36C25020B0016-013.pdf

PDF Posted

Attached to
Upgrade OIT HVAC 583-16-122 Federal contract opportunity
Solicitation number
36C25020B0016
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This pre-solicitation notice announces an upcoming solicitation for construction services. The Richard L. Roudebush VA Medical Center intends to solicit bids to install new Liebert units, in-rack cooling units, chilled water lines and insulation, drain lines, a new sump pump, and lay-in ceiling grid and tiles. Additional requirements include demolishing existing piping, hangers, equipment and ceiling; installing controls sensors integrating into the existing FX building management system; firestopping wall penetrations; and performing leak testing and commissioning. The contractor must provide phasing, lookahead scheduling, waste diversion reporting, and training. The work must be done according to the contract drawings and specifications. As a 100% SDVOSB set-aside, the estimated value is between $500,000 and $1,000,000. The solicitation will be issued on January 25, 2020 via https://uscontractorregistration.com.

36C25020B0016 583-16-122 C FBD Drawing Set_Part4.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade OIT HVAC 583-16-122, newest first.
File Type Posted
36C25020B0016 A00010.pdf PDF
36C25020B0016 0008.docx DOCX document
36C25020B0016 A00007.docx DOCX document
Drawings.pdf PDF
Specs.pdf PDF
36C25020B0016 0006.docx DOCX document
36C25020B0016-0005000.docx DOCX document
36C25020B0016-0004000.docx DOCX document
36C25020B0016-0003000.docx DOCX document
36C25020B0016-0003001.pdf PDF
36C25020B0016-0002000.docx DOCX document
36C25020B0016-0002001.docx DOCX document
36C25020B0016-0001000.docx DOCX document
36C25020B0016-007.pdf PDF
36C25020B0016-011.pdf PDF
36C25020B0016-010.pdf PDF
36C25020B0016-006.pdf PDF
36C25020B0016-008.pdf PDF
36C25020B0016-005.pdf PDF
36C25020B0016-002.docx DOCX document
36C25020B0016-003.doc DOC document
36C25020B0016-009.pdf PDF
36C25020B0016-004.docx DOCX document
36C25020B0016-014.txt TXT text file
36C25020B0016-012.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

ROOFTOP UNITRTU-

DUCT WORK (UNLINED)

DUCT WORK (LINED)

VARIABLE AIR VOLUME TERMINAL BOX

DIFFUSER

DUCT COIL

FAN POWERED VAV BOX WITH REHEAT

EXHAUST OR RETURN GRILLE

RECTANGULAR DUCTXX"xXX"

ROUND DUCTX"Ø

DUAL DUCT TERMINAL BOX

SHUT-OFF TERMINAL BOX W/ REHEAT

SHUT-OFF TERMINAL BOX

FIRE DAMPER

TRANSFER AIR GRILLETG-

UNIT VENTILATOR

ABOVE FINISHED FLOOR

FLAT OVAL DUCT

UV-

VAV-

A.F.F.

XX"xXX"Ø

UNIT HEATERUH-

PRESSURE RELIEF VALVE

PRESSURE REGULATING VALVE

EXPANSION LOOP

TURBINE FLOWMETER

ORIFICE FLOWMETER

SUPPLY REGISTER

TERMINAL BOX

SUPPLY FANSF-

SR-

TB-

RELIEF VENTRV-

T

H

SECURITY THERMOSTAT

HUMIDISTAT

AV

MV

S SMOKE SENSOR

MANUAL AIR VENT

AUTOMATIC AIR VENT

HUMIDIFIERH-

ELECTRIC RADIATIONRAD-

RETURN AIR GRILLE

RETURN REGISTER

ROOF CAP

RELIEF FAN

RC-

RF-

RG-

RR-

T

T

S

P

P PRESSURE SENSOR

ELECTRONIC THERMOSTAT

PNUEMATIC THERMOSTAT

FLEXIBLE DUCT

BACKDRAFT DAMPER

HEAT EXCHANGER

LOUVER

PUMP

CONDITIONING UNIT

HX-

L-

P-

HEATING VENTILLATION AIRHVAC-

P

MANUAL AIR BALANCING DAMPER

MANUAL OPPOSED BLADE DAMPER

ACTUATOR

PRESSURE GAUGE

TIE-IN

INLINE PUMP EXHAUST GRILLEEG-

EXPANSION TANK

EXHAUST REGISTER

FINNED TUBE RADIATION

FIRE DAMPER

ER-

ET-

FD-

FTR-

PRESSURE & TEMPERATURE TEST PLUG

THERMOMETER

STRAINER

TEMPERATURE WELL

DUCT COILDC-

EXHAUST FANEF-

D-

CUH-

B- BOILER

DIFFUSER

CABINET UNIT HEATER

METER

PIPING RISE

PIPING DROP

THREADED HOSE CONNECTION W/ CAP

INLINE DROP

CHILLED WATER SUPPLY PIPING

CHILLED WATER RETURN PIPING

AS-

AHU-

AFMS-

AC-

CWR

AIR FLOW MEASURING STATION

AIR CONDITIONER

CONDENSER WATER RETURN

AIR HANDLING UNIT

AIR SEPARATOR

AUTOMATIC FLOW CONTROL VALVE

UNION

WITH P & T PORTS

BLIND FLANGE CONNECTION

WITH P & T PORTS

D

HWS

CHWS

HWR HOT WATER RETURN PIPING

HOT WATER SUPPLY PIPING

CONDENSATE DRAIN

CWS CONDENSER WATER SUPPLY

CHWR

PNEUMATIC 3-WAY VALVE

PNEUMATIC 2-WAY VALVE

ELECTRONIC 3-WAY VALVE

ELECTRONIC 2-WAY VALVE

CHECK VALVE

GLOBE VALVE

STEAMS

COND STEAM CONDENSATE

BALL VALVE

BUTTERFLY VALVE

MECHANICAL SYMBOL SCHEDULE

DUCT WORK (DOUBLE WALL/PERFORATED INNER)

NEW MECHANICAL EQUIPMENT

NEW MECHANICAL DUCTWORK

EXISTING MECHANICAL EQUIPMENT AND

DUCTWORK TO REMAIN

M

M

SMOKE/FIRE DAMPER

FD

SFD

LRP- LINEAR RADIANT PANEL

SFD- SMOKE/FIRE DAMPER

O.A.C. OPENING ABOVE CEILING

ST

T

HEAT PUMPHP-

MAU- MAKE UP AIR UNIT

GATE VALVE

FLANGE CONNECTION

PIPING SLEEVE

FLOW SWITCHF

SPHERICAL RUBBER VIBRATION ISOLATOR

PIPING INCREASER

T STEAM TRAP

FLOW METER WITH WELL

MANUAL FLOW CONTROL VALVE

PLUMBING SYMBOL SCHEDULE

AW

AW

SAN

SAN

ST

ST

G

RAW

HOT WATER

COLD WATER

VENT

GAS

BELOW GRADE ACID WASTE

ABOVE GROUND ACID WASTE

HOT WATER RECIRC

DOMESTIC WATER (RAW)

STORM DRAIN BELOW FLOOR

STORM DRAIN ABOVE FLOOR

SANITARY DRAIN BELOW FLOOR

SANITARY DRAIN ABOVE FLOORBALL VALVE

BUTTERFLY VALVE

PRESSURE REDUCING STATION

GATE VALVE

GLOBE VALVE

TEMPERATURE MIXING VALVE

GAS COCK

GAS TURRET

COMPRESSED AIR TURRET

CHECK VALVE

IN LINE PUMP

STRAINER

AUTOMATIC FLOW VALVE

UNION

ACTUATOR

METER

PIPING DROP

INLINE PIPING DROP

PIPING RISE

PIPE CAP

PIPE BREAK

WALL CLEANOUT/ END FERRULE CLEANOUT

TIE-IN

THERMOMETER

WATER HAMMER ARRESTOR TAG

(SHOCK ABSORBER)

SHOCK ABSORBER

CLEAN OUT

FLOOR DRAIN

FLOOR SINK

ROOF DRAIN

VENT THROUGH ROOF

WALL HYDRANT/ HOSE BIBB

SHOWER HEAD

REDUCED PRESSURE PRINCIPLE

BACKFLOW PREVENTER

X

M

M

CLEANOUT

DRINKING FOUNTAIN

EMERGENCY DRENCH SHOWER

EMERGENCY EYE WASH

EXPANSION TANK

ELECTRIC WATER COOLER

ELECTRIC WATER HEATER

HOSE BIBB

LAVATORY

MOP BASIN

ROOF DRAIN

REDUCED PRESSURE PRINCIPLE

BACKFLOW PREVENTER

SINK

SHOWER

SUMP PUMP

TRENCH DRAIN

TEMPERATURE MIXING VALVE

URINAL

VENT THROUGH ROOF

WALL BOX

WATER CLOSET

WALL HYDRANT

YARD HYDRANT

SUFFIX INDICATES HANDICAP

ACCESSIBLE

ABOVE FINISHED FLOOR

FLOOR DRAIN

GARBAGE DISPOSER

GAS WATER HEATER

CO-

DF-

EDS-

EEW-

ET-

EWC-

EWH-

FD-

GD-

GWH-

HB-

L-

MB-

RD-

RPBP-

S-

SH-

SP-

TD-

TMV-

U-

VTR-

WB-

WC-

WH-

YH-

"H"

A.F.F.

T

PRESSURE REDUCING VALVE

MANUAL FLOW CONTROL VALVE

COLD WATERCW-

HUB DRAINHD-

ACCU- AIR COOLED CONDENSING UNIT

TERMINAL UNITTU-

S T TEMPERATURE SENSOR

F FLOOD SENSOR

CWD CITY WATER DRAIN

Point Description Air Conditioning Units (AC-1 through 6) Space Served

INPUT/OUTPUT SUMMARY TABLE

HARDWARE

OUTPUT (O)

DGTL

C on tr ol

R el ay S ol en oi d

ANALOG

Pn eu m at ic T ra ns du ce r El ec tr ic al

T ra ns du ce r

-2 m a or

-1

V

D C

INPUT (T, D, V, C)

DIGITAL

Pr es su re

S w itc h Fl ow S w itc h C on ta ct C lo su re A ux ili ar y C on ta ct

KW

M et er C on ta ct

ANALOG

Te m pe ra tu re

R el at iv e

H um id ity

S et

P oi nt A dj us tm en t Ps ig

Ps ia

Ps id

IN

H

O

Fl ow

El ec tr ic al C ur re nt F lo w

Po si tio n

Tr en di ng

ALARMS

DGTL

Eq ui pm en t S ta tu s

M ai nt en an ce

ANALOG

H ig h Li m it Lo w L im it

(T em pe ra tu re

R un

T im e

SOFTWARE

EMCS FUNCTIONS

S ch ed ul ed O n/ O ff O pt im um S ta rt

/S to p D em an d Li m iti ng

To ta liz at io n

D ay

/N ig ht S et ba ck Ec on om iz er

V en til at io n/

R ec irc ul at io n D ire ct

D gt al T em pe ra tu re C on tr ol En th al py G lo ba

l) H ea tin g or C oo lin g R es et B oi le r

O pt im iz at io n

O .A

R es et C hi lle r O pt im iz at io n

C hi lle d

W at er R es et

V A V C on tr ol V ar ia bl e S pe ed P um pi ng Ic e S to ra ge

C on tr ol

Le ad

/L ag

C on tr ol

Li gh tin g

C on tr ol

C ol or G ra ph ic s

It em

Liquid Sensors

SEQUENCE OF OPERATIONS FOR HVAC CONTROLS

1. ALARMS

A. Coordinate with the owner to identify alarms as "general" or " critical". General alarms will only be displayed at the computer graphics. Critical alarms will be displayed in the computer graphics program and dialed-out, emailed, or text messaged to pre-programmed telephone numbers and email address via the internet.

2. MONITORING SEQUENCES

A. Monitor space temperature of C-B022 and C-B027 and generate an alarm message at the computer graphics if space temperature falls below 50 deg F or rises above 76 deg F during occupied mode. Generate a critical alarm if space temperature falls below 40 deg F or rises above 80 deg F during occupied or unoccupied mode.

B. Connect to air conditioning equipment interface to read all available points.

Coordinate with the VA to determine which points should be displayed graphically on the building automation system. Air conditioning equipment factory controls are to provide the sequence of operation to maintain space temperature and humidity set points. Monitor air conditioning equipment capacity and generate an alarm message if an air conditioner reaches 80% of its maximum capacity for at lease 15 minutes (adjustable).

C. Monitor liquid sensors in floor space and send an alarm if liquid is detected.

D. Connect to Starline Modbus to read all available points. Coordinate with the VA to determine which points should be displayed graphically on the building automation system.

E. Monitor status of city water changeover valves. Valves are not to be adjustable from the BMS. Valves are to be controlled by switches in the space. The switches can allow either AC-3, AC-4, AC-5, and AC-6, or a combination of AC-2 and two in-row units (AC-3, AC-4, AC-5, or AC-6) to operate on city water but not all units can operate on city water at the same time. AC-1 may be operated on city water at any time independent of the other units. Include all wiring and switches as part of the controls contractor's work.

3. SINGLE DUCT SHUT OFF VAV TERINAL UNIT WITH HOT WATER REHEAT

A. Modulate open primary air valve with a rise in space temperature. With a fall in space temperature, modulate primary air valve towards the minimum setting.

With a continued fall in space temperature below the heating set point, modulate open the hot water coil control valve, when valve is 100% open, modulate air valve increasing air flow to maintain space heating set point. If hot water is not available, close primary air valve 100% with a fall in space temperature below heating set point.

4. SINGLE DUCT SHUT OFF VAV TERMINAL UNIT WITHOUT REHEAT

A. Occupied Mode: Modulate open primary air valve with a rise in space temperature. With a fall in space temperature, modulate primary air valve towards the minimum setting.

5. PUMP CONTROL SEQUENCE

A. P-1 & 1-A (Chilled Water Loop): Variable speed lead/Lag back-up operation. Lead pump is to run continuously. Modulate lead pump with a 4-20mA output to variable speed drive to maintain a differential pressure (adjustable) across the supply and return mains at the location shown. With a failure of the lead pump to establish flow within 15 seconds after a call to operate, start the lag pump and generate an alarm message reading "PRIMARY CHILLED WATER LEAD PUMP FAILURE" to be automatically displayed in computer graphics and dial out, text messaged, and email to pre-programmed addresses and/or numbers. Alternate lead and lag pumps every seven days.

B. P-2 & 2-A (Chilled Water Secondary Loop): Variable speed lead/Lag back-up operation. Lead pump is to run continuously. Modulate lead pump with a 4-20mA output to variable speed drive to maintain a differential pressure (adjustable) across the supply and return mains at the location shown. With a failure of the lead pump to establish flow within 15 seconds after a call to operate, start the lag pump and generate an alarm message reading "SECONDARY CHILLED WATER LEAD PUMP FAILURE" to be automatically displayed in computer graphics and dial out, text messaged, and email to pre-programmed addresses and/or numbers.

Alternate lead and lag pumps every seven days.

6. CITY WATER MANUAL CHANGEOVER SEQUENCE

A. A switch located in the IT space will allow the VA to manually switch to city water by opening automatic city water valves and closing chilled water valves. Each unit will have its own changeover switch. The BMS will only monitor the status of the valves and limit the maximum number of units that can operate on city water

Pumps P-1 & 1-A P-2 & 2-A

Chilled Water Primary Loop

CHWS

CHWR

Secondary Loop Supply Return

Shutoff VAV TU-6-22 Primary Air Space Served

Primary Air HW Coil Valve Discharge Air

Shutoff VAV TU-6-21

Space Served

Starline Modbus

A COMPRESSED AIR

City Water Changeover Valves simultaneously.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

DIFFUSER - SEE PLANS FOR

TYPES AND SIZES.

SUPPORT FROM CEILING

GRIDWORK OR BUILDING

STRUCTURE.

MANUAL BALANCE DAMPER LEAVE HANDLE

CLEAR FOR BALANCING, EXTEND BLADE

SHAFT TO PREVENT EXTERNAL INSULATION

DAMAGE FROM HANDLE

SEE PLANS FOR

DUCT SIZES

FLEXIBLE DUCT. KEEP DUCT

AS SHORT AS POSSIBLE.

MAX. LENGTH 6 FT. MAY BE

LOCATED IN VERTICAL DROP

TO DIFFUSER

RIGID METAL ELBOW USE

FOR CHANGES IN

DIRECTION

NTS

TYPICAL CEILING DIFFUSER INSTALLATION DETAIL

S T

P

CHWS

CHWR

55°-65°F

70°-80°F

A

T

SB

FROM PUMPED LOOP

2"

2-POSITION ELECTRIC SOLENOID VALVE

UNION

FROM CITY WATER SUPPLY

ROUTE TO STORM DRAIN

SHUT-OFF VALVE

3-WAY VALVE

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

IN ROW AC UNIT

CONNECTION POINT FOR CHWR PIPING.

CONNECTION POINT FOR CITY WATER DRAIN PIPING.

CONNECTION POINT FOR CHWS PIPING.

CONNECTION POINT FOR CITY WATER SUPPLY PIPING.

IN ROW AIR CONDITIONING UNIT, ALL COMPONENTS INSIDE DASHED LINE ARE

PROVIDED BY THE MANUFACTURER. CONNECTION POINTS FOR CHILLED WATER

SUPPLY AND RETURN AND CITY WATER SUPPLY AND DRAIN ARE INDICATED.

PRESSURE AND TEMPERATURE TRANSDUCER SHALL BE CONNECTED TO THE

AC UNIT PROGRAMABLE CONTROLLER TO OPEN AND CLOSE THE SOLENOID

VALVES NUMBERED 1 THROUGH 4 .

A

B

NTS

IN ROW AC UNIT SCHEMATIC PIPING DETAIL

WATER COOLED BRAZED PLATE CONDENSER

8"

8"

3"

3"

CHWS

CHWR

16" CHWS16" CHWR

CHWS

CHWR

T S

T S

P S

P S

S

T 80 GPM 3"

3"

3"

CHWS

CHWR

3"

2-1/2"

P-2 P-2A

3" CHWS TO AC-4, AC-5, AND AC-6

2" CHWS TO AC-3

2" CHWR FROM AC-3

CHWR

CHWS

T S

P-1A

P-1

2-1/2" CHWR FROM AC-1

2-1/2" CHWS TO AC-1

2-1/2" CHWR FROM AC-2

2-1/2" CHWS TO AC-2

3"

2-1/2"

NTS

COMPUTER ROOM AIR CONDITIONER CHILLED WATER SCHEMATIC

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

CHWR

CHWR

CHWR

CHWS

CHWS

CHWR

CHWS 45°-55°F

CHWR 55°-65°F

THERMISTOR

3-WAY VALVE

COOLED

WATER

CONDENSER

WATER

CHILLED

COIL

REFRIGERANT HOT GAS

REFRIGERANT LIQUID

COOLED

WATER

CONDENSER

NTS

DOWN FLOW AC UNIT SCHEMATIC PIPING DETAIL

DIFFERENTIAL

PRESSURE

SENSOR

DIGITAL

THERMOMETER

2"

1-1/2"

2"

AUTOMATIC FLOW CONTROL VALVE

2-1/2"

T S

TEMPERATURE SENSOR

CONNECTION POINT FOR CHWR PIPING.

CONNECTION POINT FOR CHWS PIPING.

CONNECTION POINT FOR CITY WATER SUPPLY.

CONNECTION POINT FOR CITY WATER DRAIN.

DOWN FLOW AIR CONDITIONING UNIT, ALL

COMPONENTS INSIDE DASHED LINE ARE

PROVIDED BY THE MANUFACTURER.

CONNECTION POINTS FOR CHILLED WATER

SUPPLY AND RETURN AND CITY WATER SUPPLY

AND DRAIN ARE INDICATED.

1 4

CHWR

CHWS

CHWS

CHWR

NEENAH R-4380 GRATING

SURE SEAL TRAP SEALER

DEEP SEAL TRAP

HD-1, 4" WASTE

6" MIN. ABOVE SURE

SEAL TRAP SEALER

FLOOR

NTS

PIPE HANGERS - PROVIDE DOUBLE DEFLECTION

NEOPRENE (TYPE HN) FOR FIRST TWO ON EACH

SIDE OF PUMP (SEE NOTE NO. 1)

PRESSURE GAGE

1/2" [15mm]

STRAINERFLEXIBLE CONNECTION

BALL OR

BUTTERFLY TYP.

NOTES:

1. SUPPORT PUMP FROM PIPING ONLY. DO NOT SUPPORT PUMP FROM MOTOR.

IN-LINE PUMPS - CONNECTIONS

BALANCING DEVICE

NTS

HUB DRAIN DETAIL

NOTES:

NOTES:

T

T

T

T

FLEXIBLE HOSE TO

ALLOW MOVEMENT

OF UNIT

FLEXIBLE HOSE TO

ALLOW MOVEMENT

OF UNIT

B

3" CHWR FROM AC-4, AC-5, AND AC-6

A

SS

P

SS

P

DIFFERENTIAL PRESSURE SENSOR

2-HOUR FIRE STOPPING SYSTEM

AT ALL FLOOR PENETRATIONS

SS

T

T

STRAINER

TO STORM DRAIN

FROM CITY WATER SUPPLY

STRAINER

A

TO EXISTING AIR CONDITIONER IN UPS C-B017

3/4"

AIR CONDITIONING UNIT SCHEDULE

TAG

AC-1

AC-2

AC-3

AC-4

AC-5

AC-6

REMARKS:

1. PROVIDE WITH INTEGRAL INFRARED HUMIDIFIER AND ELECTRIC REHEAT.

2. PROVIDE WITH DIGITAL COMPRESSOR FULLY MODULATING BETWEEN 100% AND 20% CAPACITY, VARIABLE SPEED FAN, AND 12" FLOOR STAND.

3. PROVIDE WITH BACNET INTERFACE TO ALLOW THE BUILDING AUTOMATION SYSTEM TO MONITOR AND DISPLAY UNIT STATUS AND ALARMS.

4. DOWN FLOW UNITS ARE TO BE PROVIDED DISASSEMBLED INTO MODULES AND REASSEMBLED IN FINAL INSTALLATION LOCATION.

5. PROVIDE WITH INTEGRAL CANISTER HUMIDIFIER AND ELECTRIC REHEAT.

6. PROVIDE AND INSTALL WITH THREE RACK MOUNTED SENSORS AT LOCATION TO BE DETERMINED IN THE FIELD.

7. PROVIDE AND INSTALL WITH SUPPLY AND RETURN AIR TEMPERATURE SENSORS AND A HUMIDITY SENSOR.

8. PROVIDE AND INSTALL WITH SUPPLY AIR TEMPERATURE SENSOR ON 15 FOOT CABLE. INSTALL SENSOR UNDER THE FLOOR IN FRONT OF THE UNIT AS FAR FROM THE UNIT AS POSSIBLE. MAINTAIN A DISCHARGE AIR TEMPERATURE OF 62 DEGREES (ADJUSTABLE).

9. PROVIDE WITH VNSA NETWORK SWITCH TO NETWORK UNITS.

CONFIGURATION

DOWN FLOW

DOWN FLOW

IN-ROW

IN-ROW

IN-ROW

IN-ROW

AIR FLOW (CFM)

SUPPLY

RETURN

OA

ESP

0.2 0.2

BLOWER SECTION

QUANTITY

FAN TYPE

EC PLUG

EC PLUG

EC PLUG

EC PLUG

EC PLUG

EC PLUG

ELECT

208/3 208/3 208/3 208/3 208/3 208/3

COOLING (CHILLED WATER)

TON (NOMINAL)

20.0 20.0

MBH (TOT)

MBH (SEN)

EA DB/WB

75/61 75/61

LA DB/WB

57.4/53.9 57.4/53.9

EWT

LWT

GPM

ROWS

FPI

WPD (FT H2O)

COOLING (DX)

TON (NOMINAL)

20.0 20.0 10.0 10.0 10.0 10.0

MBH (TOT)

MBH (SEN)

EA DB/WB

75/61 75/61 80/59 80/59 80/59 80/59

LA DB/WB

54.6/51.5 54.6/51.5 50.1/46.0 50.1/46.0 50.1/46.0 50.1/46.0

EWT

LWT

GPM

ROWS

FPI

WPD (FT H2O)

COOLING (CITY WATER BACK-UP)

MBH (TOT)

MBH (SEN)

EWT

LWT

GPM

WPD (FT H2O)

FILTER MEDIA

DEPTH

4" 4" 4" 4" 4" 4"

RATING

MERV 8

MERV 8

MERV 8

MERV 8

MERV 8

MERV 8

REMARKS

1, 3, 4, 7, 8, 9 1, 3, 4, 7, 8, 9 2, 3, 5, 6, 7, 9 2, 3, 5, 6, 7, 9 2, 3, 5, 6, 7, 9 2, 3, 5, 6, 7, 9

DIFFUSER SCHEDULE

TAG

D-1 D-2 D-3

RG-1

RG-2

EG-1

TA-1

REMARKS:

1. PROVIDE ALL NECESSARY TRIM AND BORDERS FOR INSTALLATION INTO CEILING TYPES AND WALLS. REFER

TO ARCHITECTURAL DRAWINGS FOR ROOM FINISHES.

2. PROVIDE AND INSTALL DUCT TRANSITION FITTINGS AS REQUIRED FOR CONNECTION TO DIFFUSERS AND GRILLES.

3. PROVIDE WITH INTEGRAL VOLUME DAMPER.

NECK

8"

10" 24" X 6"

6" X 6" 12" X 12"

6" X 6"

24" X 6"

FACE

12" x 12" 24" x 24" 26" X 8"

12" x 12" 24" x 24"

12" x 12"

26" X 8"

TYPE

PERFORATED

PERFORATED

LOUVERED

PERFORATED

PERFORATED

PERFORATED

LOUVERED

MAX CFM

MAX PD

(TOTAL)

0.05" 0.05" 0.03"

0.10" 0.10"

0.10"

0.03"

MAX NC

THROW

(FEET)

MATERIAL

STEEL

STEEL

STEEL

STEEL

STEEL

STEEL

STEEL

REMARKS

1, 2 1, 2 1, 3

1, 2 1, 2

1, 2

1, 3

S

R

P&T PORT

AUTOMATIC FLOW

CONTROL VALVE WITH P&T

PORTS

2-WAY CONTROL VALVE

LINE SIZE STRAINER WITH

THREADED HOSE

CONNECTION AND CAP

NTS

TERMINAL UNIT 2-WAY HEATING COILS

NTS

MAXIMUM CAPACITY SIGN DIAGRAM3

THE MAXIMUM CITY WATER

COOLING CAPACITY IS 40 TONS

PUMP SCHEDULE

TAG

P-1 P-1A P-2 P-2A

SP-1

SP-2

REMARKS:

1. PUMPS ARE TO BE LEAD/LAG OPERATION WITH 100% BACK-UP.

2. PUMPS ARE TO BE CONTROLLED WITH VARIABLE FREQUENCY DRIVE.

3. PUMPS ARE FLOAT CONTROLLED.

4. PROVIDE CORD LENGTH TO NEARBY RECEPTACLE. PROVIDE INLINE CHECK VALVE.

TYPE

INLINE

INLINE

INLINE

INLINE

SUMP

SUMP

FLOW

(GPM)

HEAD

(FT)

PUMP EFF

(+/- 5%)

RPM

HP

0.75 0.75

BHP

2.37 2.37 2.72 2.72

ELEC.

(V/PH)

208/3 208/3 208/3 208/3 115/1 115/1

SERVICE

PRIMARY LOOP (AC-1, 2 & AC-3, 4, 5, 6)

PRIMARY LOOP (AC-1, 2 & AC-3, 4, 5, 6)

AC-3, 4, 5, 6

AC-3, 4, 5, 6

SUMP PUMP

SUMP PUMP

REMARKS

1, 2 1, 2 1, 2 1, 2 3, 4 3, 4

VARIABLE AIR VOLUME TERMINAL SCHEDULE

TAG

TU-6-21

TU-6-22

TU-6-22A

REMARKS:

1. SHEETMETAL CONTRACTOR SHALL TRANSITION DUCT AS REQUIRED FOR INLET AND DISCHARGE CONNECTIONS.

2. UNIT SHALL BE DIRECT DIGITAL CONTROLLED AND PRESSURE INDEPENDENT.

3. UNIT SHALL BE PRESSURE INDEPENDENT/ CONSTANT VOLUME.

TYPE

SHUT OFF

SHUT OFF

SHUT OFF

MAX

AIR (CFM)

MINIMUM

AIR (CFM)

MAX

INLET

S.P.

1.5" 1.5" 1.5"

INLET

SIZE (IN)

MAX

NC

HEATING COIL

HEATING

AIR (CFM)

HEATING

MBH

3.5

GPM

0.5

EAT

LAT

EWT

LWT

AIR

P.D. (IN)

0.05 0.12 0.05

WATER

P.D. (IN)

0.75 0.75

AREA

SERVED

IMS C-B027A

IMS MECH C-B027

TELECOM C-B022

REMARKS

1, 2 1, 2 1, 3

NTS

DUPLEX SUMP PUMPS8

UNION

H R

FIR

E B A R R

IER

2HR FIRE BARRIER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

2HR FIRE BARRIER

H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R

2HR FIRE BARRIER

H R

FIR

E B A R R

IER

2HR FIRE BARRIER

2 5

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

SCALE: 1/16" = 1'-0"

MECHANICAL - DEMOLITION PLAN - PARTIAL SUB BASEMENT/CRAWL SPACE OVERALL PLAN

MD100

REMOVE EXISTING CITY WATER PIPING BACK TO THIS LOCATION.

REMOVE EXISTING PIPING, FITTINGS, VALVES, STRAINERS, AND PNEUMATIC ACTUATED

VALVES. VALVES ARE TO BE SALVAGED AND TURNED OVER TO THE VA.

REMOVE EXISTING CHILLED WATER SUPPLY PIPING BACK TO THIS LOCATION.

REMOVE EXISTING CHILLED WATER RETURN PIPING BACK TO THIS LOCATION.

PATCH / REPAIR FLOOR TO MATCH EXISTING, ADJACENT FLOOR IN CONSTRUCTION.

REMOVE EXISTING HUB DRAIN AND SANITARY DRAIN PIPING. REPAIR ABANDONED

FLOOR OPENING TO MATCH EXISTING, ADJACENT FLOOR IN CONSTRUCTION.

EXISTING HUB DRAIN AND SANITARY DRAIN PIPING TO SANITARY BRANCH TO REMAIN.

PATCH / REPAIR WALL OPENINGS TO MATCH EXISTING, ADJACENT WALL IN

CONSTRUCTION AND FIRE RATING.

REMOVE EXISTING CLEANOUT AND PREPARE PIPE FOR NEW WORK.

REMOVE COMPRESSED AIR PIPING BACK TO COMPRESSOR.

REMOVE EXISTING SUMP PUMPS AND TURN OVER TO VA. REMOVE PUMP DISCHARGE

PIPING TO ABOVE WYE FITTING. TURN CHECK VALVES OVER TO VA & MAKE READY FOR

NEW WORK.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO

ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING

SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY

MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)

IMMEDIATELY.

4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.

6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY

THE CONTRACTOR - DAILY.

7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS

AND DAMAGE DURING CONSTRUCTION.

8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

9. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

10. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND

DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF

CONSTRUCTION.

11. REMOVAL OF EXISTING EQUIPMENT SHALL BE COMPLETED WHILE ADJACENT EQUIPMENT

IS IN OPERATION. SMOKE AND DUST CONTROL MEASURES SHALL BE IN PLACE PRIOR

TO REMOVAL OF HVAC EQUIPMENT, DUCTWORK, PIPING, AND SUPPLY/RETURN GRILLES.

NOT TO SCALE

SUBBASEMENT KEY PLAN

N

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

RENOVATION

AREA

NOTE:

PROVIDE FIRE STOPPING AT ALL NEW PENETRATIONS OF FLOOR. PATCH ALL

ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF FLOOR.

NOTE:

CONTRACTOR IS TO PROTECT ALL ADJACENT SPACES, EQUIPMENT, AND FINISHES

DURING CORE DRILLING AND OTHER WORK. COORDINATE AND SCHEDULE ALL CORE

DRILLING AND SHUTDOWNS WITH COR.

RA

M

P

DO

W N

RAMP

DOWN

EXISTING

TELECOM

C-BO22EXISTING

LOBBY

EXISTING

ELEVATOR P1

EXISTING

ELEVATOR P2

EXISTING

ELEVATOR P3

EXISTING

ELEVATOR P4

EXISTING

SERVICE

ELEVATOR S6

EXISTING

SERVICE

ELEVATOR S5

EXISTING

CORRIDOR

CB-35EXISTING

PAPER

STORAGE

C-B177

EXISTING

TELECOM

C-B178

EXISTING

MECH

C-B021

EXISTING

CORRIDOR

CB-38

EXISTING

CLOSET

C-B018

EXISTING

SWITCH GEAR

C-B019

EXISTING

STAIR-1

UPDO

W

N

EXISTING

UPS

C-BO17

EXISTING

IMS ENTRY

EXISTING

IMS

C-B027A

EXISTING

IMS MECH

C-B027

EXISTING

REPAIR AND

DEVELOPMENT

C-B031

EXISTING

OI&T SYSTEMS

C-B026

EXISTING

OI&T SUPERVISOR

C-B028

ELEC

EL

EC

PANEL PANEL

2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER1

7 8

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

REMOVE CHILLED WATER SUPPLY AND RETURN PIPING THROUGH FLOOR TO

CRAWLSPACE. PATCH / REPAIR FLOOR TO MATCH EXISTING, ADJACENT FLOOR IN

CONSTRUCTION.

REMOVE CITY WATER THROUGH FLOOR TO SUB-BASEMENT. PATCH / REPAIR FLOOR

TO MATCH EXISTING, ADJACENT FLOOR IN CONSTRUCTION.

REMOVE CITY WATER PIPING THROUGH FLOOR TO CRAWLSPACE. PATCH / REPAIR

FLOOR TO MATCH EXISTING, ADJACENT FLOOR IN CONSTRUCTION.

REMOVE EXISTING CHILLED WATER SUPPLY AND RETURN PIPING TO THIS POINT.

PREPARE FOR NEW WORK.

REMOVE EXISTING HUB DRAIN THROUGH FLOOR. PATCH / REPAIR FLOOR TO MATCH

EXISTING, ADJACENT FLOOR IN CONSTRUCTION.

REMOVE CHILLED WATER SUPPLY AND RETURN PIPING THROUGH FLOOR TO

SUB-BASEMENT. PATCH / REPAIR FLOOR TO MATCH EXISTING, ADJACENT FLOOR IN

CONSTRUCTION.

REMOVE EXISTING LIQUID SENSOR. PREPARE WIRING FOR CONNECTION TO NEW

SENSOR.

REMOVE EXISTING LIQUID SENSOR.

PIPING TO EXISTING COOLING UNIT TO REMAIN.

TEMPERATURE CONTROL PANEL TO REMAIN ACTIVE.

EXISTING VALVES ARE TO BE SALVAGED AND TURNED OVER TO THE VA.

REMOVE PNEUMATIC ACTUATED VALVES. VALVES ARE TO BE SALVAGED AND TURNED

OVER TO THE VA.

REMOVE DRAIN PIPE TO POINT INDICATED AND PREPARE FOR RECONNECTION.

EXISTING HUB DRAIN TO REMAIN.

REMOVE EXISTING CHILLED WATER / CITY WATER CHANGEOVER SWITCH COMPLETE.

SCALE: 1/4" = 1'-0"

MECHANICAL - DEMOLITION PLAN - PARTIAL BASEMENT FLOOR - UNDER FLOOR PIPING 1

MD101A

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO

ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING

SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY

MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)

IMMEDIATELY.

4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.

6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY

THE CONTRACTOR - DAILY.

7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS

AND DAMAGE DURING CONSTRUCTION.

8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

9. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

10. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND

DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF

CONSTRUCTION.

11. REMOVAL OF EXISTING EQUIPMENT SHALL BE COMPLETED WHILE ADJACENT EQUIPMENT

IS IN OPERATION. SMOKE AND DUST CONTROL MEASURES SHALL BE IN PLACE PRIOR

TO REMOVAL OF HVAC EQUIPMENT, DUCTWORK, PIPING, AND SUPPLY/RETURN GRILLES.

NOT TO SCALE

BASEMENT KEY PLAN

N

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

RENOVATION

AREA

NOTE:

PROVIDE FIRE STOPPING AT ALL NEW PENETRATIONS OF FLOOR. PATCH ALL

ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF FLOOR.

NOTE:

CONTRACTOR IS TO PROTECT ALL ADJACENT SPACES, EQUIPMENT, AND FINISHES

DURING CORE DRILLING AND OTHER WORK. COORDINATE AND SCHEDULE ALL CORE

DRILLING AND SHUTDOWNS WITH COR.

P

DO

W N

RAMP

DOWN

EXISTING

TELECOM

C-BO22EXISTING

LOBBY

EXISTING

ELEVATOR P1

EXISTING

ELEVATOR P2

EXISTING

ELEVATOR P3

EXISTING

ELEVATOR P4

EXISTING

SERVICE

ELEVATOR S6

EXISTING

SERVICE

ELEVATOR S5

EXISTING

CORRIDOR

CB-35EXISTING

PAPER

STORAGE

C-B177

EXISTING

TELECOM

C-B178

EXISTING

MECH

C-B021

EXISTING

CORRIDOR

CB-36

EXISTING

CORRIDOR

CB-38

EXISTING

CLOSET

C-B018

EXISTING

SWITCH GEAR

C-B019

EXISTING

MECH

C-B020

EXISTING

STAIR-1

UPDO

W

N

EXISTING

UPS

C-BO17

EXISTING

IMS ENTRY

EXISTING

IMS

C-B027A

EXISTING

IMS MECH

C-B027

EXISTING

REPAIR AND

DEVELOPMENT

C-B031

EXISTING

OI&T SYSTEMS

C-B026

EXISTING

OI&T SUPERVISOR

C-B028

ELEC

EL

EC

PANEL PANEL

2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

SCALE: 1/4" = 1'-0"

MECHANICAL - DEMOLITION PLAN - PARTIAL BASEMENT FLOOR 1

MD101B

REMOVE EXISTING IT ROOM AIR CONDITIONER IN ITS ENTIRETY. PUMP DOWN ALL

REFRIGERANT AND PROPERLY DISPOSE OF REFRIGERANT AND REFRIGERANT OIL. UNITS

TO BE DISMANTLED AND REMOVED IN SECTIONS AS NEEDED TO FIT THROUGH

EXISTING OPENINGS.

REMOVE EXISTING EXHAUST GRILLE. PATCH AND SEAL OPENING TO MATCH EXISTING

DUCTWORK.

REMOVE EXISTING TRANSFER AIR GRILLES LOCATED NEAR CEILING ON BOTH SIDES OF

WALL. REMOVE EXISTING SUPPLY AIR DIFFUSERS LOCATED NEAR FLOOR ON BOTH

SIDES OF WALL. PREPARE OPENING IN WALL NEAR CEILING AND FLOOR FOR NEW

WORK.

REMOVE EXISTING DIFFUSERS, DUCTWORK, AND TERMINAL UNITS IN THEIR ENTIRETY.

REMOVE EXISTING SUPPLY AIR BACK TO THIS LOCATION. PREPARE DUCTWORK FOR

NEW WORK.

REMOVE EXISTING HEATING HOT WATER SUPPLY AND RETURN PIPING BACK TO THIS

LOCATION. PREPARE PIPING FOR NEW WORK.

REMOVE GRILLE AND RETURN DUCT BACK TO MAIN. CAP MAIN DUCT AT TAKEOFF.

PATCH WALL TO MAINTAIN FIRE RATING.

REMOVE EXHAUST GRILLES AND DUCT BACK TO MAIN.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR IN THE EVALUATION OF THE EXTENT OF DEMOLITION: BUT SHALL NOT BE

HELD TO BE ALL INCLUSIVE.

3. CONTRACTORS SHALL FIELD INSPECT ALL DEMOLITION WORK PRIOR TO REMOVAL, TO

ENSURE SUCH REMOVAL DOES NOT IMPAIR STRUCTURAL INTEGRITY OF THE EXISTING

SITE OR BUILDING. IF THE INSPECTION INDICATES THAT THE STRUCTURAL INTEGRITY

MAY BE COMPROMISED, NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE (COR)

IMMEDIATELY.

4. GENERAL CONTRACTOR TO COORDINATE ALL ASSOCIATED WORK WITH ALL

SUB-CONTRACTORS.

5. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH COR PRIOR TO BEGINNING OF CONSTRUCTION.

6. ALL CONSTRUCTION AREAS AND ASSOCIATED WORK AREAS SHALL BE KEPT CLEAN BY

THE CONTRACTOR - DAILY.

7. PROTECT ADJACENT SPACES AND EXISTING EQUIPMENT FROM DEMOLITION DEBRIS

AND DAMAGE DURING CONSTRUCTION.

8. CONTRACTOR TO ENSURE NO DEMOLITION DEBRIS IS LEFT ON SITE PRIOR TO

COMPLETING ALL DEMOLITION WORK.

9. ALL CONTRACTORS SHALL BE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM

DURING THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES CONTRACTOR

IS TO CONTACT THE COR IMMEDIATELY; PRIOR TO THE END OF THE DAY OF

CONSTRUCTION.

10. ALL CONTRACTORS TO COORDINATE RELOCATION AND STORAGE OF EXISTING AND

DEMOLISHED EQUIPMENT AND MATERIALS WITH THE COR PRIOR TO THE START OF

CONSTRUCTION.

11. REMOVAL OF EXISTING EQUIPMENT SHALL BE COMPLETED WHILE ADJACENT EQUIPMENT

IS IN OPERATION. SMOKE AND DUST CONTROL MEASURES SHALL BE IN PLACE PRIOR

TO REMOVAL OF HVAC EQUIPMENT, DUCTWORK, PIPING, AND SUPPLY/RETURN GRILLES.

NOT TO SCALE

BASEMENT KEY PLAN

N

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

RENOVATION

AREA

NOTE:

PROVIDE FIRE STOPPING AT ALL NEW PENETRATIONS OF FLOOR. PATCH ALL

ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF FLOOR.

NOTE:

CONTRACTOR IS TO PROTECT ALL ADJACENT SPACES, EQUIPMENT, AND FINISHES

DURING CORE DRILLING AND OTHER WORK. COORDINATE AND SCHEDULE ALL CORE

DRILLING AND SHUTDOWNS WITH COR.

R

FIR

E B A R R

IER

2HR FIRE BARRIER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

2HR FIRE BARRIER

H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R

2HR FIRE BARRIER

H R

FIR

E B A R R

IER

2HR FIRE BARRIER

2 3 4

MH100B

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

SCALE: 1/16" = 1'-0"

MECHANICAL - PLAN - PARTIAL SUB BASEMENT/CRAWL SPACE OVERALL PLAN

MH100A

CONNECT CHWS AND CHWR TO EXISTING 8" CHWS AND CHWR AND EXTEND AS

INDICATED.

REFER TO PIPING SCHEMATIC AND SUB-BASEMENT FLOOR PLAN ON DRAWING

MH100B.

REFER TO ENLARGED PLAN ON DRAWING MH100B.

PROVIDE THROUGH PENETRATION FIRE STOPPING AT ALL OPENINGS CREATED BY

WORK OF THIS PROJECT IN RATED FLOORS AND WALLS.

CORE DRILL THROUGH WALLS FOR ROUTING OF NEW PIPING.

CONNECT (2) NEW 2"CW TO (2) EXISTING 2"CW TAPS. COMBINE INTO A SINGLE 3"CW

PIPE WITH A REDUCED PRESSURE BACKFLOW PREVENTER MOUNTED BETWEEN 12"

AND 60" A.F.F. PROVIDE AND INSTALL FUNNEL DRAIN ASSEMBLY PIPED TO NEAREST

FLOOR DRAIN.

CONNECT NEW 3" CITY WATER DRAIN INTO TAP OFF TOP OF EXISTING 8" STORM PIPE.

COORDINATE PIPE ROUTING TO NOT BE ABOVE EXISTING ELECTRICAL PANELS.

INSTALL CHECK VALVE IN CITY WATER DRAIN NEAR THE CONNECTION TO THE STORM

SEWER.

1. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.

2. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO

BEGINNING OF CONSTRUCTION.

3. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING

THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO

CONTACT THE COR IMMEDIATELY.

NOT TO SCALE

SUBBASEMENT KEY PLAN

N

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

RENOVATION

AREA

NOTE:

PROVIDE FIRE STOPPING AT ALL NEW PENETRATIONS OF FLOOR. PATCH ALL

ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF FLOOR. FLOOR FIRE RATING IS

2 HOURS. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

NOTE:

CONTRACTOR IS TO PROTECT ALL ADJACENT SPACES, EQUIPMENT, AND FINISHES

DURING CORE DRILLING AND OTHER WORK. COORDINATE AND SCHEDULE ALL CORE

DRILLING AND SHUTDOWNS WITH COR.

NOTE:

PROVIDE VALVE TAGS ON ALL VALVES INDICATING THE SERVICE AND A NUMBER.

PROVIDE A CORRESPONDING VALVE TAG CHART MOUNTED ON THE WALL AT A

LOCATION TO BE DETERMINED BY THE VA.

R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

2HR FIRE BARRIER2HR FIRE BARRIER2HR FIRE BARRIER2HR FIRE BARRIER2HR FIRE BARRIER2HR FIRE BARRIER

H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R H R F

IR

E

B A R R

IE

R

2HR FIRE BARRIER2HR FIRE BARRIER2HR FIRE BARRIER2HR FIRE BARRIER2HR FIRE BARRIER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

H R

FIR

E B A R R

IER

2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

SCALE: 1/4" = 1'-0"

MECHANICAL - PLAN - PARTIAL SUB BASEMENT/CRAWL SPACE

MH100B

3" CONDENSATE DRAIN DOWN TO EXISTING SUMP PUMP.

REFER TO AIR CONDITIONING PIPING SCHEMATIC AND DETAILS FOR ADDITIONAL

INFORMATION AND WORK OF THIS PROJECT. REFER TO DRAWING MG002.

CORE DRILL BASEMENT FLOOR NEAR TO AC UNIT. ROUTE CHW PIPING UP THROUGH

FLOOR AND CONNECT TO AC UNIT.

PROVIDE THROUGH PENETRATION FIRE STOPPING AT ALL OPENINGS CREATED BY

WORK OF THIS PROJECT IN RATED FLOORS AND WALLS.

CORE DRILL BASEMENT FLOOR NEAR TO AC UNIT. ROUTE CITY WATER UP THROUGH

FLOOR.

3/4" CW UP TO HUMIDIFIER CONNECTION WITHIN AC UNIT.

CORE DRILL BASEMENT FLOOR AND ROUTE 3" SAN DRAIN UP TO 4" HUB DRAIN.

PROVIDE DEEP SEAL TRAP. FIRESTOP TO MAINTAIN FIRE RATING INDICATED.

CONNECT 2" CW TO THE EXISTING 2" CW PIPING AS INDICATED AND EXTEND.

CONNECT NEW 3" CITY WATER DRAIN TO EXISTING STORM PIPING.

REFER TO DRAWING MH100A FOR CONTINUATION.

CORE DRILL SUB-BASEMENT/CRAWL SPACE WALL. TYPICAL OF ALL NEW PIPING

PENETRATING WALL. FIRESTOP TO MAINTAIN FIRE RATING INDICATED.

COORDINATE PIPE ROUTING TO NOT BE ABOVE EXISTING ELECTRICAL PANELS.

PROVIDE AND INSTALL DIFFERENTIAL PRESSURE SENSOR TO CONTROL VFD-P-1 AND

VFD-P-1A.

PROVIDE AND INSTALL DIFFERENTIAL PRESSURE SENSOR TO CONTROL VFD-P-2 AND

VFD-P-2A.

PROVIDE AND INSTALL VARIABLE FREQUENCY DRIVES ON EXISTING WALL.

3/4" CITY WATER UP TO FLOOR CAVITY FOR FUTURE CONNECTION TO PORTABLE

COOLER.

PROVIDE INLINE WATER FILTER RATED AT 0.5 GPM, 500 GALLONS, WITH QUICK

DISCONNECT FITTINGS. INSTALL THE FILTER IN AN ACCESSIBLE LOCATION ON THE

INLET TO THE HUMIDIFIER.

EXISTING OPEN HUB DRAIN TO REMAIN. DRAIN IS CONNECTED TO EXISTING SANITARY.

INSTALL AUTOMATIC CHANGEOVER VALVE IN EXISTING PIPING.

INSTALL AUTOMATIC FLOW CONTROL VALVE IN CITY WATER LINE TO LIMIT THE

MAXIMUM FLOW TO 81 GPM.

REFER TO SHEET MG002, DETAIL #1 FOR CHILLED WATER PIPE CONNECTIONS IN THIS

AREA.

CONNECT NEW 2" PVC TO EXISTING AND EXTEND DOWN TO NEW SUMP PUMPS. REFER

TO DETAIL #8 ON SHEET MG002.

1. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.

2. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO

BEGINNING OF CONSTRUCTION.

3. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING

THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO

CONTACT THE COR IMMEDIATELY.

NOT TO SCALE

SUBBASEMENT KEY PLAN

N

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

RENOVATION

AREA

NOTE:

PROVIDE FIRE STOPPING AT ALL NEW PENETRATIONS OF FLOOR. PATCH ALL

ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF FLOOR. FLOOR FIRE RATING IS

2 HOURS. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

NOTE:

CONTRACTOR IS TO PROTECT ALL ADJACENT SPACES, EQUIPMENT, AND FINISHES

DURING CORE DRILLING AND OTHER WORK. COORDINATE AND SCHEDULE ALL CORE

DRILLING AND SHUTDOWNS WITH COR.

SCALE: 1/16" = 1'-0"

TEMPORARY PIPING PRIOR TO PHASE 1

MH100B

TEMPORARY PIPING NOTES

PROVIDE TEMPORARY TIE-INS TO EXISTING CHILLED WATER MAINS

ROUTE 2" CHILLED WATER SUPPLY AND RETURN TO AC-5 AND AC-6 INSTALLED IN A

TEMPORARY LOCATION TO BE DETERMINED BY THE VA. PROVIDE AND INSTALL

FLEXIBLE HOSE CONNECTIONS TO ALLOW UNITS TO BE MOVED. ROUTE TEMORARY

CONDENSATE DRAIN PIPING TO SUMP PUMP.

NOTE:

PROVIDE VALVE TAGS ON ALL VALVES INDICATING THE SERVICE AND A NUMBER.

PROVIDE A CORRESPONDING VALVE TAG CHART MOUNTED ON THE WALL AT A

LOCATION TO BE DETERMINED BY THE VA.

P

DO

W N

RAMP

DOWN

UPDO

W

N

ELEC

EL

EC

PANEL PANEL

2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1 2

1 2 3

5 6

1 2

65 7

1 2

65 7

1 2

65 7

1 2

65 7

TELECOM

C-B022

UPS

C-B017

EXISTING

IMS ENTRY

EXISTING

IMS

C-B027A

EXISTING

IMS MECH

C-B027

15 13

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

SCALE: 1/4" = 1'-0"

MECHANICAL - PLAN - PARTIAL BASEMENT FLOOR - UNDER FLOOR PIPING 1

MH101A

ROUTE CHWS AND CHWR PIPING UP THROUGH FLOOR AND CONNECT TO AC UNIT.

MAKE FINAL CONNECTION USING STAINLESS STEEL FLEXIBLE HOSE CONNECTOR.

ROUTE CONDENSATE DRAIN TO NEAREST TRAPPED HUB DRAIN.

CONNECT NEW 3/4" CHWS AND 3/4" CHWR TO EXISTING AND ROUTE TO NEW 2-1/2"

CHWS AND 2-1/2" CHWR NEAR AC-2. CONNECT NEW 3/4" CONDENSATE DRAIN TO

EXISTING AND ROUTE TO HD-1. REFER TO DETAIL 1 ON DRAWING MG002. VALVES

ARE TO BE IN AN ACCESSIBLE LOCATION BELOW THE AISLE. LABEL FLOOR TILE TO

INDICATE VALVES BELOW.

REFER TO DRAWING MG002 PIPING SCHEMATICS AND DETAILS FOR ADDITIONAL

INFORMATION.

ROUTE CITY DOMESTIC COLD WATER PIPING UP THROUGH FLOOR AND CONNECT TO

AC UNIT AND HUMIDIFIER.

ROUTE CITY WATER DISCHARGE THROUGH FLOOR TO STORM DRAIN. REFER TO

DRAWING MH100B FOR CONTINUATION. CITY WATER DISCHARGE IS TO BE A HARD

PIPE CONNECTION THROUGH THE FLOOR.

INSTALL NEW LIQUID DETECTOR.

PIPING PENETRATIONS FROM BELOW. REFER TO DRAWING MH100B.

PROVIDE AND INSTALL NEW TEMPERATURE CONTROL PANEL TO PICK UP ADDITIONAL

CONTROL POINTS FOR NEW EQUIPMENT. CONNECT TO EXISTING PANEL FOR POWER

AND CONTROL WIRING.

PROVIDE AND INSTALL NEW ELECTRONIC CHANGEOVER VALVE FOR EXISTING AC UNIT

IN UPS C-B017. LABEL FLOOR TILE TO INDICATE VALVE BELOW.

ROUTE EXISTING DRAIN TO NEW HUB DRAIN.

MAINTAIN OPERATION OF EXISTING CITY WATER CHANGEOVER DRAIN VALVE. LABEL

FLOOR TILE TO INDICATE VALVE BELOW. DRAIN IS TO TERMINATE IN THE HUB DRAIN.

PROVIDE AND INSTALL 3/4" CAPPED AND VALVED CITY WATER CONNECTION FOR

FUTURE CONNECTION TO TEMPORARY COOLER. PROVIDE WITH HOSE THREAD

CONNECTION. LABEL FLOOR TILE TO INDICATE LOCATION OF TEMPORARY

CONNECTION.

INSTALL SUPPLY AIR TEMPERATURE SENSOR AND CABLE UNDER THE FLOOR AS FAR

AS POSSIBLE FROM THE UNIT AND UNDER THE COLD AISLE CONTAINMENT.

ROUTE CITY WATER BACKUP DRAIN TO EXISTING OPEN HUB DRAIN.

PROVIDE AND INSTALL NETWORK SWITCHES AND ALL INTERCONNECTING ETHERNET

WIRING TO CONNECT ALL AC UNITS TO NEW SWITCHES.

REFER TO SHEET MG002, DETAIL #1 FOR CHILLED WATER PIPE CONNECTIONS IN THIS

AREA.

1. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.

2. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO

BEGINNING OF CONSTRUCTION.

3. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING

THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO

CONTACT THE COR IMMEDIATELY.

NOT TO SCALE

BASEMENT KEY PLAN

N

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

RENOVATION

AREA

NOTE:

PROVIDE FIRE STOPPING AT ALL NEW PENETRATIONS OF FLOOR. PATCH ALL

ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF FLOOR. FLOOR FIRE RATING IS

2 HOURS. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

NOTE:

CONTRACTOR IS TO PROTECT ALL ADJACENT SPACES, EQUIPMENT, AND FINISHES

DURING CORE DRILLING AND OTHER WORK. COORDINATE AND SCHEDULE ALL CORE

DRILLING AND SHUTDOWNS WITH COR.

NOTE:

PROVIDE VALVE TAGS ON ALL VALVES INDICATING THE SERVICE AND A NUMBER.

PROVIDE A CORRESPONDING VALVE TAG CHART MOUNTED ON THE WALL AT A

LOCATION TO BE DETERMINED BY THE VA.

P

DO

W N

RAMP

DOWN

UPDO

W

N

ELEC

EL

EC

PANEL PANEL

IT

RA

CK

2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

SWITCH PATCH

TELECOM

C-B022

UPS

C-B017

EXISTING

IMS ENTRY

EXISTING

IMS

C-B027A

EXISTING

IMS MECH

C-B027

6 6

99 9

10 10

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netV IRIDIAN

ARCHITECTURAL DESIGN INC.

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

SCALE: 1/4" = 1'-0"

MECHANICAL - PLAN - PARTIAL BASEMENT FLOOR 1

MH101B

1. ALL CONTRACTORS SHALL CLEAN SITE THOROUGHLY AT THE END OF EACH WORK DAY.

2. ALL CONTRACTORS TO VERIFY STAGING AND STORAGE LOCATIONS OF ALL MATERIALS

AND EQUIPMENT WITH CONTRACTING OFFICER REPRESENTATIVE (COR) PRIOR TO

BEGINNING OF CONSTRUCTION.

3. ALL CONTRACTORS ARE RESPONSIBLE FOR ANY DAMAGES CAUSED BY THEM DURING

THE CONSTRUCTION PROCESS. IN THE EVENT OF ANY DAMAGES, CONTRACTOR IS TO

CONTACT THE COR IMMEDIATELY.

1 INSTALL NEW VOLUME DAMPER ON EACH NEW SUPPLY GRILLE NEAR FLOOR. VOLUME

DAMPERS ARE TO BE CLOSED. COORDINATE COOLING REQUIREMENTS WITH VA.

CONNECT NEW HWS AND HWR TO EXISTING.

CONNECT NEW 8"x6" EXHAUST DUCT TO EXISTING AND EXTEND AS INDICATED.

PROVIDE AND INSTALL COLD AISLE END ROW PLASTIC CURTAIN WALL. REFER TO

ARCHITECTURAL DRAWINGS.

PROVIDE AND INSTALL SIGN ON WALL NEXT TO DOOR INDICATING MAXIMUM

AVAILABLE COMBINED COOLING CAPACITY OF AIR CONDITIONING EQUIPMENT IN

ROOM.

PROVIDE AND INSTALL MANUAL CHANGEOVER SWITCH TO ALLOW UNITS TO BE

SWITCHED FROM CHILLED WATER TO CITY WATER SUPPLY. PROVIDE SIGNAGE TO

INDICATE ONLY A LIMITED NUMBER OF UNITS CAN OPERATE ON CITY WATER AT THE

SAME TIME. REFER TO SEQUENCE OF OPERATION ITEM 2. E. ON DRAWING MG001

AND SIGNAGE DIAGRAM ON DRAWING MG002. COORDINATE LOCATION WITH VA.

PROVIDE AND INSTALL 24 VOLT WIRING FROM TERMINAL ON AC UNIT TO FIRE PANEL

FOR REMOTE SHUTDOWN OF UNIT. COORDINATE INSTALLATION WITH OTHER TRADES.

PROVIDE AND INSTALL THREE RACK-MOUNTED SENSORS AND THE ASSOCIATED

WIRING ON THE RACKS WITHIN THE CONTAINMENT CURTAIN. EACH SENSOR IS TO

CONTROL THE ASSOCIATED IN-ROW AIR CONDITIONER.

INSTALL NEW VOLUME DAMPER IN EACH NEW TRANSFER AIR GRILLE NEAR CEILING.

MECHANICAL CONTRACTOR TO COORDINATE ROUTING OF NEW DUCT RUNS WITH

EXISTING CONSTRUCTION AND OTHER TRADES TO ALLOW FOR CEILING HEIGHT

ADJUSTMENT IN THIS AREA. VERTICAL OFFSETS WILL BE REQUIRED TO ROUTE ABOVE

AND BELOW EXISTING BUILDING ELEMENTS IN THE AREA.

NOT TO SCALE

BASEMENT KEY PLAN

N

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

RENOVATION

AREA

NOTE:

PROVIDE FIRE STOPPING AT ALL NEW PENETRATIONS OF FLOOR. PATCH ALL

ABANDONED OPENINGS AND MAINTAIN FIRE RATING OF FLOOR. FLOOR FIRE RATING IS

2 HOURS. REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION.

NOTE:

CONTRACTOR IS TO PROTECT ALL ADJACENT SPACES, EQUIPMENT, AND FINISHES

DURING CORE DRILLING AND OTHER WORK. COORDINATE AND SCHEDULE ALL CORE

DRILLING AND SHUTDOWNS WITH COR.

NOTE:

PROVIDE VALVE TAGS ON ALL VALVES INDICATING THE SERVICE AND A NUMBER.

PROVIDE A CORRESPONDING VALVE TAG CHART MOUNTED ON THE WALL AT A

LOCATION TO BE DETERMINED BY THE VA.

EXISTING

LOBBY

EXISTING

ELEVATOR P1

EXISTING

ELEVATOR P2

EXISTING

ELEVATOR P3

EXISTING

ELEVATOR P4

EXISTING

SERVICE

ELEVATOR S6

EXISTING

SERVICE

ELEVATOR S5

EXISTING

CORRIDOR

CB-35EXISTING

PAPER

STORAGE

C-B177

EXISTING

TELECOM

C-B178

EXISTING

MECH

C-B021

EXISTING

CORRIDOR

CB-36

EXISTING

CORRIDOR

CB-38

EXISTING

CLOSET

C-B018

EXISTING

SWITCH GEAR

C-B019

EXISTING

MECH

C-B020

EXISTING

STAIR-1

UPDO

W

N

EXISTING

UPS

C-BO17

EXISTING

REPAIR AND

DEVELOPMENT

C-B031

EXISTING

OI&T SYSTEMS

C-B026

EXISTING

OI&T SUPERVISOR

C-B028

H R F

IR

E

B A R R

IE

R

2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER

H R F

IR

E

B A R R

IE

R

1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

F F

C OSFA

FA

C

F

F

FAFA

F F

F

F F F WIFI

W

F

S

F W

F

FF

W

T

F

F

WIFI

F FA

FA

FA

FA

2 2

2 2

1 11

3 2

EXISTING

TELECOM

C-BO22

EXISTING

IMS ENTRY

EXISTING

IMS

C-B027A

EXISTING

IMS MECH

C-B027

SCALE: 1/1" = 1'-0"

FIRE PROTECTION - DEMOLITION PLAN - PARTIAL BASEMENT FLOOR1

FD901

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

THESE NOTES APPLY TO ALL DEMOLITION DRAWINGS AND TO ALL CONTRACTORS AND /

OR SUBCONTRACTORS THAT WORK WITHIN THIS BUILDING.

1. ALL MATERIALS INDICATED AS DASHED ARE TO BE REMOVED. THIS INCLUDES ALL

FINISHES AND MATERIALS NOT SPECIFICALLY CALLED OUT BUT PERTAINING TO THE

INTENDED SCOPE.

2. CONTRACTORS SHALL BE RESPONSIBLE FOR VISITING THE SITE TO BECOME FAMILIAR

WITH THE EXISTING CONDITIONS. THESE DEMOLITION SHEETS SHALL SERVE TO AID THE

CONTRACTOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .