36C25020B0038-004.pdf

PDF Posted

Attached to
Z1DA--Correct Pressurization in the OR 539-20-210 Federal contract opportunity
Solicitation number
36C25020B0038
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This notice announces an upcoming solicitation for a construction project at a Veterans Affairs medical center. The project involves correct pressurization in operating rooms and will be issued as a 100% set-aside for a service-disabled veteran-owned small business. The solicitation is expected to be released on or around July 15, 2018 on www.fbo.gov. The project scope includes mechanical, electrical, and architectural work. The estimated value is between $100,000 and $200,000. The NAICS code is 236210 and business size standard is $15 million. The selected contractor must perform a minimum of 25% of construction work and have no more than three serious OSHA/EPA violations or one repeat/willful violation in the past three years. The project duration is 365 days from notice to proceed. Payment and performance bonds will be required.

36C25020B0038 Attachment 3 DRAWINGS 2020 0406.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Z1DA--Correct Pressurization in the OR 539-20-210, newest first.
File Type Posted
36C25020B0038 0002.docx DOCX document
36C25020B0038-0001000.docx DOCX document
36C25020B0038-003.pdf PDF
36C25020B0038-001.docx DOCX document
36C25020B0038-005.docx DOCX document
36C25020B0038-006.docx DOCX document
36C25020B0038-002.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POLICE

VA

POLICE

VA

BUILDING 1

BUILDING 2

BUILDING

BUILDING 8

BUILDING

ARCHITECTURE PLANNING INTERIOR DESIGN

3011 NEWMARK DRIVE

MIAMISBURG, OH 45342

937.224.1931 P

937.224.3091 F

300 W. MONUMENT AVENUE SUITE 200

DAYTON, OHIO 45402

937.438.0177 P

G001

TITLE SHEET

VICINITY MAP

3200 VINE STREET CINCINNATI, OH 45220

CORRECT PRESSURIZATION IN THE OPERATING ROOMS

GENERAL PROJECT NOTES

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH SIGNAGE.

ALL WORK WILL COMPLY WITH ALL APPLICABLE NATIONAL, STATE OR LOCAL CODES, ORDINANCES AND REGULATIONS .

IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE COR OF ANY WORK THAT MIGHT REQUIRE INTERRUPTION OF UTILITY

SERVICES, CAUSE NOISE, OR CREATE VIBRATION PRIOR TO COMMENCEMENT OF THIS WORK.

THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE SPECIFICATIONS INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, MATERIAL AND CONSTRUCTION PROVISIONS WHICH APPLY TO MATERIALS OR CONSTRUCTION

METHODS REQUIRED.

DO NOT PAINT ANY SEALANTS OR CAULKING WHICH ARE SUBJECT TO MOVEMENT. CONTROL JOINTS SHALL BE CAULKED AFTER PAINTING AND SPECIAL COATING APPLICATIONS. PROVIDE CAULKING OR SEALANTS WHICH MATCH ADJACENT FINISHED COLORS UNLESS NOTED

OTHERWISE.

ALL EXISTING CONSTRUCTION TO REMAIN THAT ARE DAMAGED OR DISTURBED DURING CONSTRUCTION SHALL BE PATCHED OR REPAIRED

TO MATCH EXISTING ADJACENT CONSTRUCTION.

ALL INTERIOR WOOD BLOCKING, MISC. FRAMING, PANELS, ETC. THAT ARE TO BE USED SHALL BE FIRE-RETARDANT TREATED. ALL

EXTERIOR WOOD BLOCKING SHALL BE PRESSURE TREATED.

ALL SUSPENDED ITEMS SHALL BE ATTACHED DIRECTLY TO STRUCTURE AND NOT ANCHORED TO ANY NON-STRUCTURAL ITEM, COMPONENT OR SYSTEM.

ALL NEW PENETRATIONS IN ALL EXISTING, MODIFIED OR NEW CORRIDOR WALLS, SMOKE AND FIRE PARTITIONS, AND FLOOR SLABS SHALL BE SEALED WITH FIRE RESISTANT CAULKING OR SEALANT THAT PREVENTS THE PASSAGE OF SMOKE AND/OR FIRE ALL COMPLYING TO

THE LIFE SAFETY AND FIRE CODE AND MEETING EXISTING CONDITIONS.

NEW CORE DRILLING THROUGH EXISTING STRUCTURAL ELEMENTS REQUIRED BY CONSTRUCTION SHALL BE COORDINATED BY THE

CONTRACTOR TO AVOID DRILLING THROUGH OR INTO ANY STRUCTURAL ELEMENTS.

NEW CONSTRUCTION INSTALLED SHALL BE COORDINATED BY THE CONTRACTOR FOR PROPER FIT, DIMENSIONS AND ACCESS TO THE

BUILDING PRIOR TO BEGINNING CONSTRUCTION AND DELIVERY OF COMPONENTS TO THE SITE.

INTERIOR DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE

INTERIOR CONCRETE SLABS AND PATCHES, USE MIN. 10 MIL REINFORCED POLYETHYLENE VAPOR BARRIER UNDER CONCRETE SLAB.

TROWEL SURFACE SMOOTH AND FINISH FLUSH WITH EXISTING SLAB ELEVATION. SEAL VAPOR BARRIER WATERTIGHT.

CONTRACTOR'S BID SHALL INCLUDE THE GREATEST QUANTITY AND QUALITY OF ALL ITEMS AND ASSEMBLIES FOR A COMPLETE AND FULLY

OPERATIONAL PROJECT IN ACCORDANCE WITH THE VETERAN ADMINISTRATION'S REQUIREMENTS

UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION, REMOVAL AND REPLACEMENT WORK SPECIFIED AND REQUIRED TO ACCOMMODATE THE REQUIRED IMPROVEMENTS, AND SHALL ALSO BE RESPONSIBLE FOR ANY AND ALL NECESSARY REPLACEMENT, REPAIRING, AND PATCHING. WORK TO BE DONE BY WORKMAN SKILLED AND REGULARLY

EMPLOYED IN THE TRADES INVOLVED.

CONTRACTOR SHALL PROPERLY PLAN AND EXECUTE ALL WORK. NO EXTRA COSTS FOR LACK OF PROPER PLANNING AND EXECUTION

SHALL BE CONSIDERED.

CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS FOR MATERIAL DIFFERENCES PRIOR TO PERFORMING ANY WORK AND SHALL NOTIFY

THE COR OF ANY DISCREPANCIES.

CAMPUS MAP

SCALE | 1" = 100'

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

/1

/2

:3

:0 P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

CORRECT PRESSURIZATION

IN THE OPERATING ROOMS

CINCINNATI, OH

539-20-210

Project Section Chief

04/06/2020Revisions: Date:

KRISTINA AMIN

SCHEMATIC DESIGN SUBMITTAL 05/19/2019

DESIGN DEVELOPMENT SUBMITTAL 09/27/2019

95% OWNER REVIEW 01/08/2020

CONSTRUCTION DOCUMENT 04/06/2020

MW VP

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215

Expiration Date 12/31/2021

INDEX OF DRAWINGS

SHEET DESCRIPTION

1-M103 THIRD FLOOR MECHANICAL PLAN - REMOVALS & NEW WORK

1-M104

1-M601 SCHEDULES

1-M702 CONTROL SCHEMATICS

INDEX, LEGEND, AND GENERAL NOTES1-M001

FOURTH FLOOR MECHANICAL PLAN - REMOVALS & NEW WORK

1-M701 THIRD FLOOR TEMPERATURE CONTROL PLAN - NEW WORK

THIRD FLOOR ELECTRICAL PLAN - REMOVALS AND NEW WORK 1-E103

LEGEND, GENERAL NOTES AND INDEX OF DRAWINGS1-E001

1-E104 FOURTH FLOOR ELECTRICAL PLAN - REMOVALS AND NEW WORK

TITLE SHEET

DOOR SCHEDULE AND DETAILS

THIRD FLOOR ARCHITECTURAL FLOOR PLAN - REMOVALS AND NEW WORK

THIRD FLOOR REFLECTED CEILING PLAN - REMOVALS AND NEW WORK

G-001

1-A103

1-A123

1-A601

ELECTRICAL

MECHANICAL

ARCHITECTURAL

DN

Isolation Procedure

Rm.

C3024

Corridor C*3*14

Procedure Rm.

C3025

Signal Clos.

C3035

Patient Toilet Rm.

C3037

Prep/Recovery Rm.

C3038

Staff Lounge

C326

SPD Case Cart C3034

O.R. #7 C329

O.R.

Storage

C339

STERILE

SUPPLY

CLOSET

C327

Men's Locker C324B

O.R. 1 C354

O.R. 2 C353

O.R. Alcove C352

O.R. Alcove C352A

O.R. Alcove C352BLight Rm.

C352C

O.R. 3 C351

O.R. 4 C350

Clean Core C340

Elec.

C338A

O.R. 5 C349

O.R. 6 C348

Mech.

C345

Corridor C*3*7

Women's Locker

C322

HAC

C346

Office C330

Cysto O.R.

C332

Cysto O.R.

C347

M. Shower C324AW. Shower

C322A

Sub-Waiting C3036

Sterile Core C347A

Frozen Section

C316 Utility C320

Office C318 Elec.

C335

Tele.

Corridor

Entry C324

A/C Shaft C337A

Anesthesia Tech.

C328

Oxygen Storage

C369

Vestibule C322B

Vestibule C324C

HAC

C3033

Stair 8 S*3*8

Corridor C*3*12

Corridor C*3*13

Corridor C*3*16

Corridor C*3*15

C348B

C349B

C350B

C351B

C353B C354B

C340

C*3*7

C322B C324C

C339

C*3*16

C347A

C*3*7B

C*3*13

C*3*15

S*3*8

C327

FEC

C346

C329

UP

UP

UP

UP

UP

UP

UP

UP

DN

DN

DN

DNUP

DN UP

DN

UP

UPDN

DN

Isolation Procedure

Rm.

C3024

Fluoro Procedure

Rm.

C3023

Corridor C*3*14

Procedure Rm.

C3021

Wash Room C3020

Physician Work Room

C3019

Scope Storage

C3017

Ante Rm.

C3016

Scope Cleaning

C3016A

Procedure Rm.

C3025 Procedure

Rm.

C3026

Prep/Recovery Rm.

C3027

Clean Supply C3014

Isolation Prep/Recovery

Rm.

C3013Prep/Recovery

Rm.

C3028

Prep/Recovery Rm.

C3029

Isolation Prep/Recovery

Rm.

C3012

Prep/Recovery Rm.

C3011

Prep/Recovery Rm.

C3030

Prep/Recovery Rm.

C3010

Staff Break Rm.

C3009

Staff Toilet C3009A

Patient Toilet Rm.

C3008

Storage C3007A

Signal Clos.

C3035

Patient Toilet Rm.

C3037

Prep/Recovery Rm.

C3038 Prep/Recovery

Rm.

C3039

Post-Op C3040

Elec.

C3036A

Supplies / Equipment

C3006

Consult.

C3005

Lobby C3001

Waiting C3002

Staff Lounge

C326 Stair 10 S*3*10

Staff Work Rm.

C3007

SPD Case Cart C3034

O.R. #7 C329

O.R.

Storage

C339

STERILE

SUPPLY

CLOSET

C327

Men's Locker C324B

O.R. 1 C354

O.R. 2 C353

O.R. Alcove C352

O.R. Alcove C352A

O.R. Alcove C352BLight Rm.

C352C

O.R. 3 C351

O.R. 4 C350

Clean Core C340

Elec.

C338A

O.R. 5 C349

O.R. 6 C348

Mech.

C345

Corridor C*3*7

Women's Locker

C322

HAC

C346

Office C330

Cysto O.R.

C332

Cysto O.R.

C347

M. Shower C324AW. Shower

C322A

Sub-Waiting C3036

Work Rm.

C3004A

Nurse Station C3031

Sterile Core C347A

Frozen Section

C316 Utility C320

Office C318 Elec.

C335

Tele.

C333

Corridor C*3*9

Entry C324

A/C Shaft C337A

Soiled Utility C3032

Men's C3002A

Women's C3002B

Pat. Tlt.

C3022

Reception C3004

Dr. Office C315

Office C317

Office C319

Office C321

Office C323

Office C325

Stair 6 S*3*6

Anesthesia Tech.

C328

Cleaning Supply C3016B

Temp.

Control C3005A

Oxygen Storage

C369

Vestibule C322B

Vestibule C324C

HAC

C3033

Patient Room A387A

Patient Room A387B

Patient Room A387C

Patient Room A387D

Patient Room A387E

Patient Room A387F

Patient Room A387G

Shower A387H

Patient Room A387I

Patient Room A387J

Patient Room A387K

Nurse Station

A387

Service Lobby

A338 M. Locker

A339

F. Locker A340

Corridor C*3*19

RO DI

Water A343

De-Gown A342

Gowning Rm.

A341

De-Con B303Prep/Pack

B307C

HAC

B303A

HAC

B307D

Office B305B

Office B305A

Storage B308A

Office B305C

Conf Rm.

B305D

Vendor Drop Off

B304Cool Down Cart B307B

Steam Equip Rm.

B307A

Open Office B305

Ante Rm/ Clean Exit

B307

Elec B306

Vasc. Lab A300

Vascular Lab A301

Chief Diet.

A302

Diet Sec.

A303

Diet Off.

A305F. Tlt.

A306A

Waiting A307

Exam A308

Exam A309

Storage A310

Lab A311

Machine A311A

Plaster A312

CAD/CAM

A313

Off.

A314

Elec.

A315

M. Tlt.

A316

Stor.

A317

HAC

A318

Asst. Chief A319

Pros. Adm.

Asst.

A320

Clos.

A320A

Chief Off.

A321

Ward Adm.

Off.

A323

Adm. Asst.

A324

Office A324A

Office A324B

Office A324C

Chief PBS A324D

Office A324E

Office A324G

Stor.

A324F

Stor.

A324H

Elec.

A331A

Pros. Stor.

A330

Pros. Off.

A332

Stair 2 S*3*2 Stor.

A335

Stor.

A336

Asst. Chief Diet.

A337

Corridor C*3*2

F. Tlt.

A341

M. Tlt.

A342

Stair 1 S*3*1

Stor.

A344

Sig.

A345

Stor.

A344A

Tlt.

A347A

Vasc. Lab A347

Elec.

A350

Mech.

A351

Adm. Asst.

A352

Off.

A353

Conf.

A354

Chief of Surgery

A355

Off.

A356

Off.

A357

Off.

A358

Off.

A359

Off.

A360

Off.

A361

Corridor C*3*3

Off.

A355A

Physician Review A355B

Linen Clos.

A389

Nurse Off.

A390

Soil Utility A391

Equip. Stor.

A392

HVAC

A394

Elec.

A395

Sig.

A396

Clean Supply

A397

Vasc. Lab A379

HAC

A378

HAC

A380

Lounge A382

Tlt.

A382A

M. Lock.

A382BFemale

Locker A382C

Soc. Wrk.

A383

Respiratory Therapy

A384

Conference Room A385

Pharm.

A386

On Call A381

Tlt.

A381A

Patient Advocate

A348

Off.

A349

Stair 5 S*3*5

Off.

A350B

Off.

A350D

Off.

A350A

Off.

A350C

Corridor C*3*1

Elect.

A346

Classroom B308

Nurse Educator

B309Stor.

B310

Office B311Office

B310A Conf.

B310B

Off.

B311A

Off.

B311B

Lounge B311C

Asst. Ch.

B311D

Asst. Ch.

B311E

Adm. Off.

B311F

Word Proc.

B311G

Off.

B311H

Chief Nurse B311I

Research Off.

B312

Off.

B312A

Sig.

B312B

Elec.

B312C

Stair 3 S*3*3

Nursing Conf.

B314

F. Tlt.

B315

Stor.

B316

Eq. Stor.

B317

Res. Stor.

B318

Stor.

B319

Classroom B320

Office B321

Off.

B319A

Off.

B319B

Off.

B319C

Off.

B319D

Stor.

B321A

Classroom B321B

Work Area B320A

Stor.

B320B

Stor.

B320C

HAC

B319E

Stair 4 S*3*4

Stor.

B311M

Corridor Learning Exchange

B322

Work Area B322A

Work Area B322B

Elec.

B322C

Pat. Dining B325

Family Waiting

B326

Reception B327 Office

C300

Consult C301

Break Rm.

C302

Patient Tlt.

C303

PACU

C304

Ophthamology Optometry

C305 Office C306

Acute Care C307

Storage C308

Corridor C*3*6

Patient Rm.

C304A

Patient Rm C304B

Patiet Rm C304C

Meds.

C304D

Clean Supp.

C304E

Patient Rm.

C304F

Patient Rm.

C304G

Patient Rm.

C304H

Patient Rm.

C304IPatient Tlt.

C304J Patient Rm.

C304K Patient Rm.

C304L Patient Rm.

C304M

Patient Rm.

C304N

Patient Rm.

C304O

EMS

C360Off.

C361

Clean Stretcher

Stor.

C355

Anaesthetics C356Soil

C357 Storage

C358

HAC

C359

Electrical C309

Family Wtng.

C310

Tele C311

Lactation C312

Grieve Consult

C313

ICU Dir.

Off.

C314

Tlt.

C313B

Corridor C*3*17

Adm. Asst.

A307A

Stor.

A324I

Tlt.

A388

Stair 9 S*3*9

HAC

B301

Db. Wtr B302

Tlt.

C302A

Tr. Ch.

A338A

Stair 8 S*3*8

A/C Shaft A/C Shaft

A/C Shaft

Elec A338B

Linen Clost.

C3015

Corridor C*3*11

Corridor C*3*12

Corridor C*3*13

Corridor C*3*16

Corridor C*3*15

Corridor C*3*18

Room B303B

Room B307E

A100

C348B

C349B

C350B

C351B

C353B C354B

C340

C*3*7

C322B C324C

C339

C*3*16

C*3*7B

C*3*13

C*3*15

S*3*8

C327

FEC

C346

C329

24"x48" ACCESS

DOOR

EXISTING 16"x24"

RETURN GRILLE

2'-0"

4' -0

4'

-0

6'-0"

3' -4

3'

-6

2"2"

EXISTING FIRE

SHUTTER TO

REMAIN

. SLIDING WINDOW

WITH TEMPERED

GLAZING

FUNCTION: MANUAL

OPEN/ELECTRONIC RELEASE

WITH PRESENCE SENSOR

SCALE:

A341, A342, B303, B303A, B307A, B307C, B307E 1/8"= 1'-0"

NORTH

1-A103

SCALE:

EXISTING THIRD FLOOR PLAN

1/32"= 1'-0"

NORTH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Fi le

P at h 6/

/2

:3

9:

P M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

CORRECT PRESSURIZATION

IN THE OPERATING ROOMS

CINCINNATI, OH

539-20-210

Project Section Chief

04/06/2020Revisions: Date:

KRISTINA AMINSCHEMATIC DESIGN SUBMITTAL 05/19/2019

DESIGN DEVELOPMENT SUBMITTAL 09/27/2019

95% OWNER REVIEW 01/08/2020

CONSTRUCTION DOCUMENT 04/06/2020

MW VP

S

T A

T E OF OHIO

R E G

ISTERED ARC

HI

TE

C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215 Expiration Date 12/31/2021

SCALE:

TYP. ACCESS DOOR PANEL ELEVATION

1/4"= 1'-0"

KEY NOTESX

DOORS TO REMAIN

NEW DOORS

LEGEND

WALLS TO REMAIN

WITHIN LIMIT OF WORK

GENERAL NOTES

C212 DOOR TAG -SEE DOOR SCHEDULE

DOOR TO BE REMOVED AND REPLACED

THIRD FLOOR PLAN -

REMOVALS AND NEW WORK

1. REMOVED DOOR AND ASSOCIATED HARDWARE AND REPLACE WITH

NEW DOOR LEAF AND HARDWARE WITH COMPLETE SEALS

2. REMOVE EXISTING FIRE EXTINGUISHER CABINET, PROTECT AND

RELOCATE. CONTRACTOR TO PATCH AREA DISTURBED BY

REMOVAL.

3. EXISTING ROOMS ARE EQUIPPED WITH LEAD LINED DRYWALL.

4. NEW RECESSED 24"X48" ACCESS DOOR

5. NEW RECESSED 24"X48" FIRE RATED ACCESS DOOR

6. NEW RECESSED 24"X48" LEAD LINED ACCESS DOOR

7. RELOCATE EXISTING FIRE EXTINGUISHER

8. REMOVE EXISTING WINDOW AND REPLACE WITH NEW SLIDING

TRANSACTION WINDOW WITH MANUAL OPEN/ELECTRONIC RELEASE

9. SEE BID ITEM 2, DEDUCT ALTERNATE #1

PARTIAL THIRD FLOOR PLAN

SCALE:

WINDOW ELEVATION

1/4"= 1'-0"

20 A. COORDINATE AND SCHEDULE A MINIMUM OF 4 WEEKS IN

ADVANCE WITH COR , PHASING AND CONSTRUCTION TIMELINE.

INCLUDE TIMELINE FOR DOWNTIME OF ALL UTILITIES REQUIRED

FOR PERFORMANCE OF THIS WORK.

B. THE ASSOCIATED AIR HANDLING AHU-25 SHALL BE

OPERATIONAL DURING ALL NORMAL BUSINESS HOURS,

MONDAY-FRIDAY. ALL WORK ASSOCIATED WITH AHU-25 SHALL

TAKE PLACE ON THE WEEKENDS COORDINATE WITH COR A

MINIMUM OF 4 WEEKS IN ADVANCED. SEE MEP DRAWINGS FOR

EXTENT OF WORK.

C. A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN ACTIVE

AT ALL TIMES WITH UNOBSTRUCTED ACCESS TO ROOMS BY VA

STAFF. COORDINATE WITH COR

D. THE WORK AREAS IN THE SURGERY SUITE SHALL BE PROPERLY

TENTED AND HELD AT NEGATIVE PRESSURE FOR ENTIRE

DURATION OF THE WORK.

E. THE OPERATING SUITE IS CONSIDERING INFECTION CONTROL,

LEVEL IV, CONTRACTOR TO COMPLY WITH ALL VA SAFETY

PROTOCOL

F. ABATEMENT, REMOVAL OR ENCAPSULATION IS INCLUDED IN

THIS CONSTRUCTION CONTRACT. SEE MECHANICAL DRAWINGS

FOR EXTEND OF WORK . ANY ABATEMENT WORK PERFORMED

FOR THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING

ANY PROJECT WORK.

G. WORK TO PROVIDE COMPLETE PLUMBING,MECHANICAL, AND

ELECTRICAL SYSTEMS SHALL OCCUR BEYOND EXTENT OF

WORK LINE, AS REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF WORK LINE DUE TO

INSTALLATION OF SUCH SYSTEMS (SEE ALL PLUMBING,

MECHANICAL, &ELECTRICAL DWGS.).

H. PATCH EXISTING WALLS & FLOORS WHERE REMOVAL AND NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW WORK.

I. ALIGN NEW WORK WITH EXISTING

J. FILL ALL SLAB/WALL OPENINGS RESULTING FROM PLUMBING,

ELECTRICAL, MECHANICAL, OR OTHER REMOVALS.

K. SEE DRAWING 1-A601 FOR SHIELDING DETAILS

Isolation Procedure

Rm.

Corridor

Procedure Rm.

Signal Clos.

Patient Toilet Rm.

Prep/Recove Rm.

Staff Lounge

SPD Case Cart

O.R. #7

O.R.

Storage

STERILE

SUPPLY

CLOSET

Men's Locker

O.R. 1O.R. 2

O.R. AlcoveO.R. AlcoveO.R. Alcove Light Rm.

O.R. 3

O.R. 4

Clean Core

Elec.

O.R. 5

O.R. 6

Mech.

Corridor

Women's Locker

HAC

Office

Cysto O.R.

Cysto O.R.

M. Shower W. Shower

Sub-Waiting

Sterile Core

Frozen Section Utility Office

Elec.

Tele.

Corridor

Entry

A/C Shaft

Anesthesia Tech.

Oxygen Storage

Vestibule Vestibule

Corridor

Corridor

Corridor

Corridor

Isolation Procedure

Rm.

Fluoro

Procedure Rm.

Corridor

Procedure Rm.

Wash Room Physician

Work Room

Scope Storage

Ante Rm.

Scope Cleaning

Procedure Rm. Procedure

Rm.

Prep/Recovery Rm.

Clean Supply

Isolation Prep/Recovery

Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Isolation Prep/Recovery

Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Prep/Recovery Rm.

Staff Break Rm.

Staff Toilet

Patient Toilet Rm.

Storage

Signal Clos.

Patient Toilet Rm.

Prep/Recovery Rm.

Prep/Recovery Rm. Post-Op

Elec. Supplies / Equipment

Consult.

Lobby

Waiting

Staff Lounge

Stair 10

Staff Work Rm.

SPD Case Cart

O.R. #7

O.R.

Storage

STERILE

SUPPLY

CLOSET

Men's Locker

O.R. 1O.R. 2

O.R. AlcoveO.R. AlcoveO.R. Alcove Light Rm.

O.R. 3

O.R. 4

Clean Core

Elec.

O.R. 5

O.R. 6

Mech.

Corridor

Women's Locker

HAC

Office

Cysto O.R.

Cysto O.R.

M. Shower W. Shower

Sub-Waiting

Work Rm.

Nurse Station

Sterile Core

Frozen Section Utility Office

Elec.

Tele.

Corridor

Entry

A/C Shaft

Soiled Utility

Men's

Women's

Pat. Tlt.

Reception

Dr. Office Office Office Office Office Office Stair 6

Anesthesia Tech.

Cleaning Supply

Temp.

Control

Oxygen Storage

Vestibule Vestibule

Patient Room

Patient Room

Patient Room Patient

Room

Patient Room

Patient Room

Patient Room

Shower Patient Room

Patient Room

Patient Room

Nurse Station

Service LobbyM. Locker

F. Locker

Corridor

RO DI

WaterDe-Gown

Gowning Rm.

De-Con Prep/Pack

HAC

HAC

Office

Office

Storage

Office Conf Rm.

Vendor Drop Off

Cool Down Cart

Steam Equip Rm.

Open Office

Ante Rm/ Clean Exit

Elec

Vasc. Lab Vascular

LabChief Diet.Diet Sec.

Diet Off.

F. Tlt.

Waiting

Exam

Exam

Storage

Lab Machine

Plaster

CAD/CAM

Off.

Elec.

M. Tlt.

Stor.

HAC

Asst. Chief

Pros. Adm.

Asst.

Clos.

Chief Off.

Ward Adm.

Off.

Adm. Asst.

OfficeOffice

Office

Chief PBS

Office Office

Stor.

Stor.

Elec.

Pros. Stor.

Pros. Off.

Stair 2

Stor.

Stor. Asst. Chief Diet.

Corridor

F. Tlt.

M. Tlt.

Stair 1

Stor.

Sig.

Stor.

Tlt.

Vasc. Lab

Elec.

Mech.

Adm. Asst.

Off.

Conf.

Chief of Surgery

Off.

Off.

Off.

Off.

Off.

Off.

Corridor

Off.

Physician Review

Linen Clos.

Nurse Off.

Soil Utility

Equip. Stor.

HVAC

Elec.

Sig.

Clean Supply

Vasc. Lab

HAC HAC

Lounge

Tlt.M. Lock.

Female Locker

Soc. Wrk.

Respiratory Therapy

Conference Room

Pharm.

On Call

Tlt.

Patient Advocate

Off.

Stair 5

Off. Off.

Off. Off.

Corridor

Elect.

ClassroomNurse Educator

Stor.

Office Office Conf.

Off. Off. Lounge Asst. Ch. Asst. Ch. Adm. Off. Word Proc. Off.

Chief Nurse

Research Off.

Off.

Sig.

Elec.

Stair 3

Nursing Conf.

F. Tlt.

Stor.

Eq. Stor.

Res. Stor.

Stor.

Classroom

Office

Off.

Off.Off.Off.

Stor.

Classroom

Work Area

Stor.

Stor.

HAC

Stair 4

Stor.

Corridor Learning Exchange

Work Area

Work Area

Elec.

Pat. Dining

Family Waiting

Reception Office

Consult

Break Rm.

Patient Tlt.

PACU

Ophthamology Optometry Office Acute Care

Storage

Corridor

Patient Rm. Patient Rm Patiet Rm

Meds.

Clean Supp.

Patient Rm.

Patient Rm.

Patient Rm.Patient Rm.

Patient Tlt.

Patient Rm.Patient Rm.Patient Rm.

Patient Rm.

Patient Rm.

EMS

Off.

Clean Stretcher

Stor.

Anaesthetics

SoilStorageHAC

Electrical

Family Wtng.

Tele

Lactation

Grieve Consult

ICU Dir.

Off.

Tlt.

Corridor

Adm. Asst.

Stor.

Tlt.

Stair 9

HAC

Db. Wtr

Tlt.

Tr. Ch.

Stair 8

Elec

Linen Clost.

Corridor

Corridor

Corridor

Corridor

Corridor

Corridor

Room

Room

SCALE:

ENLARGED REFLECTED CEILING PLAN

1/8"= 1'-0"

1-A123

SCALE:

EXISTING THIRD FLOOR REFLECTED CEILING PLAN

1/32"= 1'-0"

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

F ile

P a th

/1

/2

:3

:0 P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORDCONSULTANT

321 4 5 6 7 8 9 10

CORRECT PRESSURIZATION

IN THE OPERATING ROOMS

CINCINNATI, OH

539-20-210

Project Section Chief

04/06/2020Revisions: Date:

KRISTINA AMIN

SCHEMATIC DESIGN SUBMITTAL 05/19/2019

DESIGN DEVELOPMENT SUBMITTAL 09/27/2019

95% OWNER REVIEW 01/08/2020

CONSTRUCTION DOCUMENT 04/06/2020

MW VP

S

T A

TE

OF OH

IO

R E G

IS

TERED ARC

HI

T

E C T

MARK

C.

WISEMAN

13215

Mark C. Wiseman, License #13215

Expiration Date 12/31/2021

KEY NOTES

DOORS TO REMAIN

NEW DOORS

LEGEND

WALLS TO REMAIN

WITHIN LIMIT OF WORK

C212 DOOR TAG -SEE DOOR SCHEDULE

DOOR TO BE REMOVED AND

REPLACED

THIRD FLOOR REFLECTED

CEILING PLAN

GENERAL NOTES

A. COORDINATE AND SCHEDULE A MINIMUM OF 4 WEEKS IN

ADVANCE WITH COR , PHASING AND CONSTRUCTION TIMELINE.

INCLUDE TIMELINE FOR DOWNTIME OF ALL UTILITIES REQUIRED

FOR PERFORMANCE OF THIS WORK.

B. THE ASSOCIATED AIR HANDLING AHU-25 SHALL BE

OPERATIONAL DURING ALL NORMAL BUSINESS HOURS,

MONDAY-FRIDAY. ALL WORK ASSOCIATED WITH AHU-25 SHALL

TAKE PLACE ON THE WEEKENDS COORDINATE WITH COR A

MINIMUM OF 4 WEEKS IN ADVANCED. SEE MEP DRAWINGS FOR

EXTENT OF WORK.

C. A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN ACTIVE

AT ALL TIMES WITH UNOBSTRUCTED ACCESS TO ROOMS BY VA

STAFF. COORDINATE WITH COR

D. THE WORK AREAS IN THE SURGERY SUITE SHALL BE PROPERLY

TENTED AND HELD AT NEGATIVE PRESSURE FOR ENTIRE

DURATION OF THE WORK.

E. THE OPERATING SUITE IS CONSIDERING INFECTION CONTROL,

LEVEL IV, CONTRACTOR TO COMPLY WITH ALL VA SAFETY

PROTOCOL

F. ABATEMENT, REMOVAL OR ENCAPSULATION IS INCLUDED IN

THIS CONSTRUCTION CONTRACT. SEE MECHANICAL DRAWINGS

FOR EXTEND OF WORK . ANY ABATEMENT WORK PERFORMED

FOR THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING

ANY PROJECT WORK.

G. WORK TO PROVIDE COMPLETE PLUMBING,MECHANICAL, AND

ELECTRICAL SYSTEMS SHALL OCCUR BEYOND EXTENT OF

WORK LINE, AS REQUIRED. GENERAL CONTRACTOR TO REPAIR

ANY EXISTING AREAS BEYOND EXTENT OF WORK LINE DUE TO

INSTALLATION OF SUCH SYSTEMS (SEE ALL PLUMBING,

MECHANICAL, &ELECTRICAL DWGS.).

H. PATCH EXISTING WALLS & FLOORS WHERE REMOVAL AND NEW

WORK OCCURS, OR AREAS ADJACENT TO NEW WORK.

I. ALIGN NEW WORK WITH EXISTING

J. FILL ALL SLAB/WALL OPENINGS RESULTING FROM PLUMBING,

ELECTRICAL, MECHANICAL, OR OTHER REMOVALS.

1. REMOVE EXISTING CEILING SYSTEM IN ITS ENTIRETY AND

REPLACE GRID AND CEILING TILE. SEE MECHANICAL DRAWINGS

FOR EXTEND OF WORK ABOVE CEILING

2. REMOVE EXISTING CEILING PADS AND KEEP EXISTING CEILING

GRID. SEE MECHANICAL DRAWINGS FOR EXTEND OF WORK

3. REMOVE GYPSUM BOARD CEILING AND REPLACE WITH NEW

GYPSUM BOARD CEILING

1-M001

INDEX, LEGEND, AND GENERAL

NOTES

INDEX OF DRAWINGS

SHEET DESCRIPTION

1-M103 THIRD FLOOR MECHANICAL PLAN - REMOVALS & NEW WORK

1-M104

1-M601 SCHEDULES

1-M702 CONTROL SCHEMATICS

DUCT THERMOSTAT WITH AVERAGING ELEMENT

DUCT STATIC PRESSURE SENSOR

DUCT HUMIDITY SENSOR

ROOM SENSOR: TEMPERATURE, HUMIDITY

LENGTH IN DUCT WHEN SPACE PERMITS)

REMOTE BULB THERMOSTAT

ROOM CONTROL: THERMOSTAT, HUMIDISTAT

DIFFERENTIAL PRESSURE SWITCH

DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT

SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)

DUCT OR PIPE TEMP. SENSOR

DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.

AFTER FILTER

CURRENT SENSING RELAY

AIR FOIL WHEEL (FAN)

AIR HANDLING UNIT

ANALOG INPUT

AIR PRESSURE DROP

ANALOG OUTPUT

AUTOMATIC TEMPERATURE CONTROLS

BACKWARD INCLINED WHEEL (FAN)

AIR FLOW MEASURING DEVICE

ABOVE FINISHED FLOOR

DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER

COOLING COIL

CONVERTOR

CONVECTOR

CLEAN OUT

CEILING GRILLE

CENTRIFUGAL FAN

CEILING DIFFUSER

BOTTOM REGISTER (WALL TYPE)

BOTTOM GRILLE (WALL TYPE)

CEILING REGISTER

COLD WATER (POTABLE)

DIGITAL OUTPUT

DIGITAL INPUT

DIRECT DIGITAL CONTROLS

DRY BULB TEMPERATURE, DEG. F

AUTOMATIC CONTROL DAMPER

EXHAUST FAN

ENGINEERING CONTROL CENTER

DOUBLE WIDTH DOUBLE INLET (FAN)

DOOR UNDERCUT BY GENERAL CONTRACTOR

ITEM. (TO BE USED AS AN AID IN COORDINATING THE

LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT

APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF

MANUAL VOLUME DAMPER

U/C

VARIOUS TRADES.)

FIRE DAMPER

BUTTERFLY VALVE

CIRCUIT SETTER

BALL VALVE

COMBINATION BALANCING/SHUT-OFF VALVE

MANUAL AIR VENT

AUTOMATIC FLOW CONTROL VALVE

TEST PLUG (PRESSURE/TEMPERATURE)

SAFETY VALVE OR PRESSURE RELIEF

PRESSURE REDUCING VALVE

STRAIGHT-THRU TWO-POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL VALVE

STRAIGHT-THRU MODULATING CONTROL VALVE

EX.

EF

EXISTING

DWDI

ECC

DI

DO

DB

DDC

D

Db

DECIBELS

BUILDING NO. WHERE EQUIPMENT IS LOCATED.

EQUIPMENT ABBREVIATION (SUPPLY FAN)

SUPPLY FAN NO.3 IN BUILDING NO.1

SHEET NUMBER WHERE DRAWN

DRAWING NUMBER WHERE DRAWN

SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)

RETURN DUCT (UP & DOWN)

VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF

EXHAUST OR RETURN TOP REGISTER OR GRILLE,

EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,

EXHAUST OR RETURN CEILING REGISTER OR GRILLE

SUPPLY DUCT (UP & DOWN)

INCLINED RISE, IN DIRECTION OF AIR FLOW

NEW DUCT - WIDTH X DEPTH

RECTANGULAR ELBOWS WITH VANES EVEN IF

VANED ELBOW (PROVIDE ALL SQUARE OR

INCLINED DROP, IN DIRECTION OF AIR FLOW

ACOUSTICAL DUCT LINING

STANDARD RADIUS ELBOW

R

10/8

FC

D

SYMBOL IS MISSING)

FLEXIBLE CONNECTION

UP

(WALL TYPE)

(WALL TYPE)

DN

UP

1-01

1-SF3

AIR HANDLING UNIT NUMBER

TERMINAL UNIT DESIGNATION

TYPICAL UNIT NO.

DN

SECTION LETTER

ECCENTRIC REDUCER

DIRECTION OF FLOW

CAPPED OUTLET

SIDE CONNECTION

EXISTING WORK.

ACCESSORIES (SEE STANDARD DETAIL)

INVERTED BUCKET TRAP SET INCLUDING PIPING

POINT OF CONNECTION BETWEEN NEW AND

RISE OR DROP IN PIPE

BOTTOM CONNECTION, 45 DEG. OR 90 DEG.

TOP CONNECTION, 45 DEG. OR 90 DEG.

REDUCER OR INCREASER

DIRECTION OF PIPE PITCH (DOWN)

THERMOMETER

UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP

STRAINER

GATE VALVE

PRESSURE GAGE

CHECK VALVE

GLOBE VALVE

PIPING ACCESSORIES (SEE STANDARD DETAIL)

FLOAT AND THERMOSTATIC TRAP SET INCLUDING

GATE VALVE WITH 3/4" HOSE END ADAPTER

EXISTING PIPE TO BE REMOVED

DRAIN LINE

UNION

D

CONV

CW

CR

CO

CG

CF

CD

CC

C

BR

BIW

BG

ATC

AFW

AI

APD

AO

AHU

AFM

AFF

AF

VENT LINE

HEATING HOT WATER RETURN

HEATING HOT WATER SUPPLY

LOW PRESSURE STEAM CONDENSATE RETURN

LOW PRESSURE STEAM (15 PSIG & BELOW)

MEDIUM PRESSURE STEAM CONDENSATE RETURN

MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)

NUMBER INDICATES STEAM PRESSURE

NUMBER INDICATES STEAM PRESSURE

LPR

V

HWS

HWR

LPS (5)

MPS (30)

MPR

HEATING

SP

S F

T

H

T

T H

WET BULB TEMPERATURE, DEG. FWb

MAXIMUM

OUTSIDE AIR

(16 PSIG THRU 59 PSIG)

PRE-FILTER

PUMPED CONDENSATE

PREHEAT COIL

RELATIVE HUMIDITY

SUPPLY FAN

STEAM HUMIDIFIER

TRANSFER GRILLE

UNIT HEATER

STATIC PRESSURE (INCHES OF WATER)

PRESSURE REDUCING VALVE

MEDIUM PRESSURE STEAM SUPPLY

MEDIUM PRESSURE STEAM CONDENSATE RETURN

PRESSURE DROP (FEET OF WATER)

TOP REGISTER (WALL TYPE)

VARIABLE FREQUENCY DRIVE

STATIC PRESSURE SENSOR

DOOR UNDERCUT BY GENERAL CONTRACTOR

SPS

TR

U/C

VFD

UH

V

TG

VALVE

S.P.

SH

SF

Rh

PD

PF

PH

PRV

MPR

MAX

O.A.

NOM

MIN

PC

MPS

NOMINAL

MINIMUM

HEATING COIL

HORSEPOWER

MIXING BOX

POUNDS PER HOUR

HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)

LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)

LOW PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM CONDENSATE RETURNHPR

HPS

LPR

LBS/HR

MB

LPS

FLR.

HC

HP

FLOOR

BLOW UNLESS OTHERWISE NOTED)

CEILING DIFFUSERS (FOUR WAY CHILLED WATER RETURN

CHILLED WATER SUPPLYCHS

CHR

AIR CONDITIONING

CONTROL CIRCUIT CONN.H1 N

ETCHED CLEAR LACQUERE.C.L.

WHITE BAKED ENAMELW.B.E.

BRAKE HORSEPOWERBHP

BRITISH THERMAL UNITBTU

BRITISH THERMAL UNIT PER HOURBTUH

CUBIC FEET PER MINUTECFM

DEGREEDEG

DIAMETERDIA

DIFFERENTIAL PRESSURE SENSORDPS

ENTERINGENT

F FAHRENHEIT

F&T FLOAT AND THERMOSTATIC

FPM FEET PER MINUTE

FT FEET

GALLONS PER MINUTEGPM

HEADHD

CHILLED WATER RETURNCHR

CHILLED WATER SUPPLYCHS

HEATING HOT WATER RETURNHWR

HEATING HOT WATER SUPPLYHWS

INCHESIN

INCHES WATER COLUMNIN WC

INCHES WATER GAUGEIN WG

LEAVING AIR TEMPERATURELAT

LEAVINGLVG

MBH 1000 BTUH

MERV MINIMUM EFFICIENCY REPORTING VALUE

NC NOISE CRITERIA

REVOLUTIONS PER MINUTERPM

SMOKE DAMPER (SUPPLY)SDS

SMOKE DAMPER (RETURN)SDR

STEAM PRESSURE REDUCING VALVESPRV

VOLUME DAMPERVD

HIGH PRESSURE STEAM CONDENSATE RETURN

HIGH PRESSURE STEAM (60 PSIG AND ABOVE)

NUMBER INDICATES STEAM PRESSURE

HPS (125)

HPR

PIPE UP

PIPE DOWN

IN-LINE CENTRIFUGAL FANICF

T

T

T

T

H dP

CS

DP SP

1-MS4

A

H7

9'-6"

MV MANUAL AIR VENT

ABBREVIATIONSCONTROLSPIPING SYMBOLSDRAWING SYMBOLS

DUCTWORK SYMBOLS

GENERAL NOTES

GENERAL

VALVES

ABBREVIATIONS

EXHAUST DUCT (UP & DOWN)UP DN

PUMPED CONDENSATE RETURNPC

COMBINATION HOT/CHILLED WATER SUPPLYHWS/CHS

COMBINATION HOT/CHILLED WATER RETURNHWR/CHR

EXPANSION TANK PIPEET

CONDENSATE PUMPCP

CABINET UNIT HEATERCUH

FCU FAN COIL UNIT

EXPANSION TANKET

PUMPP

PROPELLER UNIT HEATERPUH

RETURN FANRF

WATER FILTERWF

POWER TYPE ROOF VENTILATORRV

POWER TYPE WALL VENTILATORWV

COTR

PROPELLER TYPE EXHAUST FANPEF

RETURN AIRR.A.

SUPPLY AIRS.A.

SINGLE WIDTH SINGLE INLET (FAN)SWSI

SPECIFIC GRAVITYSP. GR.

ACCESS DOORAD

FD FLOOR DRAIN

FCW FOWARD CURVED WHEEL (FAN)

FC FLEXIBLE CONNECTION

ENERGY EFFICIENCY RATIOEER

EXHAUST AIRE.A.

CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE

CENTRIFUGAL OR HELICAL ROTARY SCREW CHILLER UNITCCU

AIR SEPARATORAS

ANGLE GLOBE VALVE

PIPE GUIDE

PIPE ANCHOR

ORIFICE UNION

TREATED DOMESTIC MAKE-UP WATER

STAINLESS STEEL DUCT

MU

GMU

FOR HUMIDIFIER

GLYCOL MAKEUP WATER

HOT GLYCOL WATER RETURN

HOT GLYCOL WATER SUPPLYGHS

GHR

DOMESTIC HOT WATER SUPPLYDHW

DOMESTIC HOT WATER RECIRCULATIONDHWR

COMBINATION AXIAL/BACKWARD CURVED WHEELA/BCW

UTILITY SET FANUSF

T

GENERAL

DOMESTIC COLD WATERW

FLOW METER

PIPE MOUNTED DDC TEMPERATURE SENSOR

TOP GRILLE (WALL TYPE)TG

WATER GAUGEWG

WATTSW

VARIABLE AIR VOLUMEVAV

THERMOSTATTSTAT

TOTAL STATIC PRESSURETSP

SMOKE DETECTORSD

SUPPLY AIR TEMPERATURESAT

OUTSIDE DIAMETEROD

N.C. NORMALLY CLOSED

N.O. NORMALLY OPEN

MCA MINIMUM BRANCH CIRCUIT AMPACITY

LEAVING WATER TEMPERATURELWT

ENTERING WATER TEMPERATUREEWT

EXTERNAL STATIC PRESSUREESP

DIRECT EXPANSIONDX

ENTERING AIR TEMPERATUREEAT

CABINET CEILING FANCCF

1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.

2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.

3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING

SCHEMATICS.

4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING MEDIUM

AND AIR.

5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH EXISTING

WHERE OPENING IS NOT RE-USED.

6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.

7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE

DISTURBED UNDER THIS WORK TO MATCH EXISTING.

8 WHERE WORK IS REQUIRED ABOVE EXISTING SUSPENDED CEILINGS, CONTRACTOR SHALL CAREFULLY REMOVE SUSPENDED

CEILING COMPONENTS AS REQUIRED TO PERFORM THE SPECIFIED WORK UNLESS NOTED OTHERWISE ON DRAWINGS. UPON

COMPLETION, REINSTALL CEILING AND COMPONENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CEILING

COMPONENTS.

9 ALL WALL & FLOOR PENETRATIONS AT FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.

10 UPON THE DISCOVERY OF ANY ASBESTOS MATERIAL, STOP WORK IMMEDIATELY AND REPORT IT TO THE COR. THE COR WILL NOTIFY

CONTRACTOR WHEN WORK IS SAFE TO PROCEED.

11 ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE

PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.

12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.

13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO

INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY ANTICIPATED

INSTALLATION ISSUES.

14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO

PERFORMING WORK.

15 HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.

COORDINATE WITH COR.

16 WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND CONTROL

WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.

17 ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE

EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE

USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND

STRAINERS, TRANSMITTERS, CONTROL DEVICES.

18 WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND RESTORED

AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH

INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE ROOF.

19 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK TO BE

REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE ASSOCIATED WITH

THE REMOVAL WORK.

20 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO GENERAL REQUIREMENTS SECTION 01 00 00.

21 WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL

BE PERFORMED ON WEEKENDS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED

AND SCHEDULED WELL IN ADVANCE WITH THE COR.

22 INSTALL ALL STRAINERS IN STEAM PIPING SIDEWAYS, WITH CLEANOUT LEG PARALLEL TO THE GROUND.

23 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF

WORK IN THIS PROJECT.

24 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.

25 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.

THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE

EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS

WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN

WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.

26 ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING ASBESTOS-CONTAINING MATERIALS IS INCLUDED IN THIS CONSTRUCTION

CONTRACT. REFER TO DRAWINGS AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES OF ASBESTOS. FOR CONCEALED

DUCTWORK, THE WALL SHALL BE OPENED AND DUCT INSULATION SHALL BE ABATED BEFORE NEW WORK SHALL TAKE PLACE.

ABATEMENT WORK SHALL TAKE PLACE AS ACCESS IS PROVIDED. ABATEMENT CONTRACTOR SHALL WORK WITH MECHANICAL

CONTRACTOR FOR SCHEDULE OF WORK.

27 ALL 90° ELBOWS IN SUPPLY AND EXHAUST AIR DUCTWORK SHALL BE PROVIDED WITH AIR TURNING VANES.

28 SEAL ALL PIPE AND DUCT PENETRATIONS THRU NON-FIRE RATED WALLS AND CEILINGS WITH SILICONE SEALANT TO PREVENT

ENTRANCE OF INSECTS.

29 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS SHALL

BE COORDINATED WITH THE COR.

30 WHERE EXISTING LAY-IN DEVICE IN SUSPENDED CEILING IS REMOVED AS PART OF THIS PROJECT, PROVIDE NEW ACOUSTIC CEILING

TILE TO FILL EMPTY GRID SPACE. CEILING TILE PATTERN, STYLE, COLOR, ETC. SHALL MATCH ADJACENT TILES.

31 UNLESS NOTED OTHERWISE, ALL WORK IN OCCUPIED AREAS OF THE BUILDING, OR WORK THAT REQUIRES SHUTDOWN OF SYSTEMS, SHALL TAKE PLACE ON WEEKENDS - COORDINATE WITH COR. NO WORK IN THE OCCUPIED SPACE SHALL OCCUR DURING THE DAY OR

EVENING HOURS.

32 A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN ACTIVE AT ALL TIMES WITH UNOBSTRUCTED ACCESS TO OPERATING ROOMS.

33 CONTRACTOR SHALL PROVIDE A WORK SCHEDULE AND PHASING SCHEDULE TO THE COR A MINIMUM OF 30 DAYS PRIOR TO START OF

THE CONSTRUCTION PERIOD. COR SHALL REVIEW SCHEDULE WITH OPERATING ROOM STAFF.

34 THE WORK AREAS SHALL BE PROPERLY TENTED AND HELD AT A NEGATIVE PRESSURE FOR ENTIRE DURATION OF THE WORK.

35 THE OPERATING SUITE IS CONSIDERED INFECTION CONTROL, LEVEL IV. ALL WORKERS SHALL WEAR PROPER PPE ATTIRE WHILE IN

THE SURGERY SPACES.DOMESTIC HOT WATER SUPPLYDHW

DOMESTIC HOT WATER RECIRCULATIONDHWR

FREE STEAM (LOW PRESSURE STEAM)FS(5)

INDEX, LEGEND, AND GENERAL NOTES1-M001

M

MJGJAC

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F ile

P a th

/1

/2

:3

:0

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT PRESSURIZATION

IN THE OPERATING ROOMS

CINCINNATI, OH

539-20-210

Project Section Chief

04/06/2020Revisions: Date:

KRISTINA AMIN

SCHEMATIC DESIGN SUBMITTAL 05/19/2019

DESIGN DEVELOPMENT SUBMITTAL 09/27/2019

95% OWNER REVIEW 01/08/2020

CONSTRUCTION DOCUMENT 04/06/2020

FOURTH FLOOR MECHANICAL PLAN - REMOVALS & NEW WORK

1-M701 THIRD FLOOR TEMPERATURE CONTROL PLAN - NEW WORK

1. REMOVE DUCTWORK BETWEEN THESE LOCATIONS.

PREPARE DUCTWORK FOR NEW CONNECTION.

2. REMOVE PORTION OF RETURN DUCTWORK IN VERTICAL

SHAFT FOR INSTALLATION OF NEW VENTURI VALVE.

PREPARE DUCTWORK FOR NEW CONNECTION.

3. REMOVE REHEAT DUCT COIL AND DISPOSE OFF SITE.

DISCONNECT HEATING COIL PIPING. PREPARE PIPING AND

DUCTWORK FOR CONNECTION TO NEW COIL. HEATING

CONTROL VALVE, AND SHUTOFF VALVE TO REMAIN.

4. REMOVE EXISTING RETURN / EXHAUST GRILLE AND

DISPOSE OFF SITE. CAP DUCT ABOVE CEILING.

5. EXHAUST VAV BOX SERVING OR #7 AND ASSOCIATED

CONTROLS TO REMAIN.

6. REMOVE SUPPLY DIFFUSER AND CAP SUPPLY DUCT ABOVE

CEILING.

7. DUCT INSULATION CONTAINS ASBESTOS. ASBESTOS

ABATEMENT OF DUCT INSULATION SHALL OCCUR PRIOR TO

START OF DEMOLITION.

8. BALANCE SUPPLY DIFFUSERS AND RETURN GRILLES TO

AIRFLOW CFM AS INDICATED ON DRAWING.

9. CONNECT EXISTING HEATING WATER PIPING TO NEW

HEATING WATER COIL.

10. INSTALL AIR VALVE IN VERTICAL SHAFT. REFER TO DETAIL

FOR ADDITIONAL INFORMATION.

11. REMOVE VAV BOX, ASSOCIATED PNEUMATIC CONTROLS,

HEATING WATER CONTROL VALVE AND THERMOSTAT. CAP

PNEUMATIC CONTROL TUBING.

12. CONTROL CONTRACTOR SHALL PROVIDE AND INSTALL AN

AC POWER SUPPLY. INSTALL BELOW CEILING IN HAC ROOM.

CONTROL CONTRACTOR SHALL PROVIDE ALL LOW

VOLTAGE CONTROL WIRING FROM THIS PANEL TO ALL AFCV

CONTROLLERS IN THE SURGICAL SUITE. ELECTRICAL

CONTRACTOR TO PROVIDE POWER WIRING TO POWER

SUPPLY AND CONNECT.

13. CAP DUCT TAKEOFF AT DUCT MAIN. PREPARE DUCTWORK

DOWNSTREAM OF EXISTING COIL FOR NEW CONNECTION.

14. REPLACE POSITIVE PRESSURE MONITOR WITH NEGATIVE

PRESSURE MONITOR OF IDENTICAL DESIGN.

PLAN NOTES

A. COORDINATE AND SCHEDULE A MINIMUM OF 4 WEEKS IN

ADVANCE WITH COR, PHASING AND CONSTRUCTION

TIMELINE. INCLUDE TIMELINE FOR DOWNTIME OF ALL

UTILITIES REQUIRED FOR PERFORMANCE OF THIS WORK.

B. THE ASSOCIATED AIR HANDLING UNIT AHU-25 SHALL BE

OPERATIONAL DURING ALL NORMAL BUSINESS HOURS,

MONDAY-FRIDAY. ALL WORK ASSOCIATED WITH AHU-25

SHALL TAKE PLACE ON WEEKENDS. COORDINATE

SCHEDULE OF WORK ON AHU-25 WITH COR A MINIMUM OF

4 WEEKS IN ADVANCE.

C. A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN

ACTIVE WITH UNOBSTRUCTED ACCESS TO ROOMS.

D. THE WORK AREAS IN THE SURGERY SUITE SHALL BE

PROPERLY TENTED AND HELD AT NEGATIVE PRESSURE

FOR ENTIRE DURATION OF THE WORK.

E. THE OPERATING SUITE IS CONSIDERED INFECTION

CONTROL, LEVEL IV. ALL WORKERS SHALL WEAR PROPER

PPE ATTIRE WHILE IN THIS SPACE.

F. ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING

ASBESTOS-CONTAINING MATERIALS IS INCLUDED IN THIS

CONSTRUCTION CONTRACT. REFER TO DRAWINGS

AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES

OF ASBESTOS. ANY ABATEMENT WORK PERFORMED AS

PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO

STARTING ANY OTHER PROJECT WORK.

GENERAL NOTES

1-M103

THIRD FLOOR MECHANICAL PLAN -

REMOVALS AND NEW WORK

SCALE: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - REMOVALS

SCALE: 1/8" = 1'-0"

PARTIAL THIRD FLOOR PLAN - NEW WORK

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F ile

P a th

/1

/2

:3

:0

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT PRESSURIZATION

IN THE OPERATING ROOMS

CINCINNATI, OH

539-20-210

Project Section Chief

04/06/2020Revisions: Date:

KRISTINA AMIN

SCHEMATIC DESIGN SUBMITTAL 05/19/2019

DESIGN DEVELOPMENT SUBMITTAL 09/27/2019

95% OWNER REVIEW 01/08/2020

CONSTRUCTION DOCUMENT 04/06/2020

MJGJAC

NO SCALE

3RD FLOOR KEY PLAN

SCALE: 1/4" = 1'-0"

OPERATING ROOM RETURN AIR DUCT SECTION

4 1

36"x12"

SPD Case Cart

C3034

O.R. #7 C329

C339

C327

Men's Locker

C324B

O.R. 1 C354

O.R. 2 C353

O.R. Alcove C352

O.R. Alcove C352A

O.R. Alcove C352B

Storage C352C

O.R. 3 C351

O.R. 4 C350

Clean Core C340

Elec.

C338A

O.R. 5 C349

O.R. 6 C348

Mech.

C345

Corridor C*3*17

Women's Locker

C322

HAC

C346

Office C330

Cysto O.R. 2

C332 Cysto O.R. 1

C347

M. Shower C324A

W. Shower C322A

Frozen Section

C316

Office C318

Entry C324

A/C Shaft C337A

Anesthesia Tech.

C328

Oxygen Storage

C369

Vestibule C322B Vestibule

C324C

S*3*8

Corridor C*3*13

Corridor C*3*16

Corridor C*3*15

Sterile Core C347A

Ortho Sterile

Storage

Sterile Suppy Stor.

Cysto Storage

C320

24"x48" ACCESS DOOR (BY G.C.)

EXIST 16x24 RETURN GRILLE

VENTURI VALVE

FLOOR

EXIST 18x18x25 DUCT

EXIST 18x18x25 DUCT

EXISTING CEILING

4'x6' OPENING

CUT AND REMOVE DRYWALL

PROVIDE SUPPORT FRAME

FOR ACCESS DOOR.

G.C. TO PATCH WALL

8"x8" DUCT ACCESS PANEL

1-AFCV1

1-AFCV31-AFCV2

1-AFCV4

1-AFCV7

1-AFCV6

1-AFCV9

1-AFCV10

1-AFCV11

1-AFCV12

1-AFCV13

1-AFCV14

1-AFCV18

1-AFCV19

1-AFCV20

1-AFCV211-AFCV22

1-AFCV17

1-AFCV15

1-AFCV16

1-AFCV5

1-AFCV8

675 1050

(QTY12)

CR1

E-EG

110 110

130 130 130

85 85

85 85

85 85

130 130

110575

130130130

130 130 130

325 325 325

67 67 67

100100100

100 100

75 75

120120

135135135

135 135

135135135

120 120 120

100100

123 123123

100 100

123 123123

123123123

150150150150

80 150 150150150

220220

CR1

SPD Case Cart

C3034

O.R. #7 C329

Ortho Sterile

Storage

C339

Sterile Suppy Stor.

C327

Men's Locker

C324B

O.R. 1 C354

O.R. 2 C353

O.R. Alcove C352

O.R. Alcove C352A

O.R. Alcove C352B

Storage C352C

O.R. 3 C351

O.R. 4 C350 Clean Core

C340

Elec.

C338A

O.R. 5 C349

O.R. 6 C348

Mech.

C345

Corridor C*3*17

Women's Locker

C322

HAC

C346

Office C330

Cysto O.R. 2

C332 Cysto O.R. 1

C347

M. Shower

C324A

W. Shower C322A

Frozen Section

C316

Cysto Storage

C320

Office C318

Entry C324

A/C Shaft C337A

Anesthesia Tech.

C328

Oxygen Storage

C369

Vestibule C322B Vestibule

C324C

Corridor C*3*13

Corridor C*3*16

Corridor C*3*15

Sterile Core C347A

1-RH1

16/16

14/12

10/10

E-20/12

14/12

14/12

10 10

8/8

67 67 67

E-VAV

123123123123

94 94

949494

CD1

CD1

10"Ø

(TYP 4)

1-RH4

1-RH3

1-RH2

24/16

1-CAV1

UP

UP

UP

UP

UP

UP

UP

UP

DN

DN

DN

DNUP

DN UP

DN

UP

UPDN

DN

A/C Shaft A/C Shaft

A/C Shaft

AREA OF WORK

1-M104

FOURTH FLOOR MECHANICAL PLAN -

REMOVALS AND NEW WORK

SCALE: 1/8" = 1'-0"

FOURTH FLOOR PLAN - REMOVALS

SCALE: 1/8" = 1'-0"

FOURTH FLOOR PLAN - NEW WORK

1. REMOVE DUCTWORK BETWEEN THESE LOCATIONS AND

DISPOSE OFF SITE. PREPARE DUCTWORK FOR NEW

CONNECTION. EXISTING HEATING COIL AND DUCT

MOUNTED HUMIDIFIER TO REMAIN. REMOVE DUCT UP TO

TRANSITION TO HEATING COIL.

2. REMOVE AIR HANDLING UNIT #25 SUPPLY FAN, MOTOR,

MOUNTING FRAME, AND DISPOSE OFF SITE.

3. REMOVE BOTH EXISTING OUTSIDE AIRFLOW MONITORING

STATIONS AND ALL ASSOCIATED COMPONENTS. EXISTING

AIRFLOW MONITORING STATIONS TO REMAIN UNDER

DEDUCT ALTERNATE #3.

4. PROVIDE A NEW SUPPLY FAN ARRAY IN AIR HANDLING UNIT

SUPPLY SECTION. REFER TO FAN SCHEDULE FOR FAN

ARRAY REQUIREMENTS.

5. INSTALL NEW OUTSIDE AIRFLOW MONITORING STATION

UPSTREAM OF OUTSIDE AIR DAMPER. PROVIDE

SHEETMETAL SLEEVE OFF OA INLET FOR AIRFLOW STATION

INSTALLATION. THE AIRFLOW MONITORING STATION

MANUFACTURER'S REPRESENTATIVE SHALL FIELD VERIFY

LOCATION AND DIMENSIONS PRIOR TO RELEASING FOR

FABRICATION AND TAKE RESPONSIBILITY FOR THE

APPLICATION. SCOPE OF WORK TO BE REMOVED UNDER

DEDUCT ALTERNATE #3. EXISTING OUTSIDE AIRFLOW

STATION AND DUCTWORK TO REMAIN UNDER DEDUCT

ALTERNATE #3.

6. REPLACE EXISTING AHU-25 RETURN AIR CONTROL DAMPER.

REMOVE EXISTING CONTROL DAMPER AND ACTUATOR AND

PROVIDE AND INSTALL NEW 132"X25" PARALLEL BLADE

DAMPER AND NEW DDC ACTUATOR. INSTALL DAMPER SO

BLADE DIRECTION THROWS AIR TOWARD ENERGY

RECOVERY WHEEL. SCOPE OF WORK TO BE REMOVED

UNDER DEDUCT ALTERNATE #3. EXISTING RETURN AIR

DAMPER TO REMAIN UNDER DEDUCT ALTERNATE #3.

7. EXISTING VAV BOX TO REMAIN. EXISTING DUCT MOUNTED

HEATING COIL AND STEAM HUMIDIFICATION COIL TO

REMAIN. EXISTING DDC CONTROLS FOR VAV BOX, HEATING

COIL, AND HUMIDIFICATION COIL TO REMAIN.

8. EXISTING AIR HANDLING UNIT RETURN FAN TO REMAIN.

REBALANCE RETURN AIRFLOW TO VALUE AS SHOWN ON

EXISTING AIR HANDLING UNIT SCHEDULE.

9. REMOVE THE OUTSIDE AIR DUCT CONNECTED TO AIR

HANDLING UNIT OUTSIDE AIR OPENING AND DISPOSE OFF

SITE. OUTSIDE AIR DAMPER TO REMAIN. OUTSIDE AIR

OPENING SHALL BE OPEN TO THE EXISTING OUTSIDE AIR

PLENUM. DUCT TO REMAIN UNDER DEDUCT ALTERNATE #3.

10. DUCT INSULATION CONTAINS ASBESTOS. ASBESTOS

ABATEMENT OF DUCT INSULATION SHALL OCCUR PRIOR TO

START OF DEMOLITION.

11. RECALIBRATE EXISTING AIRFLOW MONITORING STATION.

12. REPLACE THE EXISTING TWO-POSITION AND MODULATING

CONTROL VALVE ON THE AHU-25 STEAM HUMIDIFIER.

2-POSITION VALVE SHALL BE LINE SIZE AND MODULATING

VALVE SHALL BE 1/2" WITH A Cv OF 4.4. REUSE EXISTING

ACTUATOR.

13. PROVIDE A 24V CONTROL POWER TRANSFORMER.

ELECTRICAL CONTRACTOR TO PROVIDE 115V/1PH POWER

TO BOX. DDC CONTROL CONTRACTOR SHALL PROVIDE 24V

CONTROL WIRING FROM TRANSFORMER TO AFCV VALVES

ON FOURTH FLOOR PENTHOUSE. INSTALL ALL CONTROL

WIRING USING J-HOOKS.

14. PROVIDE A BAFFLE PLATE INSIDE AHU-25. BAFFLE PLATE

SHALL BE SOLID 12 GAUGE GALVANIZED STEEL. SECURE

PLATE TO BOTTOM OF AHU CASING. REFER TO DETAIL FOR

ADDITIONAL INFORMATION. SCOPE OF WORK TO BE

REMOVED UNDER DEDUCT ALTERNATE #3.

15. INSTALL AIR TURNING VANE IS SUPPLY DUCT ELBOW.

PLAN NOTES

GENERAL NOTES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F ile

P a th

/1

/2

:3

:0

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT PRESSURIZATION

IN THE OPERATING ROOMS

CINCINNATI, OH

539-20-210

Project Section Chief

04/06/2020Revisions: Date:

KRISTINA AMIN

SCHEMATIC DESIGN SUBMITTAL 05/19/2019

DESIGN DEVELOPMENT SUBMITTAL 09/27/2019

95% OWNER REVIEW 01/08/2020

CONSTRUCTION DOCUMENTS 04/06/2020

MJGJAC

A. COORDINATE AND SCHEDULE A MINIMUM OF 4 WEEKS IN

ADVANCE WITH COR, PHASING AND CONSTRUCTION

TIMELINE. INCLUDE TIMELINE FOR DOWNTIME OF ALL

UTILITIES REQUIRED FOR PERFORMANCE OF THIS WORK.

B. THE ASSOCIATED AIR HANDLING UNIT AHU-25 SHALL BE

OPERATIONAL DURING ALL NORMAL BUSINESS HOURS,

MONDAY-FRIDAY. ALL WORK ASSOCIATED WITH AHU-25

SHALL TAKE PLACE ON WEEKENDS. COORDINATE

SCHEDULE OF WORK ON AHU-25 WITH COR A MINIMUM OF

4 WEEKS IN ADVANCE.

C. A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN

ACTIVE WITH UNOBSTRUCTED ACCESS TO ROOMS.

D. ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING

ASBESTOS-CONTAINING MATERIALS IS INCLUDED IN THIS

CONSTRUCTION CONTRACT. REFER TO DRAWINGS

AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES

OF ASBESTOS. ANY ABATEMENT WORK PERFORMED AS

PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO

STARTING ANY OTHER PROJECT WORK.

NO SCALE

4TH FLOOR KEY PLAN

SCALE: 1/4" = 1'-0"

AHU-25 BAFFLE PLATE DETAIL

SCALE: 1/4" = 1'-0"

VENTURI SUPPLY VALVE INSTALLATION DETAIL

SCALE: 1/4" = 1'-0"

SECTION AA

Mech Room A456E

198x60 LOUVER

E X

IS

T

-3

/2

E X

IS

T

-1

/1

E X

IS

T

-3

/2

EXIST-20/20

AHU-22

EXISTING

AHU-24

EXISTING

AHU-32

EXISTING

AHU-23

EXISTING

AHU-25

EXISTING

MECHANICAL SHAFT

EXIST-16/10

EXIST-16/18

EXIST-16/18

EXIST-22/38

EXIST-16/18

EXIST-22/96

RETURN

RETURN

EXIST-16/18

EXIST-16/18

E X

IS

T

-3

/3

E X

IS

T

-3

/2

EXIST

30/16

1 1 1

E-198x60 LOUVER

E X

IS

T

-3 /2

E X

IS

T

-1 /1

E X

IS

T

-3 /2

EXIST-20/20

1-AFCV24

1-AFCV25

1-AFCV26

1-AFCV27

1-AFCV28

1-AFCV29

1-AFCV30

1-AFCV31

AHU-22

EXISTING

AHU-24

EXISTING

AHU-32

EXISTING

AHU-23

EXISTING

AHU-25

EXISTING

MECHANICAL SHAFT

EXIST-16/10

E-16/18

E-16/18

EXIST-22/38

16/18

16/18

18/16

EXIST-16/18

16/18

EXIST-22/96

RETURN

RETURN

EXIST-16/18

16/18

EXIST-16/18

16/18

E-EF

E -3

/3

E

-3 /2

E -4

/3

E-30/16

E-RTV

1-AFMS1

30/16

30/16

14/14

30/26

1-AFCV23

E-VAV

Mech Room A456E

AA

1-SF1

DN

DN

UP

DN

UP

DN

UP

DN

UP

UP

DN

Reception A400

Interview A401

Interview

A401A Reception

A401BInterview A402A

HAC

A403 Stor.

A404

Med Room A405

Exam Rm.

A406

Exam Rm.

A407

Exam Rm.

A408

Exam Rm.

A409

Exam Rm.

A410

Exam Rm.

A411

Exam Rm.

A412

Exam Rm.

A413

Exam Rm.

A414

Exam Rm.

A415

Exam Rm.

A416

Exam Rm.

A417

Stor.

A418

Elec.

A418A

Stor.

A420

Staff Tlt.

A421

HSRD

Office A422

Dr's

Off.

A423

HSRD

Off.

A424

Oncology Pharmacy

Sattelite A425

Chemo Prep.

A425A

IRM Office A427

Stair 2

S*4*2

HSRD

Off.

A424A

Comp.

Training

A430

Comp.

Specialist Off.

A431

Service Lobby

A436

IRM

Network

Operation

Center

A437 Comp.

Programmer Off.

A439

Computer

Off.

A440

Chief Rm.

A441

Res. Off.

A442

Stair 1

S*4*1

IRM

Storage (Hdwr)

A444

Elec.

A445

Toilet A446

Toilet A446A

IRM

Storage (Comm)

A445A

Infusion A449

Tlt.

A449A

Stair 5

S*4*5 Sub. Lab.

A453 Pharm.

A454

Exam A455

Elec.

A456

Stor.

A457A

S.B.

A457B

Tlt.

A457C

D.B.

A457D

Proc.

A457E

Nurse Station

A457F

Lab.

A457G

Exam

A458 Exam A458A

Exam A458B

Exam A458C

Elec.

A459

Stor.

A460

Soil. Util.

A461

CL. Lin.

A462

Exam A463

Exam 2 A464

Exam 4

A465

Exam 6 A466

Exam 8 A467

Exam 10

A468

Exam 9

A469

Exam 7 A470

Exam 5 A471

Exam 3

A472

Exam 1 A473

Exam A474

KIT.

A475

Supp.

A476

HAC

A477

Waiting

A478

GCRC

Corridor A457

Tlt.

A457H

Tlt.

A474A

Waiting A402B

Trash Chute

A435

Stor.

A436A

Elec.

A436B

Comp. Rm.

A437C

Stor.

A444A

Tlt.

A464A

Tlt.

A473A

Tlt.

A465A

Tlt.

A471A

Tlt.

A467A

Tlt.

A470A

Corridor

C*4*2

HSRD

Off.

A424E

HSRD

Off.

A424D

Common

Area A424C

Dir.

Off.

A424B Dr's

Off.

A423A

Social

Worker A422A

Tlt.

A406A

HSRD

Off.

A424F

HSRD

Off.

A424G

Neuro.

Res.

A442A

Corridor C*4*1

Elec.

A424H

Tlt.

A416A

Tlt.

A414A

Tlt.

A413A

Tlt.

A410A

Tlt.

A408A

Tlt.

A407A

Tlt.

A463A

Tlt.

A439A

Staff Physician

B403A

Neuro Office

B439

Regular E.E.G

B403B

E.E.G.

Control &

Observation

B403

F. Tlt.

B406

M. Tlt.

B407

Auto-Clave

Dishwasher

B408

HAC

B409

Elec.

B410

LAB.

Procedure

Rm

B411

W. Lab.

B412

Ram Lab.

B412A

Tissue Culture

B412B Office

B412C

Stair 4 S*4*4

Electrophoresis

Core B413A

RAM Lab.

B413B

Corridor C*4*5

Infectious Disease

Lab

B414

Office B414C Tissue

Culture

B414D Office B415

Cold Rm.

B415A

Freez.

B415B

Sig. Clos.

B416

Elec.

B417

Stair 3 S*4*3

Research Adm. Off.

B420

Adm. Off.

B420B

CFBRE Off.

B421 Conf.

B425

Clos.

B425A

Office

B426A

Associate Chief of

Staff/Research

B426

Office

B427

Office B428

HAC

B429

Refrig.

B430

Elec.

B431

Lab B432

Tissue

Culture B433A

Mic Rotomy

B435

Microscope Core

B436

Office

B437

Evoked Potential

Lab

B438

Copier Room

B437A

Corridor B429A

Director's Office

B429B

A/C Shaft A/C Shaft

A/C Shaft

Mech Room A456E

AREA OF WORK

1'-8"

OA BYPASS

DAMPER (EXIST)

OA FILTER

(EXIST)

ERW WHEEL

(EXIST)

RELIEF AIR BYPASS

DAMPER (EXIST)

RETURN AIR

DAMPER (NEW)

PRE FILTER

(EXIST)

12 GAUGE GALVANIZED

STEEL BAFFLE PLATE (NEW)

AHU-25

SECURE TO FLOOR

OA DAMPER

(EXIST)

OA AFMS

(NEW)

STAINLESS STEEL DUCT

REFER TO PLAN FOR SIZE

VENTURI VALVE

DUCT TRANSITION.

MAX 45° ANGLE

EXISTING DUCT

NEW 8"x8" DUCT ACCESS PANEL

EXISTING HEATING

COIL

EXISTING HUMIDIFIER

TO OPERATING ROOM

CONNECT TO EXISTING DUCT

AIR TURNING VANEFROM AHU-25

1-AFCV24

1-AFCV23

AHU-23

EXISTING

26/30

E-30/16 STAINLESS STEEL

E-30/16

TO OPERATING ROOMTO OPERATING ROOM

EXISTING HEATING

COIL

EXISTING HUMIDIFIER

SUPPLY DUCT

EXISTING

HEATING COIL

EXISTING

HUMIDIFIER

AIR TURNING

VANE (TYP)

30/16

30/16

30/16

NEW 8"x8" DUCT

ACCESS PANEL

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

F ile

P a th

/1

/2

:3

:0

P

M

CONSTRUCTION

DOCUMENTS

FULLY SPRINKLERED

Cincinnati V.A.

Medical Center

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

CORRECT PRESSURIZATION

IN THE OPERATING ROOMS

CINCINNATI, OH

539-20-210

Project Section Chief

04/06/2020Revisions: Date:

KRISTINA AMIN

SCHEMATIC DESIGN SUBMITTAL 05/19/2019

DESIGN DEVELOPMENT SUBMITTAL 09/27/2019

95% OWNER REVIEW 01/08/2020

CONSTRUCTION DOCUMENT 04/06/2020

1-M601

SCHEDULES

MJGJAC

AIR DISTRIBUTION DEVICE SCHEDULE

SURFACE

TYPE MOUNTING

DESCRIPTION

LINEAR PLENUM SLOT DIFFUSER

SYMBOL

CD-1

LAY-IN

FINISH

E.C.L.STEEL ALUM.

MATERIAL

W.B.E.

SEE NOTE

FAN SCHEDULE

LOCATIONMARK

1-SF1 AHU-25

MAX

RPM

FAN

ARRAY

CFM

S.P.

IN-WG

FAN

TYPE

DESCRIPTION

WHEEL

TYPE MIN

DIAMETER

DRIVE

MOTOR

MAX

BHP / FAN

NOM

HP / FAN

VOLTAGE/

PHASE

VFD NOTETYPE

23,500 8.0 ECM SUPPLY FAN ARRAY AIRFOIL 15.7" 3550 DIRECT ECM 6.39 7.02 460/3 NO 1,2,3,4,5

NOTES:

1. SUPPLY FANS PART OF AIR HANDLING UNIT FAN ARRAY.

2. MOTORS PROVIDED WITH INTEGRATED DRIVE.

3. PROVIDE MOTOR CONTROL CENTER. FANS TO RECEIVE 0-10VDC CONTROL SIGNAL FOR SPEED CONTROL. PROVIDE LOCAL SPEED CONTROLLER.

4. PROVIDE INTEGRATED FUSED DISCONNECT WITH MOTOR STARTER.

5. FILTER STATIC PRESSURE BASED ON FILTERS BEING 50% LOADED.

AIR FLOW MEASURING DEVICE SCHEDULE

MIN

CFM

LOCATION

4TH FLOOR

PENTHOUSE

MARK

1-AFMS1

MAX

MAX SP

DROP

IN-WG

DUCT SIZESYSTEM

AHU-25 OA 23500 6450 0.02

FAN SIZE /

TYPE

NOTE

HVAC DESIGN DATA

DESIGN

CONDITIONS

OUTDOOR DESIGN

CONDITIONS

INDOOR DESIGN DATA

SUMMER

TEMP (°F)

DB WB

%HUMIDITY

WINTER

TEMP (°F)

DB DP

%HUMIDITY

LOWEST

ANNUAL

DP

OPERATING ROOMS

92.7° 75.1° 44.6% 8.2° 3.0° N/A -2.2°

65.0° 56.6° 60% 75° 58° 35%

DUCT PRESSURE CLASS & LEAKAGE TABLE

SYSTEM

ALL

SYSTEMS

DUCT INVOLVED

POS (P)

NEG (N)

PRESSURE

ALL DUCTWORK EXCEPT

AS LISTED BELOW

SUPPLY AIR DUCTS BETWEEN

AHU AND AIR TERMINAL UNIT

SUPPLY AIR DUCTS…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .