36C25219Q0048-0001000.docx

DOCX document 3 MB Posted

Attached to
Repair Hydronic System Project 537-19-138 Federal contract opportunity
Solicitation number
36C25219Q0048
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

36C25219Q0048 0001 36C25219Q0048 0001.docx

View the file

Other files for this federal contract opportunity

Other files attached to Repair Hydronic System Project 537-19-138, newest first.
File Type Posted
36C25219Q0048-001.docx DOCX document
36C25219Q0048-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS

ENTERED INTO

PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-04-2018 N/A 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) Southern Tier 3001 Green Bay Rd North Chicago IL 60064-3048 36C252 Department of Veterans Affairs GLAC - Southern Tier 3001 Green Bay Rd North Chicago IL 60064-3048 To all Offerors/Bidders

36C25219Q0048 11-21-2018

X X X Monday December 10, 2018 11:00 AM CST See CONTINUATION Page The purpose of this amendment is to update the Statement of Work and provide answers to the questions posed at the site visit held at Jesse Brown VAMC.

Table of Contents

STATEMENT OF WORK3
Solicitation Number 36C25219Q0048 Hydronic System Repairs – Questions & Answers8

STATEMENT OF WORK

Project Name: Repair Hydronic System

Place of Performance:Jesse Brown VA Medical Center (JBVAMC)
820 S. Damen Ave

Chicago IL 60612

Part 1: Project Scope of Work: Provide the following repairs:

Replacement material, unless otherwise noted, shall be technical equivalent to the existing components.

Task 1: Replace (1) failed Air Compressor #1 and (1) partially operational Air Compressor #2, BLDG 1 – Basement: See Exhibit 1 Caption 1.

Remove and replace the failed Air Compressor #1. The Contractor shall also replace the partially operational Air Compressor #2 to original working conditions after Air Compressor #1 is in operation. Contractor shall demonstrate air compressors functionality and control interlocks are operating at industry standards (Lead/Lag).

Task 2: Repair failed heat exchanger assembly and circulating pumps, BLDG 30 - North Penthouse: See Exhibit 1 Caption 2.

Remove and replace (2) heating circulating pump assemblies including but not limited to motor, couplings, backflow preventers, starters, float, triple duty valves, expansion joints, and related valves. Remove and replace (1) steam to hot water heat exchanger assembly including but not limited to insulation, pipe, fittings, and related valves including steam control valves. Integrate into the existing building automation system (JCI Metasys). All disturbed hydronic loops to be filled with 40% propylene glycol, corrosion inhibited. Flange gaskets shall be EPDM with a temperature range of -40⁰F to 250⁰F.Contractor shall demonstrate functionality and control to the HVAC Shop Supervisor. Remove and replace approximately 60-ft of insulation and install heat trace along the exterior supply and return pipes for AHU first floor entrance heat.

Task 3: Repair failed humidifier, BLDG 1 - Room 5489: See Exhibit 1 Caption 3.

Remove and replace (1) humidifier and associated piping, hoses, valves, strainer, traps, reducers and insulation.

Task 4: Replace failed chiller, BLDG 1 - Roof: See Exhibit 1 Caption 4.

a. Remove and replace (1) circulating pump assembly including but not limited to motor, starters, float, expansion joints, and related valves. Complete the existing power circuit. Replace the starter and reconnect on/off to the existing BAS system.

b. Remove and replace (1) existing 30-ton chiller and associated piping, valves and insulation. Complete the existing power circuit. Provide crane lift plan for VA review.

c. Provide protection to area of work on Damen roof throughout the duration of the project.

d. Dispose of the existing chiller refrigerant and provide disposal documentation to the VA COR and GEMS coordinator.

e. Dispose of old chiller and provide disposal documentation to the VA COR and GEMS coordinator.

f. Remove and reconfigure as necessary the 3” chilled water supply line and chilled water return line to accommodate the replacement chiller. Include replacing the 3” valves and gages, low point drain and filter screen. Replace the existing expansion / flexible connections on the supply and the return.

g. Heat trace and insulate the chilled water pipes. Reuse the existing heat trace if suitable for continued use.

h. Provide refrigerant with full charge.

i. Provide factory startup of chiller to be witnessed by VA HVAC Shop Supervisor.

j. Provide connection and integration of all alarms into the existing building automation system controls (JCI Metasys) and monitoring. Contractor shall provide graphics and demonstrate functionality and control to the VA the HVAC Shop Supervisor. Provide connection and integration of all alarms to building automation system.

Part 2: Applicable Performance Standards

1. All persons working on any electrical systems rated 50 volts or more shall have the minimum qualification as a State Licensed Master Electrician or Registered Journeyman Electrician, all activities shall follow the safe work practices in compliance with NFPA 70E Electrical Safety in the Workplace.

Part 3: Jesse Brown VAMC Additional Requirements

1. Comply with all Jesse Brown VAMC site specific requirements and SOPs including and not limited to: Key Policy, Badging Policy, Rules of Behavior, and Smoking Policy.

2. Normal work hours are 7:00 am to 3:30 pm Monday through Friday.

a. No work by the Contractor on Federal Holidays and no work on the weekend when the Federal Holiday is on the respective Monday or Friday.

b. Crane lifts, any work that closes drive isles, closes building entries or closes public corridors shall be during low patient time and performed Sundays.

c. The Contractor shall check in (in person) with the Administrative Officer of the Day (AOD) which is located in Patient Admitting for any work between 6:00 pm through midnight to 6:00 am or any time on weekends. Provide the name and cell number of the on-site supervisor to the AOD. At the completion of the work, check out with the AOD.

3. All building systems will be maintained in full operation mode at all times:

a. Request system shutdowns in writing not less than 3 calendar days in advance.

b. Shutdown work shall be during low patient time and performed between Saturday 6 pm through midnight concluding by 6 pm on the following Sunday.

4. Deliveries, Parking, Elevators:

a. Deliveries only at the Polk Street dock, and coordinated with the Contracting Officer Representative (COR). At time of delivery: provide vehicle information to the VA Police and remove the vehicle as soon as delivery is complete. Move materials in public corridors during low patient time and performed between 6 pm through midnight concluding by 6 am on the following day.

b. No on-site parking or parking in the VA garage. Utilize street parking or other parking structures such as the Cook County Juvenile Parking Garage at their daily rate. The existing JB VAMC parking garage is at capacity and reserved for patients and staff.

c. Contractor shall use Freight Elevators. Do not move materials and employees in passenger elevators unless written approval by COR.

5. No on-site office or on-site storage/office container shall be allowed. Provide ‘just in time delivery and pickup’. Coordinate with COR for staging within the area of work.

6. No music radios. Two-way communications radios are allowed where broadcast frequency is approved by COR.

7. All work in the JB VAMC crawl spaces shall be planned and carried out as OSHA Permit Required Confined Space.

8. Immediately stop work and notify the COR if asbestos is noticed or suspected in the area of work.

Page 1 of Page 1 of

Caption 1: Repair failed Compressor, BLDG 1 - Basement

Description

(2) Quincy Compressor Type QGS-30; 132 PSIG: 3 Phase; 60 Hz; Voltage 208/230/460

The compressor in the back is partially operational.

Caption 2: Repair failed heat exchanger assembly and circulating pumps, BLDG 30 - North Penthouse

Description

(2) Bell & Gossett 1/2 HP Circulating Pump with motor starter; 1 1/2-in Inlet/Outlet; Motor: 115V, 60HZ, 1PH, Class F

Bell and Gossett 4-in Heat Exchanger Type SU45-2; 2 Pass; Cast Iron 150 psi at 375⁰F (60 ft) heat tracing and exterior insulation

Caption 3: Repair failed humidifier, BLDG 1 - Room 5489

Description

(1) Pure Humidifier SX-3; 120V; Single Phase; 60 Hz, 15 psig steam pressure

Caption 4: Replace failed chiller, BLDG 1 - Roof

Description

(1) 30-ton scroll type air cooler chiller (3-in water supply and return)

(1) Pump with Baldor Industrial Motor Cat No. VJMM3615T; 3-in Inlet/Outlet

(1) 3-in butterfly valve

Electrical power panels are located at the blue barrel

Solicitation Number 36C25219Q0048 Hydronic System Repairs – Questions & Answers

Question: Task 1 reflects “replace (1) failed non-repairable Air Compressor #1 and repair (1) partially operational Air Compressor #2”, which are located in the basement of Building #1. Is there any indication what repairs may be required for Air Compressor #2? Obviously from a bidding standpoint, without specific information, it might be determined by the contractor to simply include the costs of a new air compressor, rather than rolling the dice on the cost of unspecified repairs.

Answer: Statement of work has been revised. Contractor shall replace both Air Compressors.

Question: In performance of Task 1, are we to use the same plywood ramp which is placed over the stairs in the removal and replacement of Air Compressor #1?

Answer: No.

Question: Can you specify which elements of Task 3 are being revised? There was discussion about removing the hot water coil from the scope of work, but leaving the heat exchanger in the scope of work.

Answer: There was not revisions to Task 3. Task 2 has been revised as follows:

Deleted: Remove and replace (1) hot water coil.

Added: All disturbed hydronic loops to be filled with 40% propylene glycol, corrosion inhibited.

Added: Flange gaskets shall be EPDM with a temperature range of -40⁰F to 250⁰F.

Added: Remove and replace approximately 60-ft of insulation and install heat trace along the exterior pipes for AHU first floor entrance heat.

Question: Can you provide specific information regarding crane access associated with the replacement of the chiller located on the roof of Building 1 (Task 4)? There was speculation a CT trailer is often parked in the area which would prohibit crane access, and even further speculation relative to the times in which crane lifting may be allowed or scheduled.

Answer: Per Statement of Work Part 3, Crane lifts, any work that closes drive isles, closes building entries or closes public corridors shall be during low patient time and performed Sundays.

Please provide or reference any measures required of the contractor as would apply to the performance of work near or adjacent to ongoing medical operations. Task 3, for example is adjacent to areas in which ongoing medical care is active.

Answer: The Contractor shall provide mitigating activities as outlined in the Construction Safety Precautions and Construction Infection Control Risk Assessment / Dust Control Precautions Including but Not Less Than The following:

a. Fire extinguishers, pedestal mounted in the area of work

b. Walk off dust mats, inside and outside all entry / exit points to the workspace, changed not less than daily or more as required by the construction or COR.

c. Block off all HVAC return ductwork and lovers so not to introduce dust into the HVAC system.

d. Provide a plastic dust tight temporary construction barrier to isolate the area of work.

e. No trash, used packaging, or construction spoils shall be stored on site. Remove each day using covered gondolas.

f. Broom sweep the work area at the end of each day. Provide HEPA vacuum and damp mop daily where broom-sweeping creates airborne dust.