This notice announces an upcoming solicitation for a construction project at a Veterans Affairs medical center. The project involves correct pressurization in operating rooms and will be issued as a 100% set-aside for a service-disabled veteran-owned small business. The solicitation is expected to be released on or around July 15, 2018 on www.fbo.gov. The project scope includes mechanical, electrical, and architectural work. The estimated value is between $100,000 and $200,000. The NAICS code is 236210 and business size standard is $15 million. The selected contractor must perform a minimum of 25% of construction work and have no more than three serious OSHA/EPA violations or one repeat/willful violation in the past three years. The project duration is 365 days from notice to proceed. Payment and performance bonds will be required.
36C25020B0038 Attachment 3 DRAWINGS 2020 0406.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0038 0002.docx | DOCX document | |
| 36C25020B0038-0001000.docx | DOCX document | |
| 36C25020B0038-003.pdf | ||
| 36C25020B0038-001.docx | DOCX document | |
| 36C25020B0038-005.docx | DOCX document | |
| 36C25020B0038-006.docx | DOCX document | |
| 36C25020B0038-002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
POLICE
VA
POLICE
VA
BUILDING 1
BUILDING 2
BUILDING
BUILDING 8
BUILDING
ARCHITECTURE PLANNING INTERIOR DESIGN
3011 NEWMARK DRIVE
MIAMISBURG, OH 45342
937.224.1931 P
937.224.3091 F
300 W. MONUMENT AVENUE SUITE 200
DAYTON, OHIO 45402
937.438.0177 P
G001
TITLE SHEET
VICINITY MAP
3200 VINE STREET CINCINNATI, OH 45220
CORRECT PRESSURIZATION IN THE OPERATING ROOMS
GENERAL PROJECT NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
COORDINATE FINAL PLACEMENT OF ALL WALL MOUNTED EQUIPMENT WITH SIGNAGE.
ALL WORK WILL COMPLY WITH ALL APPLICABLE NATIONAL, STATE OR LOCAL CODES, ORDINANCES AND REGULATIONS .
IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE COR OF ANY WORK THAT MIGHT REQUIRE INTERRUPTION OF UTILITY
SERVICES, CAUSE NOISE, OR CREATE VIBRATION PRIOR TO COMMENCEMENT OF THIS WORK.
THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL PROVISIONS OF THE SPECIFICATIONS INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, MATERIAL AND CONSTRUCTION PROVISIONS WHICH APPLY TO MATERIALS OR CONSTRUCTION
METHODS REQUIRED.
DO NOT PAINT ANY SEALANTS OR CAULKING WHICH ARE SUBJECT TO MOVEMENT. CONTROL JOINTS SHALL BE CAULKED AFTER PAINTING AND SPECIAL COATING APPLICATIONS. PROVIDE CAULKING OR SEALANTS WHICH MATCH ADJACENT FINISHED COLORS UNLESS NOTED
OTHERWISE.
ALL EXISTING CONSTRUCTION TO REMAIN THAT ARE DAMAGED OR DISTURBED DURING CONSTRUCTION SHALL BE PATCHED OR REPAIRED
TO MATCH EXISTING ADJACENT CONSTRUCTION.
ALL INTERIOR WOOD BLOCKING, MISC. FRAMING, PANELS, ETC. THAT ARE TO BE USED SHALL BE FIRE-RETARDANT TREATED. ALL
EXTERIOR WOOD BLOCKING SHALL BE PRESSURE TREATED.
ALL SUSPENDED ITEMS SHALL BE ATTACHED DIRECTLY TO STRUCTURE AND NOT ANCHORED TO ANY NON-STRUCTURAL ITEM, COMPONENT OR SYSTEM.
ALL NEW PENETRATIONS IN ALL EXISTING, MODIFIED OR NEW CORRIDOR WALLS, SMOKE AND FIRE PARTITIONS, AND FLOOR SLABS SHALL BE SEALED WITH FIRE RESISTANT CAULKING OR SEALANT THAT PREVENTS THE PASSAGE OF SMOKE AND/OR FIRE ALL COMPLYING TO
THE LIFE SAFETY AND FIRE CODE AND MEETING EXISTING CONDITIONS.
NEW CORE DRILLING THROUGH EXISTING STRUCTURAL ELEMENTS REQUIRED BY CONSTRUCTION SHALL BE COORDINATED BY THE
CONTRACTOR TO AVOID DRILLING THROUGH OR INTO ANY STRUCTURAL ELEMENTS.
NEW CONSTRUCTION INSTALLED SHALL BE COORDINATED BY THE CONTRACTOR FOR PROPER FIT, DIMENSIONS AND ACCESS TO THE
BUILDING PRIOR TO BEGINNING CONSTRUCTION AND DELIVERY OF COMPONENTS TO THE SITE.
INTERIOR DIMENSIONS ARE TO FINISH FACE UNLESS NOTED OTHERWISE
INTERIOR CONCRETE SLABS AND PATCHES, USE MIN. 10 MIL REINFORCED POLYETHYLENE VAPOR BARRIER UNDER CONCRETE SLAB.
TROWEL SURFACE SMOOTH AND FINISH FLUSH WITH EXISTING SLAB ELEVATION. SEAL VAPOR BARRIER WATERTIGHT.
CONTRACTOR'S BID SHALL INCLUDE THE GREATEST QUANTITY AND QUALITY OF ALL ITEMS AND ASSEMBLIES FOR A COMPLETE AND FULLY
OPERATIONAL PROJECT IN ACCORDANCE WITH THE VETERAN ADMINISTRATION'S REQUIREMENTS
UNLESS SPECIFICALLY NOTED OTHERWISE ON THE DRAWINGS, CONTRACTOR SHALL BE RESPONSIBLE FOR DEMOLITION, REMOVAL AND REPLACEMENT WORK SPECIFIED AND REQUIRED TO ACCOMMODATE THE REQUIRED IMPROVEMENTS, AND SHALL ALSO BE RESPONSIBLE FOR ANY AND ALL NECESSARY REPLACEMENT, REPAIRING, AND PATCHING. WORK TO BE DONE BY WORKMAN SKILLED AND REGULARLY
EMPLOYED IN THE TRADES INVOLVED.
CONTRACTOR SHALL PROPERLY PLAN AND EXECUTE ALL WORK. NO EXTRA COSTS FOR LACK OF PROPER PLANNING AND EXECUTION
SHALL BE CONSIDERED.
CONTRACTOR SHALL VERIFY AS-BUILT CONDITIONS FOR MATERIAL DIFFERENCES PRIOR TO PERFORMING ANY WORK AND SHALL NOTIFY
THE COR OF ANY DISCREPANCIES.
CAMPUS MAP
SCALE | 1" = 100'
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F ile
P a th
/1
/2
:3
:0 P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CORRECT PRESSURIZATION
IN THE OPERATING ROOMS
CINCINNATI, OH
539-20-210
Project Section Chief
04/06/2020Revisions: Date:
KRISTINA AMIN
SCHEMATIC DESIGN SUBMITTAL 05/19/2019
DESIGN DEVELOPMENT SUBMITTAL 09/27/2019
95% OWNER REVIEW 01/08/2020
CONSTRUCTION DOCUMENT 04/06/2020
MW VP
S
T A
TE
OF OH
IO
R E G
IS
TERED ARC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215
Expiration Date 12/31/2021
INDEX OF DRAWINGS
SHEET DESCRIPTION
1-M103 THIRD FLOOR MECHANICAL PLAN - REMOVALS & NEW WORK
1-M104
1-M601 SCHEDULES
1-M702 CONTROL SCHEMATICS
INDEX, LEGEND, AND GENERAL NOTES1-M001
FOURTH FLOOR MECHANICAL PLAN - REMOVALS & NEW WORK
1-M701 THIRD FLOOR TEMPERATURE CONTROL PLAN - NEW WORK
THIRD FLOOR ELECTRICAL PLAN - REMOVALS AND NEW WORK 1-E103
LEGEND, GENERAL NOTES AND INDEX OF DRAWINGS1-E001
1-E104 FOURTH FLOOR ELECTRICAL PLAN - REMOVALS AND NEW WORK
TITLE SHEET
DOOR SCHEDULE AND DETAILS
THIRD FLOOR ARCHITECTURAL FLOOR PLAN - REMOVALS AND NEW WORK
THIRD FLOOR REFLECTED CEILING PLAN - REMOVALS AND NEW WORK
G-001
1-A103
1-A123
1-A601
ELECTRICAL
MECHANICAL
ARCHITECTURAL
DN
Isolation Procedure
Rm.
C3024
Corridor C*3*14
Procedure Rm.
C3025
Signal Clos.
C3035
Patient Toilet Rm.
C3037
Prep/Recovery Rm.
C3038
Staff Lounge
C326
SPD Case Cart C3034
O.R. #7 C329
O.R.
Storage
C339
STERILE
SUPPLY
CLOSET
C327
Men's Locker C324B
O.R. 1 C354
O.R. 2 C353
O.R. Alcove C352
O.R. Alcove C352A
O.R. Alcove C352BLight Rm.
C352C
O.R. 3 C351
O.R. 4 C350
Clean Core C340
Elec.
C338A
O.R. 5 C349
O.R. 6 C348
Mech.
C345
Corridor C*3*7
Women's Locker
C322
HAC
C346
Office C330
Cysto O.R.
C332
Cysto O.R.
C347
M. Shower C324AW. Shower
C322A
Sub-Waiting C3036
Sterile Core C347A
Frozen Section
C316 Utility C320
Office C318 Elec.
C335
Tele.
Corridor
Entry C324
A/C Shaft C337A
Anesthesia Tech.
C328
Oxygen Storage
C369
Vestibule C322B
Vestibule C324C
HAC
C3033
Stair 8 S*3*8
Corridor C*3*12
Corridor C*3*13
Corridor C*3*16
Corridor C*3*15
C348B
C349B
C350B
C351B
C353B C354B
C340
C*3*7
C322B C324C
C339
C*3*16
C347A
C*3*7B
C*3*13
C*3*15
S*3*8
C327
FEC
C346
C329
UP
UP
UP
UP
UP
UP
UP
UP
DN
DN
DN
DNUP
DN UP
DN
UP
UPDN
DN
Isolation Procedure
Rm.
C3024
Fluoro Procedure
Rm.
C3023
Corridor C*3*14
Procedure Rm.
C3021
Wash Room C3020
Physician Work Room
C3019
Scope Storage
C3017
Ante Rm.
C3016
Scope Cleaning
C3016A
Procedure Rm.
C3025 Procedure
Rm.
C3026
Prep/Recovery Rm.
C3027
Clean Supply C3014
Isolation Prep/Recovery
Rm.
C3013Prep/Recovery
Rm.
C3028
Prep/Recovery Rm.
C3029
Isolation Prep/Recovery
Rm.
C3012
Prep/Recovery Rm.
C3011
Prep/Recovery Rm.
C3030
Prep/Recovery Rm.
C3010
Staff Break Rm.
C3009
Staff Toilet C3009A
Patient Toilet Rm.
C3008
Storage C3007A
Signal Clos.
C3035
Patient Toilet Rm.
C3037
Prep/Recovery Rm.
C3038 Prep/Recovery
Rm.
C3039
Post-Op C3040
Elec.
C3036A
Supplies / Equipment
C3006
Consult.
C3005
Lobby C3001
Waiting C3002
Staff Lounge
C326 Stair 10 S*3*10
Staff Work Rm.
C3007
SPD Case Cart C3034
O.R. #7 C329
O.R.
Storage
C339
STERILE
SUPPLY
CLOSET
C327
Men's Locker C324B
O.R. 1 C354
O.R. 2 C353
O.R. Alcove C352
O.R. Alcove C352A
O.R. Alcove C352BLight Rm.
C352C
O.R. 3 C351
O.R. 4 C350
Clean Core C340
Elec.
C338A
O.R. 5 C349
O.R. 6 C348
Mech.
C345
Corridor C*3*7
Women's Locker
C322
HAC
C346
Office C330
Cysto O.R.
C332
Cysto O.R.
C347
M. Shower C324AW. Shower
C322A
Sub-Waiting C3036
Work Rm.
C3004A
Nurse Station C3031
Sterile Core C347A
Frozen Section
C316 Utility C320
Office C318 Elec.
C335
Tele.
C333
Corridor C*3*9
Entry C324
A/C Shaft C337A
Soiled Utility C3032
Men's C3002A
Women's C3002B
Pat. Tlt.
C3022
Reception C3004
Dr. Office C315
Office C317
Office C319
Office C321
Office C323
Office C325
Stair 6 S*3*6
Anesthesia Tech.
C328
Cleaning Supply C3016B
Temp.
Control C3005A
Oxygen Storage
C369
Vestibule C322B
Vestibule C324C
HAC
C3033
Patient Room A387A
Patient Room A387B
Patient Room A387C
Patient Room A387D
Patient Room A387E
Patient Room A387F
Patient Room A387G
Shower A387H
Patient Room A387I
Patient Room A387J
Patient Room A387K
Nurse Station
A387
Service Lobby
A338 M. Locker
A339
F. Locker A340
Corridor C*3*19
RO DI
Water A343
De-Gown A342
Gowning Rm.
A341
De-Con B303Prep/Pack
B307C
HAC
B303A
HAC
B307D
Office B305B
Office B305A
Storage B308A
Office B305C
Conf Rm.
B305D
Vendor Drop Off
B304Cool Down Cart B307B
Steam Equip Rm.
B307A
Open Office B305
Ante Rm/ Clean Exit
B307
Elec B306
Vasc. Lab A300
Vascular Lab A301
Chief Diet.
A302
Diet Sec.
A303
Diet Off.
A305F. Tlt.
A306A
Waiting A307
Exam A308
Exam A309
Storage A310
Lab A311
Machine A311A
Plaster A312
CAD/CAM
A313
Off.
A314
Elec.
A315
M. Tlt.
A316
Stor.
A317
HAC
A318
Asst. Chief A319
Pros. Adm.
Asst.
A320
Clos.
A320A
Chief Off.
A321
Ward Adm.
Off.
A323
Adm. Asst.
A324
Office A324A
Office A324B
Office A324C
Chief PBS A324D
Office A324E
Office A324G
Stor.
A324F
Stor.
A324H
Elec.
A331A
Pros. Stor.
A330
Pros. Off.
A332
Stair 2 S*3*2 Stor.
A335
Stor.
A336
Asst. Chief Diet.
A337
Corridor C*3*2
F. Tlt.
A341
M. Tlt.
A342
Stair 1 S*3*1
Stor.
A344
Sig.
A345
Stor.
A344A
Tlt.
A347A
Vasc. Lab A347
Elec.
A350
Mech.
A351
Adm. Asst.
A352
Off.
A353
Conf.
A354
Chief of Surgery
A355
Off.
A356
Off.
A357
Off.
A358
Off.
A359
Off.
A360
Off.
A361
Corridor C*3*3
Off.
A355A
Physician Review A355B
Linen Clos.
A389
Nurse Off.
A390
Soil Utility A391
Equip. Stor.
A392
HVAC
A394
Elec.
A395
Sig.
A396
Clean Supply
A397
Vasc. Lab A379
HAC
A378
HAC
A380
Lounge A382
Tlt.
A382A
M. Lock.
A382BFemale
Locker A382C
Soc. Wrk.
A383
Respiratory Therapy
A384
Conference Room A385
Pharm.
A386
On Call A381
Tlt.
A381A
Patient Advocate
A348
Off.
A349
Stair 5 S*3*5
Off.
A350B
Off.
A350D
Off.
A350A
Off.
A350C
Corridor C*3*1
Elect.
A346
Classroom B308
Nurse Educator
B309Stor.
B310
Office B311Office
B310A Conf.
B310B
Off.
B311A
Off.
B311B
Lounge B311C
Asst. Ch.
B311D
Asst. Ch.
B311E
Adm. Off.
B311F
Word Proc.
B311G
Off.
B311H
Chief Nurse B311I
Research Off.
B312
Off.
B312A
Sig.
B312B
Elec.
B312C
Stair 3 S*3*3
Nursing Conf.
B314
F. Tlt.
B315
Stor.
B316
Eq. Stor.
B317
Res. Stor.
B318
Stor.
B319
Classroom B320
Office B321
Off.
B319A
Off.
B319B
Off.
B319C
Off.
B319D
Stor.
B321A
Classroom B321B
Work Area B320A
Stor.
B320B
Stor.
B320C
HAC
B319E
Stair 4 S*3*4
Stor.
B311M
Corridor Learning Exchange
B322
Work Area B322A
Work Area B322B
Elec.
B322C
Pat. Dining B325
Family Waiting
B326
Reception B327 Office
C300
Consult C301
Break Rm.
C302
Patient Tlt.
C303
PACU
C304
Ophthamology Optometry
C305 Office C306
Acute Care C307
Storage C308
Corridor C*3*6
Patient Rm.
C304A
Patient Rm C304B
Patiet Rm C304C
Meds.
C304D
Clean Supp.
C304E
Patient Rm.
C304F
Patient Rm.
C304G
Patient Rm.
C304H
Patient Rm.
C304IPatient Tlt.
C304J Patient Rm.
C304K Patient Rm.
C304L Patient Rm.
C304M
Patient Rm.
C304N
Patient Rm.
C304O
EMS
C360Off.
C361
Clean Stretcher
Stor.
C355
Anaesthetics C356Soil
C357 Storage
C358
HAC
C359
Electrical C309
Family Wtng.
C310
Tele C311
Lactation C312
Grieve Consult
C313
ICU Dir.
Off.
C314
Tlt.
C313B
Corridor C*3*17
Adm. Asst.
A307A
Stor.
A324I
Tlt.
A388
Stair 9 S*3*9
HAC
B301
Db. Wtr B302
Tlt.
C302A
Tr. Ch.
A338A
Stair 8 S*3*8
A/C Shaft A/C Shaft
A/C Shaft
Elec A338B
Linen Clost.
C3015
Corridor C*3*11
Corridor C*3*12
Corridor C*3*13
Corridor C*3*16
Corridor C*3*15
Corridor C*3*18
Room B303B
Room B307E
A100
C348B
C349B
C350B
C351B
C353B C354B
C340
C*3*7
C322B C324C
C339
C*3*16
C*3*7B
C*3*13
C*3*15
S*3*8
C327
FEC
C346
C329
24"x48" ACCESS
DOOR
EXISTING 16"x24"
RETURN GRILLE
2'-0"
4' -0
4'
-0
6'-0"
3' -4
3'
-6
2"2"
EXISTING FIRE
SHUTTER TO
REMAIN
. SLIDING WINDOW
WITH TEMPERED
GLAZING
FUNCTION: MANUAL
OPEN/ELECTRONIC RELEASE
WITH PRESENCE SENSOR
SCALE:
A341, A342, B303, B303A, B307A, B307C, B307E 1/8"= 1'-0"
NORTH
1-A103
SCALE:
EXISTING THIRD FLOOR PLAN
1/32"= 1'-0"
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h 6/
/2
:3
9:
P M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CORRECT PRESSURIZATION
IN THE OPERATING ROOMS
CINCINNATI, OH
539-20-210
Project Section Chief
04/06/2020Revisions: Date:
KRISTINA AMINSCHEMATIC DESIGN SUBMITTAL 05/19/2019
DESIGN DEVELOPMENT SUBMITTAL 09/27/2019
95% OWNER REVIEW 01/08/2020
CONSTRUCTION DOCUMENT 04/06/2020
MW VP
S
T A
T E OF OHIO
R E G
ISTERED ARC
HI
TE
C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215 Expiration Date 12/31/2021
SCALE:
TYP. ACCESS DOOR PANEL ELEVATION
1/4"= 1'-0"
KEY NOTESX
DOORS TO REMAIN
NEW DOORS
LEGEND
WALLS TO REMAIN
WITHIN LIMIT OF WORK
GENERAL NOTES
C212 DOOR TAG -SEE DOOR SCHEDULE
DOOR TO BE REMOVED AND REPLACED
THIRD FLOOR PLAN -
REMOVALS AND NEW WORK
1. REMOVED DOOR AND ASSOCIATED HARDWARE AND REPLACE WITH
NEW DOOR LEAF AND HARDWARE WITH COMPLETE SEALS
2. REMOVE EXISTING FIRE EXTINGUISHER CABINET, PROTECT AND
RELOCATE. CONTRACTOR TO PATCH AREA DISTURBED BY
REMOVAL.
3. EXISTING ROOMS ARE EQUIPPED WITH LEAD LINED DRYWALL.
4. NEW RECESSED 24"X48" ACCESS DOOR
5. NEW RECESSED 24"X48" FIRE RATED ACCESS DOOR
6. NEW RECESSED 24"X48" LEAD LINED ACCESS DOOR
7. RELOCATE EXISTING FIRE EXTINGUISHER
8. REMOVE EXISTING WINDOW AND REPLACE WITH NEW SLIDING
TRANSACTION WINDOW WITH MANUAL OPEN/ELECTRONIC RELEASE
9. SEE BID ITEM 2, DEDUCT ALTERNATE #1
PARTIAL THIRD FLOOR PLAN
SCALE:
WINDOW ELEVATION
1/4"= 1'-0"
20 A. COORDINATE AND SCHEDULE A MINIMUM OF 4 WEEKS IN
ADVANCE WITH COR , PHASING AND CONSTRUCTION TIMELINE.
INCLUDE TIMELINE FOR DOWNTIME OF ALL UTILITIES REQUIRED
FOR PERFORMANCE OF THIS WORK.
B. THE ASSOCIATED AIR HANDLING AHU-25 SHALL BE
OPERATIONAL DURING ALL NORMAL BUSINESS HOURS,
MONDAY-FRIDAY. ALL WORK ASSOCIATED WITH AHU-25 SHALL
TAKE PLACE ON THE WEEKENDS COORDINATE WITH COR A
MINIMUM OF 4 WEEKS IN ADVANCED. SEE MEP DRAWINGS FOR
EXTENT OF WORK.
C. A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN ACTIVE
AT ALL TIMES WITH UNOBSTRUCTED ACCESS TO ROOMS BY VA
STAFF. COORDINATE WITH COR
D. THE WORK AREAS IN THE SURGERY SUITE SHALL BE PROPERLY
TENTED AND HELD AT NEGATIVE PRESSURE FOR ENTIRE
DURATION OF THE WORK.
E. THE OPERATING SUITE IS CONSIDERING INFECTION CONTROL,
LEVEL IV, CONTRACTOR TO COMPLY WITH ALL VA SAFETY
PROTOCOL
F. ABATEMENT, REMOVAL OR ENCAPSULATION IS INCLUDED IN
THIS CONSTRUCTION CONTRACT. SEE MECHANICAL DRAWINGS
FOR EXTEND OF WORK . ANY ABATEMENT WORK PERFORMED
FOR THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING
ANY PROJECT WORK.
G. WORK TO PROVIDE COMPLETE PLUMBING,MECHANICAL, AND
ELECTRICAL SYSTEMS SHALL OCCUR BEYOND EXTENT OF
WORK LINE, AS REQUIRED. GENERAL CONTRACTOR TO REPAIR
ANY EXISTING AREAS BEYOND EXTENT OF WORK LINE DUE TO
INSTALLATION OF SUCH SYSTEMS (SEE ALL PLUMBING,
MECHANICAL, &ELECTRICAL DWGS.).
H. PATCH EXISTING WALLS & FLOORS WHERE REMOVAL AND NEW
WORK OCCURS, OR AREAS ADJACENT TO NEW WORK.
I. ALIGN NEW WORK WITH EXISTING
J. FILL ALL SLAB/WALL OPENINGS RESULTING FROM PLUMBING,
ELECTRICAL, MECHANICAL, OR OTHER REMOVALS.
K. SEE DRAWING 1-A601 FOR SHIELDING DETAILS
Isolation Procedure
Rm.
Corridor
Procedure Rm.
Signal Clos.
Patient Toilet Rm.
Prep/Recove Rm.
Staff Lounge
SPD Case Cart
O.R. #7
O.R.
Storage
STERILE
SUPPLY
CLOSET
Men's Locker
O.R. 1O.R. 2
O.R. AlcoveO.R. AlcoveO.R. Alcove Light Rm.
O.R. 3
O.R. 4
Clean Core
Elec.
O.R. 5
O.R. 6
Mech.
Corridor
Women's Locker
HAC
Office
Cysto O.R.
Cysto O.R.
M. Shower W. Shower
Sub-Waiting
Sterile Core
Frozen Section Utility Office
Elec.
Tele.
Corridor
Entry
A/C Shaft
Anesthesia Tech.
Oxygen Storage
Vestibule Vestibule
Corridor
Corridor
Corridor
Corridor
Isolation Procedure
Rm.
Fluoro
Procedure Rm.
Corridor
Procedure Rm.
Wash Room Physician
Work Room
Scope Storage
Ante Rm.
Scope Cleaning
Procedure Rm. Procedure
Rm.
Prep/Recovery Rm.
Clean Supply
Isolation Prep/Recovery
Rm.
Prep/Recovery Rm.
Prep/Recovery Rm.
Isolation Prep/Recovery
Rm.
Prep/Recovery Rm.
Prep/Recovery Rm.
Prep/Recovery Rm.
Staff Break Rm.
Staff Toilet
Patient Toilet Rm.
Storage
Signal Clos.
Patient Toilet Rm.
Prep/Recovery Rm.
Prep/Recovery Rm. Post-Op
Elec. Supplies / Equipment
Consult.
Lobby
Waiting
Staff Lounge
Stair 10
Staff Work Rm.
SPD Case Cart
O.R. #7
O.R.
Storage
STERILE
SUPPLY
CLOSET
Men's Locker
O.R. 1O.R. 2
O.R. AlcoveO.R. AlcoveO.R. Alcove Light Rm.
O.R. 3
O.R. 4
Clean Core
Elec.
O.R. 5
O.R. 6
Mech.
Corridor
Women's Locker
HAC
Office
Cysto O.R.
Cysto O.R.
M. Shower W. Shower
Sub-Waiting
Work Rm.
Nurse Station
Sterile Core
Frozen Section Utility Office
Elec.
Tele.
Corridor
Entry
A/C Shaft
Soiled Utility
Men's
Women's
Pat. Tlt.
Reception
Dr. Office Office Office Office Office Office Stair 6
Anesthesia Tech.
Cleaning Supply
Temp.
Control
Oxygen Storage
Vestibule Vestibule
Patient Room
Patient Room
Patient Room Patient
Room
Patient Room
Patient Room
Patient Room
Shower Patient Room
Patient Room
Patient Room
Nurse Station
Service LobbyM. Locker
F. Locker
Corridor
RO DI
WaterDe-Gown
Gowning Rm.
De-Con Prep/Pack
HAC
HAC
Office
Office
Storage
Office Conf Rm.
Vendor Drop Off
Cool Down Cart
Steam Equip Rm.
Open Office
Ante Rm/ Clean Exit
Elec
Vasc. Lab Vascular
LabChief Diet.Diet Sec.
Diet Off.
F. Tlt.
Waiting
Exam
Exam
Storage
Lab Machine
Plaster
CAD/CAM
Off.
Elec.
M. Tlt.
Stor.
HAC
Asst. Chief
Pros. Adm.
Asst.
Clos.
Chief Off.
Ward Adm.
Off.
Adm. Asst.
OfficeOffice
Office
Chief PBS
Office Office
Stor.
Stor.
Elec.
Pros. Stor.
Pros. Off.
Stair 2
Stor.
Stor. Asst. Chief Diet.
Corridor
F. Tlt.
M. Tlt.
Stair 1
Stor.
Sig.
Stor.
Tlt.
Vasc. Lab
Elec.
Mech.
Adm. Asst.
Off.
Conf.
Chief of Surgery
Off.
Off.
Off.
Off.
Off.
Off.
Corridor
Off.
Physician Review
Linen Clos.
Nurse Off.
Soil Utility
Equip. Stor.
HVAC
Elec.
Sig.
Clean Supply
Vasc. Lab
HAC HAC
Lounge
Tlt.M. Lock.
Female Locker
Soc. Wrk.
Respiratory Therapy
Conference Room
Pharm.
On Call
Tlt.
Patient Advocate
Off.
Stair 5
Off. Off.
Off. Off.
Corridor
Elect.
ClassroomNurse Educator
Stor.
Office Office Conf.
Off. Off. Lounge Asst. Ch. Asst. Ch. Adm. Off. Word Proc. Off.
Chief Nurse
Research Off.
Off.
Sig.
Elec.
Stair 3
Nursing Conf.
F. Tlt.
Stor.
Eq. Stor.
Res. Stor.
Stor.
Classroom
Office
Off.
Off.Off.Off.
Stor.
Classroom
Work Area
Stor.
Stor.
HAC
Stair 4
Stor.
Corridor Learning Exchange
Work Area
Work Area
Elec.
Pat. Dining
Family Waiting
Reception Office
Consult
Break Rm.
Patient Tlt.
PACU
Ophthamology Optometry Office Acute Care
Storage
Corridor
Patient Rm. Patient Rm Patiet Rm
Meds.
Clean Supp.
Patient Rm.
Patient Rm.
Patient Rm.Patient Rm.
Patient Tlt.
Patient Rm.Patient Rm.Patient Rm.
Patient Rm.
Patient Rm.
EMS
Off.
Clean Stretcher
Stor.
Anaesthetics
SoilStorageHAC
Electrical
Family Wtng.
Tele
Lactation
Grieve Consult
ICU Dir.
Off.
Tlt.
Corridor
Adm. Asst.
Stor.
Tlt.
Stair 9
HAC
Db. Wtr
Tlt.
Tr. Ch.
Stair 8
Elec
Linen Clost.
Corridor
Corridor
Corridor
Corridor
Corridor
Corridor
Room
Room
SCALE:
ENLARGED REFLECTED CEILING PLAN
1/8"= 1'-0"
1-A123
SCALE:
EXISTING THIRD FLOOR REFLECTED CEILING PLAN
1/32"= 1'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
A
F ile
P a th
/1
/2
:3
:0 P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORDCONSULTANT
321 4 5 6 7 8 9 10
CORRECT PRESSURIZATION
IN THE OPERATING ROOMS
CINCINNATI, OH
539-20-210
Project Section Chief
04/06/2020Revisions: Date:
KRISTINA AMIN
SCHEMATIC DESIGN SUBMITTAL 05/19/2019
DESIGN DEVELOPMENT SUBMITTAL 09/27/2019
95% OWNER REVIEW 01/08/2020
CONSTRUCTION DOCUMENT 04/06/2020
MW VP
S
T A
TE
OF OH
IO
R E G
IS
TERED ARC
HI
T
E C T
MARK
C.
WISEMAN
13215
Mark C. Wiseman, License #13215
Expiration Date 12/31/2021
KEY NOTES
DOORS TO REMAIN
NEW DOORS
LEGEND
WALLS TO REMAIN
WITHIN LIMIT OF WORK
C212 DOOR TAG -SEE DOOR SCHEDULE
DOOR TO BE REMOVED AND
REPLACED
THIRD FLOOR REFLECTED
CEILING PLAN
GENERAL NOTES
A. COORDINATE AND SCHEDULE A MINIMUM OF 4 WEEKS IN
ADVANCE WITH COR , PHASING AND CONSTRUCTION TIMELINE.
INCLUDE TIMELINE FOR DOWNTIME OF ALL UTILITIES REQUIRED
FOR PERFORMANCE OF THIS WORK.
B. THE ASSOCIATED AIR HANDLING AHU-25 SHALL BE
OPERATIONAL DURING ALL NORMAL BUSINESS HOURS,
MONDAY-FRIDAY. ALL WORK ASSOCIATED WITH AHU-25 SHALL
TAKE PLACE ON THE WEEKENDS COORDINATE WITH COR A
MINIMUM OF 4 WEEKS IN ADVANCED. SEE MEP DRAWINGS FOR
EXTENT OF WORK.
C. A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN ACTIVE
AT ALL TIMES WITH UNOBSTRUCTED ACCESS TO ROOMS BY VA
STAFF. COORDINATE WITH COR
D. THE WORK AREAS IN THE SURGERY SUITE SHALL BE PROPERLY
TENTED AND HELD AT NEGATIVE PRESSURE FOR ENTIRE
DURATION OF THE WORK.
E. THE OPERATING SUITE IS CONSIDERING INFECTION CONTROL,
LEVEL IV, CONTRACTOR TO COMPLY WITH ALL VA SAFETY
PROTOCOL
F. ABATEMENT, REMOVAL OR ENCAPSULATION IS INCLUDED IN
THIS CONSTRUCTION CONTRACT. SEE MECHANICAL DRAWINGS
FOR EXTEND OF WORK . ANY ABATEMENT WORK PERFORMED
FOR THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING
ANY PROJECT WORK.
G. WORK TO PROVIDE COMPLETE PLUMBING,MECHANICAL, AND
ELECTRICAL SYSTEMS SHALL OCCUR BEYOND EXTENT OF
WORK LINE, AS REQUIRED. GENERAL CONTRACTOR TO REPAIR
ANY EXISTING AREAS BEYOND EXTENT OF WORK LINE DUE TO
INSTALLATION OF SUCH SYSTEMS (SEE ALL PLUMBING,
MECHANICAL, &ELECTRICAL DWGS.).
H. PATCH EXISTING WALLS & FLOORS WHERE REMOVAL AND NEW
WORK OCCURS, OR AREAS ADJACENT TO NEW WORK.
I. ALIGN NEW WORK WITH EXISTING
J. FILL ALL SLAB/WALL OPENINGS RESULTING FROM PLUMBING,
ELECTRICAL, MECHANICAL, OR OTHER REMOVALS.
1. REMOVE EXISTING CEILING SYSTEM IN ITS ENTIRETY AND
REPLACE GRID AND CEILING TILE. SEE MECHANICAL DRAWINGS
FOR EXTEND OF WORK ABOVE CEILING
2. REMOVE EXISTING CEILING PADS AND KEEP EXISTING CEILING
GRID. SEE MECHANICAL DRAWINGS FOR EXTEND OF WORK
3. REMOVE GYPSUM BOARD CEILING AND REPLACE WITH NEW
GYPSUM BOARD CEILING
1-M001
INDEX, LEGEND, AND GENERAL
NOTES
INDEX OF DRAWINGS
SHEET DESCRIPTION
1-M103 THIRD FLOOR MECHANICAL PLAN - REMOVALS & NEW WORK
1-M104
1-M601 SCHEDULES
1-M702 CONTROL SCHEMATICS
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
COOLING COIL
CONVERTOR
CONVECTOR
CLEAN OUT
CEILING GRILLE
CENTRIFUGAL FAN
CEILING DIFFUSER
BOTTOM REGISTER (WALL TYPE)
BOTTOM GRILLE (WALL TYPE)
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOUBLE WIDTH DOUBLE INLET (FAN)
DOOR UNDERCUT BY GENERAL CONTRACTOR
ITEM. (TO BE USED AS AN AID IN COORDINATING THE
LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO CENTER OF
MANUAL VOLUME DAMPER
U/C
VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
DWDI
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
SHEET NUMBER WHERE DRAWN
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
1-01
1-SF3
AIR HANDLING UNIT NUMBER
TERMINAL UNIT DESIGNATION
TYPICAL UNIT NO.
DN
SECTION LETTER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES (SEE STANDARD DETAIL)
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
UNIVERSAL (2-BOLT) INVERTED BUCKET TRAP
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES (SEE STANDARD DETAIL)
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CONV
CW
CR
CO
CG
CF
CD
CC
C
BR
BIW
BG
ATC
AFW
AI
APD
AO
AHU
AFM
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
MAXIMUM
OUTSIDE AIR
(16 PSIG THRU 59 PSIG)
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
PRESSURE REDUCING VALVE
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
PH
PRV
MPR
MAX
O.A.
NOM
MIN
PC
MPS
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
MIXING BOX
POUNDS PER HOUR
HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)
LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM CONDENSATE RETURNHPR
HPS
LPR
LBS/HR
MB
LPS
FLR.
HC
HP
FLOOR
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY CHILLED WATER RETURN
CHILLED WATER SUPPLYCHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.H1 N
ETCHED CLEAR LACQUERE.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNITBTU
BRITISH THERMAL UNIT PER HOURBTUH
CUBIC FEET PER MINUTECFM
DEGREEDEG
DIAMETERDIA
DIFFERENTIAL PRESSURE SENSORDPS
ENTERINGENT
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FPM FEET PER MINUTE
FT FEET
GALLONS PER MINUTEGPM
HEADHD
CHILLED WATER RETURNCHR
CHILLED WATER SUPPLYCHS
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
INCHESIN
INCHES WATER COLUMNIN WC
INCHES WATER GAUGEIN WG
LEAVING AIR TEMPERATURELAT
LEAVINGLVG
MBH 1000 BTUH
MERV MINIMUM EFFICIENCY REPORTING VALUE
NC NOISE CRITERIA
REVOLUTIONS PER MINUTERPM
SMOKE DAMPER (SUPPLY)SDS
SMOKE DAMPER (RETURN)SDR
STEAM PRESSURE REDUCING VALVESPRV
VOLUME DAMPERVD
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FANICF
T
T
T
T
H dP
CS
DP SP
1-MS4
A
H7
9'-6"
MV MANUAL AIR VENT
ABBREVIATIONSCONTROLSPIPING SYMBOLSDRAWING SYMBOLS
DUCTWORK SYMBOLS
GENERAL NOTES
GENERAL
VALVES
ABBREVIATIONS
EXHAUST DUCT (UP & DOWN)UP DN
PUMPED CONDENSATE RETURNPC
COMBINATION HOT/CHILLED WATER SUPPLYHWS/CHS
COMBINATION HOT/CHILLED WATER RETURNHWR/CHR
EXPANSION TANK PIPEET
CONDENSATE PUMPCP
CABINET UNIT HEATERCUH
FCU FAN COIL UNIT
EXPANSION TANKET
PUMPP
PROPELLER UNIT HEATERPUH
RETURN FANRF
WATER FILTERWF
POWER TYPE ROOF VENTILATORRV
POWER TYPE WALL VENTILATORWV
COTR
PROPELLER TYPE EXHAUST FANPEF
RETURN AIRR.A.
SUPPLY AIRS.A.
SINGLE WIDTH SINGLE INLET (FAN)SWSI
SPECIFIC GRAVITYSP. GR.
ACCESS DOORAD
FD FLOOR DRAIN
FCW FOWARD CURVED WHEEL (FAN)
FC FLEXIBLE CONNECTION
ENERGY EFFICIENCY RATIOEER
EXHAUST AIRE.A.
CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE
CENTRIFUGAL OR HELICAL ROTARY SCREW CHILLER UNITCCU
AIR SEPARATORAS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
TREATED DOMESTIC MAKE-UP WATER
STAINLESS STEEL DUCT
MU
GMU
FOR HUMIDIFIER
GLYCOL MAKEUP WATER
HOT GLYCOL WATER RETURN
HOT GLYCOL WATER SUPPLYGHS
GHR
DOMESTIC HOT WATER SUPPLYDHW
DOMESTIC HOT WATER RECIRCULATIONDHWR
COMBINATION AXIAL/BACKWARD CURVED WHEELA/BCW
UTILITY SET FANUSF
T
GENERAL
DOMESTIC COLD WATERW
FLOW METER
PIPE MOUNTED DDC TEMPERATURE SENSOR
TOP GRILLE (WALL TYPE)TG
WATER GAUGEWG
WATTSW
VARIABLE AIR VOLUMEVAV
THERMOSTATTSTAT
TOTAL STATIC PRESSURETSP
SMOKE DETECTORSD
SUPPLY AIR TEMPERATURESAT
OUTSIDE DIAMETEROD
N.C. NORMALLY CLOSED
N.O. NORMALLY OPEN
MCA MINIMUM BRANCH CIRCUIT AMPACITY
LEAVING WATER TEMPERATURELWT
ENTERING WATER TEMPERATUREEWT
EXTERNAL STATIC PRESSUREESP
DIRECT EXPANSIONDX
ENTERING AIR TEMPERATUREEAT
CABINET CEILING FANCCF
1 ALL PIPING IN FINISHED ROOMS OR SPACES SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
2 ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS ARE REQUIRED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, CONTROLS, ETC.
3 FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING
SCHEMATICS.
4 PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN HEATING MEDIUM
AND AIR.
5 WHERE DUCTS OR PIPES ARE REMOVED THRU BUILDING ELEMENT THAT IS TO REMAIN, PATCH BUILDING OPENING TO MATCH EXISTING
WHERE OPENING IS NOT RE-USED.
6 ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
7 ALL CUTTING AND PATCHING REQUIRED FOR THE PROJECT WORK SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE
DISTURBED UNDER THIS WORK TO MATCH EXISTING.
8 WHERE WORK IS REQUIRED ABOVE EXISTING SUSPENDED CEILINGS, CONTRACTOR SHALL CAREFULLY REMOVE SUSPENDED
CEILING COMPONENTS AS REQUIRED TO PERFORM THE SPECIFIED WORK UNLESS NOTED OTHERWISE ON DRAWINGS. UPON
COMPLETION, REINSTALL CEILING AND COMPONENTS. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO CEILING
COMPONENTS.
9 ALL WALL & FLOOR PENETRATIONS AT FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED TO RETARD PASSAGE OF FIRE & SMOKE.
10 UPON THE DISCOVERY OF ANY ASBESTOS MATERIAL, STOP WORK IMMEDIATELY AND REPORT IT TO THE COR. THE COR WILL NOTIFY
CONTRACTOR WHEN WORK IS SAFE TO PROCEED.
11 ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE
PREMISES AND DISPOSED OF PROPERLY BY THE CONTRACTOR.
12 REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
13 THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO
INSTALL THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY ANTICIPATED
INSTALLATION ISSUES.
14 FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO
PERFORMING WORK.
15 HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.
COORDINATE WITH COR.
16 WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO ACTIVE MAIN AND CAPPED, AND CONTROL
WIRING AND CONDUIT SHALL BE REMOVED BACK TO SOURCE.
17 ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE
EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE
USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND
STRAINERS, TRANSMITTERS, CONTROL DEVICES.
18 WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND RESTORED
AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH
INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON THE ROOF.
19 ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK TO BE
REMOVED IS SHOWN. REMOVE ALL INCIDENTAL ABANDONED UTILITY ITEMS THAT MAY NOT BE SHOWN BUT ARE ASSOCIATED WITH
THE REMOVAL WORK.
20 INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO GENERAL REQUIREMENTS SECTION 01 00 00.
21 WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL
BE PERFORMED ON WEEKENDS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED
AND SCHEDULED WELL IN ADVANCE WITH THE COR.
22 INSTALL ALL STRAINERS IN STEAM PIPING SIDEWAYS, WITH CLEANOUT LEG PARALLEL TO THE GROUND.
23 RE-INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED OR REMOVED IN THE PERFORMANCE OF
WORK IN THIS PROJECT.
24 ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.
25 EXISTING CONDITIONS SHOWN ARE BASED UPON AVAILABLE EXISTING DRAWINGS, AND MAY DIFFER FROM ACTUAL WORK IN PLACE.
THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE
EXECUTION OF THE WORK. ANY VARIATION BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS
WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER IN
WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
26 ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING ASBESTOS-CONTAINING MATERIALS IS INCLUDED IN THIS CONSTRUCTION
CONTRACT. REFER TO DRAWINGS AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES OF ASBESTOS. FOR CONCEALED
DUCTWORK, THE WALL SHALL BE OPENED AND DUCT INSULATION SHALL BE ABATED BEFORE NEW WORK SHALL TAKE PLACE.
ABATEMENT WORK SHALL TAKE PLACE AS ACCESS IS PROVIDED. ABATEMENT CONTRACTOR SHALL WORK WITH MECHANICAL
CONTRACTOR FOR SCHEDULE OF WORK.
27 ALL 90° ELBOWS IN SUPPLY AND EXHAUST AIR DUCTWORK SHALL BE PROVIDED WITH AIR TURNING VANES.
28 SEAL ALL PIPE AND DUCT PENETRATIONS THRU NON-FIRE RATED WALLS AND CEILINGS WITH SILICONE SEALANT TO PREVENT
ENTRANCE OF INSECTS.
29 CONTRACTOR IS RESPONSIBLE TO VISIT THE SITE, EXAMINE AND ACCEPT EXISTING CONDITIONS PRIOR TO BIDDING. SITE VISITS SHALL
BE COORDINATED WITH THE COR.
30 WHERE EXISTING LAY-IN DEVICE IN SUSPENDED CEILING IS REMOVED AS PART OF THIS PROJECT, PROVIDE NEW ACOUSTIC CEILING
TILE TO FILL EMPTY GRID SPACE. CEILING TILE PATTERN, STYLE, COLOR, ETC. SHALL MATCH ADJACENT TILES.
31 UNLESS NOTED OTHERWISE, ALL WORK IN OCCUPIED AREAS OF THE BUILDING, OR WORK THAT REQUIRES SHUTDOWN OF SYSTEMS, SHALL TAKE PLACE ON WEEKENDS - COORDINATE WITH COR. NO WORK IN THE OCCUPIED SPACE SHALL OCCUR DURING THE DAY OR
EVENING HOURS.
32 A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN ACTIVE AT ALL TIMES WITH UNOBSTRUCTED ACCESS TO OPERATING ROOMS.
33 CONTRACTOR SHALL PROVIDE A WORK SCHEDULE AND PHASING SCHEDULE TO THE COR A MINIMUM OF 30 DAYS PRIOR TO START OF
THE CONSTRUCTION PERIOD. COR SHALL REVIEW SCHEDULE WITH OPERATING ROOM STAFF.
34 THE WORK AREAS SHALL BE PROPERLY TENTED AND HELD AT A NEGATIVE PRESSURE FOR ENTIRE DURATION OF THE WORK.
35 THE OPERATING SUITE IS CONSIDERED INFECTION CONTROL, LEVEL IV. ALL WORKERS SHALL WEAR PROPER PPE ATTIRE WHILE IN
THE SURGERY SPACES.DOMESTIC HOT WATER SUPPLYDHW
DOMESTIC HOT WATER RECIRCULATIONDHWR
FREE STEAM (LOW PRESSURE STEAM)FS(5)
INDEX, LEGEND, AND GENERAL NOTES1-M001
M
MJGJAC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT PRESSURIZATION
IN THE OPERATING ROOMS
CINCINNATI, OH
539-20-210
Project Section Chief
04/06/2020Revisions: Date:
KRISTINA AMIN
SCHEMATIC DESIGN SUBMITTAL 05/19/2019
DESIGN DEVELOPMENT SUBMITTAL 09/27/2019
95% OWNER REVIEW 01/08/2020
CONSTRUCTION DOCUMENT 04/06/2020
FOURTH FLOOR MECHANICAL PLAN - REMOVALS & NEW WORK
1-M701 THIRD FLOOR TEMPERATURE CONTROL PLAN - NEW WORK
1. REMOVE DUCTWORK BETWEEN THESE LOCATIONS.
PREPARE DUCTWORK FOR NEW CONNECTION.
2. REMOVE PORTION OF RETURN DUCTWORK IN VERTICAL
SHAFT FOR INSTALLATION OF NEW VENTURI VALVE.
PREPARE DUCTWORK FOR NEW CONNECTION.
3. REMOVE REHEAT DUCT COIL AND DISPOSE OFF SITE.
DISCONNECT HEATING COIL PIPING. PREPARE PIPING AND
DUCTWORK FOR CONNECTION TO NEW COIL. HEATING
CONTROL VALVE, AND SHUTOFF VALVE TO REMAIN.
4. REMOVE EXISTING RETURN / EXHAUST GRILLE AND
DISPOSE OFF SITE. CAP DUCT ABOVE CEILING.
5. EXHAUST VAV BOX SERVING OR #7 AND ASSOCIATED
CONTROLS TO REMAIN.
6. REMOVE SUPPLY DIFFUSER AND CAP SUPPLY DUCT ABOVE
CEILING.
7. DUCT INSULATION CONTAINS ASBESTOS. ASBESTOS
ABATEMENT OF DUCT INSULATION SHALL OCCUR PRIOR TO
START OF DEMOLITION.
8. BALANCE SUPPLY DIFFUSERS AND RETURN GRILLES TO
AIRFLOW CFM AS INDICATED ON DRAWING.
9. CONNECT EXISTING HEATING WATER PIPING TO NEW
HEATING WATER COIL.
10. INSTALL AIR VALVE IN VERTICAL SHAFT. REFER TO DETAIL
FOR ADDITIONAL INFORMATION.
11. REMOVE VAV BOX, ASSOCIATED PNEUMATIC CONTROLS,
HEATING WATER CONTROL VALVE AND THERMOSTAT. CAP
PNEUMATIC CONTROL TUBING.
12. CONTROL CONTRACTOR SHALL PROVIDE AND INSTALL AN
AC POWER SUPPLY. INSTALL BELOW CEILING IN HAC ROOM.
CONTROL CONTRACTOR SHALL PROVIDE ALL LOW
VOLTAGE CONTROL WIRING FROM THIS PANEL TO ALL AFCV
CONTROLLERS IN THE SURGICAL SUITE. ELECTRICAL
CONTRACTOR TO PROVIDE POWER WIRING TO POWER
SUPPLY AND CONNECT.
13. CAP DUCT TAKEOFF AT DUCT MAIN. PREPARE DUCTWORK
DOWNSTREAM OF EXISTING COIL FOR NEW CONNECTION.
14. REPLACE POSITIVE PRESSURE MONITOR WITH NEGATIVE
PRESSURE MONITOR OF IDENTICAL DESIGN.
PLAN NOTES
A. COORDINATE AND SCHEDULE A MINIMUM OF 4 WEEKS IN
ADVANCE WITH COR, PHASING AND CONSTRUCTION
TIMELINE. INCLUDE TIMELINE FOR DOWNTIME OF ALL
UTILITIES REQUIRED FOR PERFORMANCE OF THIS WORK.
B. THE ASSOCIATED AIR HANDLING UNIT AHU-25 SHALL BE
OPERATIONAL DURING ALL NORMAL BUSINESS HOURS,
MONDAY-FRIDAY. ALL WORK ASSOCIATED WITH AHU-25
SHALL TAKE PLACE ON WEEKENDS. COORDINATE
SCHEDULE OF WORK ON AHU-25 WITH COR A MINIMUM OF
4 WEEKS IN ADVANCE.
C. A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN
ACTIVE WITH UNOBSTRUCTED ACCESS TO ROOMS.
D. THE WORK AREAS IN THE SURGERY SUITE SHALL BE
PROPERLY TENTED AND HELD AT NEGATIVE PRESSURE
FOR ENTIRE DURATION OF THE WORK.
E. THE OPERATING SUITE IS CONSIDERED INFECTION
CONTROL, LEVEL IV. ALL WORKERS SHALL WEAR PROPER
PPE ATTIRE WHILE IN THIS SPACE.
F. ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING
ASBESTOS-CONTAINING MATERIALS IS INCLUDED IN THIS
CONSTRUCTION CONTRACT. REFER TO DRAWINGS
AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES
OF ASBESTOS. ANY ABATEMENT WORK PERFORMED AS
PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO
STARTING ANY OTHER PROJECT WORK.
GENERAL NOTES
1-M103
THIRD FLOOR MECHANICAL PLAN -
REMOVALS AND NEW WORK
SCALE: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - REMOVALS
SCALE: 1/8" = 1'-0"
PARTIAL THIRD FLOOR PLAN - NEW WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT PRESSURIZATION
IN THE OPERATING ROOMS
CINCINNATI, OH
539-20-210
Project Section Chief
04/06/2020Revisions: Date:
KRISTINA AMIN
SCHEMATIC DESIGN SUBMITTAL 05/19/2019
DESIGN DEVELOPMENT SUBMITTAL 09/27/2019
95% OWNER REVIEW 01/08/2020
CONSTRUCTION DOCUMENT 04/06/2020
MJGJAC
NO SCALE
3RD FLOOR KEY PLAN
SCALE: 1/4" = 1'-0"
OPERATING ROOM RETURN AIR DUCT SECTION
4 1
36"x12"
SPD Case Cart
C3034
O.R. #7 C329
C339
C327
Men's Locker
C324B
O.R. 1 C354
O.R. 2 C353
O.R. Alcove C352
O.R. Alcove C352A
O.R. Alcove C352B
Storage C352C
O.R. 3 C351
O.R. 4 C350
Clean Core C340
Elec.
C338A
O.R. 5 C349
O.R. 6 C348
Mech.
C345
Corridor C*3*17
Women's Locker
C322
HAC
C346
Office C330
Cysto O.R. 2
C332 Cysto O.R. 1
C347
M. Shower C324A
W. Shower C322A
Frozen Section
C316
Office C318
Entry C324
A/C Shaft C337A
Anesthesia Tech.
C328
Oxygen Storage
C369
Vestibule C322B Vestibule
C324C
S*3*8
Corridor C*3*13
Corridor C*3*16
Corridor C*3*15
Sterile Core C347A
Ortho Sterile
Storage
Sterile Suppy Stor.
Cysto Storage
C320
24"x48" ACCESS DOOR (BY G.C.)
EXIST 16x24 RETURN GRILLE
VENTURI VALVE
FLOOR
EXIST 18x18x25 DUCT
EXIST 18x18x25 DUCT
EXISTING CEILING
4'x6' OPENING
CUT AND REMOVE DRYWALL
PROVIDE SUPPORT FRAME
FOR ACCESS DOOR.
G.C. TO PATCH WALL
8"x8" DUCT ACCESS PANEL
1-AFCV1
1-AFCV31-AFCV2
1-AFCV4
1-AFCV7
1-AFCV6
1-AFCV9
1-AFCV10
1-AFCV11
1-AFCV12
1-AFCV13
1-AFCV14
1-AFCV18
1-AFCV19
1-AFCV20
1-AFCV211-AFCV22
1-AFCV17
1-AFCV15
1-AFCV16
1-AFCV5
1-AFCV8
675 1050
(QTY12)
CR1
E-EG
110 110
130 130 130
85 85
85 85
85 85
130 130
110575
130130130
130 130 130
325 325 325
67 67 67
100100100
100 100
75 75
120120
135135135
135 135
135135135
120 120 120
100100
123 123123
100 100
123 123123
123123123
150150150150
80 150 150150150
220220
CR1
SPD Case Cart
C3034
O.R. #7 C329
Ortho Sterile
Storage
C339
Sterile Suppy Stor.
C327
Men's Locker
C324B
O.R. 1 C354
O.R. 2 C353
O.R. Alcove C352
O.R. Alcove C352A
O.R. Alcove C352B
Storage C352C
O.R. 3 C351
O.R. 4 C350 Clean Core
C340
Elec.
C338A
O.R. 5 C349
O.R. 6 C348
Mech.
C345
Corridor C*3*17
Women's Locker
C322
HAC
C346
Office C330
Cysto O.R. 2
C332 Cysto O.R. 1
C347
M. Shower
C324A
W. Shower C322A
Frozen Section
C316
Cysto Storage
C320
Office C318
Entry C324
A/C Shaft C337A
Anesthesia Tech.
C328
Oxygen Storage
C369
Vestibule C322B Vestibule
C324C
Corridor C*3*13
Corridor C*3*16
Corridor C*3*15
Sterile Core C347A
1-RH1
16/16
14/12
10/10
E-20/12
14/12
14/12
10 10
8/8
67 67 67
E-VAV
123123123123
94 94
949494
CD1
CD1
10"Ø
(TYP 4)
1-RH4
1-RH3
1-RH2
24/16
1-CAV1
UP
UP
UP
UP
UP
UP
UP
UP
DN
DN
DN
DNUP
DN UP
DN
UP
UPDN
DN
A/C Shaft A/C Shaft
A/C Shaft
AREA OF WORK
1-M104
FOURTH FLOOR MECHANICAL PLAN -
REMOVALS AND NEW WORK
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN - REMOVALS
SCALE: 1/8" = 1'-0"
FOURTH FLOOR PLAN - NEW WORK
1. REMOVE DUCTWORK BETWEEN THESE LOCATIONS AND
DISPOSE OFF SITE. PREPARE DUCTWORK FOR NEW
CONNECTION. EXISTING HEATING COIL AND DUCT
MOUNTED HUMIDIFIER TO REMAIN. REMOVE DUCT UP TO
TRANSITION TO HEATING COIL.
2. REMOVE AIR HANDLING UNIT #25 SUPPLY FAN, MOTOR,
MOUNTING FRAME, AND DISPOSE OFF SITE.
3. REMOVE BOTH EXISTING OUTSIDE AIRFLOW MONITORING
STATIONS AND ALL ASSOCIATED COMPONENTS. EXISTING
AIRFLOW MONITORING STATIONS TO REMAIN UNDER
DEDUCT ALTERNATE #3.
4. PROVIDE A NEW SUPPLY FAN ARRAY IN AIR HANDLING UNIT
SUPPLY SECTION. REFER TO FAN SCHEDULE FOR FAN
ARRAY REQUIREMENTS.
5. INSTALL NEW OUTSIDE AIRFLOW MONITORING STATION
UPSTREAM OF OUTSIDE AIR DAMPER. PROVIDE
SHEETMETAL SLEEVE OFF OA INLET FOR AIRFLOW STATION
INSTALLATION. THE AIRFLOW MONITORING STATION
MANUFACTURER'S REPRESENTATIVE SHALL FIELD VERIFY
LOCATION AND DIMENSIONS PRIOR TO RELEASING FOR
FABRICATION AND TAKE RESPONSIBILITY FOR THE
APPLICATION. SCOPE OF WORK TO BE REMOVED UNDER
DEDUCT ALTERNATE #3. EXISTING OUTSIDE AIRFLOW
STATION AND DUCTWORK TO REMAIN UNDER DEDUCT
ALTERNATE #3.
6. REPLACE EXISTING AHU-25 RETURN AIR CONTROL DAMPER.
REMOVE EXISTING CONTROL DAMPER AND ACTUATOR AND
PROVIDE AND INSTALL NEW 132"X25" PARALLEL BLADE
DAMPER AND NEW DDC ACTUATOR. INSTALL DAMPER SO
BLADE DIRECTION THROWS AIR TOWARD ENERGY
RECOVERY WHEEL. SCOPE OF WORK TO BE REMOVED
UNDER DEDUCT ALTERNATE #3. EXISTING RETURN AIR
DAMPER TO REMAIN UNDER DEDUCT ALTERNATE #3.
7. EXISTING VAV BOX TO REMAIN. EXISTING DUCT MOUNTED
HEATING COIL AND STEAM HUMIDIFICATION COIL TO
REMAIN. EXISTING DDC CONTROLS FOR VAV BOX, HEATING
COIL, AND HUMIDIFICATION COIL TO REMAIN.
8. EXISTING AIR HANDLING UNIT RETURN FAN TO REMAIN.
REBALANCE RETURN AIRFLOW TO VALUE AS SHOWN ON
EXISTING AIR HANDLING UNIT SCHEDULE.
9. REMOVE THE OUTSIDE AIR DUCT CONNECTED TO AIR
HANDLING UNIT OUTSIDE AIR OPENING AND DISPOSE OFF
SITE. OUTSIDE AIR DAMPER TO REMAIN. OUTSIDE AIR
OPENING SHALL BE OPEN TO THE EXISTING OUTSIDE AIR
PLENUM. DUCT TO REMAIN UNDER DEDUCT ALTERNATE #3.
10. DUCT INSULATION CONTAINS ASBESTOS. ASBESTOS
ABATEMENT OF DUCT INSULATION SHALL OCCUR PRIOR TO
START OF DEMOLITION.
11. RECALIBRATE EXISTING AIRFLOW MONITORING STATION.
12. REPLACE THE EXISTING TWO-POSITION AND MODULATING
CONTROL VALVE ON THE AHU-25 STEAM HUMIDIFIER.
2-POSITION VALVE SHALL BE LINE SIZE AND MODULATING
VALVE SHALL BE 1/2" WITH A Cv OF 4.4. REUSE EXISTING
ACTUATOR.
13. PROVIDE A 24V CONTROL POWER TRANSFORMER.
ELECTRICAL CONTRACTOR TO PROVIDE 115V/1PH POWER
TO BOX. DDC CONTROL CONTRACTOR SHALL PROVIDE 24V
CONTROL WIRING FROM TRANSFORMER TO AFCV VALVES
ON FOURTH FLOOR PENTHOUSE. INSTALL ALL CONTROL
WIRING USING J-HOOKS.
14. PROVIDE A BAFFLE PLATE INSIDE AHU-25. BAFFLE PLATE
SHALL BE SOLID 12 GAUGE GALVANIZED STEEL. SECURE
PLATE TO BOTTOM OF AHU CASING. REFER TO DETAIL FOR
ADDITIONAL INFORMATION. SCOPE OF WORK TO BE
REMOVED UNDER DEDUCT ALTERNATE #3.
15. INSTALL AIR TURNING VANE IS SUPPLY DUCT ELBOW.
PLAN NOTES
GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT PRESSURIZATION
IN THE OPERATING ROOMS
CINCINNATI, OH
539-20-210
Project Section Chief
04/06/2020Revisions: Date:
KRISTINA AMIN
SCHEMATIC DESIGN SUBMITTAL 05/19/2019
DESIGN DEVELOPMENT SUBMITTAL 09/27/2019
95% OWNER REVIEW 01/08/2020
CONSTRUCTION DOCUMENTS 04/06/2020
MJGJAC
A. COORDINATE AND SCHEDULE A MINIMUM OF 4 WEEKS IN
ADVANCE WITH COR, PHASING AND CONSTRUCTION
TIMELINE. INCLUDE TIMELINE FOR DOWNTIME OF ALL
UTILITIES REQUIRED FOR PERFORMANCE OF THIS WORK.
B. THE ASSOCIATED AIR HANDLING UNIT AHU-25 SHALL BE
OPERATIONAL DURING ALL NORMAL BUSINESS HOURS,
MONDAY-FRIDAY. ALL WORK ASSOCIATED WITH AHU-25
SHALL TAKE PLACE ON WEEKENDS. COORDINATE
SCHEDULE OF WORK ON AHU-25 WITH COR A MINIMUM OF
4 WEEKS IN ADVANCE.
C. A MINIMUM OF TWO OPERATING ROOMS SHALL REMAIN
ACTIVE WITH UNOBSTRUCTED ACCESS TO ROOMS.
D. ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING
ASBESTOS-CONTAINING MATERIALS IS INCLUDED IN THIS
CONSTRUCTION CONTRACT. REFER TO DRAWINGS
AND/OR SPECIFICATIONS FOR LOCATION AND QUANTITIES
OF ASBESTOS. ANY ABATEMENT WORK PERFORMED AS
PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO
STARTING ANY OTHER PROJECT WORK.
NO SCALE
4TH FLOOR KEY PLAN
SCALE: 1/4" = 1'-0"
AHU-25 BAFFLE PLATE DETAIL
SCALE: 1/4" = 1'-0"
VENTURI SUPPLY VALVE INSTALLATION DETAIL
SCALE: 1/4" = 1'-0"
SECTION AA
Mech Room A456E
198x60 LOUVER
E X
IS
T
-3
/2
E X
IS
T
-1
/1
E X
IS
T
-3
/2
EXIST-20/20
AHU-22
EXISTING
AHU-24
EXISTING
AHU-32
EXISTING
AHU-23
EXISTING
AHU-25
EXISTING
MECHANICAL SHAFT
EXIST-16/10
EXIST-16/18
EXIST-16/18
EXIST-22/38
EXIST-16/18
EXIST-22/96
RETURN
RETURN
EXIST-16/18
EXIST-16/18
E X
IS
T
-3
/3
E X
IS
T
-3
/2
EXIST
30/16
1 1 1
E-198x60 LOUVER
E X
IS
T
-3 /2
E X
IS
T
-1 /1
E X
IS
T
-3 /2
EXIST-20/20
1-AFCV24
1-AFCV25
1-AFCV26
1-AFCV27
1-AFCV28
1-AFCV29
1-AFCV30
1-AFCV31
AHU-22
EXISTING
AHU-24
EXISTING
AHU-32
EXISTING
AHU-23
EXISTING
AHU-25
EXISTING
MECHANICAL SHAFT
EXIST-16/10
E-16/18
E-16/18
EXIST-22/38
16/18
16/18
18/16
EXIST-16/18
16/18
EXIST-22/96
RETURN
RETURN
EXIST-16/18
16/18
EXIST-16/18
16/18
E-EF
E -3
/3
E
-3 /2
E -4
/3
E-30/16
E-RTV
1-AFMS1
30/16
30/16
14/14
30/26
1-AFCV23
E-VAV
Mech Room A456E
AA
1-SF1
DN
DN
UP
DN
UP
DN
UP
DN
UP
UP
DN
Reception A400
Interview A401
Interview
A401A Reception
A401BInterview A402A
HAC
A403 Stor.
A404
Med Room A405
Exam Rm.
A406
Exam Rm.
A407
Exam Rm.
A408
Exam Rm.
A409
Exam Rm.
A410
Exam Rm.
A411
Exam Rm.
A412
Exam Rm.
A413
Exam Rm.
A414
Exam Rm.
A415
Exam Rm.
A416
Exam Rm.
A417
Stor.
A418
Elec.
A418A
Stor.
A420
Staff Tlt.
A421
HSRD
Office A422
Dr's
Off.
A423
HSRD
Off.
A424
Oncology Pharmacy
Sattelite A425
Chemo Prep.
A425A
IRM Office A427
Stair 2
S*4*2
HSRD
Off.
A424A
Comp.
Training
A430
Comp.
Specialist Off.
A431
Service Lobby
A436
IRM
Network
Operation
Center
A437 Comp.
Programmer Off.
A439
Computer
Off.
A440
Chief Rm.
A441
Res. Off.
A442
Stair 1
S*4*1
IRM
Storage (Hdwr)
A444
Elec.
A445
Toilet A446
Toilet A446A
IRM
Storage (Comm)
A445A
Infusion A449
Tlt.
A449A
Stair 5
S*4*5 Sub. Lab.
A453 Pharm.
A454
Exam A455
Elec.
A456
Stor.
A457A
S.B.
A457B
Tlt.
A457C
D.B.
A457D
Proc.
A457E
Nurse Station
A457F
Lab.
A457G
Exam
A458 Exam A458A
Exam A458B
Exam A458C
Elec.
A459
Stor.
A460
Soil. Util.
A461
CL. Lin.
A462
Exam A463
Exam 2 A464
Exam 4
A465
Exam 6 A466
Exam 8 A467
Exam 10
A468
Exam 9
A469
Exam 7 A470
Exam 5 A471
Exam 3
A472
Exam 1 A473
Exam A474
KIT.
A475
Supp.
A476
HAC
A477
Waiting
A478
GCRC
Corridor A457
Tlt.
A457H
Tlt.
A474A
Waiting A402B
Trash Chute
A435
Stor.
A436A
Elec.
A436B
Comp. Rm.
A437C
Stor.
A444A
Tlt.
A464A
Tlt.
A473A
Tlt.
A465A
Tlt.
A471A
Tlt.
A467A
Tlt.
A470A
Corridor
C*4*2
HSRD
Off.
A424E
HSRD
Off.
A424D
Common
Area A424C
Dir.
Off.
A424B Dr's
Off.
A423A
Social
Worker A422A
Tlt.
A406A
HSRD
Off.
A424F
HSRD
Off.
A424G
Neuro.
Res.
A442A
Corridor C*4*1
Elec.
A424H
Tlt.
A416A
Tlt.
A414A
Tlt.
A413A
Tlt.
A410A
Tlt.
A408A
Tlt.
A407A
Tlt.
A463A
Tlt.
A439A
Staff Physician
B403A
Neuro Office
B439
Regular E.E.G
B403B
E.E.G.
Control &
Observation
B403
F. Tlt.
B406
M. Tlt.
B407
Auto-Clave
Dishwasher
B408
HAC
B409
Elec.
B410
LAB.
Procedure
Rm
B411
W. Lab.
B412
Ram Lab.
B412A
Tissue Culture
B412B Office
B412C
Stair 4 S*4*4
Electrophoresis
Core B413A
RAM Lab.
B413B
Corridor C*4*5
Infectious Disease
Lab
B414
Office B414C Tissue
Culture
B414D Office B415
Cold Rm.
B415A
Freez.
B415B
Sig. Clos.
B416
Elec.
B417
Stair 3 S*4*3
Research Adm. Off.
B420
Adm. Off.
B420B
CFBRE Off.
B421 Conf.
B425
Clos.
B425A
Office
B426A
Associate Chief of
Staff/Research
B426
Office
B427
Office B428
HAC
B429
Refrig.
B430
Elec.
B431
Lab B432
Tissue
Culture B433A
Mic Rotomy
B435
Microscope Core
B436
Office
B437
Evoked Potential
Lab
B438
Copier Room
B437A
Corridor B429A
Director's Office
B429B
A/C Shaft A/C Shaft
A/C Shaft
Mech Room A456E
AREA OF WORK
1'-8"
OA BYPASS
DAMPER (EXIST)
OA FILTER
(EXIST)
ERW WHEEL
(EXIST)
RELIEF AIR BYPASS
DAMPER (EXIST)
RETURN AIR
DAMPER (NEW)
PRE FILTER
(EXIST)
12 GAUGE GALVANIZED
STEEL BAFFLE PLATE (NEW)
AHU-25
SECURE TO FLOOR
OA DAMPER
(EXIST)
OA AFMS
(NEW)
STAINLESS STEEL DUCT
REFER TO PLAN FOR SIZE
VENTURI VALVE
DUCT TRANSITION.
MAX 45° ANGLE
EXISTING DUCT
NEW 8"x8" DUCT ACCESS PANEL
EXISTING HEATING
COIL
EXISTING HUMIDIFIER
TO OPERATING ROOM
CONNECT TO EXISTING DUCT
AIR TURNING VANEFROM AHU-25
1-AFCV24
1-AFCV23
AHU-23
EXISTING
26/30
E-30/16 STAINLESS STEEL
E-30/16
TO OPERATING ROOMTO OPERATING ROOM
EXISTING HEATING
COIL
EXISTING HUMIDIFIER
SUPPLY DUCT
EXISTING
HEATING COIL
EXISTING
HUMIDIFIER
AIR TURNING
VANE (TYP)
30/16
30/16
30/16
NEW 8"x8" DUCT
ACCESS PANEL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F ile
P a th
/1
/2
:3
:0
P
M
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Cincinnati V.A.
Medical Center
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
CORRECT PRESSURIZATION
IN THE OPERATING ROOMS
CINCINNATI, OH
539-20-210
Project Section Chief
04/06/2020Revisions: Date:
KRISTINA AMIN
SCHEMATIC DESIGN SUBMITTAL 05/19/2019
DESIGN DEVELOPMENT SUBMITTAL 09/27/2019
95% OWNER REVIEW 01/08/2020
CONSTRUCTION DOCUMENT 04/06/2020
1-M601
SCHEDULES
MJGJAC
AIR DISTRIBUTION DEVICE SCHEDULE
SURFACE
TYPE MOUNTING
DESCRIPTION
LINEAR PLENUM SLOT DIFFUSER
SYMBOL
CD-1
LAY-IN
FINISH
E.C.L.STEEL ALUM.
MATERIAL
W.B.E.
SEE NOTE
FAN SCHEDULE
LOCATIONMARK
1-SF1 AHU-25
MAX
RPM
FAN
ARRAY
CFM
S.P.
IN-WG
FAN
TYPE
DESCRIPTION
WHEEL
TYPE MIN
DIAMETER
DRIVE
MOTOR
MAX
BHP / FAN
NOM
HP / FAN
VOLTAGE/
PHASE
VFD NOTETYPE
23,500 8.0 ECM SUPPLY FAN ARRAY AIRFOIL 15.7" 3550 DIRECT ECM 6.39 7.02 460/3 NO 1,2,3,4,5
NOTES:
1. SUPPLY FANS PART OF AIR HANDLING UNIT FAN ARRAY.
2. MOTORS PROVIDED WITH INTEGRATED DRIVE.
3. PROVIDE MOTOR CONTROL CENTER. FANS TO RECEIVE 0-10VDC CONTROL SIGNAL FOR SPEED CONTROL. PROVIDE LOCAL SPEED CONTROLLER.
4. PROVIDE INTEGRATED FUSED DISCONNECT WITH MOTOR STARTER.
5. FILTER STATIC PRESSURE BASED ON FILTERS BEING 50% LOADED.
AIR FLOW MEASURING DEVICE SCHEDULE
MIN
CFM
LOCATION
4TH FLOOR
PENTHOUSE
MARK
1-AFMS1
MAX
MAX SP
DROP
IN-WG
DUCT SIZESYSTEM
AHU-25 OA 23500 6450 0.02
FAN SIZE /
TYPE
NOTE
HVAC DESIGN DATA
DESIGN
CONDITIONS
OUTDOOR DESIGN
CONDITIONS
INDOOR DESIGN DATA
SUMMER
TEMP (°F)
DB WB
%HUMIDITY
WINTER
TEMP (°F)
DB DP
%HUMIDITY
LOWEST
ANNUAL
DP
OPERATING ROOMS
92.7° 75.1° 44.6% 8.2° 3.0° N/A -2.2°
65.0° 56.6° 60% 75° 58° 35%
DUCT PRESSURE CLASS & LEAKAGE TABLE
SYSTEM
ALL
SYSTEMS
DUCT INVOLVED
POS (P)
NEG (N)
PRESSURE
ALL DUCTWORK EXCEPT
AS LISTED BELOW
SUPPLY AIR DUCTS BETWEEN
AHU AND AIR TERMINAL UNIT
SUPPLY AIR DUCTS…