About this file

This document contains specifications for Correcting Information Technology Deficiencies at the Northern Indiana VA Healthcare System in Fort Wayne, Indiana. The contractor shall provide all tools, equipment, parts, materials, labor and supervision necessary to complete the project, as described in the attachments and Statement of Work. Submittals and requests for information from the contractor will be reviewed by the VA within 15 and 10 working days respectively. The designated Architect-Engineer will assist the VA in reviewing submittals and determining contractual compliance. The review process is intended to check for conformance with contract requirements and not to verify accuracy or completeness of details. An approval indicates general compliance and does not represent a full check of the submittal. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to AMENDMENT 02 - Z1DA--Correct OIT Deficiencies 610A4-16-101 SB, newest first.
File Type Posted
RFI 02 - Answers.pdf PDF
36C25020B0037 0002.pdf PDF
Specifications Revised.pdf PDF
RFI 01 - Building 6 - Answers (001).pdf PDF
36C25020B0037 0001.pdf PDF
Sheets 1 to 20 from 610A4-16-101_Combined_Final.pdf PDF
Sheets 41 to 60 from 610A4-16-101_Combined_Final-3.pdf PDF
Sheets 21 to 40 from 610A4-16-101_Combined_Final-2.pdf PDF
Sheets 61 to 87 from 610A4-16-101_Combined_Final-4.pdf PDF
Drawings 2 of 11.pdf PDF
Drawings 7 of 11.pdf PDF
Drawings 1 of 11.pdf PDF
Drawings 6 of 11.pdf PDF
36C25020B0037_final.pdf PDF
Drawings 10 of 11.pdf PDF
Drawings 11 of 11.pdf PDF
Drawings 3 of 11.pdf PDF
Drawings 4 of 11.pdf PDF
Drawings 8 of 11.pdf PDF
Specifications.pdf PDF
Drawings 9 of 11.pdf PDF
RFI Form.doc DOC document
Wage Determination IN20200002 04032020.pdf PDF
Drawings 5 of 11.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

610A4-16-101 CORRECT OIT DEFICIENCIES, FORT WAYNE, INDIANA 05-01-17

01 33 23 - 9

1.8 OPERATION AND MAINTENANCE DATA

A. Submit data specified for a given item within 30 calendar days after the item is delivered to the contract site.

B. In the event the Contractor fails to deliver O&M Data within the time limits specified, the Contracting Officer may withhold from progress payments 50 percent of the price of the item with which such O&M Data are applicable.

1.9 TEST REPORTS

A. SRE may require specific test after work has been installed or completed which could require contractor to repair test area at no additional cost to contract.

1.10 VA REVIEW OF SUBMITTALS AND RFIS

A. The VA will review all submittals for compliance with the technical requirements of the contract documents. The designated Architect-Engineer for this project will assist the VA in reviewing all submittals and determining contractual compliance. The Architect-Engineer shall review and approve or take other appropriate action to determine conformance with applicable codes and standards of the contract requirements and return to the COR. The review shall not be exhaustive and shall only be for the limited purpose of checking for conformance with information given and the design concept expressed in the contract documents.

Review of such submittals is not conducted for the purpose of determining the accuracy, completeness of other details such as dimensions and quantities; the review shall not constitute approval of safety precautions or of the construction means, methods, techniques, sequences or procedures of the Contractor.

B. Period of review for submittals begins when the VA COR receives submittal from the Contractor.

610A4-16-101 CORRECT OIT DEFICIENCIES, FORT WAYNE, INDIANA 05-01-17

01 33 23 - 10

C. Period of review for each resubmittal is the same as for initial submittal.

D. VA review period is 15 working days for submittals.

E. VA review period is 10 working days for RFIs.

F. The VA will return submittals to the Contractor with the following notations:

1. "Approved": authorizes the Contractor to proceed with the work covered.

2. "Approved as noted": authorizes the Contractor to proceed with the work covered provided the Contractor incorporates the noted comments and makes the noted corrections.

3. "Disapproved, revise and resubmit": indicates noncompliance with the contract requirements or that submittal is incomplete. Resubmit with appropriate changes and corrections. No work shall proceed for this item until resubmittal is approved.

4. "Not reviewed": indicates submittal does not have evidence of being reviewed and approved by Contractor or is not complete. A submittal marked "not reviewed" will be returned with an explanation of the reason it is not reviewed. Resubmit submittals after taking appropriate action.

1.11 APPROVED SUBMITTALS

A. The VA approval of submittals is not to be construed as a complete check, and indicates only that the general method of construction, materials, detailing, and other information are satisfactory.

00.610A4-16-101_SPEC_COVER Spec Cover Vol 1 (1)
000110
000115
010000
013323
013526
014219
014529
015719
015816
017419
018113
024100
042000
061000
061663
070150.19
072113
075423
076000
078400
079200
081113
081400
087100
088000
090516
090600
092216
092300
092900
095100
096513
096516
096519
099100
102600
211313
220511
220523
220711
221100
221300
230511
230593
230711
230923
232113
232213
232300
233100
238100
260511
260519
260533
260923
262200
262416
262726
262921
265100
320523