36C25218B0984-0001003.pdf
PDF 4 MB Posted
- Attached to
- Demolish Quonset Huts 550-18-111 Federal contract opportunity
- Solicitation number
- 36C25218B0984
About this file
36C25218B0984 0001 Asbestos Inspection-Lead-Based Paint Report-2013.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25218C0213-001.pdf | ||
| 36C25218C0213-000.docx | DOCX document | |
| 36C25218B0984-0001000.docx | DOCX document | |
| 36C25218B0984-0001002.pdf | ||
| 36C25218B0984-0001001.pdf | ||
| 36C25218B0984-003.pdf | ||
| 36C25218B0984-002.docx | DOCX document | |
| 36C25218B0984-004.pdf | ||
| 36C25218B0984-001.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS NESHAP INSPECTION
LEAD-BASED PAINT SAMPLING REPORT
for the
DEPARTMENT OF VETERANS AFFAIRS
VA ILLIANA HEALTH CARE SYSTEM
DANVILLE CAMPUS
DANVILLE, IL
VA PROJECT #
550-13-114
DEMOLISH QUARTERS & QUONSET HUTS
20 BUILDINGS
INSPECTION DATE:
AUGUST 2, 2013
CONDUCTED BY:
USFIN DEVELOPMENT, LLC
7920 N. WOODBRIDGE RD.
MONCLOVA, OH 43542
419-382-9574
ASBESTOS NESHAP & LEAD-BASED PAINT INSPECTION REPORT
DANVILLE VAMC – DANVILLE, IL
DEMOLISH QUARTERS & QUONSET HUTS - 20 BUILDINGS
AUGUST 2013
TABLE OF CONTENTS
1.0 ASBESTOS INSPECTION SUMMARY
2.0 ASBESTOS INSPECTION SAMPLING PROTOCOL & GLOSSARY
3.0 SUMMARY OF ASBESTOS MATERIALS
4.0 SUMMARY TABLE OF ASBESTOS MATERIALS BY BUILDING
5.0 SUMMARY OF NON-ASBESTOS CONTAINING MATERIALS
6.0 LEAD-BASED PAINT INSPECTION SUMMARY
7.0 LEAD-BASED PAINT SAMPLING DATA AND RESULTS
8.0 LABORATORY ANALYSIS RESULTS APPENDICES
Appendix A - Asbestos Bulk Sampling Log Form and Results
Appendix B – Lead Bulk Sampling Log Form and Results
Appendix C – Laboratory Reports (Asbestos & Lead)
Appendix D – Inspector and Laboratory Certifications
1.0 ASBESTOS INSPECTION SUMMARY
On August 2, 2013, Wes Green, Brett Brumbaugh and Samuel Ansara performed an inspection and sampling to comply with the US Environmental Protection Agency (EPA) regulation National Emission Standards for Hazardous Air Pollutants (NESHAP). The purpose of this inspection was identify and quantify the potential regulated asbestos containing materials (RACM) and non-RACM materials located in Quarters 31, 32, 33, 34, 37, 38, 41, Quarter Garages 75, 78, 81, 82, 83, and Quonset Huts 110, 111, 112, 113, 114, 116, 117, and 124 on the Danville VA campus in Danville, IL for the Department of Veterans Affairs as part of the planned demolition of the structures.
As a result of this inspection, and previous asbestos inspections, asbestos was identified in the following structures:
Quarters 31
Quarters 32
Quarters 33
Quarters 34
Quarters 37
Quarters 38
Quarters 41
Quonset Hut 124
The asbestos materials in these 8 structures must be removed by a State Licensed asbestos contractor prior to the demolition of the structures in accordance with USEPA NESHAP and State of Illinois asbestos regulations.
The remaining 12 structures were determined to be asbestos free as a result of the inspections and subsequent laboratory analyses of suspect asbestos containing materials.
Bulk sampling of suspected ACM was based upon the appearance, texture, and location of the material. All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMSL laboratory in Ann Arbor, MI. EMSL laboratory is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
The bulk sampling of the asbestos materials was conducted by Wes Green who is accredited by the State of Illinois as an Asbestos Inspector and Management Planner #100-06951. Also assisting with the surveys and report preparation were Brett Brumbaugh who is an accredited asbestos inspector in 7 states and has conducted asbestos inspections for 26 years; and Sam Ansara was also assisting on the inspections and has also been conducting asbestos inspections for 25 years.
Prior to this inspection, USFin was provided copies of the previous asbestos survey conducted by Cape Environmental in 1995 that included extensive sampling. The purpose of this inspection was to verify the adequacy of the previous sampling and to re-quantify all asbestos containing materials in the buildings. Also, the 1995 survey determined that numerous suspect asbestos containing materials that were analyzed had no asbestos detected. A negative sample analysis is the only definitive method to determine if a material can be considered “non-asbestos” in accordance with OSHA and EPA regulations.
All physically accessible areas in the buildings were visually inspected and any material suspected to contain asbestos was sampled during the inspection. Bulk sampling of suspected ACM was based upon the appearance, texture, and location of the material. Random samples were taken from each homogeneous area of materials. Every effort was made to collect bulk samples from already damaged areas. When samples were taken, efforts were made to reduce the potential for exposure to the evaluator and the building occupants. Where feasible, the sampling area was wetted with amended water to reduce the release of fibers when the sample was taken.
Inspectors:
Wes Green Certified Asbestos Inspector/Management Planner Illinois License Number: #100-06951
Brett Brumbaugh US EPA Trained Asbestos Inspector/Management Planner/Project Designer
Samuel Ansara US EPA Trained Asbestos Inspector/Management Planner/Project Designer
2.0 ASBESTOS INSPECTION SAMPLING PROTOCOL & GLOSSARY
SAMPLING PROTOCOL
The bulk samples were collected from locations that were selected to be representative of the building materials. Sampling was accomplished using the simplified sampling scheme referenced in the AHERA regulations and found in the “Pink Book”. Locations of individual samples are referenced on this report.
The samples were either collected with a coring tool designed for asbestos sampling or placed into a plastic bag for laboratory analysis. The samples were analyzed via polarized light microscopy with dispersion staining, using the “Interim method for the Determination of Asbestos in Bulk Insulation Samples” found in Appendix A to Subpart F in 40 CFR Part 763.
The regulations require specific numbers of samples be obtained per homogeneous area. For example when sampling for joint compound or asbestos in hard plaster (sprayed-on or troweled-on surfacing materials) samples are to be taken based on the following increments: 0 to 1000 square feet of material, 3 samples are necessary. From 1001 to 5000 square feet, 5 samples are necessary, over 5000 square feet 7 samples are required. If during analysis any samples are found to contain asbestos, the entire homogeneous area is delineated as asbestos containing material. In the case of pipe insulation or other types of manufactured materials, the regulations require only enough samples to ascertain whether asbestos is present. In this case, the minimum amount of samples to collect and analyze is usually three.
The sampling performed in this inspection followed these sampling guidelines.
ASBESTOS GLOSSARY OF TERMS
Friable asbestos material: means any material containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763 section 1, Polarized Light Microscopy, that, when dry, can be crumbled, pulverized, or reduced to powder by hand pressure.
Category I Non-friable Asbestos Containing Material (ACM) means asbestos containing packings, gaskets, resilient floor coverings, and asphalt roofing products containing more that 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, Section 1, Polarized Light Microscopy.
Category II Non-friable ACM means any material, excluding Category I non-friable ACM, containing more than 1 percent asbestos as determined using the method specified in appendix E, subpart E, 40 CFR part 763, section 1, Polarized Light Microscopy that when dry, cannot be crumbled, pulverized, or reduced to powder by hand pressure.
Regulated Asbestos Containing Material (RACM): means (a) Friable asbestos material, (b) Category I non-friable ACM that has become friable, (c) category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading, or (d) Category II non-friable ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material expected in the course of demolition or renovation operations regulated by this subpart.
3.0 SUMMARY OF ASBESTOS MATERIALS
Asbestos Containing Materials
Building A B C D E
Quarters 31 X X
Quarters 32 X
Quarters 33 X X
Quarters 34 X X
Quarters 37 X X
Quarters 38 X X
Quarters 41 X
Quarters Garage 75
Quarters Garage 78
Quarters Garage 81
Quarters Garage 82
Quarters Garage 83
Quonset Hut 110
Quonset Hut 111
Quonset Hut 112
Quonset Hut 113
Quonset Hut 114
Quonset Hut 116
Quonset Hut 117
Quonset Hut 124 X
Legend: A = Pipe Insulation B = Floor Tile & Mastic C = Asbestos Paper D = Sink Mastic E = Transite Panels
4.0 SUMMARY TABLE OF ASBESTOS MATERIALS BY BUILDING
Quarters Building 31
Asbestos Material Locations Quantity NESHAP Category
Pipe Insulation Basement Laundry, Hallway, Workshop, Storage Rooms, Service Room, and Bathroom
380 lf and 60 fittings RACM
Paper behind radiators
Dining Room and Living Room on 1st Floor
100 LF of 6” paper RACM
Quarters Building 32
Category
Pipe Insulation In walls from boiler room and laundry room to attic; behind kitchen wall by closet; attic
120 lf and 12 fittings RACM
Quarters Building 33
Category
Pipe Insulation Basement Boiler Room and 7 storage rooms
320 lf and 50 fittings RACM
9” vinyl floor tile and mastic
Toilet off of living room 70 sf Cat. 1 Non-Friable
Quarters Building 34
Category
Pipe Insulation Basement Boiler Room and 5 storage rooms
380 lf and 55 fittings RACM
Sink mastic Kitchen 1 sink Cat. 1 Non-Friable
Quarters Building 37
Category
Pipe Insulation Basement Boiler Room and 4 storage rooms
320 lf and 40 fittings RACM
9” vinyl floor tile and mastic under new tile
Pantry off Kitchen 55 sf Cat. 1 Non-Friable
Quarters Building 38
Category
Pipe Insulation Basement Boiler Room and 3 storage rooms
360 lf and 45 fittings RACM
9” vinyl floor tile and mastic
Stairs and landing to basement and first floor closet; 2nd floor bathroom
55 sf Cat. 1 Non-Friable
Quarters Building 41
Category
9” & 12” vinyl floor tile and mastic
Kitchens and Pantry’s (A&B);
Entry and Stairs of A
960 sf Cat. 1 Non-Friable
9” & 12” vinyl floor tile and mastic under linoleum
1st Floor Restrooms of A&B 80 sf Cat. 1 Non-Friable
Quonset Hut Building 124
Category
Transite cement sheets
South storage area (east wall) 80 sf Cat. 2 Non-Friable
5.0 SUMMARY OF NON-ASBESTOS CONTAINING MATERIALS
The materials that have been determined to be non-asbestos through current or previous laboratory analyses, and/or EPA exemption include:
Hard wall and ceiling plaster (base and finish coats)
Drywall systems (gypsum board and joint compound)
Ceiling Tiles (12”, 2x2, and 2x4)
Vinyl cove base and mastic
Fiberglass pipe insulation
Cellulose spray-in attic insulation
Black foam rubber pipe insulation
Fiberglass duct insulation with foil jacketing
Window glazing and caulk
Styrofoam exterior coating
Cellulose board
Stucco exterior wall coatings
Mudded fittings and calcium-silicate pipe insulation (116 & 117)
Fireplace cement
6.0 LEAD-BASED PAINT INSPECTION SUMMARY
The sampling of the paint chips was conducted by Wes Green who is accredited by the State of Illinois as a Lead Inspector. Also assisting with the sampling and report preparation were Brett Brumbaugh who is an EPA trained Lead Inspector and Risk Assessor and has conducted lead testing for 22 years.
Lead paint testing was conducted in the structures by collecting paint chips of representative chips of paint. Lead paint is not regulated as asbestos in such that it does not need removal prior to demolition. However, the OSHA Lead in Construction Standard (1926.62), mandates that any contractors who will disturb lead-based paint are required to conduct an initial exposure assessment of their workers to determine whether the action level for airborne Lead exposure to workers of 30 ug/m3 will be exceeded during the project (unless the contractor has historical data or a negative exposure assessment from a similar project.)
The OSHA Lead Exposure in Construction Standard 29 CFR 1926.62 makes no exceptions for the percentages of lead in paint. The actual wording in the OSHA Standard is “if lead is present in your workplace in any quantity...”, then the Standard is in effect. Therefore, the demolition contractor must abide by the OSHA regulation during demolition regarding employee exposure.
In addition, it is recommended that the demolition contractor cleanup all loose paint chips on the soil following the demolition of the structures and prior to backfilling the excavated holes. This will prevent the lead paint chips from remaining in the soil for potential future exposure to the campus occupants.
As a result of the paint chip testing, it is determined that all structures have painted surfaces that contain lead in some percentage and therefore the contractor must abide by the OSHA regulations during the demolition activities. The summary of the lead chip testing is provided in Appendix B.
APPENDIX A
ASBESTOS BULK SAMPLING LOG
ASBESTOS BULK SAMPLING INFORMATION
Facility: VAMC Danville – Danville, IL Project: Demolish Quarters & Quonsets Project Number: 550-13-114 Inspection Date: August 2, 2013 Inspector: Wes Green, IL License #100-06951 Analysis Date: August 12-14, 2013 Laboratory: EMSL Analytical, Inc. – Indianapolis, IN Accreditation: NVLAP Asbestos Bulk Accredited Laboratory #200188-0
SAMPLE
NUMBER
BUILDING SAMPLE LOCATION MATERIAL LABORATORY
ANALYSIS RESULT
1 116 S. side window Window glazing No Asbestos Detected
2 116 N. side window “” No Asbestos Detected
3 116 E. side heater Mud fitting on cal-sil pipe No Asbestos Detected
4 116 W. side heater “” No Asbestos Detected
5 116 S. side Cellulose ceiling board No Asbestos Detected
6 116 S. side exterior Spray-on Styrofoam insul. No Asbestos Detected
7 116 S. side interior “” No Asbestos Detected
8 117 E. side interior Mud fitting on cal-sil pipe No Asbestos Detected
9 117 S. side interior Cellulose ceiling board No Asbestos Detected
10 117 N. side exterior Spray-on Styrofoam insul. No Asbestos Detected
11 117 S. side window Window glazing No Asbestos Detected
12 117 N. side window “” No Asbestos Detected
13 110 Above 2x4 ceiling tile Cellulose ceiling board No Asbestos Detected
14 110 W. side window Window glazing No Asbestos Detected
15 111 S. side window “” No Asbestos Detected
16 111 Smoking room Drywall system No Asbestos Detected
17 112 S. side window Window caulk No Asbestos Detected
18 112 “” Window glazing No Asbestos Detected
19 112 S. side interior Drywall mud No Asbestos Detected
20 112 “” Drywall board No Asbestos Detected
21 113 S. side window Window caulk No Asbestos Detected
22 113 “” Window glazing No Asbestos Detected
23 113 S. interior Drywall system No Asbestos Detected
24 114 S. side window Window glazing No Asbestos Detected
25 114 Interior Cellulose board No Asbestos Detected
26 114 “” Drywall board No Asbestos Detected
27 124 E. side window Window glazing No Asbestos Detected
28 124 N. side interior Cellulose board No Asbestos Detected
Project Number: 550-13-114 Inspection Date: August 2, 2013 Inspector: Wes Green, IL License #100-06951 Analysis Date: August 12-14, 2013 Laboratory: EMSL Analytical, Inc. – Indianapolis, IN Accreditation: NVLAP Asbestos Bulk Accredited Laboratory #200188-0
SAMPLE
NUMBER
BUILDING SAMPLE LOCATION MATERIAL LABORATORY
ANALYSIS RESULT
29 33 1 st Fl. Dining room Window glazing No Asbestos Detected
30 33 Fireplace Refractory cement No Asbestos Detected
31 33 N. Living room Window glazing No Asbestos Detected
32 81 Ceiling Cellulose board No Asbestos Detected
33 81 N. side of garage Stucco No Asbestos Detected
34 81 S. side of garage “” No Asbestos Detected
35 81 E. side of garage “” No Asbestos Detected
36 34 Stairs to 2 nd floor Window glazing No Asbestos Detected
37 34 2 nd floor middle bedroom “” No Asbestos Detected
38 34 Living room on 1 st floor Fireplace refractory cement No Asbestos Detected
39 82 N. side of garage Stucco No Asbestos Detected
40 82 S. side of garage “” No Asbestos Detected
41 82 E. side of garage “” No Asbestos Detected
42 82 Window Window Glazing No Asbestos Detected
43 83 N. window Window Glazing No Asbestos Detected
44 83 N. side of garage Stucco No Asbestos Detected
45 83 S. side of garage “” No Asbestos Detected
46 83 E. side of garage “” No Asbestos Detected
47 83 S. side of garage Cellulose board No Asbestos Detected
48 37 2 nd floor n. window Window glazing No Asbestos Detected
49 37 1 st floor living room “” No Asbestos Detected
50 37 2 nd floor bathroom 9” floor tile & mastic No Asbestos Detected
51 41 1 st floor living room Window glazing No Asbestos Detected
52 78 N. side of garage Stucco No Asbestos Detected
53 78 S. side of garage “” No Asbestos Detected
54 78 E. side of garage “” No Asbestos Detected
55 78 E. window Window Glazing 0.75% Chrysotile Asbestos
56 31 Basement fireplace Refractory cement No Asbestos Detected
Project Number: 550-13-114 Inspection Date: August 2, 2013 Inspector: Wes Green, IL License #100-06951 Analysis Date: August 12-14, 2013 Laboratory: EMSL Analytical, Inc. – Indianapolis, IN Accreditation: NVLAP Asbestos Bulk Accredited Laboratory #200188-0
SAMPLE
NUMBER
BUILDING SAMPLE LOCATION MATERIAL LABORATORY
ANALYSIS RESULT
57 75 Garage wall Drywall No Asbestos Detected
58 75 Window Glazing No Asbestos Detected
59 75 N. side of garage Stucco No Asbestos Detected
60 75 S. side of garage “” No Asbestos Detected
61 75 E. side of garage “” No Asbestos Detected
62 32 Basement window Window glazing No Asbestos Detected
63 32 3 rd floor window “” No Asbestos Detected
64 32 Basement window “” No Asbestos Detected
65 38 Landing to 2 nd floor “” No Asbestos Detected
66 38 W. basement window “” No Asbestos Detected
APPENDIX B
LEAD CHIP SAMPLING LOG
LEAD CHIP SAMPLING INFORMATION
Project Number: 550-13-114 Inspection Date: August 2, 2013 Inspector: Wes Green, IL License #14572 Analysis Date: August 12, 2013 Laboratory: EMSL Analytical, Inc. – Indianapolis, IN Accreditation: AIHA Accredited Environmental Lead Laboratory #157245
SAMPLE BUILDING LOCATION BUILDING COMPONENT Lab Result
% Pb by weight
1 116 Exterior roof Corrugated metal 0.11%
2 110 Exterior trim Window trim 0.60%
3 110 Exterior siding Corrugated metal 0.37%
4 114 Exterior siding Corrugated metal 1.1%
5 112 Exterior window Window trim 26%
6 124 Exterior siding Corrugated metal 0.97%
7 33 Back porch Railing 7.8%
8 33 Home wood siding Wood siding 1.1%
9 34 Exterior siding Wood siding 9.0%
10 82 Exterior window Trim 17%
11 37 Exterior siding Wood siding 21%
12 41 Exterior siding Wood siding 22%
13 31 Front porch Railing 1.2%
14 32 Back porch Trim 16%
15 38 Exterior siding Wood siding 7.5%
APPENDIX C
ASBESTOS & LEAD LABORATORY
REPORT
EMSL Analytical, Inc.
APPENDIX D
INSPECTOR & LAB CERTIFICATIONS