks that need to be provided, which detail should be used?
b. Could clarification be provided on which exact head ends get a new paging data rack?
c. We cannot locate any fiber optic cable run to the data racks other than fiber jumpers from the existing VA network rack. Is the fiber optic patch panel required in the data rack?
d. Could more details be provided on the POE switch in the rack?
e. What voltage does the UPS need to be in paging rack?
Response: Both details. New racks are shown and described in a plan note. Fiber optic patch is requiring and specified. Provide PoE switches as specified. 120 volt.
83. Question: Drawing T-602, detail 12. Does a new paging microphone need to be installed and included in each building? If so, in what location are these required?
Response: Provide paging microphones as specified and as shown on the drawing.
84. Question: Spec section 01 35 26, 1.7.
85. Question: 01 35 26, 1.7, A, 1 states “The superintendent may not perform any duties for the sub-contractor as designated competent person.” However, 01 35 26, 1.7, C states “These Competent Persons can have collateral duties as the subcontractor’s superintendent and/or work crew lead persons as well as fill more than one specialized CP role”. Which is correct or required?
Response: The GC superintendent cannot be the subs CP as stated. The CP works for the sub and can have multiple responsibilities within the subs purview as stated.
86. Question: 01 35 26, 1.7, A The Prime Contractor shall designate a minimum of one SSHO at each project site. Can the SSHO have other duties or only SSHO?
01 35 26, 1.7, C states “However, the SSHO has be a separate qualified individual from the Prime Contractor’s Superintendent and/or Quality Control Manager with duties only as the SSHO.” Is a separate SSHO, separate Superintendent and separate Quality control manager required on site at all times, dedicated only to this project?
Response: The GC provides the Site Super that can also be the SSHO; to be onsite at all times of work. The Sub provides the Competent person.
END
See attached document: 09 29 00 Gypsum Board.
See attached document: Paging Site Visit Roster.
See attached document: 3 - 695-20-101 Firestop_SingleSourceJustification_MPT-SAT Amed 1.
AMENDMENT NO. 1
CONSTRUCTION BULLETIN 1
Page | 1
Page 1 of
AMENDMENT NO. 1
Page | 14 of 7
File details come from the government source that posted it. Updated .