Att4 - IMVA-Building6Report.pdf
PDF 3 MB Posted
- Attached to
- Z1DA--585-21-703 EHRM Training and Admin Space Support Federal contract opportunity
- Solicitation number
- 36C25222B0002
About this file
This pre-solicitation notice outlines requirements for a construction project at a Department of Veterans Affairs medical center. The VA seeks to renovate approximately 3,300 square feet of space on the first floor of Building 6 at the Oscar G Johnson VAMC campus in Iron Mountain, Michigan, including demolition, new construction, finishes, communications infrastructure upgrades, physical security improvements, and hazardous material abatement. The estimated price range for the project is between $1,000,000 and $5,000,000. Pursuant to Public Law 109-461, this solicitation is set aside for service-disabled veteran-owned small businesses. Interested SDVOSBs must represent eligibility at the time of bid submission. The solicitation and supporting documents will be posted to SAM.gov on or around October 22, 2021, with a pre-bid site visit tentatively scheduled for the week of November 1, 2021.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25222B0002 0002.docx | DOCX document | |
| Att1 - Site Plan 2021.pdf | ||
| Att1 - Bid RFI Sheet.docx | DOCX document | |
| Att3 - Addendum1.docx | DOCX document | |
| 36C25222B0002 0001.docx | DOCX document | |
| Att2 - Prebid Sign-In.pdf | ||
| P07 - Wage Rate dtd. 10.22.21 _ 585-21-703.pdf | ||
| S02 - Att2 SPEC_BidDocuments 585-21-703.pdf | ||
| S02 - Att1 SOW 585-21-703.pdf | ||
| S02 - Att3 EHRM Bid Documents_DWGs_rev1 58-21-703.pdf | ||
| 36C25222B0002_1.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Manual for: Building 6
Oscar G. Johnson VA Medical Center Iron Mountain, Michigan
Asbestos Management Plan VA Project 585-14-111
February 2015
100% Documents
NDW Project Number:
BDN Project Number:
16297
Compiled By: Prepared By:
420 Rail Street 8105 Valleywood Lane Negaunee, MI 49866 Portage, MI 49024 906-475-6616 269-329-1237
WWW.NDW.US
http://www.ndw.us/
TABLE OF CONTENTS
INTRODUCTION
SCOPE OF WORK
BUILDING DESCRIPTION
METHODOLOGY
ASBESTOS SURVEY
SAMPLE ANALYSIS
ASBESTOS SURVEY RESULTS
HAZARD RANKING
POTENTIAL FOR DISTURBANCE
CONCLUSIONS AND RECOMMENDATIONS
APPENDICES
APPENDIX A: Functional Space, Material Description, Asbestos Analytical Result
Summary
– Sorted by Space
– Sorted by Material
APPENDIX B: Analytical Report
APPENDIX C: Photographs
APPENDIX D: Floor Plans
APPENDIX E: Operations and Maintenance Plan
APPENDIX F: Asbestos Abatement Estimates
INTRODUCTION
Northern Design Works of Negaunee, MI, retained BDN Industrial Hygiene Consultants, Inc. to conduct a building inspection to determine the presence, quantities, and locations of asbestos-containing building materials (ACBM) in Building 6 at the Oscar G. Johnson VA Medical Center, Iron Mountain, Michigan.
Scope of Work BDN identified building materials suspected of containing asbestos in Building 6. These materials were surveyed in a manner compliant with the sampling protocols of the Asbestos Hazard Emergency Response Act (AHERA) by inspecting the materials for damage, measuring the amount of material and obtaining sample(s) for laboratory analysis. The survey was completed by BDN industrial hygienists Travis Noa, asbestos inspector accreditation number A38262 and David Steger, asbestos inspector accreditation number A1788, both are Michigan-accredited asbestos building inspectors.
This Asbestos Survey was conducted to identify the types, quantities, locations, and conditions of the asbestos-containing materials within Building 6.
Building Description Building 6 of the Oscar G. Johnson VA Medical Center is located at 325 East H Street, Iron Mountain, Michigan. Building 6 is a two story building with a basement. The exterior of building 6 is brick with a flat roof. The interior of building 6 has wood-framed walls with plaster and drywall. The floors are a mix of carpet, ceramic tile, floor tile and concrete.
The ceilings varied from drop ceilings and plaster. The total square footage for Building 6 is approximately 7,077 square feet.
METHODOLOGY
Asbestos Survey BDN industrial hygienists Travis Noa, asbestos inspector accreditation number A38262 and David Steger, asbestos inspector accreditation number A1788 conducted the asbestos survey of Building 6 in December of 2014.
Field inspection alone is not conclusive to identify asbestos-containing materials.
Therefore, bulk samples of suspected asbestos-containing materials (ACMs) were obtained using U.S. EPA/OSHA protocols by a State-accredited inspector and analyzed to determine if asbestos fibers were present, and if found, the types and percentages of asbestos were reported.
BDN recommends that when suspect ACMs not identified within the report are encountered for which no analytical data exists, the materials remain undisturbed until the asbestos content of the materials(s) is determined in accordance with U.S. EPA and OSHA regulations. BDN’s quantities are intended to be “Order of Magnitude” estimates and the estimated quantities and other information in this report should not be used as an exclusive source of information for bid formulation or for notification to regulatory agencies.
Bulk samples of friable suspected ACMs were obtained using U.S. EPA/OSHA protocols by a State of Michigan accredited inspectors. An area the approximate size of a half-dollar was thoroughly wetted with water and a wetting agent applied from a handheld spray bottle to reduce fiber release during sample collection. A knife or boring tool was used to cut the outer protective covering to expose the suspected ACM underneath. The knife or boring tool was then employed to remove a small amount of the material for the sample. Bulk samples of non-friable suspected ACMs were collected using hand tools to obtain a sample approximately the size of a postage stamp. The sample was placed in a resealable plastic bag, labeled, and secured. Wood and Metal fire-rated doors are assumed to be asbestos-containing due to the damaging effects to obtain samples which would compromise the fire rating of the door. BDN followed U.S. EPA and OSHA protocols for determining sampling locations and total number of samples taken.
Sample Analysis
Laboratory descriptions of materials analyzed by Polarized Light Microscopy (PLM) method for asbestos content were based upon the microscopist’s perceptions of bulk samples that were pulverized and prepared with dispersion oils for PLM analysis. Due to the preparation of the sampled materials and the minute level of observation by the laboratory personnel, the descriptions on the Certificates of Analysis may not match the sample descriptions recorded by BDN in the field. BDN’s sample descriptions and locations should be used to identify materials that were sampled and BDN’s sample numbers should be used to correlate analytical results for the sampled materials.
Building material samples collected from Building 6 at the Oscar G. Johnson VA Medical Center were submitted to the asbestos laboratory at BDN in Portage, Michigan.
Laboratory descriptions of materials analyzed by Polarized Light Microscopy (PLM) method for asbestos content were based upon the microscopists’ visual observations of bulk samples that were homogenized and prepared for analysis. The analytical data from the asbestos-containing materials is presented in the tables below.
ASBESTOS SURVEY RESULTS
As detailed in Table 1, the following materials were identified as asbestos-containing materials:
A summary of the functional space names, descriptions of materials, observed quantities, hazard rankings, and analytical results are presented in Appendix A. The laboratory analytical report is presented as Appendix B. Photos of these materials are provided in Appendix C. Asbestos was not detected in the other sampled materials.
Table 1
DESCRIPTION OF ASBESTOS
CONTAINING MATERIAL
LOCATION QUANTITY
Corrugated Paper Pipe Insulation (Aircell) 1st Floor, 2nd Floor 328 ln. ft.
Paper Pipe Insulation (Woolfelt) 1st Floor 262 ln. ft.
Floor Tile – 12”x12” Cream with Brown
Streaks 1st Floor, 2nd Floor 256 sq. ft.
Floor Tile – 9”x9” Green 1st Floor 280 sq. ft.
Floor Tile – 9”x9” Red with Cream Streaks
1st Floor, 2ndFloor, Basement 1252 sq. ft.
Metal Fire Rated Door Basement 1 door
HAZARD RANKINGS
DEPARTMENT OF VETERANS AFFAIRS VA MEDICAL CENTER
IRON MOUNTAIN, MICHIGAN
Hazard Rank Removal Priority AHERA Categories Response Action Required by
AHERA
1 1 Significantly Damaged Evacuate or isolate the area if needed.
Remove the ACBM (or enclose or encapsulate if sufficient to contain fibers).
Repair of thermal system insulation is allowed if feasible and safe. O&M required for all friable ACBM.
2 2 Damaged + Potential for Significant Damage
Evacuate or isolate the area if needed.
Remove, enclose, encapsulate, or repair to correct damage. Take steps to reduce potential for disturbance. O&M required for all friable ACBM.
3 3 Damaged + Potential for Damaged
Remove, enclose, encapsulate, or repair to correct damage. O&M required for all friable ACBM.
4 4 Damaged Same as hazard rank 5.
5 5 Potential for Significant Damage
Evacuate or isolate the area if needed.
Take steps to reduce potential for disturbance. O&M required for all friable ACBM and TSI.
6 6 Potential for Damage O&M required for all friable ACBM and
TSI.
7 7 All Remaining ACBM O&M required for all friable ACBM, but measures need not be as extensive as above.
NOTE: AHERA DOES NOT ACCOUNT FOR COMBINATIONS OF CURRENT AND
POTENTIAL DAMAGE (I.E., HAZARD RANKS #5 AND 6). THE RESPONSE ACTIONS
SHOWN ARE COMBINATIONS OF THOSE REQUIRED FOR EACH CONDITION.
Potential for Disturbance
Asbestos-containing materials are rated for Potential for Disturbance. The ratings are located on the spreadsheet. The ratings are as follows:
L = Low, no direct contact with employees, patients, and/or visitors
M = Medium, minimal contact with employees only
H = High, direct contact by employees, patients, and or visitors
CONCLUSIONS AND RECOMMENDATIONS
General Materials BDN identified one asbestos-containing material and recommends that this material be removed by a licensed asbestos abatement contractor prior to renovation or demolition activities that would disturb this material in any way. Personal and clearance air samples should be collected to demonstrate that asbestos fibers are not released through the abatement process.
Notification
A “Notification of Intent to Renovate/ Demolish” form required by the U.S. EPA NESHAP regulations must be submitted to the MDEQ-AQD 10-working days prior to removal of the asbestos quantities of 260 lineal feet, 160 square feet or 35 cubic feet.
Regulatory Information Regarding Asbestos Removal, Renovation, and Demolition
A licensed asbestos removal contractor, utilizing workers accredited under the requirements of Michigan, must perform asbestos removal work. BDN recommends asbestos abatement project design by a Project Designer accredited under the requirements of Michigan Act 440 and monitoring asbestos removal work with air sampling, visual verification and clearance air monitoring performed by an independent third party. All ACM waste generated should be placed in doubled, labeled waste bags, affixed with a waste generator location label and disposed in a Type II landfill. All ACM waste removed from the site should be inventoried on a Waste Shipment Record that complies with NESHAP regulations, 40 CFR Part 61.
Once an asbestos building survey has confirmed or assumed the presence of ACMs, all employees who work around and may contact, but not disturb ACMs (i.e., persons conducting janitorial, building maintenance, security and/or housekeeping activities) must receive, at minimum, two-hour asbestos awareness training. Additionally, employees who may disturb ACMs (i.e., persons working with any of the mechanical systems that have asbestos-containing materials) must have additional asbestos-related training that satisfies the class of work activity that they are involved with (i.e., Class I, II or III).
Before allowing a contractor to work on their building, building owners should also ascertain if the contractor has acquired asbestos awareness training. Such training is required when the contractor works in the proximity of ACMs and may contact, but not disturb the material.
Building owners removing asbestos-containing materials from their own structure are not required to be a Michigan-licensed asbestos abatement contractor, however, the building owner’s employees performing the work must comply with the requirements of Part 602, the MIOSHA Asbestos Standards for Construction and hold a current Contractor/Supervisor card. No notifications are required for properly trained employees removing ACM in the employer owned facility.
ASBESTOS MANAGEMENT PLAN
325 East H Street Iron Mountain, MI
APPENDIX A
Functional Space Summary
Sorted by Space
Sorted by Material
BDN JOB NO. 16297
NDW NO. 1416
Sorted by Space Code VA Medical Center
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 1 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 1 Room 113 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 45 sq. ft. — — — Negative — — None
6 1 1 North Stairwell and Closet Floor Tile - 12"x12" Cream with Brown Streaks and Adhesive 25 sq. ft. — — 16297-6-2.1
Tile: 5% Chrysotile Adhesive:
None Detected 7 H O & M
6 1 1 North Stairwell and Closet
Floor Tile - 12"x12" Light Pink with White Streaks and
Adhesive 45 sq. ft. — — 16297-6-1.1
Tile and Adhesive
None Detected — — None
6 1 1 North Stairwell and Closet Metal Door - No Tag 1 door (s) — — — — — — None
6 1 1 North Stairwell and Closet Metal Door - No Tag 2 door (s) — — — — — — None
6 1 1 North Stairwell and Closet Plaster 700 sq. ft. — — — Negative — — None 6 1 2 Room 113 Carpet — — — — — — — — None 6 1 2 Room 113 Concrete Ceiling — — — — — — — — None 6 1 2 Room 113 Concrete Slab Floor — — — — — — — — None Under carpet
6 1 2 Room 113 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None 6 1 2 Room 113 Fiberglass Insulated Line — — — — — — — — None Above drop ceiling tile 6 1 2 Room 113 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 2 Room 113 Plaster 520 sq. ft. — — — Negative — — None 6 1 3 Room 116 Carpet — — — — — — — — None 6 1 3 Room 116 Concrete Ceiling — — — — — — — — None
6 1 3 Room 116 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None 6 1 3 Room 116 Drywall 168 sq. ft. — — — Negative — — None 6 1 3 Room 116 Drywall Joint Compound 140 sq. ft. — — — Negative — — None 6 1 3 Room 116 Fiberglass Insulated Line — — — — — — — — None
6 1 3 Room 116 Fire Door Frame 1 frame (s) — — — Negative — — None
6 1 3 Room 116
Floor Tile - 12"x12" Cream with Light Brown Streaks and
Adhesive 140 sq. ft. — — 16297-6-13.1
Tile and Adhesive
None Detected — — None Under carpet
6 1 3 Room 116 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 3 Room 116 Plaster 380 sq. ft. — — — Negative — — None 6 1 4 Room 114 Base Trim - 4" Black 42 ln. ft. — — — Negative — — None 6 1 4 Room 114 Carpet — — — — — — — — None 6 1 4 Room 114 Concrete Ceiling — — — — — — — — None
6 1 4 Room 114 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 108 sq. ft. — — — Negative — — None
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 2 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 4 Room 114 Drywall 192 sq. ft. — — — Negative — — None 6 1 4 Room 114 Drywall Joint Compound 192 sq. ft. — — — Negative — — None 6 1 4 Room 114 Fiberglass Insulated Line — — — — — — — — None Above drop ceiing tile
6 1 4 Room 114 Fire Door Frame 1 frame (s) — — — Negative — — None
6 1 4 Room 114
Floor Tile - 12"x12" Cream with Light Brown Streaks and
Adhesive 108 sq. ft. — — — Negative — — None Under carpet 6 1 4 Room 114 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 4 Room 114 Plaster 144 sq. ft. — — — Negative — — None
6 1 5 Women's Rest
Room 111 Base Trim - 4" Grey 40 ln. ft. — — 16297-6-15.1 None
Detected — — None
6 1 5 Women's Rest
Room 111 Concrete Ceiling — — — — — — — — None
6 1 5 Women's Rest
Room 111 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 84 sq. ft. — — — Negative — — None
6 1 5 Women's Rest
Room 111 Fire Door Frame 1 frame (s) — — — Negative — — None
6 1 5 Women's Rest
Room 111
Floor Tile - 12"x12" Cream with Light Brown Streaks and
Adhesive 84 sq. ft. — — — Negative — — None
6 1 5 Women's Rest
Room 111 Metal Door - No Tag 1 door (s) — — — — — — None
6 1 5 Women's Rest
Room 111 Paper Pipe Insulation
(Woolfelt) 45 ln. ft. — — 16297-6-16.1 20%
Chrysotile 7 L O & M Inside walls for fixtures
6 1 5 Women's Rest
Room 111 Plaster 400 sq. ft. — — — Negative — — None 6 1 6 Room 109 Carpet — — — — — — — — None 6 1 6 Room 109 Concrete Slab Floor — — — — — — — — None Above drop ceiling tile
6 1 6 Room 109 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None 6 1 6 Room 109 Fiberglass Insulated Line — — — — — — — — None Above drop ceiling tile
6 1 6 Room 109 Floor Tile - 9"x9" Green and
Adhesive 168 sq. ft. — — 16297-6-17.1
Tile: 5% Chrysotile Adhesive:
None Detected 7 H O & M Under carpet
6 1 6 Room 109 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 6 Room 109 Plaster 500 sq. ft. — — — Negative — — None 6 1 7 Room 112 Carpet — — — — — — — — None 6 1 7 Room 112 Concrete Slab Floor — — — — — — — — None
6 1 7 Room 112 Corrugated Paper Pipe
Insulation (Aircell) 18 ln. ft. — — 16297-6-18.1 70%
Chrysotile 7 L O & M Exterior wall for heater, west wall
6 1 7 Room 112
Dot, Wormy 84 sq. ft. — — — Negative — — None
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 3 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 7 Room 112 Drywall 280 sq. ft. — — — Negative — — None 6 1 7 Room 112 Drywall Joint Compound 280 sq. ft. — — — Negative — — None 6 1 7 Room 112 Fiberglass Insulated Line — — — — — — — — None
6 1 7 Room 112 Fire Door Frame 1 frame (s) — — — Negative — — None
6 1 7 Room 112 Floor Tile - 12"x12" Cream with Brown Streaks and Adhesive 84 sq. ft. — — —
Tile: Positive Adhesive:
Negative 7 H O & M Under carpet
6 1 7 Room 112 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 7 Room 112 Plaster 120 sq. ft. — — — Negative — — None
6 1 8 Room 107, Data closet Drop Ceiling Tile - 2'x2' White, Dot, Wormy 18 sq. ft. — — — Negative — — None
6 1 8 Room 107, Data closet Floor Tile - 9"x9" Red with
Cream Streaks and Adhesive 18 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M
6 1 8 Room 107, Data closet Metal Door - No Tag 1 door (s) — — — — — — None
6 1 8 Room 107, Data closet Plaster 168 sq. ft. — — — Negative — — None
6 1 9 Room 108B
Floor Tile - 12"x12" Light Pink with White Streaks and
Adhesive 24 sq. ft. — — — Negative — — None 6 1 9 Room 108B Metal Door - No Tag 1 door (s) — — — — — — None
6 1 9 Room 108B Paper Pipe Insulation
(Woolfelt) 18 ln. ft. — — — Positive 7 L O & M Assumed in wall for slop sink fixtures
6 1 9 Room 108B Plaster 224 sq. ft. — — — Negative — — None
6 1 10 Room 108A Floor Tile - 9"x9" Red with
Cream Streaks and Adhesive 16 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M 6 1 10 Room 108A Metal Door - No Tag 1 door (s) — — — — — — None 6 1 10 Room 108A Plaster 136 sq. ft. — — — Negative — — None
6 1 11 Room 105A, Men's Restroom Ceramic Tile — — — — — — — — None
6 1 11 Room 105A, Men's Restroom Corrugated Paper Pipe
Insulation (Aircell) 10 ln. ft. — — — Positive 7 M O & M Above drop ceiling tile
6 1 11 Room 105A, Men's Restroom Metal Door - No Tag 1 door (s) — — — — — — None
6 1 11 Room 105A, Men's Restroom Plaster 240 sq. ft. — — — Negative — — None
6 1 12 Room 103, front foyer & closets Ceramic Tile — — — — — — — — None
6 1 12 Room 103, front foyer & closets
Dot, Wormy 72 sq. ft. — — — Negative — — None
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 4 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 12 Room 103, front foyer & closets
Floor Tile - 9"x9" Red with Cream Streaks and Adhesive 36 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M Both closets
6 1 12 Room 103, front foyer & closets Metal Door - No Tag 1 door (s) — — — — — — None
6 1 12 Room 103, front foyer & closets
Paper Pipe Insulation (Woolfelt) 38 ln. ft. — — — Positive 7 M O & M
5 lines above drop ceiling tile in foyer
6 1 12 Room 103, front foyer & closets Plaster 360 sq. ft. — — — Negative — — None
6 1 13 Room 110 Carpet — — — — — — — — None 6 1 13 Room 110 Concrete Slab Floor — — — — — — — — None
6 1 13 Room 110 Corrugated Paper Pipe
Insulation (Aircell) 10 ln. ft. — — — Positive 7 M O & M 2 horizontal lines above drop ceiling tile
6 1 13 Room 110 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 112 sq. ft. — — — Negative — — None 6 1 13 Room 110 Drywall 64 sq. ft. — — — Negative — — None 6 1 13 Room 110 Drywall Joint Compound 64 sq. ft. — — — Negative — — None 6 1 13 Room 110 Fiberglass Insulated Line — — — — — — — — None
6 1 13 Room 110 Fire Door Frame 1 frame (s) — — — Negative — — None under carpet
6 1 13 Room 110 Floor Tile - 12"x12" Cream with Brown Streaks and Adhesive 112 sq. ft. — — —
Tile: Positive Adhesive:
Negative 7 H O & M
6 1 13 Room 110 Plaster 272 sq. ft. — — — Negative — — None
6 1 14 Room 101 Base Trim - 6" Black 68 ln. ft. — — 16297-6-22.1 None
Detected — — None 6 1 14 Room 101 Concrete Ceiling — — — — — — — — None
6 1 14 Room 101 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 280 sq. ft. — — — Negative — — None
6 1 14 Room 101
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 280 sq. ft. — — 16297-6-21.1
Tile and Adhesive
None Detected — — None
6 1 14 Room 101 Metal Door - No Tag 1 door (s) — — — — — — None
6 1 14 Room 101 Paper Pipe Insulation
(Woolfelt) 161 ln. ft. 21 ln. ft. — Positive 3 M Patch & Repair
Above drop ceiling tile damaged aircell pieces on wall obove drop ceiling tile
6 1 14 Room 101 Plaster 544 sq. ft. — — — Negative — — None
6 1 15 Room 101A Base Trim - 6" Brown 60 ln. ft. — — 16297-6-23.1 None
Detected — — None 6 1 15 Room 101A Carpet — — — — — — — — None 6 1 15 Room 101A Concrete Ceiling — — — — — — — — None
6 1 15 Room 101A Corrugated Paper Pipe
Insulation (Aircell) 40 ln. ft. — — — Positive 7 M O & M Above drop ceiling tile
(2) horizontal lines
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 5 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 15 Room 101A Drop Ceiling Tile - 2'x2' White, Dot, Wormy 224 sq. ft. — — 16297-6-4.1 None
Detected — — None 6 1 15 Room 101A Drywall 128 sq. ft. — — — Negative — — None 6 1 15 Room 101A Drywall Joint Compound 128 sq. ft. — — — Negative — — None
6 1 15 Room 101A
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 224 sq. ft. — — — Negative — — None Under carpet 6 1 15 Room 101A Metal Door - No Tag 1 door (s) — — — — — — None 6 1 15 Room 101A Plaster 352 sq. ft. — — — Negative — — None 6 1 16 Room 101B Base Trim - 6" Brown 68 ln. ft. — — — Negative — — None 6 1 16 Room 101B Brick Wall — — — — — — — — None 6 1 16 Room 101B Carpet — — — — — — — — None 6 1 16 Room 101B Concrete Ceiling — — — — — — — — None Above drop ceiling tile
6 1 16 Room 101B Drop Ceiling Tile - 2'x2' White, Bumpy, Fiberglass — — — — — — — — None 6 1 16 Room 101B Drywall 342 sq. ft. — — — Negative — — None 6 1 16 Room 101B Drywall Joint Compound 342 sq. ft. — — — Negative — — None 6 1 16 Room 101B Metal Door - No Tag 1 door (s) — — — — — — None 6 1 16 Room 101B Metal Door - No Tag 1 door (s) — — — — — — None
6 1 17 Room 102 kitchen 102A Base Trim - 4" Cream 31 sq. ft. — — 16297-6-27.1 None
Detected — — None
6 1 17 Room 102 kitchen 102A Concrete Ceiling — — — — — — — — None Above drop ceiling tile
6 1 17 Room 102 kitchen 102A Corrugated Paper Pipe
Insulation (Aircell) 58 ln. ft. — — — Positive 7 M O & M
Above drop ceiling tile
(5) lines, (2) lines in exterior wall
6 1 17 Room 102 kitchen 102A Drop Ceiling Tile - 2'x2' White, Dot, Wormy 119 sq. ft. — — — Negative — — None
6 1 17 Room 102 kitchen 102A Floor Mastic - Black 28 sq. ft. — — 16297-6-26.1 None
Detected — — None Inside vestibule
6 1 17 Room 102 kitchen 102A
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 91 sq. ft. — — — Negative — — None
6 1 17 Room 102 kitchen 102A Metal Door - No Tag 1 door (s) — — — — — — None
6 1 17 Room 102 kitchen 102A Plaster 384 sq. ft. — — — Negative — — None
6 1 18 Room 104 Corrugated Paper Pipe
Insulation (Aircell) 161 ln. ft. — — — Positive 7 M O & M Above drop ceiling tile
6 1 18 Room 104 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 112 sq. ft. — — — Negative — — None
6 1 18 Room 104
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 112 sq. ft. — — — Negative — — None Under 12"x12" floor tile
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 6 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 18 Room 104
Floor Tile - 12"x12" Light Pink with White Streaks and
Adhesive 112 sq. ft. — — — Negative — — None Top layer 6 1 18 Room 104 Metal Door - No Tag 2 door (s) — — — — — — None 6 1 18 Room 104 Plaster 352 sq. ft. — — — Negative — — None 6 1 19 Room 106 Carpet — — — — — — — — None 6 1 19 Room 106 Concrete Ceiling — — — — — — — — None
6 1 19 Room 106 Corrugated Paper Pipe
Insulation (Aircell) 10 ln. ft. — — — Positive 7 M O & M Above drop ceiling tile along exterior wall
6 1 19 Room 106 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 112 sq. ft. — — — Negative — — None
6 1 19 Room 106 Floor Tile - 9"x9" Green and
Adhesive 112 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M 6 1 19 Room 106 Plaster 352 sq. ft. — — — Negative — — None 6 1 20 108 hallway Base Trim - 4" Cream 44 sq. ft. — — — Negative — — None 6 1 20 108 hallway Concrete Ceiling — — — — — — — — None
6 1 20 108 hallway Corrugated Paper Pipe
Insulation (Aircell) 1 ln. ft. — — — Positive 7 M O & M South end of hallway
6 1 20 108 hallway Drop Ceiling Tile - 2'x2' White, Dot, Wormy 636 sq. ft. — — — Negative — — None
6 1 20 108 hallway
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 52 sq. ft. — — — Negative — — None
6 1 20 108 hallway Floor Tile - 9"x9" Red with
Cream Streaks and Adhesive 636 sq. ft. — — 16297-6-19.1
Tile: 5% Chrysotile Adhesive:
None Detected 7 H O & M
6 1 20 108 hallway Metal Door - No Tag 1 door (s) — — — — — — None 6 1 20 108 hallway Metal Door - No Tag 1 door (s) — — — — — — None
6 1 20 108 hallway Plaster 1,240 sq. ft. — —
16297-6-3.1 16297-6-3.2 16297-6-3.3 16297-6-3.4
None Detected
None Detected
None Detected
None Detected — — None
6 2 21 Room 208 Base Trim - 4" Cream 48 sq. ft. — — — Negative — — None 6 2 21 Room 208 Concrete Ceiling — — — — — — — — None
6 2 21 Room 208 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 490 sq. ft. — — — Negative — — None
6 2 21 Room 208 Drywall 80 sq. ft. — — 16297-6-11.1 None
Detected — — None Storage closet
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 7 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 2 21 Room 208 Drywall Joint Compound 80 sq. ft. — — 16297-6-12.1 None
Detected — — None Storage closet
6 2 21 Room 208
Floor Tile - 12"x12" Cream with Light Brown and Gray Streaks and Adhesive 490 sq. ft. — — — Negative — — None 6 2 21 Room 208 Metal Door - No Tag 4 door (s) — — — — — — None 6 2 21 Room 208 Plaster 784 sq. ft. — — — Negative — — None 6 2 22 Room 211 Carpet — — — — — — — — None 6 2 22 Room 211 Concrete Ceiling — — — — — — — — None 6 2 22 Room 211 Concrete Slab Floor — — — — — — — — None Under carpet
6 2 22 Room 211 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None 6 2 22 Room 211 Metal Door - No Tag 1 door (s) — — — — — — None 6 2 22 Room 211 Plaster 136 sq. ft. — — — Negative — — None
6 2 23
Room 209, Women's restroom Base Trim - 4" Black 40 ln. ft. — — 16297-6-14.1
None Detected — — None
6 2 23
Room 209, Women's restroom Concrete Ceiling — — — — — — — — None
6 2 23
Room 209, Women's restroom
Corrugated Paper Pipe Insulation (Aircell) 6 ln. ft. — — — Positive 7 L O & M
6 2 23
Room 209, Women's restroom
Drop Ceiling Tile - 2'x2' White, Dot, Wormy 84 sq. ft. — — — Negative — — None
6 2 23
Room 209, Women's restroom Fire Door Frame 1 frame (s) — — 16297-6-29.1
None Detected — — None Wood door- no tag
6 2 23
Room 209, Women's restroom
Floor Tile - 12"x12" Cream with Light Brown and Gray Streaks and Adhesive 84 sq. ft. — — — Negative — — None
6 2 23
Room 209, Women's restroom Plaster 124 sq. ft. — — 16297-6-3.6
None Detected — — None
6 2 24 Room 207 Base Trim - 4" Tan (New) 30 ln. ft. — — — — — — None 6 2 24 Room 207 Concrete Ceiling — — — — — — — — None
6 2 24 Room 207 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 616 sq. ft. — — — Negative — — None
6 2 24 Room 207
Floor Tile - 12"x12" Cream with Light Brown and Gray Streaks and Adhesive 616 sq. ft. — — — Negative — — None 6 2 24 Room 207 Metal Door - No Tag 3 door (s) — — — — — — None 6 2 24 Room 207 Plaster 928 sq. ft. — — — Negative — — None 6 2 25 Room 203 Base Trim - 6" Tan 8 ln. ft. — — — — — — None
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 8 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 2 25 Room 203 Carpet — — — — — — — — None 6 2 25 Room 203 Concrete Ceiling — — — — — — — — None 6 2 25 Room 203 Concrete Slab Floor — — — — — — — — None Under carpet
6 2 25 Room 203 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None
6 2 25 Room 203 Fire Door Frame 1 frame (s) — — — Negative — — None North door frame into accounting
6 2 25 Room 203 Metal Door - No Tag 2 door (s) — — — — — — None
6 2 25 Room 203 Plaster 416 sq. ft. — — 16297-6-3.5 None
Detected — — None
6 2 26 Room 201- Men's restroom Base Trim - 4" Black 32 ln. ft. — — — Negative — — None
6 2 26 Room 201- Men's restroom Corrugated Paper Pipe
Insulation (Aircell) 6 ln. ft. — — — Positive 7 L O & M Assumed in wall fixtures
6 2 26 Room 201- Men's restroom Fire Door Frame 1 frame (s) — — — Negative — — None
6 2 26 Room 201- Men's restroom
Floor Tile - 12"x12" Cream with Light Brown and Gray Streaks and Adhesive 60 sq. ft. — — 16297-6-28.1
Tile and Adhesive
None Detected — — None
6 2 26 Room 201- Men's restroom Metal Door - No Tag 1 door (s) — — — — — — None
6 2 26 Room 201- Men's restroom Plaster 380 sq. ft. — — — Negative — — None 6 2 27 Room 202 Carpet — — — — — — — — None 6 2 27 Room 202 Concrete Ceiling — — — — — — — — None 6 2 27 Room 202 Concrete Slab Floor — — — — — — — — None
6 2 27 Room 202 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 196 sq. ft. — — — Negative — — None 6 2 27 Room 202 Metal Door - No Tag 1 door (s) — — — — — — None 6 2 27 Room 202 Plaster 448 sq. ft. — — — Negative — — None
6 2 28 Room 204 Utility closet Corrugated Paper Pipe
Insulation (Aircell) 8 ln. ft. — — — Positive 7 L O & M Assumed in wall for slop sink
6 2 28 Room 204 Utility closet
Floor Tile - 12"x12" Light Pink with White Streaks and
Adhesive 24 sq. ft. — — — Negative — — None
6 2 28 Room 204 Utility closet Metal Door - No Tag 1 door (s) — — — — — — None
6 2 28 Room 204 Utility closet Plaster 144 sq. ft. — — — Negative — — None 6 2 29 Room 206 Carpet — — — — — — — — None 6 2 29 Room 206 Concrete Ceiling — — — — — — — — None
6 2 29 Room 206 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 126 sq. ft. — — — Negative — — None 6 2 29 Room 206 Metal Door - No Tag 1 door (s) — — — — — — None
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 9 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 2 29 Room 206 Plaster 368 sq. ft. — — 16297-6-3.7 None
Detected — — None
6 2 30 Room 212 hallway Base Trim - 4" Tan (New) 4 ln. ft. — — — — — — None
6 2 30 Room 212 hallway Drop Ceiling Tile - 2'x2' White, Dot, Wormy 528 sq. ft. — — — Negative — — None
6 2 30 Room 212 hallway Floor Tile - 9"x9" Red with
Cream Streaks and Adhesive 528 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M
6 2 30 Room 212 hallway Plaster 1,376 sq. ft. — — — Negative — — None
6 Basement 31 Basement & crawlspaces Base Trim - 4" Black 33 ln. ft. — — — Negative — — None
6 Basement 31 Basement & crawlspaces Concrete Slab Floor — — — — — — — — None
6 Basement 31 Basement & crawlspaces Concrete Wall — — — — — — — — None
6 Basement 31 Basement & crawlspaces Drywall 264 sq. ft. — — — Negative — — None
6 Basement 31 Basement & crawlspaces Drywall Joint Compound 264 sq. ft. — — — Negative — — None
6 Basement 31 Basement & crawlspaces Fiberglass Insulated Line — — — — — — — — None
6 Basement 31 Basement & crawlspaces
Floor Tile - 9"x9" Red with Cream Streaks and Adhesive 18 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M Landing
6 Basement 31 Basement & crawlspaces Metal Fire Door 1 door (s) — — Assumed Assumed 7 L O & M Storage room
6 Basement 31 Basement & crawlspaces Plaster 400 sq. ft. — — — Negative — — None
Sorted by Material VA Medical Center
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 1 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 Basement 31 Basement & crawlspaces Base Trim - 4" Black 33 ln. ft. — — — Negative — — None
6 1 4 Room 114 Base Trim - 4" Black 42 ln. ft. — — — Negative — — None
6 2 26 Room 201- Men's restroom Base Trim - 4" Black 32 ln. ft. — — — Negative — — None
6 2 23
Room 209, Women's restroom Base Trim - 4" Black 40 ln. ft. — — 16297-6-14.1
None Detected — — None
6 1 20 108 hallway Base Trim - 4" Cream 44 sq. ft. — — — Negative — — None
6 1 17 Room 102 kitchen 102A Base Trim - 4" Cream 31 sq. ft. — — 16297-6-27.1 None
Detected — — None 6 2 21 Room 208 Base Trim - 4" Cream 48 sq. ft. — — — Negative — — None
6 1 5 Women's Rest
Room 111 Base Trim - 4" Grey 40 ln. ft. — — 16297-6-15.1 None
Detected — — None 6 2 24 Room 207 Base Trim - 4" Tan (New) 30 ln. ft. — — — — — — None
6 2 30 Room 212 hallway Base Trim - 4" Tan (New) 4 ln. ft. — — — — — — None
6 1 14 Room 101 Base Trim - 6" Black 68 ln. ft. — — 16297-6-22.1 None
Detected — — None
6 1 15 Room 101A Base Trim - 6" Brown 60 ln. ft. — — 16297-6-23.1 None
Detected — — None 6 1 16 Room 101B Base Trim - 6" Brown 68 ln. ft. — — — Negative — — None 6 2 25 Room 203 Base Trim - 6" Tan 8 ln. ft. — — — — — — None 6 1 16 Room 101B Brick Wall — — — — — — — — None 6 1 15 Room 101A Carpet — — — — — — — — None 6 1 16 Room 101B Carpet — — — — — — — — None 6 1 19 Room 106 Carpet — — — — — — — — None 6 1 6 Room 109 Carpet — — — — — — — — None 6 1 13 Room 110 Carpet — — — — — — — — None 6 1 7 Room 112 Carpet — — — — — — — — None 6 1 2 Room 113 Carpet — — — — — — — — None 6 1 4 Room 114 Carpet — — — — — — — — None 6 1 3 Room 116 Carpet — — — — — — — — None 6 2 27 Room 202 Carpet — — — — — — — — None 6 2 25 Room 203 Carpet — — — — — — — — None 6 2 29 Room 206 Carpet — — — — — — — — None 6 2 22 Room 211 Carpet — — — — — — — — None
6 1 12 Room 103, front foyer & closets Ceramic Tile — — — — — — — — None
6 1 11 Room 105A, Men's Restroom Ceramic Tile — — — — — — — — None 6 1 20 108 hallway Concrete Ceiling — — — — — — — — None 6 1 14 Room 101 Concrete Ceiling — — — — — — — — None 6 1 15 Room 101A Concrete Ceiling — — — — — — — — None 6 1 16 Room 101B Concrete Ceiling — — — — — — — — None Above drop ceiling tile
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 2 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 17 Room 102 kitchen 102A Concrete Ceiling — — — — — — — — None Above drop ceiling tile 6 1 19 Room 106 Concrete Ceiling — — — — — — — — None 6 1 2 Room 113 Concrete Ceiling — — — — — — — — None 6 1 4 Room 114 Concrete Ceiling — — — — — — — — None 6 1 3 Room 116 Concrete Ceiling — — — — — — — — None 6 2 27 Room 202 Concrete Ceiling — — — — — — — — None 6 2 25 Room 203 Concrete Ceiling — — — — — — — — None 6 2 29 Room 206 Concrete Ceiling — — — — — — — — None 6 2 24 Room 207 Concrete Ceiling — — — — — — — — None 6 2 21 Room 208 Concrete Ceiling — — — — — — — — None
6 2 23
Room 209, Women's restroom Concrete Ceiling — — — — — — — — None
6 2 22 Room 211 Concrete Ceiling — — — — — — — — None
6 1 5 Women's Rest
Room 111 Concrete Ceiling — — — — — — — — None
6 Basement 31 Basement & crawlspaces Concrete Slab Floor — — — — — — — — None
6 1 6 Room 109 Concrete Slab Floor — — — — — — — — None Above drop ceiling tile 6 1 13 Room 110 Concrete Slab Floor — — — — — — — — None 6 1 7 Room 112 Concrete Slab Floor — — — — — — — — None 6 1 2 Room 113 Concrete Slab Floor — — — — — — — — None Under carpet 6 2 27 Room 202 Concrete Slab Floor — — — — — — — — None 6 2 25 Room 203 Concrete Slab Floor — — — — — — — — None Under carpet 6 2 22 Room 211 Concrete Slab Floor — — — — — — — — None Under carpet
6 Basement 31 Basement & crawlspaces Concrete Wall — — — — — — — — None
6 1 20 108 hallway Corrugated Paper Pipe
Insulation (Aircell) 1 ln. ft. — — — Positive 7 M O & M South end of hallway
6 1 15 Room 101A Corrugated Paper Pipe
Insulation (Aircell) 40 ln. ft. — — — Positive 7 M O & M Above drop ceiling tile
(2) horizontal lines
6 1 17 Room 102 kitchen 102A Corrugated Paper Pipe
Insulation (Aircell) 58 ln. ft. — — — Positive 7 M O & M
Above drop ceiling tile
(5) lines, (2) lines in exterior wall
6 1 18 Room 104 Corrugated Paper Pipe
Insulation (Aircell) 161 ln. ft. — — — Positive 7 M O & M Above drop ceiling tile
6 1 11 Room 105A, Men's Restroom Corrugated Paper Pipe
Insulation (Aircell) 10 ln. ft. — — — Positive 7 M O & M Above drop ceiling tile
6 1 19 Room 106 Corrugated Paper Pipe
Insulation (Aircell) 10 ln. ft. — — — Positive 7 M O & M Above drop ceiling tile along exterior wall
6 1 13 Room 110 Corrugated Paper Pipe
Insulation (Aircell) 10 ln. ft. — — — Positive 7 M O & M 2 horizontal lines above drop ceiling tile
6 1 7 Room 112 Corrugated Paper Pipe
Insulation (Aircell) 18 ln. ft. — — 16297-6-18.1 70%
Chrysotile 7 L O & M Exterior wall for heater, west wall
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 3 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 2 26 Room 201- Men's restroom Corrugated Paper Pipe
Insulation (Aircell) 6 ln. ft. — — — Positive 7 L O & M Assumed in wall fixtures
6 2 28 Room 204 Utility closet Corrugated Paper Pipe
Insulation (Aircell) 8 ln. ft. — — — Positive 7 L O & M Assumed in wall for slop sink
6 2 23
Room 209, Women's restroom
Corrugated Paper Pipe Insulation (Aircell) 6 ln. ft. — — — Positive 7 L O & M
6 1 16 Room 101B Drop Ceiling Tile - 2'x2' White, Bumpy, Fiberglass — — — — — — — — None
6 1 20 108 hallway Drop Ceiling Tile - 2'x2' White, Dot, Wormy 636 sq. ft. — — — Negative — — None
6 1 14 Room 101 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 280 sq. ft. — — — Negative — — None
6 1 15 Room 101A Drop Ceiling Tile - 2'x2' White, Dot, Wormy 224 sq. ft. — — 16297-6-4.1 None
Detected — — None
6 1 17 Room 102 kitchen 102A Drop Ceiling Tile - 2'x2' White, Dot, Wormy 119 sq. ft. — — — Negative — — None
6 1 12 Room 103, front foyer & closets
Drop Ceiling Tile - 2'x2' White, Dot, Wormy 72 sq. ft. — — — Negative — — None
6 1 18 Room 104 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 112 sq. ft. — — — Negative — — None
6 1 19 Room 106 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 112 sq. ft. — — — Negative — — None
6 1 8 Room 107, Data closet Drop Ceiling Tile - 2'x2' White, Dot, Wormy 18 sq. ft. — — — Negative — — None
6 1 6 Room 109 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None
6 1 13 Room 110 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 112 sq. ft. — — — Negative — — None
6 1 7 Room 112 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 84 sq. ft. — — — Negative — — None
6 1 1 Room 113 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 45 sq. ft. — — — Negative — — None
6 1 2 Room 113 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None
6 1 4 Room 114 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 108 sq. ft. — — — Negative — — None
6 1 3 Room 116 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None
6 2 27 Room 202 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 196 sq. ft. — — — Negative — — None
6 2 25 Room 203
Dot, Wormy 168 sq. ft. — — — Negative — — None
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 4 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 2 29 Room 206 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 126 sq. ft. — — — Negative — — None
6 2 24 Room 207 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 616 sq. ft. — — — Negative — — None
6 2 21 Room 208 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 490 sq. ft. — — — Negative — — None
6 2 23
Room 209, Women's restroom
Drop Ceiling Tile - 2'x2' White, Dot, Wormy 84 sq. ft. — — — Negative — — None
6 2 22 Room 211 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 168 sq. ft. — — — Negative — — None
6 2 30 Room 212 hallway Drop Ceiling Tile - 2'x2' White, Dot, Wormy 528 sq. ft. — — — Negative — — None
6 1 5 Women's Rest
Room 111 Drop Ceiling Tile - 2'x2' White, Dot, Wormy 84 sq. ft. — — — Negative — — None
6 Basement 31 Basement & crawlspaces Drywall 264 sq. ft. — — — Negative — — None
6 1 15 Room 101A Drywall 128 sq. ft. — — — Negative — — None 6 1 16 Room 101B Drywall 342 sq. ft. — — — Negative — — None 6 1 13 Room 110 Drywall 64 sq. ft. — — — Negative — — None 6 1 7 Room 112 Drywall 280 sq. ft. — — — Negative — — None 6 1 4 Room 114 Drywall 192 sq. ft. — — — Negative — — None 6 1 3 Room 116 Drywall 168 sq. ft. — — — Negative — — None
6 2 21 Room 208 Drywall 80 sq. ft. — — 16297-6-11.1 None
Detected — — None Storage closet
6 Basement 31 Basement & crawlspaces Drywall Joint Compound 264 sq. ft. — — — Negative — — None
6 1 15 Room 101A Drywall Joint Compound 128 sq. ft. — — — Negative — — None 6 1 16 Room 101B Drywall Joint Compound 342 sq. ft. — — — Negative — — None 6 1 13 Room 110 Drywall Joint Compound 64 sq. ft. — — — Negative — — None 6 1 7 Room 112 Drywall Joint Compound 280 sq. ft. — — — Negative — — None 6 1 4 Room 114 Drywall Joint Compound 192 sq. ft. — — — Negative — — None 6 1 3 Room 116 Drywall Joint Compound 140 sq. ft. — — — Negative — — None
6 2 21 Room 208 Drywall Joint Compound 80 sq. ft. — — 16297-6-12.1 None
Detected — — None Storage closet
6 Basement 31 Basement & crawlspaces Fiberglass Insulated Line — — — — — — — — None
6 1 6 Room 109 Fiberglass Insulated Line — — — — — — — — None Above drop ceiling tile 6 1 13 Room 110 Fiberglass Insulated Line — — — — — — — — None 6 1 7 Room 112 Fiberglass Insulated Line — — — — — — — — None 6 1 2 Room 113 Fiberglass Insulated Line — — — — — — — — None Above drop ceiling tile 6 1 4 Room 114 Fiberglass Insulated Line — — — — — — — — None Above drop ceiing tile 6 1 3 Room 116 Fiberglass Insulated Line — — — — — — — — None
6 1 13 Room 110 Fire Door Frame 1 frame (s) — — — Negative — — None under carpet
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 5 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 7 Room 112 Fire Door Frame 1 frame (s) — — — Negative — — None
6 1 4 Room 114 Fire Door Frame 1 frame (s) — — — Negative — — None
6 1 3 Room 116 Fire Door Frame 1 frame (s) — — — Negative — — None
6 2 26 Room 201- Men's restroom Fire Door Frame 1 frame (s) — — — Negative — — None
6 2 25 Room 203 Fire Door Frame 1 frame (s) — — — Negative — — None North door frame into accounting
6 2 23
Room 209, Women's restroom Fire Door Frame 1 frame (s) — — 16297-6-29.1
None Detected — — None Wood door- no tag
6 1 5 Women's Rest
Room 111 Fire Door Frame 1 frame (s) — — — Negative — — None
6 1 17 Room 102 kitchen 102A Floor Mastic - Black 28 sq. ft. — — 16297-6-26.1 None
Detected — — None Inside vestibule
6 1 1 North Stairwell and Closet Floor Tile - 12"x12" Cream with Brown Streaks and Adhesive 25 sq. ft. — — 16297-6-2.1
Tile: 5% Chrysotile Adhesive:
None Detected 7 H O & M
6 1 13 Room 110 Floor Tile - 12"x12" Cream with Brown Streaks and Adhesive 112 sq. ft. — — —
Tile: Positive Adhesive:
Negative 7 H O & M
6 1 7 Room 112 Floor Tile - 12"x12" Cream with Brown Streaks and Adhesive 84 sq. ft. — — —
Tile: Positive Adhesive:
Negative 7 H O & M Under carpet
6 2 26 Room 201- Men's restroom
Floor Tile - 12"x12" Cream with Light Brown and Gray Streaks and Adhesive 60 sq. ft. — — 16297-6-28.1
Tile and Adhesive
None Detected — — None
6 2 24 Room 207
Floor Tile - 12"x12" Cream with Light Brown and Gray Streaks and Adhesive 616 sq. ft. — — — Negative — — None
6 2 21 Room 208
Floor Tile - 12"x12" Cream with Light Brown and Gray Streaks and Adhesive 490 sq. ft. — — — Negative — — None
6 2 23
Room 209, Women's restroom
Floor Tile - 12"x12" Cream with Light Brown and Gray Streaks and Adhesive 84 sq. ft. — — — Negative — — None
6 1 4 Room 114
Floor Tile - 12"x12" Cream with Light Brown Streaks and
Adhesive 108 sq. ft. — — — Negative — — None Under carpet
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 6 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 3 Room 116
Floor Tile - 12"x12" Cream with Light Brown Streaks and
Adhesive 140 sq. ft. — — 16297-6-13.1
Tile and Adhesive
None Detected — — None Under carpet
6 1 5 Women's Rest
Room 111
Floor Tile - 12"x12" Cream with Light Brown Streaks and
Adhesive 84 sq. ft. — — — Negative — — None
6 1 20 108 hallway
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 52 sq. ft. — — — Negative — — None
6 1 14 Room 101
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 280 sq. ft. — — 16297-6-21.1
Tile and Adhesive
None Detected — — None
6 1 15 Room 101A
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 224 sq. ft. — — — Negative — — None Under carpet
6 1 17 Room 102 kitchen 102A
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 91 sq. ft. — — — Negative — — None
6 1 18 Room 104
Floor Tile - 12"x12" Cream with White and Brown Streaks and
Adhesive 112 sq. ft. — — — Negative — — None Under 12"x12" floor tile
6 1 1 North Stairwell and Closet
Floor Tile - 12"x12" Light Pink with White Streaks and
Adhesive 45 sq. ft. — — 16297-6-1.1
Tile and Adhesive
None Detected — — None
6 1 18 Room 104
Floor Tile - 12"x12" Light Pink with White Streaks and
Adhesive 112 sq. ft. — — — Negative — — None Top layer
6 1 9 Room 108B
Floor Tile - 12"x12" Light Pink with White Streaks and
Adhesive 24 sq. ft. — — — Negative — — None
6 2 28 Room 204 Utility closet
Floor Tile - 12"x12" Light Pink with White Streaks and
Adhesive 24 sq. ft. — — — Negative — — None
6 1 19 Room 106 Floor Tile - 9"x9" Green and
Adhesive 112 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M
6 1 6 Room 109 Floor Tile - 9"x9" Green and
Adhesive 168 sq. ft. — — 16297-6-17.1
Tile: 5% Chrysotile Adhesive:
None Detected 7 H O & M Under carpet
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 7 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 20 108 hallway Floor Tile - 9"x9" Red with
Cream Streaks and Adhesive 636 sq. ft. — — 16297-6-19.1
Tile: 5% Chrysotile Adhesive:
None Detected 7 H O & M
6 Basement 31 Basement & crawlspaces
Floor Tile - 9"x9" Red with Cream Streaks and Adhesive 18 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M Landing
6 1 12 Room 103, front foyer & closets
Floor Tile - 9"x9" Red with Cream Streaks and Adhesive 36 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M Both closets
6 1 8 Room 107, Data closet Floor Tile - 9"x9" Red with
Cream Streaks and Adhesive 18 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M
6 1 10 Room 108A Floor Tile - 9"x9" Red with
Cream Streaks and Adhesive 16 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M
6 2 30 Room 212 hallway Floor Tile - 9"x9" Red with
Cream Streaks and Adhesive 528 sq. ft. — — —
Tile Positive and Adhesive
Negative 7 H O & M 6 1 20 108 hallway Metal Door - No Tag 1 door (s) — — — — — — None 6 1 20 108 hallway Metal Door - No Tag 1 door (s) — — — — — — None
6 1 1 North Stairwell and Closet Metal Door - No Tag 1 door (s) — — — — — — None
6 1 1 North Stairwell and Closet Metal Door - No Tag 2 door (s) — — — — — — None 6 1 14 Room 101 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 15 Room 101A Metal Door - No Tag 1 door (s) — — — — — — None 6 1 16 Room 101B Metal Door - No Tag 1 door (s) — — — — — — None 6 1 16 Room 101B Metal Door - No Tag 1 door (s) — — — — — — None
6 1 17 Room 102 kitchen 102A Metal Door - No Tag 1 door (s) — — — — — — None
6 1 12 Room 103, front foyer & closets Metal Door - No Tag 1 door (s) — — — — — — None
6 1 18 Room 104 Metal Door - No Tag 2 door (s) — — — — — — None
6 1 11 Room 105A, Men's Restroom Metal Door - No Tag 1 door (s) — — — — — — None
6 1 8 Room 107, Data closet Metal Door - No Tag 1 door (s) — — — — — — None 6 1 10 Room 108A Metal Door - No Tag 1 door (s) — — — — — — None 6 1 9 Room 108B Metal Door - No Tag 1 door (s) — — — — — — None 6 1 6 Room 109 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 7 Room 112 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 2 Room 113 Metal Door - No Tag 1 door (s) — — — — — — None 6 1 4 Room 114 Metal Door - No Tag 1 door (s) — — — — — — None
BDN Project No. 16297
January 2015
Asbestos Management Plan Project NO: 585-14-111 Building #6 Page 8 of 9
Bldg Number Floor
Space Code Space Name Description of Material
Quantity in Space
Quantity Damaged
Sample Number/
Photo Number
Sample Result
Hazard Ranking
Potential for Disturbance Response Notes
6 1 3 Room 116 Metal Door - No Tag 1 door (s) — — — — — — None
6 2 26 Room 201- Men's restroom Metal Door - No Tag 1 door (s) — — — — — — None 6 2 27 Room 202 Metal Door - No Tag 1 door (s) — — — — — — None 6 2 25 Room 203 Metal Door - No Tag 2 door (s) — — — — — — None
6 2 28 Room 204 Utility closet Metal Door - No Tag 1 door (s) — — — — — — None 6 2 29 Room 206 Metal Door - No Tag 1 door (s) — — — — — — None 6 2 24 Room 207 Metal Door -…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .