Project 538-20-204 RFI _ VA Response.pdf

PDF 590 KB Posted

Attached to
Y1LZ--Repave Roads Federal contract opportunity
Solicitation number
36C25022B0022
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document contains questions and answers regarding a request for information (RFI) for Project 538-20-204 to repave Dobson Circle, Taft, Roland, and Hines Roads for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. Specifications are provided for asphalt material mix design and full depth repair procedures. Clarification is given that the project is tax exempt and the prime contractor will be provided a tax exemption certificate to share with subcontractors and vendors. Trailer space with electrical hookup will be made available for a temporary job site office, and staging and parking areas are adequate. The plans include scaled drawings with repair area square footages to estimate mill and fill quantities.

View the file

Other files for this federal contract opportunity

Other files attached to Y1LZ--Repave Roads, newest first.
File Type Posted
36C25022B0022 0004.docx DOCX document
36C25022B0022 0003.docx DOCX document
Bid Drawings 538-20-204 Rev 1.pdf PDF
36C25022B0022 0002.docx DOCX document
36C25022B0022.pdf PDF
36C25022B0022 0001.docx DOCX document
S02. 36C25022B0022.pdf PDF
Ross County Wage Determination.pdf PDF
Drawings 538-20-204.pdf PDF
Specifications 538-20-204.pdf PDF
36C25022B0022_1.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 538-20-204

Repave Dobson Circle, Taft, Roland, and Hines Roads

Request for Information (Q.) & VA Response (A.)

Q. Please provide the specification for the material that will be needed for the asphalt.

A. Plan set sheet GI003 refers mix design to ODOT 2019 Construction and Material Specifications

Q. In the plan notes it states that the full depth repairs are to be completed before the mill and overlay. Is the intent to place surface asphalt in the full depth areas and then do a mill and fill of 1.5” over the entire areas, or do they want the 3” of type 2 placed, then mill the overlay areas and pave surface on everything in that phase?

A. The spot repairs (full depth and partial depth) are to be completed prior to the entire drive area is milled. This will insure a uniform surface for repaving.

Q. Is this a tax-exempt project? If tax-exempt, will the government be providing a tax-exempt certificate to the Prime Contractor for use by subcontractors and vendors?

A. This project is tax exempt. Yes, Contracting will provide upon request a tax-exempt form for the Prime contractor’s use.

Q. Can the Superintendent be shared across multiple projects, or should they be dedicated full-time to this project and this project only?

A. FAR Clause 52.236-6 Superintendence by the Contractor states that at all times during performance of the contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent superintendent who is satisfactory to the Contracting Officer and has authority to act for the Contractor. For each project, the Superintendent must be always on site while work is being performed, may not be shared across multiple projects while work is being performed, and may not supervise multiple projects at the same time. This requirement ensures adequate supervision and safety for the workers on site.

Q. Can the Superintendent fulfil multiple roles? If so, can they also fulfil the Quality Control role?

What about the SSHO role?

A. Yes, with appropriate qualifications and approval, though multiple SSHOs may be required based on project phasing. See section 01 35 26.

Q. Will the VA provide a spot for the Prime Contractor to set up a temp office? (We ask this because we know the VA has very little spare real estate).

A. Trailer lots are available with electrical hookup. Trailers must not exceed 55 feet in length and 12 feet in width (access stairs not included in maximum width). See exhibits below.

Q. Should contractors include monies for a temp office, utilities, etc.?

A. See Spec 01 00 00 para 1.6B

Q. Will staging and/ or parking be an issue for this project?

A. No. See previously referenced map above.

Q. Does the VA anticipate this project will require off hours work? If so, what trades or scopes will be required to perform off hours work?

A. Not currently

Q. The Synopsis in the “Statement of Work” describes 4 roads having work done in this project. The “Statement of Bid Items” confines bids only on 2 roads (Base Item I with deducts). Please clarify if Taft and Dobson are to be included in Base Bid Item

A. The limits of the project are confined to those illustrated in the plans.

Q. Will new drawings be issued with scale and reference?

A. Please see attached revised scaled drawings.

Q. The repair areas have the square feet on each page. However, for the 1.5” mill & fill for the streets, there is no scale to go off of for us to get the square footage for this item.

A. The mill areas can be scaled from the drawings. A set with scales is provided.

Q. The repair areas on the plans are called full depth repair, remove and replace pavement, & full depth replacement. On the asphalt details page GI003 they are called partial depth repair, Roland Ave full depth repair, & general full depth repair. Just looking for clarification so we are not guessing. For example, is the partial depth repair the remove and replace pavement?

A. The Roland Full Depth Repair is a Re-build of that section of Roland Ave.

File details come from the government source that posted it. Updated .