36C25021Q0996 0005.docx
DOCX document 15 KB Posted
- Attached to
- H959--5 Year Arc Flash Survey Federal contract opportunity
- Solicitation number
- 36C25021Q0996
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25021Q0996 0004.docx | DOCX document | |
| 36C25021Q0996 0003.docx | DOCX document | |
| 36C25021Q0996 0002.docx | DOCX document | |
| 2018-08-07 FH Dayton Electrical As-Built E-1.pdf | ||
| 15-0608FinalRev-S Dayton VAMC Study Report.pdf | ||
| VA Dayton building list-Arf Flsah Study 2021.pdf | ||
| TQSIOH835 DAYTON VA MODERNIZE REPORT Rev4.pdf | ||
| 36C25021Q0996 0001.docx | DOCX document | |
| 36C25021Q0996.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment to a Previous Combined Solicitation
Amendment to a Previous Combined Solicitation
| SUBJECT* |
| 5 Year Arc Flash Survey |
GENERAL INFORMATION
| CONTRACTING OFFICE’S ZIP CODE* |
| 45409-1337 |
| SOLICITATION NUMBER* |
| 36C25021Q0996 |
| RESPONSE DATE/TIME/ZONE |
| 08-19-2021 4PM EASTERN TIME, NEW YORK, USA |
| ARCHIVE |
| 60 DAYS AFTER THE RESPONSE DATE |
| RECOVERY ACT FUNDS |
| N |
| SET-ASIDE |
| SDVOSBC |
| PRODUCT SERVICE CODE* |
| H959 |
| NAICS CODE* |
| 238210 |
| CONTRACTING OFFICE ADDRESS |
| Department of Veterans Affairs |
Network Contracting Office (NCO) 10 Dayton VA Medical Center 3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337
POINT OF CONTACT*
Contracting Officer Mary Jane Crim maryjane.crim@va.gov 937-268-6511
PLACE OF PERFORMANCE
| ADDRESS |
| Department of Veterans Affairs |
Dayton VA Medical Center
4100 West Third St
Dayton OH
| POSTAL CODE |
| 45428-9000 |
| COUNTRY |
| USA |
ADDITIONAL INFORMATION
AGENCY’S URL
URL DESCRIPTION
AGENCY CONTACT’S EMAIL ADDRESS
EMAIL DESCRIPTION
DESCRIPTION
The purpose of this amendment is to extend the close date and time and to answer an additional question and make a change to the SOW. The due date and time are hereby extended from 8/17/2021 @4PM to 8/19/2021 @4PM. The question and answer are listed below with answers in red text.
2.5.1 Perform this study using the SKM power tools software model and provide the complete study SKM files and software model to the VA when the work is accepted. The SKM model must consider the equipment configuration, whether the buss/conductor is horizontal or vertical. Also, the equipment’s actual dimensions need to accounted for to increase the calculation accuracy.
We would ask that the above-referenced solicitation section be changed to recognize and accept “equivalent” arc flash study software. The VA will accept equivalent arc flash study software.
Section 2.5.1 is hereby replaced with:
2.5.1 Perform this study using the SKM power tools software model (or equivalent software) and provide the complete study SKM (or equivalent) files and software model to the VA when the work is accepted. The SKM model (or equivalent) must consider the equipment configuration, whether the buss/conductor is horizontal or vertical. Also, the equipment’s actual dimensions need to account for to increase the calculation accuracy.
Mary Jane Crim Contracting Officer maryjane.crim@va.gov
| *= Required Field |
| Amendment to a Previous Combined Solicitation |
Page 1 of
Amendment to a Previous Combined Solicitation
File details come from the government source that posted it. Updated .