This document contains an amendment to a solicitation for a federal contract opportunity with the Department of Veterans Affairs. The amendment provides answers to questions from potential offerors regarding project details. Specifically, it addresses a project to replace an air handling unit at a VA medical center, with a value between $100,000 and $200,000 under NAICS code 236210. The solicitation requires the work be performed by a verified Service-Disabled Veteran-Owned Small Business, and that the contractor perform a minimum of 25% of the construction work. Offerors must submit all required small business registrations and certifications. The amendment clarifies access to the mechanical room, thickness of an existing concrete pad, tax exemption status, and other technical details. It does not provide any new information on products or services required for the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0033 0007.docx | DOCX document | |
| 36C25020B0033 0006.docx | DOCX document | |
| 36C25020B0033 0005.docx | DOCX document | |
| 36C25020B0033 0003.docx | DOCX document | |
| 36C25020B0033-0002000.docx | DOCX document | |
| 36C25020B0033-0001000.docx | DOCX document | |
| 36C25020B0033-022.pdf | ||
| 36C25020B0033-025.pdf | ||
| 36C25020B0033-021.pdf | ||
| 36C25020B0033-023.docx | DOCX document | |
| 36C25020B0033-019.pdf | ||
| 36C25020B0033-018.docx | DOCX document | |
| 36C25020B0033-024.docx | DOCX document | |
| 36C25020B0033-020.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE 7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODE CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 3
0004 06-16-2020
539-20-1-6913-0004
539-20-213
Department of Veterans Affairs Network Contracting Office 10 3140 Governor's Place Blvd, Suite 210
Kettering OH 45409
Department of Veterans Affairs Network Contracting Office 10 3140 Governor's Place Blvd, Suite 210
Kettering OH 45409
To all Offerors/Bidders
36C25020B0033
05-05-2020
X
X X
** HOUR & DATE for Receipt of Offers is EXTENDED to:
539-3600162-6905-854200-3220-23NRNR000
The purpose of this amendment is to post answers to questions.
SEE FOLLOWING PAGES
Questions
Q1. Where are doors located on the roof that will provide the egress for the new AHU? What is the size of these doors?
A1. Drawing M104 shows the double doors that go to the chillers on the roof.
Q2. Is there the proper clearance to get the AHU in its location in the mechanical room (duct work, piping in the way)?
A2. The unit is required to be brought into the penthouse in pieces and re-assembled in the final location. Refer to the phasing notes on sheet M104 for more detail on what is required for transporting AHU components into and through the penthouse.
Q3. How do you get to this mechanical room (elevator, stairwell)?
A3. Access to the mechanical room is via the stairwell shown on M104.
Q4. We are supposed to remove the existing AHU concrete pad, how thick is this slab?
A4. The A/E notes show 2”.
Q5. Is this a tax-exempt project?
A5. Yes, this is a tax-exempt project.
Q6. If so, will the VA issue a Tax-Exempt certificate for use by the Prime Contractor and Subcontractors?
A6. The tax-exempt document will be issue to the prime contractor after award of the project.
Q7. During the Prebid walk we were unable to see the CT Scan Room. We were very interested in seeing above the ceiling tiles. There are no utilities shown on the drawings. Can the VA provide details on fire sprinkler piping and other utilities above the ceiling? If something like a fire main or other major utility needs to be moved, and its not indicated in the drawings, and we were unable to see inside the room or in the ceiling during the Prebid, this could present an obstacle.
A7. The following drawing is for reference only. It shows a fire mains running along the corridor and a 4” main that enters into the control room.
Q8. Who is the Honeywell and/or Fire Alarm rep? We’ve been unable to reach Honeywell after several attempts.
A8. Courtney Shoemaker at 613-800-9450
Q9. The drawing FX102 shows sprinkler modifications extending outside of the CT Scan room and into the corridor. Does the VA expect the piping outside of the room needs to be reworked or replaced?
A9. Yes, piping modifications are anticipated which is why it is included on the fire suppression sheet.
Q10. Is yes to the above question, are we do build ICRA partitions in the Corridor? If the piping in this area needs to be replaced, the ICRA walls would block the Corridor.
A10. Yes. ICRA barriers are required for the work. Corridor shall not be blocked during daytime hours. Coordinate work times with COR.
Q11. Does the VA expect us to cover the whole room with plastic before beginning any work?
A11. Areas of work will not be cleared for work. Any equipment, furniture, etc. must be protected in place.
Q12. Are we expected to build ICRA walls in the corridor area where cross ties to the Bone Density room ductwork will happen or can this work take place with the ceiling tiles removed as-is?
A12. Yes. Corridor shall not be blocked during daytime hours. Coordinate work times with