Project 506-21-210 Drawings Updated.pdf
PDF 43 MB Posted
- Attached to
- Y1DA--Correct Deficiencies 1W sub-basement 506-21-210 Federal contract opportunity
- Solicitation number
- 36C25022B0058
About this file
This document provides details for a federal contract solicitation to correct deficiencies in the 1-W sub-basement of building 506-21-210 at the Ann Arbor VA Medical Center. The solicitation number is 36C25022B0058 and is seeking a contractor to completely prepare the site for building operations, including demolition and removal of existing structures, as well as furnishing labor, materials, and work for additions and renovations to the project. All work must take place at the specified medical center location. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The contractor will be responsible for demolition, site preparation, and additions/renovations in accordance with provided drawings and specifications to correct deficiencies in the specified sub-basement area.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Notice of Award.pdf | ||
| Project 506-21-210 Specifications Updated.pdf | ||
| 36C25022B0058 Amendment 0001.pdf | ||
| Contractor EMR Certification Form .docx | DOCX document | |
| Project 506-21-210 Drawings.pdf | ||
| Project 506-21-210 Specifications.pdf | ||
| Project 506-21-210 Statement of Work (SOW).pdf | ||
| 36C25022B0058.pdf | ||
| Wage Determination MI20220100 7-15-22.pdf | ||
| RFI Form Solicitation.doc | DOC document | |
| BID SCHEDULE.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BUILDING 1W
BUILDING 28
BUILDING 1E
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:5
P
M
GI000
COVER SHEET
11/05/2021 PQ CL
ANN ARBOR VAMC
CORRECT DEFICIENCIES 1-W SUB-BASEMENT
DEPARTMENT OF VETERANS AFFAIRS
2215 Fuller Road
Ann Arbor, MI 48105 D R A W I N G I N D E X
SHEET NO. SHEET NAME
GENERAL
GI000 COVER SHEET
ARCHITECTURAL
AD100 ARCHITECTURAL DEMOLITION PLAN
AE100 ARCHITECTURAL NEW WORK
AS101 ARCHITECTURAL SITE PLAN AND DETAILS
AE501 ARCHITECTURAL DETAILS, SECTIONS AND SCHEDULES
PLUMBING
P001 PLUMBING LEGEND AND ABBREVIATIONS
PD100 PLUMBING DEMOLITION PLAN
PL100 PLUMBING NEW WORK PLAN
PL501 PLUMBING DETAILS AND ISOMETRICS
MECHANICAL
M001 MECHANICAL LEGEND AND ABBREVIATIONS
MD100A MECHANICAL DEMOLITION
MD100B MECHANICAL DEMOLITION - PIPING
MH100 MECHANICAL NEW WORK
MP101 MECHANICAL NEW WORK - PIPING
MP301 MECHANICAL SECTIONS - PIPING
MH501 MECHANICAL SECTIONS, DETAILS, AND CONTROLS
MH601 MECHANICAL SCHEDULES
ELECTRICAL
ED100 ELECTRICAL DEMOLITION PLAN
EP100 ELECTRICAL POWER PLAN
EP601 ELECTRICAL SCHEDULES
R E G I O N A L V I C I N I T Y M A P V I C I N I T Y M A P
1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.
2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND C.O.R..
3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.
4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.
5. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF
THE VA'S OCCUPIED AREAS.
6. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. FOR THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES. IF WORK ACTIVITY WILL GENERATE NOISE OVER 85 DECIBELS OR IF THE WORK SCHEDULED IS LIKELY TO PRODUCE VIBRATIONS THROUGHOUT THE BUILDING STRUCTURE, THEN THE CONTRACTOR SHALL WORK WITH THE COR TO SCHEDULE THE MOST APPROPRIATE TIME TO PERFORM THE DISRUPTIVE
WORK ACTIVITY.
7. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH C.O.R. NO LESS THAN 10 WORKING DAYS PRIOR TO THE REQUIRED OUTAGE. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY THE C.O.R.
8. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE V.A.'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL
CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND WATER.
9. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE USING OPEN FLAMES, WELDING RODS AND TORCHES.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.
10. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.
11. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION.
FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.
1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL AUTHORITIES, CODES, RULES AND REGULATIONS.
2. THESE DOCUMENTS SHOW THE MINIMUM CONSTRUCTION REQUIREMENTS AND THE MINIMUM QUALITY OF WORK EXPECTED. MORE STRINGENT REQUIREMENTS STIPULATED WITHIN RELEVANT MANUFACTURER’S INSTALLATION INSTRUCTIONS WILL SUPERSEDE.
3. ANY UNFORESEEN OR UNCLEAR CONDITIONS SHALL BE REPORTED TO THE ARCHITECT AND C.O.R. PRIOR TO PROCEEDING WITH WORK.
4. ANY CONFLICTS WITHIN THE DRAWINGS, BETWEEN THE DRAWINGS AND THE SPECIFICATIONS, OR BETWEEN THE DRAWINGS AND THE ACTUAL CONDITIONS AT THE SITE, ARE TO BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE ARCHITECT AND C.O.R. THE CONTRACTOR SHALL NOT PROCEED WITH WORK UNTIL WRITTEN CLARIFICATION
FROM THE ARCHITECT IS RECEIVED.
5. UNLESS OTHERWISE NOTED, ALL MATERIALS AND EQUIPMENT ARE TO BE INSTALLED PER THE APPLICABLE PROVISIONS OF THESE DOCUMENTS AND THE
MANUFACTURER’S INSTRUCTIONS.
6. ALL MATERIALS USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED AND/OR OF A QUALITY TO MEET OR EXCEED ALL APPLICABLE INDUSTRY STANDARDS.
WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO OBTAIN A MINIMUM STANDARD OF
QUALITY.
7. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS, METHODS AND TECHNIQUES FOR CONSTRUCTION.
8. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR JOB-SITE SAFETY INCLUDING BUT NOT LIMITED TO THE ADHERENCE TO OSHA REGULATIONS.
9. ALL ELECTRICAL AND MECHANICAL WORK SHALL BE PERFORMED BY PERSONNEL LICENSED IN THE STATE WHERE THIS PROJECT IS LOCATED.
10. REMOVE ALL DEBRIS PROPERLY FROM THE SITE. LOAD DEBRIS DIRECTLY ONTO TRUCKS OR INTO DUMPSTERS FOR REMOVAL. DISPOSE OF DEBRIS LEGALLY. DO NOT BURN DEBRIS ON THE SITE. DO NOT ALLOW DEBRIS TO ENTER SEWERS. DO NOT ALLOW PILED DEBRIS TO ENDANGER STRUCTURES, BLOCK EXISTS OR ROADWAYS.
COMBUSTIBLE WASTE WHICH COULD CREATE A FIRE HAZARD SHALL NOT BE PERMITTED TO ACCUMULATE IN OR AROUND THE CONSTRUCTION SITE..
11. DO NOT SCALE DRAWINGS. DIMENSIONS SHALL GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF CONSTRUCTION.
12. LAYOUT AND VERIFY ALL PARTITION LOCATIONS PRIOR TO CONSTRUCTION FOR CLEARANCES AND DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
13. THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL AND ELECTRICAL, TO DETERMINE THE SIZE AND LOCATION OF ALL PENETRATIONS IN NEW CONSTRUCTION. COORDINATE AND PROVIDE ALL OPENINGS. SEAL CONSTRUCTION TIGHT TO ALL PENETRATIONS AND
CAULK.
14. ALL PENETRATIONS THROUGH FIRE RATED CONSTRUCTION MUST BE FIRE SAFE'D IN ACCORDANCE WITH THE SPECIFICATIONS.
15. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND VERIFYING ALL REQUIRED ROUGH OPENINGS, AND ROUGH-IN DIMENSIONS WITH THE EQUIPMENT MANUFACTURER, OWNER AND ARCHITECT PRIOR TO CONSTRUCTION.
16. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR HOSTING THE SUBMITTAL EXCHANGE FOR THE DURATION OF THE PROJECT.
G E N E R A L N O T E S - E X I S T I N G F A C I L I T I E S : G E N E R A L N O T E S - N E W W O R K :
12. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION
ROUTES BEYOND THE AREAS OF WORK.
13. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.
14. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.
15. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE
RATING BY THE END OF CONSTRUCTION OPERATIONS FOR EACH DAY.
16. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING
NEW MATERIAL.
17. CONTRACTOR SHALL PROVIDE DUST MITIGATION AT ALL INTERIOR AREAS WHERE AIR-BORNE PARTICLES FROM CONSTRUCTION ACTIVITY IS
EXPECTED.
Revisions: Date:
BID DOCUMENTS 100% 11/05/2021
EXP. 10/25/2023
N P Q R S T
SERVICE ROOM
3915 SF
3' - 2"
3' - 0"
5' - 6"
1' - 0"
6 66
PICTURE A1
11 11
UP
CORRIDOR
CB-3
5"
G E N E R A L N O T E S
A. ON COMPLETION OF WORK AND AFTER REMOVAL OF ALL DEBRIS,
LEAVE SITE IN CLEAN CONDITION SATISFACTORY TO THE COR.
B. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL
DEMOLITION.
C. SEE ASBESTOS SPECIFICATION FOR REMOVAL OF HAZARDOUS
MATERIALS.
T
B
AE501
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:3
P
M
AD100
ARCHITECTURAL DEMOLITION
PLAN
11/05/2021 PQ CL
N
1/4" = 1'-0"
SUB-BASMENT - DEMOLITION
D R A W I N G N O T E S
1 REMOVE PLYWOOD SLIDING DOOR AND STEEL TRACK.
2 REMOVE ALL RIGID INSULATION FROM THE UNDERSIDE OF THE
CONCRETE STRUCTURE ABOVE - PREPARE SURFACE FOR
INSTALLATION OF NEW SPRAY-APPLIED INSULATION.
3 REMOVE CONCRETE CONTAINMENT CURB AND PREPARE TO FLOORING
FOR NEW WORK - SUPPORT EXISTING PIPING AFTER DEMOLITION - SEE
PICTURE A1.
4 REMOVE ELEVATED CONCRETE PAD - SEE NEW WORK PLANS.
5 REMOVE DEBRIS THROUGHOUT THE SERVICE ROOM. CONTRACTOR
SHALL QUANTIFY REMOVED ITEMS PRIOR TO BID. CONSULT WITH THE
C.O.R. BEFORE REMOVAL.
6 REMOVE EXISTING WALL GUARDS.
7 REMOVE PORTION OF EXISTING MASONRY WALL SHOWN AS DASHED TO
ACCOMMODATE NEW DUCT PENETRATION - SUPPORT MASONRY ABOVE
OPENING - SEE NEW WORK DRAWINGS.
8 REMOVE PORTION OF EXISTING CONCRETE WALL SHOWN AS DASHED
TO ACCOMMODATE NEW DUCT PENETRATION. REFER TO FIRE DAMPER
SCHEDULE FOR SIZE.
9 REMOVE CMU COLUMN WRAP SHOWN AS DASHED.
10 REMOVE PLYWOOD BOX AROUND OPENING.
11 REMOVE AND RELOCATE EXISTING STAINLESS STEEL CORNER GUARDS.
12 EXISTING THERMOSTAT TO BE REMOVED. SEE NEW WORK FOR
REINSTALLATION.
PICTURE A1
KEYPLAN
N
1/4" = 1'-0"
FIRST FLOOR - DEMOLITION
Revisions: Date:
N Q R S T
SERVICE ROOM
3915 SF
/1
11' - 0" 4' - 8"
A
AE501
C
AE501
UP
CORRIDOR
CB-3
PASSENGER
ELEVATOR LOBBY
CB-5
SERVICE
ELEVATOR LOBBY
CB-4
STORAGE
CB02
STORAGE
CB03
MAILROOM
DISTRIBUTION
CB05
PAPER/RIBBON
DISTRIBUTION
CB04
5' - 10" +/- G E N E R A L N O T E S
A. REFER TO MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS
FOR ADDITIONAL DESIGN INFORMATION.
B. MECHANICAL AND ELECTRICAL WORK MAY EXTEND BEYOND
EXTENTS SHOWN IN ARCHITECTURAL DRAWINGS. CONTRACTOR
SHALL BE RESPONSIBLE FOR PROVIDING THE NECESSARY ICRA
BARRIERS AND REQUIRED FIRE / SMOKE PARTITIONS AROUND
CONSTRUCTION. LOCATION OF BARRIERS SHOWN ON PLANS ARE
FOR INTENT ONLY
C. MINIMIZE CONSTRUCTION ZONE TO MAINTAIN EGRESS THROUGH
CORRIDORS.
T
B
AE501
4' - 6"
13 14
MECH
B177A
FAN ROOM
B177B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:3
P
M
AE100
ARCHITECTURAL NEW WORK
11/05/2021 PQ CL
N
1/4" = 1'-0"
SUB-BASMENT - NEW WORK
D R A W I N G N O T E S
1 PATCH CONCRETE FLOOR TO MATCH EXISTING ADJACENT CONCRETE
FLOOR AFTER REMOVAL OF CONCRETE PAD.
2 PATCH CONCRETE FLOOR AFTER THE REMOVAL OF CONTAINMENT CURB
- SLOPE NEW FLOOR TO FLOOR DRAIN - EXTEND EXISTING PIPING TO
DRAIN - SUPPORT AS REQUIRED.
3 PROVIDE 6" OF SPRAY APPLIED THERMAL AND ACOUSTIC INSULATION AT
THE FULL EXTENT OF THE UNDERSIDE OF THE CONCRETE STRUCTURE
ABOVE AND 2" AROUND THE CONCRETE BEAMS. INSULATION SHALL
MEET SURFACE BURNING CLASS 1, CLASS A FIRE RATING PER ASTM E 84.
PROTECT ALL SPRINKLERS FROM OVERSPRAY. DO NOT COVER SURFACE
MOUNTED OBJECTS AT CEILING.
4 PROVIDE A NEW SLIDING DOOR AT EXISTING 4'-10" X 3'-2" OPENING.
REFER TO DOOR SCHEDULE.
5 NEW 4" CMU WALL. PAINT WITH EPOXY PAINT TO MATCH ADJACENT CMU.
REINSTALL EXISTING STAINLESS STEEL CORNER GUARDS AND
THERMOSTAT AND PROVIDE NEW WALL GUARDS AND RUBBER BASE ON
ALL THREE SIDES.
6 PROVIDE NEW WALL GUARD. MATCH EXISTING TYPE, SIZE, COLOR AND
MOUNTING HEIGHT.
7 12"W X 16"H WALL MOUNTED ACCESS PANEL. COORDINATE WITH
MECHANICAL FOR LOCATION.
8 TEMPORARY PREFABRICATED ICRA BARRIER TO UNDERSIDE OF CEILING -
PROVIDE NEGATIVE PRESSURE WITHIN BARRIER - ADD AIR-TIGHT
PLASTIC BARRIER ABOVE CEILING FOR CORING AT EXTERIOR WALL -
REMOVE ICRA BARRIER BEFORE CONSTRUCTING ADDITIONAL BARRIER
AT OTHER SIDE OF CORRIDOR TO MAINTAIN EGRESS.
9 TEMPORARY PREFABRICATED ICRA BARRIER TO UNDERSIDE OF CEILING -
PROVIDE NEGATIVE PRESSURE WITHIN BARRIER - INSTALL AFTER
REMOVAL OF ICRA BARRIER AT OTHER SIDE OF CORRIDOR TO MAINTAIN
EGRESS.
10 1-1/4" X 3/16" GALVANIZED GRATING SECURED TO THE FLOOR.
11 PROVIDE A NEW MANUAL COILING DOOR AT EXISTING 4'-8" X 2'-8"
OPENING.
12 NEW LOUVER AND LINTEL. REFER TO MECHANICAL SCHEDULES AND
ARCHITECTURAL SECTION.
13 NEW LOUVER AND FAN. REFER TO MECHANICAL DRAWINGS.
14 PROVIDE A 5/16" FLAT PLATE LINTEL WITH 6" BEARING ON EACH SIDE FOR
EXISTING OPENING.
15 RELOCATE EXISTING THERMOSTAT TO NEW WALL. INSTALL SO TOP OF
THERMOSTAT IS AT 48" AFF.
N
1/4" = 1'-0"
FIRST FLOOR - NEW WORK
S T
BUILDING 1E
(GENERATOR ROOM)
RAMP
DOCK
A
AS101
BUILDING 1W
3' - 6"
1' - 9"
5 UP
BUILDING 1E
GRADE
REMOVE RAILING
SHOWN AS DASHED
BEYOND FIRST POST
3' - 8" +/-
EXISTING EXPANSION
JOINT TO REMAIN
EXISTING ANGLE TO
REMAIN. PROTECT
DURING CONSTRUCTION
BUILDING 1E
GRADE MOUNT LIFT TO CONCRETE
ACCORDING TO MANUFACTURERS
REQUIRMENTS
NEW BOLLARD
SPRING LOADED HINGES
ATTACHED TO WALL
GATE LATCH
NEW GATE WITH ASTREGAL
AND LATCH
STEEL ENCLOSURE AT
LOCATIONS OF REMOVED
POSTS (TYP.)
EXISTING RAILING
3' - 8" +/-
GATE
ASTREGAL
6" DIAMETER x 5'-0" STANDARD
PIPE POST BARRICADE
CONCRETE FILLED
1' - 0"
CONCRETE FOUNDATION
PAINT YELLOW
EXISTING
CONCRETE SLAB
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:4
P
M
AS101
ARCHITECTURAL SITE PLAN AND
DETAILS
11/05/2021 PQ CL
1/4" = 1'-0"
LOADING DOCK LIFT
1/4" = 1'-0" A
LIFT DETAIL
REMOVALS NEW WORK
3/4" = 1'-0"
BOLLARD DETAIL
D R A W I N G N O T E S
1 PROVIDE A NEW BOLLARD. REFER TO DETAIL ON THIS SHEET.
2 PROVIDE A NEW 3000 LB. CAPACITY ELECTRIC EQUIPMENT LIFT
WITH RAMP.
3 PROVIDE A NEW GATE. REFER TO DETAILS ON THIS SHEET.
4 EXISTING STEEL PIPE RAILING TO REMAIN.
5 EXISTING STAIR TO REMAIN.
4" CMU
EXISTING ACT CEILING - REWORK
AT LOCATION OF NEW WALL
RUBBER BASE
PROVIDE NEW VINYL WALL GUARD.
MATCH EXISTING TYPE, SIZE,
COLOR AND MOUNTING HEIGHT
FIRE DAMPER, SEE
MECH.
RELOCATE EXISTING THERMOSTAT
804' - 0"
816' - 3"
808' - 3"
5/16" FLAT PLATE
WITH 6" BEARING
EACH SIDE
EXISTING CMU WALL
EXISTING CONCRETE WALL
DUCT, SEE MECH.
SERVICE ROOM 001
CORRIDOR CB-3
M
IN
T
FIRST FLOOR
827' - 3"
1-1/4"x3/16" GRATING
REFER TO DOOR
SCHEDULE
2 LAYERS OF 5/8"
GYPSUM BOARD
(EACH SIDE)
3-5/8" 16 GA.
COLD-FORMED
STEEL FRAMING
6 1/8"SEE PLAN
WALL TYPE
TWO LAYERS OF 5/8" GYPSUM
BOARD ON EACH SIDE OF 3-5/8"
16 GA. COLD-FORMED STEEL
FRAMING @ 16" O.C.
STAGGER GYPSUM BOARD
JOINTS. FIRE CAULK ALL PENETRATIONS.
UL DESIGN U419 - 2 HR RATED
EXISTING CONCRETE
FLOOR STRUCTURE
RUBBER BASE
AROUND PERIMETER
(BOTH SIDES)
3' - 2" +/-
16 GA. C-H STUD
@ 24" O.C.
1" GYPSUM
BOARD LINER
PANEL
3 LAYERS OF 1/2"
TYPE C GYPSUM
BOARD (STAGGER
JOINTS)
CEILING ASSEMBLY
THREE LAYERS OF 1/2" TYPE C GYPSUM
BOARD ON UNDER SIDE OF 16 GA.
2 1/2" C-H STUDS AT 24" O.C.
WITH 1" GYPSUM BOARD LINER PANEL
WITHIN STUD. STAGGER GYPSUM BOARD
JOINTS. FIRE CAULK ALL PENETRATIONS.
WHI-495-PHS-054/0167 - 2 HR RATED
FAN ROOM
B177B
MECH
B177A
SCHEDULED PARTITION
METAL RUNNER
HOLLOW METAL FRAME 16 GA.
DOOR AS SCHEDULED
1/2"
1/2"
VARIES
CAULK AROUND PERIMETER
OF DOOR FRAMES
SCHEDULED PARTITION
DOUBLE METAL STUD AT JAMB, TYP.
HOLLOW METAL FRAME 16G
DOOR AS SCHEDULED
1/2" 1/2"
VARIES
CAULK AT PERIMETER OF
DOOR FRAMES, TYP.
F
S E
E S
C H
E D
U L E
SEE SCHEDULE
SEE SCHEDULE
S E
E S
C H
E D
U L E
C S
P E
R M
A N
U F
A C
T U
R E
R
S E
E S
C H
E D
U L E
SEE SCHEDULE
PER MANUFACTURER
DUCT, SEE MECHANICAL
EXISTING LIMESTONE
EXISTING INSULATION
EXISTING CONCRETE
LOUVER, SEE MECHANICAL
CONTINUOUS SEALANT
AT PERIMETER
5/16" FLAT PLATE
ANGLE W/ 6" BEARING
FLASHING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:4
P
M
AE501
ARCHITECTURAL DETAILS,
SECTIONS AND SCHEDULES
11/05/2021 PQ CL
3/8" = 1'-0" A
SECTION
MARK WIDTH HEIGHT HARDWARE GROUP FIRE RATING DOOR TYPE FRAME MATERIAL COMMENTS
001 3'-6" 4'-6" 01 90 MIN. HOLLOW METAL STEEL SLIDING
D O O R S C H E D U L E
3/8" = 1'-0" B
SECTION
002 2'-8" 6'-0" 90 MIN. STEEL COILING, MANUAL
3" = 1'-0"
HEAD DETAIL 1 - METAL STUD
3" = 1'-0"
JAMB DETAIL 1 - METAL STUD
1/2" = 1'-0"
DOOR ELEVATIONS
DOOR ELEVATION
F3'-0" 7'-0" 90 MIN. HOLLOW METAL HOLLOW METAL
C
S
STAINLESS STEEL
3/8" = 1'-0" C
SECTION THRU LOUVER
Revisions: Date:
BID DOCUMENTS 100% 11/05/2021
DOOR SCHEDULE NOTES
1. SEE SPECIFICATION SECTION 08 71 00 FOR DOOR HARDWARE SETS.
2. HOLLOW METAL DOORS AND FRAMES ARE TO RECEIVE SEMI-GLOSS PAINT. COLOR SHALL BE SELECTED BY VA INTERIOR DESIGN FROM MANUFACTURER'S STANDARD RANGE OF COLORS. SEE PAINTING SPECIFICATION 09 90 00 FOR MORE INFORMATION.
3. CONTRACTOR SHALL PROVIDE TWO BLANK KEYS FOR EACH LOCKSET.
PLUMBING VALVE SYMBOLS
BALL VALVE
CHECK VALVE
BUTTERFLY VALVE
GATE VALVE
GENERAL PLUMBING SYMBOLS
LIMIT OF DEMOLITION
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
RISE OR DROP IN PIPE
CAPPED OUTLET
POINT OF CONNECTION BETWEEN
NEW AND EXISTING WORK
PIPE UP
PIPE DOWN
DRAWING SYMBOLS
PL101
A
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
PL105
PIPING CONTINUATION
PLUMBING ABBREVIATIONS
REVISION NUMBER
PIPING SYMBOLS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
VENT (SANITARY)
DCW
DHW
DHWR
SANITARY SEWER
SAN
V
PLUMBING GENERAL NOTES
A. THE FOLLOWING NOTES APPLY EQUALLY TO THE FULL SET OF PLUMBING
DOCUMENTS.
B. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
C. REFER TO SCHEDULES, DETAILS, AND DIAGRAMS FOR PIPING, PIPE SIZES AND
PIPELINE DEVICES NOT INDICATED ON FLOOR PLAN.
D. LOCATIONS AND SIZES OF EXISTING PIPING SHOWN ON THIS DRAWING HAVE BEEN
DETERMINED FROM A REVIEW OF EXISTING DRAWINGS AND/OR SITE INVESTIGATION
WHERE POSSIBLE. CONTRACTOR TO FIELD VERIFY EXISTING CONDITIONS. ANY
DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE
CONTRACT DRAWINGS WHICH MAY IMPACT THE PROGRESS OF WORK SHALL BE
BROUGHT TO THE ATTENTION OF THE VA COR IN WRITING BEFORE PROCEEDING
WITH THE WORK.
E. EACH CONTRACTOR SHALL COORDINATE THEIR WORK WITH THE WORK OF OTHERS.
F. ALL WORK SHALL BE IN COMPLIANCE WITH GOVERNING CODES AND VA STANDARDS.
G. CONTRACTOR SHALL IMMEDIATELY INFORM THE COR IN THE EVENT THAT MATERIALS
OBSERVED ARE SUSPECTED TO CONTAIN ASBESTOS.
H. PROVIDE OFFSETS AS NECESSARY TO COMPLETE SYSTEMS AND COORDINATE WORK
WITH OTHER TRADES.
I. ADHERE TO VHA DIRECTIVE 1061 FOR PREVENTION OF HEALTHCARE-ASSOCIATED
LEGIONELLA DISEASE AND SCALD INJURY FROM POTABLE WATER DISTRIBUTION
SYSTEMS.
J. INTERNAL PARTS OF ALL PLUMBING FIXTURES, WATER PIPING, FITTINGS, AND
ACCESSORIES SHALL BE ABLE TO WITHSTAND DISINFECTING OPERATIONS OF
CHEMICAL AND THERMAL TREATMENT OF WATER TEMPERATURES UP TO 82°C (180°F)
FOR 30 MINUTES OR 50 MG/L (50 PPM) CHLORINE RESIDUAL CONCENTRATION FOR 24
HOURS.
PIPING PENETRATION THROUGH FLOOR/ROOF
NEW PIPING
PIPING TO BE REMOVED
EXISTING PIPING
A/E ARCHITECT / ENGINEER
AD AREA DRAIN/ACCESS DOOR
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG AIR GAP
AP ACCESS PANEL
AS AUTOMATIC SPRINKLER/AIR SEPARATOR
ASD ADJUSTABLE SPEED DRIVES/AUTOMATIC SPRINKLER DRAIN
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR
CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
ASPE AMERICAN SOCIETY OF PLUMBING ENGINEERS
ASR AUTOMATIC SPRINKLER RISER
AV ACID VENT
AW ACID WASTE
AXF AXIAL FLOW
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BPW BEDPAN WASHER
BSP BLACK STEEL PIPE
BT BATHTUB
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CA COMPRESSED AIR
CGA COMPRESSED GAS ASSOCIATION
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM COUNTER MOUNTED/CUBIC METER
CO CLEAN OUT
CO2 CARBON DIOXODE
COMP COMPARTMENT
CS CLINICAL SINK
CV CONSTANT VOLUME/CONTROL VALVE
D DRAIN
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DD-2 DESIGN DEVELOPMENT (SUBMISSION 2)
DDC DIRECT DIGITAL CONTROLS
DFU DRAINAGE FIXTURE UNITS
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DI DEIONIZED WATER
DIA DIAMETERN
DN DOWN
DOE DEPARTMENT OF ENERGY
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
DWH DOMESTIC WATER HEATER
DWS DIALYSIS WATER SUPPLY
DWV DRAIN WASTE VENT
EL ELEVATION
EPA ENVIRONMENTAL PROTECTION AGENCY
EPACT ENERGY POLICY ACT
ESC ESCUTCHEON
ESH EMERGENCY SHOWER
ET EXPANSION TANK
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
EWS EYE WASH STATION
EWS/SH EYE WASH/DRENCH SHOWER
(E) EXISTING TO REMAIN
F FAHRENHEIT
FCO FLOOR CLEANOUT
FD FLOOR DRAIN
FDC FIRE DEPARTMENT (HOSE) CONNECTION
FF FINISHED FLOOR
FM FLOW METER/FLOOR MOUNTED
FOP FUEL OIL PUMP
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FUEL OIL TANK
FOV FUEL OIL VENT
FOHX FUEL OIL HEAT EXCHANGER
FPS FEET PER SECOND
FS FLOW SWITCH/FLOOR SINK
FT FEET
FT WC FEET OF WATER COLUMN
FT-LB FOOT-POUND
FU FIXTURE UNITS
GAL GALLON
GCO GRADE CLEANOUT
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
GT GREASE TRAP
GVTR GAS VENT THROUGH ROOF
GWH GAS FIRED WATER HEATER
H&CW HOT AND COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HD HUB DRAIN
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HS HAND SINK
HST HOT WATER STORAGE TANK (DOMESTIC)
HWB HOT WATER BOILER
HWCP HOT WATER CIRCULATING PUMP
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
HX HEAT EXCHANGER
HYD HYDRANT
IBT INVERTED BUCKET TRAP
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IE INVERT ELEVATION
ICW INDUSTRIAL COLD WATER
IHW INDUSTRIAL HOT WATER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
INV INVERT
IPC INTERNATIONAL PLUMBING CODE
IRW IRRIGATION WATER
IW INDIRECT WASTE
IWH INSTANTANEOUS WATER HEATER
IWR INDUSTRIAL WATER RETURN
IWS INDUSTRIAL WATER SUPPLY
KG KILOGRAM
KW KILOWATT
KWH KILOWATT HOUR
L LITER
L/H LITERS PER HOUR (or LITERS/HOUR) L/M LITERS PER MINUTE (or LITERS/MINUTE) L/S LITERS PER SECOND (or LITERS/SECOND)
LA LABORATORY AIR
LAV LAVATORY
LBS/HR POUNDS PER HOUR
LCW LABORATORY COLD WATER
LHW LABORATORY HOT WATER
LF LINEAR FOOT (FEET)
LPG LIQUEFIED PETROLEUM GAS
LNG LIQUID NATURAL GAS
LOX LIQUID OXYGEN
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LV LABORATORY VACUUM
LW LOW WATER
M METER
M/S METERS PER SECOND (OR METERS/SECOND)
MA MEDICAL AIR
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH 1,000 BTUH
MED MEDICAL
MER MECHANICAL EQUIPMENT ROOM
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MOU MEMORANDUM OF UNDERSTANDING
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MS MOP SINK
MV MEDICAL VACUUM
N2 NITROGEN
N2O NITROUS OXIDE
NA NOT APPLICABLE
NC NORMALLY CLOSED
NG NATURAL GAS
NIC NOT IN CONTRACT
NGFM NATURAL GAS FLOWMETER
NO NORMALLY OPEN
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NPSHA NET POSITIVE SUCTION HEAD AVAILABLE
NPSHR NET POSITIVE SUCTION HEAD REQUIRED
NPW NON POTABLE WATER
NTS NOT TO SCALE
O2 OXYGEN
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OR OPERATING ROOM
OVFL OVERFLOW
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PDI PLUMBING AND DRAINAGE INSTITUTE
PG PRESSURE GAGE
PPM PARTS PER MILLION
PRS PRESSURE REDUCING STATION
PRV PRESSURE REDUCING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PTRV PRESSURE TEMPERATURE RELIEF VALVE
PW POTABLE WATER
RCP RECIRCULATING PUMP
RD ROOF DRAIN
RDL ROOF DRAIN LEADER
RL ROOF LEADER
RP RECIRCULATION PUMP
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RTU ROOF TOP UNIT
RV RELIEF VALVE
SAN SANITARY SEWER
SCFM STANDARD CUBIC FEET PER MINUTE
SCW SOFTENED COLD WATER
SHW SOFTENED HOT WATER
SD SMOKE DETECTOR
SDMH STORM DRAIN MANHOLE
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SD-2 SCHEMATIC DESIGN (SUBMISSION2)
SF SQUARE FOOT (FEET)
SH SHOWER
SMACNA SHEET METAL AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
SMH SANITARY MANHOLE
SP SUMP PUMP/STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPRV STEAM PRESSURE REDUCING VALVE
SS STAINLESS STEEL
ST STORAGE TANK/STEAM TRAP
SW STORM WATER
SW SOFTWATER
SWHX STEAM TO WATER HEAT EXCHANGER
TCV TEMPERATURE CONTROL VALVE
TD TRENCH DRAIN/TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TEMP TEMPERATURE
TMV THERMOSTATIC MIXING VALVE
TP TRAP PRIMER
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TWR TEMPERED WATER RETURN
TWS TEMPERED WATER SUPPLY
TYP TYPICAL
UG UNDERGROUND (BELOW GRADE)
V VENT
VAC VACUUM
VB VACUUM BREAKER
VCO VACUUM CLEANER OUTLET
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VP VACUUM PUMP
VS VENT STACK
VSD VARIABLE SPEED DRIVE
VTR VENT THROUGH ROOF
W WASTE/WATTS
WC WATER CLOSET
WCO WALL CLEANOUT
WG WATER GAGE
WH WALL HYDRANT/WATER HEATER
WHA WATER HAMMER ARRESTER
WL WATER LINE
WM WATER METER/WALL MOUNTED
WPD WATER PRESSURE DROP
WS WASTE STACK
WSFU WATER SUPPLY FIXTURE UNITS
YCO YARD CLEANOUT
YH YARD HYDRANT
ZV ZONE VALVE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:2
P
M
P001
PLUMBING LEGEND AND
ABBREVIATIONS
11/05/2021 GP GPRevisions: Date:
BID DOCUMENTS 11/05/2021
11/05/2021
N O P Q R S T
UG 4" SAN
FD-E FD-E FD-E
FD-E
FD-E FD-E
FD-E
FD-E
FD-E
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
(E) UG 4" SAN (E) UG 6" SAN
(E) UG 6" SAN
(E) STEAM TO DHW
HEAT EXCHANGER
(E) STEAM TO DHW
HEAT EXCHANGER
STEAM TO DHW
HEAT EXCHANGER
(NOT CONNECTED)
3" HUB DRAIN
(E) UG 3" SAN
(E) 3" V
(E) 3" V UP
FIRE PUMP (NOT
CONNECTED)
2 2
2 2
RECIRCULATION PUMP
(NOT CONNECTED)
WATER SOFTENING
SYSTEM EQUIPMENT
(E) 4" DCW (E) 4" DCW
(E) 2" DCW (E) 2" DCW (E) 2" DCW (E) 2" DCW
(E) 3" DCW
(E) 3" DCW
(E) 3" DCW
(E) 6" DCW
(E) 6" DCW
(E) 4" DCW
(E) 6" DCW
(E) 4" DCW
(E) 6" DCW
G E N E R A L N O T E S
A. CONTRACTOR TO CONFIRM ALL EXISTING CONDITIONS PRIOR TO COMMENCING
WORK. IF INCONSISTENCIES, CONSULT WITH THE COR.
B. ON COMPLETION OF WORK AND AFTER REMOVAL OF ALL DEBRIS, LEAVE SITE IN
CLEAN CONDITION SATISFACTORY TO THE COR.
C. REFER TO DRAWING P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT
NOTES.
D. CONTRACTOR SHALL PROVIDE DUST MITIGATION AT ALL INTERIOR AREAS WHERE
AIR-BORNE PARTICLES FROM CONSTRUCTION ACTIVITY IS EXPECTED.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:3
P
M
PD100
PLUMBING DEMOLITION PLAN
11/05/2021 GP GP
N
1/4" = 1'-0"
PLUMBING DEMOLITION PLAN
D R A W I N G N O T E S
1 FILL UNDERGROUND SANITARY PIPING WITH FLOWABLE GROUT TO POINT SHOWN.
2 REMOVE FLOOR DRAIN AND ASSOCIATED SANITARY PIPING DOWN TO PIPE ELBOW.
3 REMOVE HUB DRAIN AND ASSOCIATED SANITARY PIPING DOWN TO PIPE ELBOW.
4 REMOVE WATER SOFTENING SYSTEM AND ALL ASSOCIATED PIPING, POWER, AND
CONTROLS. ANY PIPING TO SOFTENER FROM ACTIVE DOMESTIC WATER SYSTEM
SHALL BE REMOVED TO WITHIN (2) PIPE DIAMETERS OF THE ACTIVE MAIN AND CAP.
SEE PICTURE P1. CONTRACTOR TO FIELD VERIFY LOCATIONS OF ACTIVE DOMESTIC
WATER SYSTEM.
5 REMOVE ABANDONED FIRE PUMP AND ASSOCIATED EQUIPMENT PAD. SEE PICTURE
P2.
6 REMOVE ABANDONED STEAM TO DOMESTIC HOT WATER HEAT EXCHANGER. SEE
PICTURE P3.
7 REMOVE ABANDONED RECIRCULATION PUMP AND ASSOCIATED EQUIPMENT PAD. SEE
PICTURE P4.
8 REMOVE EXISTING SINK AND ASSOCIATED PIPING AND CAP.
PICTURE P2 PICTURE P4PICTURE P3PICTURE P1
KEYPLAN
Revisions: Date:
N O P Q R S T
(E) UG 4" SAN (E) UG 6" SAN
(E) UG 6" SAN
(E) STEAM TO DHW
HEAT EXCHANGER
(E) STEAM TO DHW
HEAT EXCHANGER
3" HUB DRAIN
(E) UG 3" SAN
(E) 3" V
(E) 3" V UP
FD-E FD-E
FD-E
FD-E FD-E FD-E
FD-E
FD-E
FD-E
4" FCO
4" FCO
4" FCO
UG 4" SAN
UG 3" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
TP-1
3" V
3" V
3" V
1/2" DCW
(E) 4" DCW(E) 4" DCW
(E) 2" DCW
G E N E R A L N O T E S
A. CONTRACTOR TO CONFIRM ALL EXISTING CONDITIONS PRIOR TO COMMENCING
WORK. IF INCONSISTENCIES, CONSULT WITH THE COR.
B. ON COMPLETION OF WORK AND AFTER REMOVAL OF ALL DEBRIS, LEAVE SITE IN
CLEAN CONDITION SATISFACTORY TO THE COR.
C. SAW CUT FLOOR AS NECESSARY FOR INSTALLATION OF UNDERGROUND PIPING.
TRENCH AND BACKFILL AFTER INSTALLATION OF PIPING AND PATCH AND SEAL
FLOOR TO MATCH EXISTING. REFER TO PIPE TRENCH DETAIL ON DRAWING PL501.
D. ROUTE UNDERGROUND DOMESTIC WATER PIPING FROM TRAP PRIMER IN SAME
TRENCHES CREATED FOR UNDERGROUND SANITARY PIPING.
E. REFER TO DRAWING P001 FOR LEGEND, ABBREVIATIONS, AND GENERAL PROJECT
NOTES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:3
P
M
PL100
PLUMBING NEW WORK PLAN
11/05/2021 GP GP
N
1/4" = 1'-0"
PLUMBING NEW WORK PLAN
D R A W I N G N O T E S
1 CONNECT NEW UNDERGROUND SANITARY PIPING TO EXISTING AT POINT SHOWN.
2 CONNECT NEW VENT PIPING TO EXISTING AT POINT SHOWN.
3 CONNECT NEW DOMESTIC WATER PIPING TO EXISTING AT POINT SHOWN.
KEYPLAN
Revisions: Date:
UG 4" SAN
UG 4" SAN
(E) UG 4" SAN
(E) 3" V
(E) 3" V
3" V4" FCO
4" FCO
4" FCO
FD-E
FD-E
FD-E
FD-E
FD-E
FD-E
FD-E
FD-E
FD-E
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 3" SAN
UG 4" SAN
UG 4" SAN
3" V
UG 3" V
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
UG 4" SAN
SUB-BASEMENT
FLOOR
3" HUB DRAIN
SUB-BASEMENT
FLOOR
BASEMENT
FLOOR
UP TO VENT
THRU ROOF
1/2" DCW
TP-1
UG 1/2" DCWUG 1/2" DCWUG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCWUG 1/2" DCW
UG 1/2" DCW
UG 1/2" DCW
SUB-BASEMENT
FLOOR
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
TO SANITARY
P-TRAP
(E) 2" DCW
[2100]
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm]
SIDE VIEW TRAPEZE HANGER FOR UP
TO 1000 LB. [453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS
HANGER TYPE 1 -
SEE SPECIFICATIONS
PROVIDE INSULATION
SHIELD & INSERT FOR ALL
PIPING (8" [200mm] MIN.)
BAND
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4" [50x50x6.4mm] ANGLE
1/2" [15mm] DIA. HANGER RODS WITH 36" [900mm] MAX. SPACING
ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR BARRIER
TYPE IS REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
[2 m m
M A
X
.NOTES:
SEE SPECIFER FOR
DETAILED HANGER
REQUIREMENTS
ADJUSTABLE CLEVIS
HANGER TYPE 43 -
SEE SPECIFICATIONS
THRU 3/4
THRU [20]
5 FT
[1500]
[25]
[2100]
[1800]
1 1/4 [32]
[2100]
[2100]
1 1/2 [40]
[2700]
[2400]
[50]
[3000]
[2400]
2 1/2 [65]
[3400]
[2700]
[75]
[3700]
[3000]
[100]
[4100]
[3700]
[125]
[4900]
[4000]
[150]
[200]
[250]
[300]
[350]
[400]
[450]
[500]
[600]
[5200]
[5800]
[4100]
[4900]
[6700]
[7000]
[7600]
[8200]
[8500]
[9100]
[9600]
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRICTION THIS TYPE SHALL BE USED ONLY
IN SLABS OR BEAMS OF 4" [100mm] MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
CONCRETE
FLOOR SLAB
CLIP
ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1-1/2"x1-1/2"x1/4" [40x40x6.4mm] ANGLE.
ALL PIPES 2" [50mm] & LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
(TYP.)
0' - 3"
(TYP.)
0' - 3"
COMPACTED SOIL
NEW PIPE - REFER TO PLUMBING
SAWCUT EXISTING SLAB
#4 BAR @ 18" O.C.
(TYP.)
#4 CONT. (BOTH SIDES)
APPLY BONDING AGENT (TYP.)
NEW CONCRETE
1' - 6"
4" BAR W/ EPOXY
GROUT @ 18" O.C.
(TYP. EACH SIDE)
VAPOR BARRIER
NOTE:
1. REFER TO PLUMBING DRAWINGS FOR LOCATIONS OF NEW UNDERGROUND PIPING.
2. DO NOT CUT EXISTING COLUMN FOUNDATIONS.
3. ALL REINFORCING SHALL BE HIGH STRENGTH DEFORMED BARS, GRADE 60, ASTM
A615, WITH 60,000 PSI MINIMUM YIELD STRENGTH.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:3
P
M
PL501
PLUMBING DETAILS AND
ISOMETRICS
11/05/2021 GP GP
NTS
SANITARY & VENT ISOMETRIC
NTS
DOMESTIC WATER ISOMETRIC
NTS
PIPE HANGERS
NTS
SECURING HANGER RODS IN CONCRETE
NTS
PIPE TRENCH DETAIL
Revisions: Date:
A/E ARCHITECT / ENGINEER
ACD-TP AUTOMATIC CONTROL DAMPER, TWO POSITION
AD ACCESS DOOR
AP ACCESS PANEL
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
CD-1 CONSTRUCTION DOCUMENTS (SUBMISSION1)
CENT CENTRIFUGAL
CFM CUBIC FEET PER MINUTE
CFP CHEMICAL FEED PUMP
CW COLD WATER (POTABLE)
D DAMPER - AUTOMATIC
Db DRY-BULB TEMPERATURE
DB DECIBELS
DCW DOMESTIC COLD WATER
DD-1 DESIGN DEVELOPMENT (SUBMISSION 1)
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DHW DOMESTIC HOT WATER
DHWR DOMESTIC HOT WATER RETURN
DIA DIAMETER
EA EXHAUST AIR
EF EXHAUST FAN
EG EXHAUST GRILLE
EH EXHAUST HOOD
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EX EXISTING
F FAHRENHEIT
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FT FEET
FT WC FEET OF WATER COLUMN
FV FACE VELOCITY
GS GALVANIZED STEEL
HD HOOD
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HWHC HOT WATER HEATING COIL
HWP HEATING HOT WATER PUMP
HWR HEATING HOT WATER RETURN
HWS HEATING HOT WATER SUPPLY
I/O INPUT/OUTPUT
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IS INSECT SCREEN
IV INLET VANES
KW KILOWATT
KWH KILOWATT HOUR
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LPS LOW PRESSURE STEAM
LPSC LOW PRESSURE STEAM (CLEAN)
LVR LOUVER
MAX MAXIMUM
MIN MINIMUM
MUA MAKE-UP AIR
NA NOT APPLICABLE
NC NOISE CRITERIA
NTS NOT TO SCALE
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
OAG OUTSIDE AIR GRILLE
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
P PUMP
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PEF PROPELLER (TYPE) EXHAUST FAN
PSI POUNDS PER SQUARE INCH
R/E RETURN OR EXHAUST
SA SUPPLY AIR
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SD-1 SCHEMATIC DESIGN (SUBMISSION1)
SDPR SMOKE DAMPER
SF SUPPLY FAN
SG SUPPLY AIR GRILLE
SI SQUARE INCHES
SP STATIC PRESSURE
SPD SUPPLY PROCESS AND DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
ST STEAM TRAP
SUH STEAM UNIT HEATER
SV STEAM PRESSURE REDUCING VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TSTAT THERMOSTAT
V VALVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
W WATTS
WEF WALL EXHAUST FAN
ABBREVIATIONS
H7
A
HOT WATER
DRAWING SYMBOLS
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
DUCTWORK SYMBOLS
LIMIT OF DEMOLITION
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
SQUARE 4-WAY CEILING DIFFUSERS
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP RETURN DUCT (UP & DOWN)
FC
10x8
FLEXIBLE CONNECTION,
EQUIPMENT, VIBRATION, OR
SEISMIC
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR ELBOWS
WITH VANES EVEN IF SYMBOL IS
MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
FIRE DAMPER
FD
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
PIPING SYMBOLS
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HOT WATER HEATING SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
HOT WATER HEATING RETURN
HPS
HPR
MPS
MPR
LPS
LPR
HWS
HWR
HW
GENERAL PIPING SYMBOLS
ANCHOR
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
ECCENTRIC REDUCER
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PIPE UP
PIPE DOWN
CONTROLS SYMBOLS
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
MT MOISTURE (HUMIDITY) TRANSMITTER
PT PRESSURE TRANSMITTER
TT
TEMPERATURE TRANSMITTER, AVERAGING
ELEMENT
FT FLOW TRANSMITTER
IT CURRENT TRANSMITTER
SPS STATIC PRESSURE SENSOR
SD SMOKE DETECTOR
PDT PRESSURE DIFFERENTIAL TRANSMITTER
PDS PRESSURE DIFFERENTIAL SWITCH
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
ES END SWITCH
T STEAM TRAP
CP CONDENSATE PUMP
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
NOTE:
ALL SYMBOLS AND ABBREVIATIONS ARE
SUBJECT TO MODIFICATIONS ON OTHER
DRAWINGS. ALL SYMBOLS OR ABBREVIATIONS
MIGHT NOT NECESSARILY BE USED ON THIS
PROJECT.
DUCT MOUNTED ACCESS PANEL
OR
ZC DAMPER POSITION CONTROLLER
HS HAND SWITCH
SST START STOP
ECC ENERGY CONTROL CENTER
ECM ELECTRONIC CONTROL MODULE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:5
P
M
M001
MECHANICAL LEGEND AND
ABBREVIATIONS
11/05/2021 PP CL
G E N E R A L N O T E S
DEMOLITION
A. REMOVE ALL HANGERS, SUPPORTS, TUBING, AND CONTROL DEVICES
ASSOCIATED WITH EQUIPMENT TO BE REMOVED. WORK MUST BE COORDINATED
WITH OWNER TO MAINTAIN OPERATION OF THE FACILITY. PROVIDE AT LEAST 14
DAYS ADVANCE NOTICE TO THE COR FOR ANY UTILITY SHUT DOWN.
B. SEAL ANY FLOOR OR WALL PENETRATIONS WHERE DUCT OR PIPES ARE
REMOVED. HOLES IN WALLS AND FLOORS CREATED OR EXPOSED DURING
DEMOLITION SHALL BE REPAIRED TO MATCH NEW OR EXISTING ARCHITECTURAL
FINISHES.
C. EQUIPMENT THAT CANNOT FIT THROUGH THE DOOR WILL HAVE TO BE SAW CUT.
D. CONTRACTOR TO CONFIRM ALL EXISTING CONDITIONS PRIOR TO COMMENCING
WORK. IF INCONSISTENCIES, CONSULT WITH THE COR.
E. ON COMPLETION OF WORK AND AFTER REMOVAL OF ALL DEBRIS, LEAVE SITE IN
CLEAN CONDITION SATISFACTORY TO THE COR.
NEW WORK
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED
TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON
THE DRAWINGS, AS SPECIFIED, AND AS REQUIRED BY CODE.
B. INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE
WITH MANUFACTURERS’ RECOMMENDATIONS, CONTRACT DOCUMENTS, AND
APPLICABLE CODES AND REGULATIONS.
C. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT
TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
D. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH
ARCHITECTURAL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT
DOCUMENT DRAWINGS.
E. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR
PIPING INSULATION IS APPLIED.
F. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN
THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE
APPROXIMATE ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST
CONDITIONS AND RESULTS MUST BE DETERMINED BY THE PROJECT SITE
CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING
INSTALLED. DO NOT SCALE DRAWINGS.
G. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION
SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
H. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY,
RETURN, AND EXHAUST) CONNECTED TO FANS, AND OTHER EQUIPMENT THAT
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT
THE POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
HAZARDOUS MATERIALS
A. ASBESTOS-CONTAINING MATERIALS (ACM) ARE PRESENT WITHIN VARIOUS
PROJECT AREAS. THE CONTRACTOR IS RESPONSIBLE FOR ANY AND ALL
ABATEMENT OF ACM IN RENOVATION AREAS. SEE SPECIFICATION 02 82 11 FOR
EXTENT OF WORK. COORDINATE WITH COR.
B. LEAD-CONTAINING PAINT MUST BE ASSUMED ON ALL PAINTED SURFACES.
CONTRACTOR IS RESPONSIBLE FOR ADDRESSING ALL PAINTS AS CONTAINING
LEAD PER THE APPROPRIATE SPECIFICATION SECTION: 02 83 33.13 FOR LEAD
PAINT REMOVAL AND DISPOSAL AND SECTION 09 091 00 FOR SURFACE
PREPARATION DISTURBING LEAD PAINT.
N P Q R S T
SERVICE ROOM
3915 SF
SEE ARCH.
T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:0
P
M
MD100A
MECHANICAL DEMOLITION
11/05/2021 PP CL
N
1/4" = 1'-0"
MECHANICAL - DEMOLITION - SUB-BASMENT
D R A W I N G N O T E S
1 REMOVE ABANDONED/DISCONNECTED 185 GALLON BLADDER
TANK. SEE PICTURE M1.
2 REMOVE ABANDONED/DISCONNECTED PANEL. SEE PICTURE M2.
3 REMOVE ABANDONED GAUGES ON WALL.
4 REMOVE INACTIVE GAUGES (3 BROWN PANELS AND 1 BLUE
PANEL). SEE PICTURE M4.
5 REMOVE WALL MOUNTED BOX UNDER THE STAIRS. SEE PICTURE
M3.
6 REMOVE EXISTING GENERATOR EXHAUST AND PATCH
PENETRATION WITH CONCRETE.
7 REMOVE EXISTING EXHAUST FAN AND LOUVER.
PICTURE M1 PICTURE M2 PICTURE M3 PICTURE M4
KEYPLAN
1/4" = 1'-0"
FIRST FLOOR - DEMOLITION
GENERAL NOTES
A. EXISTING PIPING INSULATION AND JACKETS IN
SERVICE ROOM 001 SHALL BE REMOVED AND
REPLACED WITH NEW BY THE CONTRACTOR. THIS
SCOPE OF WORK APPLIES TO ALL EXISTING PIPING
WITHIN THE ROOM, INCLUDING BUT NOT LIMITED TO:
DOMESTIC COLD WATER, DOMESTIC HOT WATER,
HIGH / MEDIUM / LOW PRESSURE STEAM, STEAM
CONDENSATE, HEATING HOT WATER
SUPPLY/RETURN, AND CHILLED WATER
SUPPLY/RETURN. SYSTEMS EXCLUDED ARE LIMITED
TO: SANITARY, VENT, AND FIRE PROTECTION.
B. SEE SHEET MP301 FOR ADDITIONAL VIEWS OF
EXISTING PIPING. PRIOR TO REMOVAL OF
INSULATION, CONTRACTOR SHALL VERIFY ALL
SYSTEMS, PIPE SIZES, AND FLOW DIRECTIONS.
SYSTEMS AND PIPE SIZES ARE REQUIRED FOR
SELECTING THE REQUIRED INSULATION TYPE AND
THICKNESS PER THE SPECIFICATIONS. SYSTEM AND
FLOW DIRECTION ARE REQUIRED FOR LABELING.
C. ASBESTOS CONTAINING MATERIALS ARE PRESENT
THAT REQUIRE ABATEMENT WITHIN THIS PROJECT.
INSUALTION THAT REQUIRES ABATEMENT IS NOT
DETAILED OR DIFFERENTIATED FROM NON-
ASBESTOS CONTAINING INSULATION ON THIS
DRAWING. REFERENCE SPECIFICATION 02 82 11
FOR ABATEMENT SCOPE AND REQUIREMENTS.
D. ABATEMENT AND INSULATION REMOVAL MAY BEGIN
AFTER IDENTIFICATION PROCESS IS COMPLETE.
CONTRACTOR SHALL RE-INSULATE PIPING AS IT IS
REMOVED AND SAFE TO DO SO. DO NOT LEAVE
EXCESSIVE RUNS OF PIPING UN-INSULATED DURING
CONSTRUCTION.
N Q R S T
A
MP301
B
MP301
C
MP301
D
MP301
E
MP301
F
MP301
SERVICE ROOM
3915 SF
12" CHS12" CHR
10" HPS
12" MPS
12" MPS
8" MPS
8" MPS
4" MPS 4" MPS6" MPS6" MPS
8" MPS
14" MPS
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
5" MPS
5" MPS 5" MPS
8" MPS 10" MPS 12" MPS
4" MPR
4" MPR
8" HPS
6" HPR
6" HPR
14" MPS
12" CHR
12" CHS
8" HPS
10" HPS
10" HPS
12" CHR
12" CHS
4" MPR
8" HPS
4" MPR
10" HPS
8" MPS
3" V8" HPS
3" DHW
12" CHS
12" CHR
1 1/2" DHW
1 1/2" DHW 1 1/2" DHW 1 1/2" DHW
14" MPS
4" DHW
4" DHW
8" MPS
6" MPR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:0
P
M
MD100B
MECHANICAL DEMOLITION -
PIPING
11/05/2021 PP CL
KEYPLAN
Revisions: Date:
BID DOCUMENTS 100% 11/05/2021
N
1/4" = 1'-0"
MECHANICAL - DEMOLITION - SUB-BASMENT
NOTE:
PIPING SHOWN IS EXISTING AND IS INTENDED TO BE
USED FOR INSULATION CONTRACTOR REFERENCE
ONLY. IT IS NOT INTENDED TO BE USED FOR PIPING
SYSTEM DESIGN OR MODIFICATION. FIELD VERIFY
EXISTING CONDITIONS.
T
N Q R S T
A
MH501
EXISTING CONTROL PANEL
SERVICE ROOM
3915 SF
6300 CFM
C
MH501
"x
M U
A
EF-1
L-1
L-2 D-2
1FD-1
D-1
SF-1
SD-1
1150 CFM
SD-1
1150 CFM
SD-1
1150 CFM
B
MH501
SD-1
1150 CFM
26"x20" 22"x14"
MUAMUA
5 6
"x
CORRIDOR
CB-3
PASSENGER
ELEVATOR LOBBY
CB-5
SERVICE
ELEVATOR LOBBY
CB-4
STORAGE
CB02
STORAGE
CB03
MAILROOM
DISTRIBUTION
CB05
PAPER/RIBBON
DISTRIBUTION
CB04
EXISTING UNIT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTSVA ANN
ARBOR
HEALTHCARE
SYSTEM
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT DEFICIENCIES
1-W SUB-BASEMENT
2215 FULLER RD, ANN ARBOR, MI.
506-21-210
1W
FULLY SPRINKLERED
C U s e rs
\c ra ig \D o c u m e n ts
\F F
E A n n A rb o r
S u b -b a s e m e n t
W c ra ig .l ie g ib e l@ ff e
-s e rv .c o m
.r v t
/2
/2
:1
:0
P
M
MH100
MECHANICAL NEW WORK
11/05/2021 PP CL
N
1/4" = 1'-0"
MECHANICAL - NEW WORK - SUB-BASMENT
D R A W I N G N O T E S
1 PROVIDE A NEW FIRE DAMPER. FIRE DAMPER SHALL BE
ACCESSIBLE FROM SERVICE ROOM 001 FOR MAINTENANCE AND
TESTING. REFER TO MECHANICAL SCHEDULES.
2 NEW SPACE TEMPERATURE SENSOR MOUNTED ON WALL AT
STAIR LANDING.
3 INSULATE ALL MAKE-UP AIR DUCTWORK. MINIMUM INSULATION
THICKNESS 2 IN PLUS JACKET. SEE SPECIFICATIONS.
4 DUCT DOWN INTO CHASE.
5 INSTALL DUCT AS CLOSE TO THE EXISTING PIPING AS POSSIBLE.
6 OFFSET DUCT TO AVOID ELECTRICAL EQUIPMENT.
7 OFFSET DUCT FROM PENETRATION THRU WALL TO BELOW
EXISTING PIPING.
8 RELOCATE EXISTING LIGHT. REFER TO ELECTRICAL DRAWINGS.
9 DUCT ACCESS PANEL.
10 CONTRACTOR TO PROVIDE ADDITIONAL OFFSETS AS NEED TO
AVOID ABOVE CEILING COMPONENTS.
KEYPLAN
N Q R S T
SERVICE ROOM
3915 SF
12" CHS12" CHR
10" HPS
12" MPS
12" MPS
8" MPS
8" MPS
4" MPS 4" MPS6" MPS6" MPS
8" MPS
14" MPS
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
M P
S
5" MPS
5" MPS
5" MPS
8" MPS 10" MPS 12" MPS
4" MPR
4" MPR
8" HPS
6" HPR
6" HPR
14" MPS
12" CHR
12" CHS
8" HPS
10" HPS
10" HPS
12" CHR
12" CHS
4" MPR
8" HPS
4" MPR
A
MP301
B
MP301
C
MP301
D
MP301
E
MP301
F
MP301
10" HPS
8" MPS
8" HPS
6" DCW
4" DCW
3" DHW
4" DCW
2" DCW
12" CHS
12" CHR
2" DCW
2" DCW
2" DCW
1 1/2" DHW
1 1/2" DHW 1 1/2" DHW 1 1/2" DHW
3" DCW
14" MPS
4" DHW
4" DHW
6" DCW
8" MPS
4" DCW
6" DCW
6" DCW
6" MPR
4" DCW
SF-1
EF-1
2 2
GENERAL NOTES
A. INSULATE AND LABEL ALL EXISTING PIPING AS
DESCRIBED ON SHEET MD100B. REFERENCE
SPECIFICATIONS FOR INSULATION AND LABELING
REQUIREMENTS.
B. EXISTING SYSTEMS IDENTIFIED ON THIS SHEET ARE
FOR REFERENCE ONLY. CONTRACTOR SHALL
CONFIRM SYSTEM TYPE, FLOW DIRECTION AND PIPE
SIZES.
Project…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .