Q4 FY20 example results.xlsx
XLSX spreadsheet 13 KB Posted
- Attached to
- Q301--Legionella Collection and Testing Federal contract opportunity
- Solicitation number
- 36C25221Q1067
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25221Q1067 0001.docx | DOCX document | |
| P07 - Lake County IL WD 2015-4935 (Rev-16) dated 07.21.2021.pdf | ||
| 36C25221Q1067_1.docx | DOCX document | |
| P07 - Cook County WD 2015-5017 (Rev-18) dated 07.21.2021.pdf | ||
| VA NOTICE OF LIMITATIONS ON SUBCONTRACTING FORM.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Building Number | Sample ID | Sample Date | Reason for Sample | Floor | Room | Occupancy | Sample Source | Sample Type | Sample volume for Legionella testing | Water Temp | Biocide Type | Other--Describe | Biocide Level - Residual | pH | Name of Individual Taking Sample | Date Environmental sample sent to lab | Was PCR screening option chosen | Was Legionella detected by PCR | Date of PCR Screening Result | Date of Legionella culture result | Name of Lab Used for Legionella Testing | Lab Sample ID | Sample stored for future molecular typing | Storage End Date | Notes |
| VISN 12 Station X:1 | X1 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1000 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-001 | No | ||||||
| VISN 12 Station X:1 | X2 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1001 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-002 | No | ||||||
| VISN 12 Station X:1 | X3 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1002 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-003 | No | ||||||
| VISN 12 Station X:1 | X4 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1003 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-004 | No | ||||||
| VISN 12 Station X:1 | X5 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1004 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-005 | No | ||||||
| VISN 12 Station X:1 | X6 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2000 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-006 | No | ||||||
| VISN 12 Station X:1 | X7 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2001 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-007 | No | ||||||
| VISN 12 Station X:1 | X8 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2002 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-008 | No | ||||||
| VISN 12 Station X:1 | X9 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2003 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-009 | No | ||||||
| VISN 12 Station X:1 | X10 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2004 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-010 | No | ||||||
| VISN 12 Station X:1 | X11 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3000 | sink | CW-cold water | 250 | 68 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-011 | No | ||||||
| VISN 12 Station X:1 | X12 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3001 | shower | CW-cold water | 250 | 68 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-012 | No | ||||||
| VISN 12 Station X:1 | X13 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3002 | sink | CW-cold water | 250 | 68 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-013 | No | ||||||
| VISN 12 Station X:1 | X14 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3003 | shower | CW-cold water | 250 | 68 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-014 | No | ||||||
| VISN 12 Station X:1 | X15 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3004 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-015 | No | ||||||
| VISN 12 Station X:1 | X16 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4000 | shower | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-016 | No | ||||||
| VISN 12 Station X:1 | X17 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4001 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-017 | No | ||||||
| VISN 12 Station X:1 | X18 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4002 | shower | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-018 | No | ||||||
| VISN 12 Station X:1 | X19 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4003 | ice machine | CW-cold water | 250 | Chlorination | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-019 | No | |||||||||
| VISN 12 Station X:1 | X20 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4004 | ice machine | CW-cold water | 250 | Chlorination | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-020 | No | |||||||||
| VISN 12 Station X:2 | X21 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1000 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-021 | No | ||||||
| VISN 12 Station X:2 | X22 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1001 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-022 | No | ||||||
| VISN 12 Station X:2 | X23 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1002 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-023 | No | ||||||
| VISN 12 Station X:2 | X24 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1003 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-024 | No | ||||||
| VISN 12 Station X:2 | X25 | 8/24/21 | Scheduled routine quarterly sampling | 1 | 1004 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-025 | No | ||||||
| VISN 12 Station X:2 | X26 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2000 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-026 | No | ||||||
| VISN 12 Station X:2 | X27 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2001 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-027 | No | ||||||
| VISN 12 Station X:2 | X28 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2002 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-028 | No | ||||||
| VISN 12 Station X:2 | X29 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2003 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-029 | No | ||||||
| VISN 12 Station X:2 | X30 | 8/24/21 | Scheduled routine quarterly sampling | 2 | 2004 | shower | HW – hot water (after mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-030 | No | ||||||
| VISN 12 Station X:2 | X31 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3000 | sink | CW-cold water | 250 | 68 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-031 | No | ||||||
| VISN 12 Station X:2 | X32 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3001 | shower | CW-cold water | 250 | 68 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-032 | No | ||||||
| VISN 12 Station X:2 | X33 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3002 | sink | CW-cold water | 250 | 68 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-033 | No | ||||||
| VISN 12 Station X:2 | X34 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3003 | shower | CW-cold water | 250 | 68 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-034 | No | ||||||
| VISN 12 Station X:2 | X35 | 8/24/21 | Scheduled routine quarterly sampling | 3 | 3004 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-035 | No | ||||||
| VISN 12 Station X:2 | X36 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4000 | shower | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-036 | No | ||||||
| VISN 12 Station X:2 | X37 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4001 | sink | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-037 | No | ||||||
| VISN 12 Station X:2 | X38 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4002 | shower | HW – hot water (no mixing valve) | 250 | 95 | Chlorination | 0.75 | 7 | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-038 | No | ||||||
| VISN 12 Station X:2 | X39 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4003 | ice machine | CW-cold water | 250 | Chlorination | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-039 | No | |||||||||
| VISN 12 Station X:2 | X40 | 8/24/21 | Scheduled routine quarterly sampling | 4 | 4004 | ice machine | CW-cold water | 250 | Chlorination | John Smith | 8/24/20 | No | 9/6/20 | ABC Engineering | 20200824-040 | No |
File details come from the government source that posted it. Updated .