About this file

This document provides details for a federal construction contract opportunity to upgrade the HVAC system at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana. The project involves installing new Liebert units and in-rack cooling units, chilled water lines and insulation, drain lines, a sump pump, lay-in ceiling grid and tiles, and controls sensors. Additional requirements include demolishing existing piping, hangers, equipment and ceiling; firestopping penetrations; leak testing and commissioning; providing phasing and lookahead schedules; waste diversion reporting; as-builts; O&M manuals and training; and a one-year warranty. The solicitation number is 36C25020B0016 and will be set aside for SDVOSB with a magnitude between $500,000 and $1,000,000. The IFB is scheduled to be issued on January 25, 2020 via www.uscontractorregistration.com.

36C25020B0016 583-16-122 C FBD Drawing Set_Part1_4 of 5.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade OIT HVAC 583-16-122, newest first.
File Type Posted
36C25020B0016 A00010.pdf PDF
36C25020B0016 0008.docx DOCX document
36C25020B0016 A00007.docx DOCX document
Drawings.pdf PDF
Specs.pdf PDF
36C25020B0016 0006.docx DOCX document
36C25020B0016-0005000.docx DOCX document
36C25020B0016-0004000.docx DOCX document
36C25020B0016-0003001.pdf PDF
36C25020B0016-0003000.docx DOCX document
36C25020B0016-0002000.docx DOCX document
36C25020B0016-0002001.docx DOCX document
36C25020B0016-0001000.docx DOCX document
36C25020B0016-007.pdf PDF
36C25020B0016-011.pdf PDF
36C25020B0016-010.pdf PDF
36C25020B0016-008.pdf PDF
36C25020B0016-005.pdf PDF
36C25020B0016-002.docx DOCX document
36C25020B0016-003.doc DOC document
36C25020B0016-006.pdf PDF
36C25020B0016-013.pdf PDF
36C25020B0016-004.docx DOCX document
36C25020B0016-014.txt TXT text file
36C25020B0016-012.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RA

M

P

DO

W N

RAMP

DOWN

EXISTING

TELECOM

C-BO22EXISTING

LOBBY

EXISTING

ELEVATOR P1

EXISTING

ELEVATOR P2

EXISTING

ELEVATOR P3

EXISTING

ELEVATOR P4

EXISTING

SERVICE

ELEVATOR S6

EXISTING

SERVICE

ELEVATOR S5

EXISTING

CORRIDOR

CB-35EXISTING

PAPER

STORAGE

C-B177

EXISTING

TELECOM

C-B178

EXISTING

MECH

C-B021

EXISTING

CORRIDOR

CB-36

EXISTING

CORRIDOR

CB-38

EXISTING

CLOSET

C-B018

EXISTING

SWITCH GEAR

C-B019

EXISTING

MECH

C-B020

EXISTING

STAIR-1

UPDO

W

N

EXISTING

UPS

C-BO17

EXISTING

IMS ENTRY

EXISTING

IMS

C-B027A

EXISTING

IMS MECH

C-B027

EXISTING

REPAIR AND

DEVELOPMENT

C-B031

EXISTING

OI&T SYSTEMS

C-B026

EXISTING

OI&T SUPERVISOR

C-B028

ELEC

EL

EC

PANEL PANEL

IT

RA

CK

IT RACK

IT

RA

CK

IT

RA

CK

IT

RA

CK

IT

RA

CK

IT

RA

CK

IT

RA

CK

IT

RA

CK

IT

RA

CK

IT RACK

IT RACK

IT RACK

IT RACK IT RACK

IT RACK

IT RACK

IT

RA

CK SWITCH

MECHANICAL

UNIT

MECHANICAL

UNIT

IT

RA

CK

IT

RA

CK

IT

RA

CK

IT

RA

CK

H R F

IR

E

B A R R

IE

R

2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER

H R F

IR

E

B A R R

IE

R

1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H

R

FIR

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H

R

FIR

E / S

M

OK

E

BA

RR

IER

1H R

FIR

E

/ S M

OK

E

BA

RR

IER

1H R

FIR

E

BA

RR

IER

PATCH

(TYP.)

(TYP.)

TELECOM

C-B022

All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.

2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803

PH: 260.424.4830

www.viridian-design.netVIRIDIAN

ARCHITECTURAL DESIGN INC.

SCALE: 1/4" = 1'-0"

ARCHITECTURAL - INFECTION CONTROL AND ILSM PLAN

GI004

NOTE:

· IMPLEMENT INFECTION CONTROL RISK

ASSESSMENT (ICRA) PROCEDURES AS PER THE

RICHARD L. ROUDEBUSH VA MEDICAL CENTER

ICRA PLAN AND AS DIRECTED BY THE

CONTRACTING OFFICER REPRESENTATIVE (COR).

· CONTRACTORS SHALL COORDINATE WITH COR

FOR ALL CONSTRUCTION DUST/ DEBRIS

REQUIREMENTS AND MEASURES DURING

DEMOLITION/ CONSTRUCTION.

· COORDINATE ALL DEMOLITION/ CONSTRUCTION

DEBRIS PATH OF TRAVEL AND INTERIM LIFE

SAFETY MEASURES (ILSM) WITH THE COR.

· THE CONTRACTOR SHALL CONFINE ALL

OPERATIONS (INCLUDING STORAGE OF

MATERIALS) ON GOVERNMENT PREMISES TO

AREAS AUTHORIZED OR APPROVED BY THE COR.

CONTRACTOR TO COORDINATE STAGING WITH

COR.

· SEE INFECTION CONTROL AND ILSM NOTES ON

SHEETS GI003 AND GI004 FOR ADDITIONAL

INFORMATION INFORMATION.

APPLICABLE PROJECT ACRONYMS & ABBREVIATIONS:

1. ICRA = INFECTION CONTROL RISK ASSESSMENT

2. ILSM = INTERIM LIFE-SAFETY MEASURES

AREA OF WORK

INFECTION CONTROL /

DUST CONTROL

PARTITION / BARRIER

PATH OF DEMOLITION /

TRASH REMOVAL

TRAVEL

INFECTION CONTROL /

DUST CONTROL

EGRESS DOOR AND

"STICKY" MAT FLOOR

PADS

COORDINATE WITH RICHARD L. ROUDEBUSH VAMC CONTRACTING OFFICER'S REPRESENTATIVE

(COR) TO COMPLETE AN INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN AN

INFECTION CONTROL CONSTRUCTION PERMIT FOR EACH PHASE OF WORK OUTLINED IN THESE

DOCUMENTS PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. COMPLY WITH ALL

INFECTION CONTROL REQUIREMENTS FOR THE DURATION OF THE CONSTRUCTION PROJECT.

SEE ITEMS LISTED BELOW AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

1. REFER TO SPECIFICATIONS FOR MEDICAL CENTER "INFECTION CONTROL RISK

ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION" FOR

INFECTION CONTROL INFORMATION AND REQUIREMENTS.

2. USING THE "INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR

CONSTRUCTION AND RENOVATION" COORDINATE WITH COR TO DETERMINE THE

FOLLOWING PROJECT CONDITIONS:

· PATIENT RISK GROUPS (LOW, MEDIUM, HIGH, HIGHEST)

· TYPE OF CONSTRUCTION PROJECT ACTIVITY (A, B, C, OR D)

· CLASS OF PRECAUTION/ LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED (I, II, III, OR IV)

3. ONCE THE "CLASS OF PRECAUTION" HAS BEEN DETERMINED IN COORDINATION WITH

THE COR, COMPLETE THE "INFECTION CONTROL CONSTRUCTION PERMIT." PROCEED

WITH DEMOLITION AND CONSTRUCTION WORK ONLY AFTER THE PERMIT HAS BEEN

AUTHORIZED BY THE COR. ONCE THE PERMIT IS AUTHORIZED, POST THE PERMIT AS

DIRECTED BY THE COR.

4. USING THE "DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS"

AS OUTLINED BELOW, COORDINATE WITH THE COR TO DETERMINE THE SPECIFIC EXTENT

AND APPLICATION METHODS OF THE REQUIRED INFECTION CONTROL PRECAUTIONS.

CLASS IV PRECAUTIONS LISTED BELOW ARE TO BE CONFIRMED WITH THE COR:

4.1. DURING CONSTRUCTION PROJECT PHASE:

4.1.1. ISOLATE THE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

4.1.2. COMPLETE ALL CRITICAL BARRIERS TO SEAL WORK AREA FROM NON-WORK

AREA BEFORE DEMOLITION OR CONSTRUCTION BEGINS.

4.1.3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA

EQUIPPED AIR FILTRATION UNITS.

4.1.4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

4.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH

THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER

BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER

COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.

4.1.6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE

COVERS. SHOE COVERS MUST BE EXCHANGED EACH TIME WORKER EXITS

THE WORK AREA.

4.1.7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT

IS INSPECTED BY THE SAFETY OFFICE AND INFECTION CONTROL AND

THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICE.

4.2. UPON COMPLETION OF PROJECT PHASE:

4.2.1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT

AND DEBRIS ASSOCIATED WITH CONSTRUCTION.

4.2.2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED

CONTAINERS

4.2.3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS

SOLID LID.

4.2.4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.

4.2.5. WET MOP AREA WITH DISINFECTANT.

4.2.6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK HAS BEEN

PERFORMED.

5. DURING THE CONSTRUCTION PROJECT PHASE, PROVIDE, INSTALL, AND MAINTAIN THE

SPECIFIC INFECTION CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH

COR.

6. UPON COMPLETION OF THE CONSTRUCTION PROJECT PHASE, REMOVE THE SPECIFIC

INFECTION CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.

7. IAQ (INDOOR AIR QUALITY) CONTROL MEASURES DURING CONSTRUCTION NOTES:

· SEAL RETURN OPENINGS WITH PLASTIC IN CONSTRUCTION AREA.

· IF CENTRAL UNIT IS SHUT DOWN DURING PARTS OF CONSTRUCTION, SEAL DIFFUSERS

WITH PLASTIC PRIOR TO CONSTRUCTION WORK.

· DURING CONSTRUCTION, A LOCAL RECIRCULATION FAN SHALL BE USED WITH A HEPA

FILTER. FILTER MEDIA SHALL BE CHANGED OUT AT THE END OF EACH WORK DAY AND

REPLACED WITH NEW MEDIA PRIOR TO THE START OF THE NEXT WORK DAY.

· SUPPRESS DUST WITH WETTING AGENTS OR SWEEPING COMPOUNDS.

· IF A VACUUM IS USED, VACUUM SHALL BE EQUIPPED WITH A HIGH EFFICIENCY FILTER

OR A WET SCRUBBER.

· AT THE COMPLETION OF CONSTRUCTION, VACUUM WORK AREA WITH HEPA EQUIPPED

VACUUM, WASH AREA WITH A DETERGENT SOLUTION, AND HEPA VACUUM AGAIN

WHEN AREA IS DRY.

GENERAL NOTES:

1 PROVIDE "STICKY" MAT FLOOR PADS IMMEDIATELY OUTSIDE INFECTION/ DUST

CONTROL PARTITION TO ENSURE THAT FLOOR CLEANLINESS IS MAINTAINED

THROUGHOUT THE DURATION OF CONSTRUCTION.

2 INFECTION/ DUST CONTROL PARTITION SURROUNDING EACH PHASE AREA. PARTITION

SHALL BE SECURED, SEALED, AND PROTECTED FOR DURATION OF CONSTRUCTION.

COORDINATE INFECTION CONTROL RISK ASSESSMENT (ICRA) AND EGRESS

REQUIREMENTS WITH COR. COORDINATE ADDITIONAL REQUIREMENTS WITH COR.

SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

3 PATH OF DEMOLITION / TRASH REMOVAL TRAVEL FROM RENOVATED AREA. ALL

CONSTRUCTION DEBRIS REMOVED AS PART OF DEMOLITION SHALL BE REMOVED IN

ENCLOSED / SEALED CONTAINERS AND FOLLOW THE INFECTION CONTROL RISK

ASSESSMENT (ICRA) REQUIREMENTS AS COORDINATED WITH THE COR.

4 EXISTING DOOR ADJACENT TO THE WORK AREA SHALL BE SECURED, W/ LIMITED,

ZIPPERED ACCESS, AND MASKED OFF/ SEALED & PROTECTED PER INFECTION CONTROL

AND EGRESS REQUIREMENTS WHERE APPLICABLE. PROVIDE AND INSTALL SIGN(S) AT

DOORS AS INDICATED. COORDINATE ALL REQUIREMENTS WITH COR. SEE

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

NOTE:

ALL PERMITS SHALL BE POSTED ON JOB SITE.

CONTRACTOR TO ACQUIRE THE FOLLOWING PERMITS FROM COR:

1. CONSTRUCTION WORK PERMIT

2. FIRE AND SMOKE WALLS PERMIT

3. UTILITY OUTAGE PERMIT

4. ABOVE CEILING WORK PERMIT

5. INFECTION CONTROL RISK ASSESSMENT (ICRA)

6. INTERIM LIFE-SAFETY MEASURES (ILSM)

NOTE:

ALL WORK SHALL BE PERFORMED DURING REGULAR BUSINESS

HOURS MONDAY THROUGH FRIDAY. COORDINATE WITH COR.

APPLICABILITY OF GENERAL CONSTRUCTION NOTES:

THESE NOTES APPLY TO ALL WORK DESCRIBED IN THESE DRAWINGS AND

SPECIFICATIONS AND TO ALL CONTRACTORS AND/OR SUBCONTRACTORS THAT

WORK IN, ON, OR AROUND THIS BUILDING OR THE ADJACENT SITE. FOR ADDITIONAL

SCOPE OF WORK DESCRIBED IN DETAIL, SEE THE RESPECTIVE DISCIPLINE DRAWINGS

AND SPECIFICATIONS.

1. EXISTING BUILDING UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY/ ALL

WORK, VERIFY THE LOCATION AND INSURE THE OBVIOUS MARKING OF ALL

EXISTING UTILITIES AND RELATED EQUIPMENT ON, ABOVE, OR BENEATH THE

ADJACENT WORK AREA, WHETHER INDICATED TO REMAIN, TO BE MODIFIED, OR

TO BE REMOVED. COORDINATE ALL VERIFICATION AND MARKING WORK WITH THE

COR.

2. BUILDING DUST AND INFECTION CONTROL: THE BUILDING WILL REMAIN FULLY

OCCUPIED DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL,

AND MAINTAIN ALL CONSTRUCTION DUST, DEBRIS AND INFECTION CONTROL

MEASURES OUTLINED. SEE INFECTION CONTROL PLAN AND SPECIFICATIONS FOR

ADDITIONAL INFORMATION. COORDINATE SPECIFIC INFORMATION WITH THE COR.

3. BUILDING ACCESS AND SECURITY: THE BUILDING WILL REMAIN FULLY OCCUPIED

DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL, AND

MAINTAIN ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND

SECURITY OF THE EXISTING BUILDING AND THE WORK AREA FOR THE DURATION

OF THE CONSTRUCTION PROJECT. COORDINATE SPECIFIC INFORMATION WITH

THE COR. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.

4. EXISTING WORK AREA AND BUILDING CONDITION: PROVIDE, INSTALL, AND

MAINTAIN PROTECTIVE MEASURES TO KEEP THE EXISTING BUILDING ADJACENT TO

THE WORK AREA AND PATH OF DEMOLITION TRAVEL FROM CONSTRUCTION

DAMAGE DURING WORK. RESTORE ANY PORTION OF THE EXISTING BUILDING OR

ADJACENT SITE INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS WORK,

AT NO ADDITIONAL COST TO THE VA. SEE SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

5. GENERAL DEMOLITION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS

AND SPECIFICATIONS FOR GENERAL DEMOLITION NOTES AND INFORMATION

INCLUDING DISPOSAL AND/ OR SALVAGE OF DEMOLISHED MATERIALS.

COORDINATE SPECIFIC INFORMATION WITH THE COR.

6. GENERAL CONSTRUCTION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS

AND SPECIFICATIONS FOR GENERAL CONSTRUCTION NOTES AND INFORMATION

INCLUDING STORAGE AND STAGING OF CONSTRUCTION MATERIALS. COORDINATE

SPECIFIC INFORMATION WITH THE COR.

7. EXISTING PLUMBING SUPPLY AND DWV SYSTEMS AND EQUIPMENT: THE BUILDING

WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE,

COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING,

MODIFICATIONS TO, REROUTING OF, AND RECONNECTING OF EXISTING

PLUMBING SUPPLY AND DRAIN WASTE VENT SYSTEMS (DWV) AND EQUIPMENT

WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL,

AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.

8. EXISTING MECHANICAL SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN

FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL

TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING

MECHANICAL SYSTEMS AND EQUIPMENT WITH THE COR. SEE DEMOLITION,

ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR

ADDITIONAL INFORMATION.

9. EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE BUILDING WILL

REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL

TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING

POWER SUPPLIES AND EQUIPMENT WITH THE COR. SEE DEMOLITION,

ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS, AND

SPECIFICATIONS FOR ADDITIONAL INFORMATION.

10.EXISTING FIRE-PROTECTION SYSTEMS AND EQUIPMENT: THE BUILDING WILL

REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL

TEMPORARY AND PERMANENT DISCONNECTING, MODIFICATIONS TO, REROUTING

OF, AND RECONNECTING OF EXISTING FIRE-PROTECTION SYSTEMS AND

EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL,

AND ELECTRICAL DRAWINGS, AND SPECIFICATIONS FOR ADDITIONAL

INFORMATION.

SERVER ROOM PHASING PLAN

GENERAL PHASING ITEMS LISTED BELOW. CONTRACTOR TO COMPLETE ALL WORK

AS OUTLINED WITHIN THE CONSTRUCTION DOCUMENTS.

PHASE I:

· VAMC IT TO RELOCATE EXISTING IT EQUIPMENT FROM AREA SHOWN.

· CONTRACTOR TO INSTALL TEMPORARY 20 TONS WORTH OF COOLING TO AREA

OUTSIDE OF PHASE 1.

· CONTRACTOR TO INSTALL IRCA BARRIERS TO SEPARATE PHASING AREA AND

PROTECT EQUIPMENT REMAINING IN AREA.

· CONTRACTOR TO COMPLETE SCOPE OF WORK OUTLINE IN THE DOCUMENTS

FOR THE AREA.

· CONTRACTOR TO CLEAN, REMOVE BARRIERS, AND TURN OVER AREA TO VAMC

IT TO INSTALL IT EQUIPMENT.

EACH OF PHASE II THROUGH PHASE IV:

· VAMC IT TO RELOCATE EXISTING IT EQUIPMENT FROM AREA SHOWN.

· CONTRACTOR TO ENSURE A MINIMUM OF 40 TONS WORTH OF PERMANENT

COOLING TO AREA OUTSIDE OF PHASE.

· CONTRACTOR TO INSTALL IRCA BARRIERS TO SEPARATE PHASING AREA AND

PROTECT EQUIPMENT REMAINING IN AREA.

· CONTRACTOR TO COMPLETE SCOPE OF WORK OUTLINE IN THE DOCUMENTS

FOR THE AREA.

· CONTRACTOR TO CLEAN, REMOVE BARRIERS, AND TURN OVER AREA TO VAMC

IT TO INSTALL IT EQUIPMENT.

NOT TO SCALE

BASEMENT KEY PLAN

N

RICHARD L. ROUDEBUSH

VA MEDICAL CENTER

RENOVATION

AREA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text D

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

JLH

AutoCAD SHX Text

TWT

AutoCAD SHX Text

ARCHITECTURAL

AutoCAD SHX Text

GI004

AutoCAD SHX Text

AutoCAD SHX Text

INFECTION-CONTROL-AND

AutoCAD SHX Text

ILSM-PLAN

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Project Title

AutoCAD SHX Text Date

AutoCAD SHX Text Location

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of 28

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text one eighth inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text one and one half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 6"

AutoCAD SHX Text 6"

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three quarters inch = one foot

AutoCAD SHX Text one half inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one quarter inch = one foot

AutoCAD SHX Text

VA FORM 08-6231

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

INDIANAPOLIS, INDIANA

AutoCAD SHX Text

OIT SERVER ROOM HVAC DESIGN

AutoCAD SHX Text 583-16-122

AutoCAD SHX Text 05/23/2018

AutoCAD SHX Text

C-WING

AutoCAD SHX Text

CERTIFICATION:

AutoCAD SHX Text

%%USYMBOL LEGEND

AutoCAD SHX Text

INFECTION CONTROL PLAN NOTES

AutoCAD SHX Text

PLAN NOTES

AutoCAD SHX Text

GENERAL CONSTRUCTION NOTES

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text R

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text

STATE OF

AutoCAD SHX Text 10800038

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text No.

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text W.

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text U

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text B

AutoCAD SHX Text N

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text Y

AutoCAD SHX Text T

04_583-16-122.C.GI004