36C25020B0016-009.pdf
PDF Posted
- Attached to
- Upgrade OIT HVAC 583-16-122 Federal contract opportunity
- Solicitation number
- 36C25020B0016
About this file
This document provides details for a federal construction contract opportunity to upgrade the HVAC system at the Richard L. Roudebush VA Medical Center in Indianapolis, Indiana. The project involves installing new Liebert units and in-rack cooling units, chilled water lines and insulation, drain lines, a sump pump, lay-in ceiling grid and tiles, and controls sensors. Additional requirements include demolishing existing piping, hangers, equipment and ceiling; firestopping penetrations; leak testing and commissioning; providing phasing and lookahead schedules; waste diversion reporting; as-builts; O&M manuals and training; and a one-year warranty. The solicitation number is 36C25020B0016 and will be set aside for SDVOSB with a magnitude between $500,000 and $1,000,000. The IFB is scheduled to be issued on January 25, 2020 via www.uscontractorregistration.com.
36C25020B0016 583-16-122 C FBD Drawing Set_Part1_4 of 5.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25020B0016 A00010.pdf | ||
| 36C25020B0016 0008.docx | DOCX document | |
| 36C25020B0016 A00007.docx | DOCX document | |
| Drawings.pdf | ||
| Specs.pdf | ||
| 36C25020B0016 0006.docx | DOCX document | |
| 36C25020B0016-0005000.docx | DOCX document | |
| 36C25020B0016-0004000.docx | DOCX document | |
| 36C25020B0016-0003001.pdf | ||
| 36C25020B0016-0003000.docx | DOCX document | |
| 36C25020B0016-0002000.docx | DOCX document | |
| 36C25020B0016-0002001.docx | DOCX document | |
| 36C25020B0016-0001000.docx | DOCX document | |
| 36C25020B0016-007.pdf | ||
| 36C25020B0016-011.pdf | ||
| 36C25020B0016-010.pdf | ||
| 36C25020B0016-008.pdf | ||
| 36C25020B0016-005.pdf | ||
| 36C25020B0016-002.docx | DOCX document | |
| 36C25020B0016-003.doc | DOC document | |
| 36C25020B0016-006.pdf | ||
| 36C25020B0016-013.pdf | ||
| 36C25020B0016-004.docx | DOCX document | |
| 36C25020B0016-014.txt | TXT text file | |
| 36C25020B0016-012.pdf |
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RA
M
P
DO
W N
RAMP
DOWN
EXISTING
TELECOM
C-BO22EXISTING
LOBBY
EXISTING
ELEVATOR P1
EXISTING
ELEVATOR P2
EXISTING
ELEVATOR P3
EXISTING
ELEVATOR P4
EXISTING
SERVICE
ELEVATOR S6
EXISTING
SERVICE
ELEVATOR S5
EXISTING
CORRIDOR
CB-35EXISTING
PAPER
STORAGE
C-B177
EXISTING
TELECOM
C-B178
EXISTING
MECH
C-B021
EXISTING
CORRIDOR
CB-36
EXISTING
CORRIDOR
CB-38
EXISTING
CLOSET
C-B018
EXISTING
SWITCH GEAR
C-B019
EXISTING
MECH
C-B020
EXISTING
STAIR-1
UPDO
W
N
EXISTING
UPS
C-BO17
EXISTING
IMS ENTRY
EXISTING
IMS
C-B027A
EXISTING
IMS MECH
C-B027
EXISTING
REPAIR AND
DEVELOPMENT
C-B031
EXISTING
OI&T SYSTEMS
C-B026
EXISTING
OI&T SUPERVISOR
C-B028
ELEC
EL
EC
PANEL PANEL
IT
RA
CK
IT RACK
IT
RA
CK
IT
RA
CK
IT
RA
CK
IT
RA
CK
IT
RA
CK
IT
RA
CK
IT
RA
CK
IT
RA
CK
IT RACK
IT RACK
IT RACK
IT RACK IT RACK
IT RACK
IT RACK
IT
RA
CK SWITCH
MECHANICAL
UNIT
MECHANICAL
UNIT
IT
RA
CK
IT
RA
CK
IT
RA
CK
IT
RA
CK
H R F
IR
E
B A R R
IE
R
2HR FIRE BARRIER 2HR FIRE BARRIER 2HR FIRE BARRIER
H R F
IR
E
B A R R
IE
R
1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER 1HR FIRE BARRIER
1H R
FIR
E
BA
RR
IER
1H
R
FIR
E
BA
RR
IER
1H R
FIR
E
BA
RR
IER
1H
R
FIR
E
BA
RR
IER
1H R
FIR
E
BA
RR
IER
1H
R
FIR
E
BA
RR
IER
1H R
FIR
E
BA
RR
IER
1H
R
FIR
E
BA
RR
IER
1H R
FIR
E
BA
RR
IER
1H
R
FIR
E
BA
RR
IER
1H R
FIR
E
BA
RR
IER
1H
R
FIR
E
BA
RR
IER
1H R
FIR
E
BA
RR
IER
1H R
FIR
E
/ S M
OK
E
BA
RR
IER
1H
R
FIR
E / S
M
OK
E
BA
RR
IER
1H R
FIR
E
/ S M
OK
E
BA
RR
IER
1H
R
FIR
E / S
M
OK
E
BA
RR
IER
1H R
FIR
E
/ S M
OK
E
BA
RR
IER
1H
R
FIR
E / S
M
OK
E
BA
RR
IER
1H R
FIR
E
/ S M
OK
E
BA
RR
IER
1H
R
FIR
E / S
M
OK
E
BA
RR
IER
1H R
FIR
E
/ S M
OK
E
BA
RR
IER
1H
R
FIR
E / S
M
OK
E
BA
RR
IER
1H R
FIR
E
/ S M
OK
E
BA
RR
IER
1H R
FIR
E
BA
RR
IER
PATCH
(TYP.)
(TYP.)
TELECOM
C-B022
All concepts, ideas, design elements, plans, and details as shown on this document are the sole property of Viridian Architectural Design Inc. and shall not be used for any purpose without prior expressed written consent. The Contracting Officer Representative shall be permitted to retain copies for information and reference.
2020 E. Washington Boulevard Suite 200 Fort Wayne, Indiana 46803
PH: 260.424.4830
www.viridian-design.netVIRIDIAN
ARCHITECTURAL DESIGN INC.
SCALE: 1/4" = 1'-0"
ARCHITECTURAL - INFECTION CONTROL AND ILSM PLAN
GI004
NOTE:
· IMPLEMENT INFECTION CONTROL RISK
ASSESSMENT (ICRA) PROCEDURES AS PER THE
RICHARD L. ROUDEBUSH VA MEDICAL CENTER
ICRA PLAN AND AS DIRECTED BY THE
CONTRACTING OFFICER REPRESENTATIVE (COR).
· CONTRACTORS SHALL COORDINATE WITH COR
FOR ALL CONSTRUCTION DUST/ DEBRIS
REQUIREMENTS AND MEASURES DURING
DEMOLITION/ CONSTRUCTION.
· COORDINATE ALL DEMOLITION/ CONSTRUCTION
DEBRIS PATH OF TRAVEL AND INTERIM LIFE
SAFETY MEASURES (ILSM) WITH THE COR.
· THE CONTRACTOR SHALL CONFINE ALL
OPERATIONS (INCLUDING STORAGE OF
MATERIALS) ON GOVERNMENT PREMISES TO
AREAS AUTHORIZED OR APPROVED BY THE COR.
CONTRACTOR TO COORDINATE STAGING WITH
COR.
· SEE INFECTION CONTROL AND ILSM NOTES ON
SHEETS GI003 AND GI004 FOR ADDITIONAL
INFORMATION INFORMATION.
APPLICABLE PROJECT ACRONYMS & ABBREVIATIONS:
1. ICRA = INFECTION CONTROL RISK ASSESSMENT
2. ILSM = INTERIM LIFE-SAFETY MEASURES
AREA OF WORK
INFECTION CONTROL /
DUST CONTROL
PARTITION / BARRIER
PATH OF DEMOLITION /
TRASH REMOVAL
TRAVEL
INFECTION CONTROL /
DUST CONTROL
EGRESS DOOR AND
"STICKY" MAT FLOOR
PADS
COORDINATE WITH RICHARD L. ROUDEBUSH VAMC CONTRACTING OFFICER'S REPRESENTATIVE
(COR) TO COMPLETE AN INFECTION CONTROL RISK ASSESSMENT MATRIX AND OBTAIN AN
INFECTION CONTROL CONSTRUCTION PERMIT FOR EACH PHASE OF WORK OUTLINED IN THESE
DOCUMENTS PRIOR TO THE START OF DEMOLITION AND CONSTRUCTION. COMPLY WITH ALL
INFECTION CONTROL REQUIREMENTS FOR THE DURATION OF THE CONSTRUCTION PROJECT.
SEE ITEMS LISTED BELOW AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
1. REFER TO SPECIFICATIONS FOR MEDICAL CENTER "INFECTION CONTROL RISK
ASSESSMENT MATRIX OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION" FOR
INFECTION CONTROL INFORMATION AND REQUIREMENTS.
2. USING THE "INFECTION CONTROL RISK ASSESSMENT MATRIX OF PRECAUTIONS FOR
CONSTRUCTION AND RENOVATION" COORDINATE WITH COR TO DETERMINE THE
FOLLOWING PROJECT CONDITIONS:
· PATIENT RISK GROUPS (LOW, MEDIUM, HIGH, HIGHEST)
· TYPE OF CONSTRUCTION PROJECT ACTIVITY (A, B, C, OR D)
· CLASS OF PRECAUTION/ LEVEL OF INFECTION CONTROL ACTIVITIES REQUIRED (I, II, III, OR IV)
3. ONCE THE "CLASS OF PRECAUTION" HAS BEEN DETERMINED IN COORDINATION WITH
THE COR, COMPLETE THE "INFECTION CONTROL CONSTRUCTION PERMIT." PROCEED
WITH DEMOLITION AND CONSTRUCTION WORK ONLY AFTER THE PERMIT HAS BEEN
AUTHORIZED BY THE COR. ONCE THE PERMIT IS AUTHORIZED, POST THE PERMIT AS
DIRECTED BY THE COR.
4. USING THE "DESCRIPTION OF REQUIRED INFECTION CONTROL PRECAUTIONS BY CLASS"
AS OUTLINED BELOW, COORDINATE WITH THE COR TO DETERMINE THE SPECIFIC EXTENT
AND APPLICATION METHODS OF THE REQUIRED INFECTION CONTROL PRECAUTIONS.
CLASS IV PRECAUTIONS LISTED BELOW ARE TO BE CONFIRMED WITH THE COR:
4.1. DURING CONSTRUCTION PROJECT PHASE:
4.1.1. ISOLATE THE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO
PREVENT CONTAMINATION OF DUCT SYSTEM.
4.1.2. COMPLETE ALL CRITICAL BARRIERS TO SEAL WORK AREA FROM NON-WORK
AREA BEFORE DEMOLITION OR CONSTRUCTION BEGINS.
4.1.3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA
EQUIPPED AIR FILTRATION UNITS.
4.1.4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
4.1.5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH
THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER
BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
4.1.6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE
COVERS. SHOE COVERS MUST BE EXCHANGED EACH TIME WORKER EXITS
THE WORK AREA.
4.1.7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT
IS INSPECTED BY THE SAFETY OFFICE AND INFECTION CONTROL AND
THOROUGHLY CLEANED BY ENVIRONMENTAL MANAGEMENT SERVICE.
4.2. UPON COMPLETION OF PROJECT PHASE:
4.2.1. REMOVE BARRIER MATERIAL CAREFULLY TO MINIMIZE SPREADING OF DIRT
AND DEBRIS ASSOCIATED WITH CONSTRUCTION.
4.2.2. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED
CONTAINERS
4.2.3. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS
SOLID LID.
4.2.4. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
4.2.5. WET MOP AREA WITH DISINFECTANT.
4.2.6. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK HAS BEEN
PERFORMED.
5. DURING THE CONSTRUCTION PROJECT PHASE, PROVIDE, INSTALL, AND MAINTAIN THE
SPECIFIC INFECTION CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH
COR.
6. UPON COMPLETION OF THE CONSTRUCTION PROJECT PHASE, REMOVE THE SPECIFIC
INFECTION CONTROL PRECAUTIONS AS DETERMINED BY COORDINATION WITH COR.
7. IAQ (INDOOR AIR QUALITY) CONTROL MEASURES DURING CONSTRUCTION NOTES:
· SEAL RETURN OPENINGS WITH PLASTIC IN CONSTRUCTION AREA.
· IF CENTRAL UNIT IS SHUT DOWN DURING PARTS OF CONSTRUCTION, SEAL DIFFUSERS
WITH PLASTIC PRIOR TO CONSTRUCTION WORK.
· DURING CONSTRUCTION, A LOCAL RECIRCULATION FAN SHALL BE USED WITH A HEPA
FILTER. FILTER MEDIA SHALL BE CHANGED OUT AT THE END OF EACH WORK DAY AND
REPLACED WITH NEW MEDIA PRIOR TO THE START OF THE NEXT WORK DAY.
· SUPPRESS DUST WITH WETTING AGENTS OR SWEEPING COMPOUNDS.
· IF A VACUUM IS USED, VACUUM SHALL BE EQUIPPED WITH A HIGH EFFICIENCY FILTER
OR A WET SCRUBBER.
· AT THE COMPLETION OF CONSTRUCTION, VACUUM WORK AREA WITH HEPA EQUIPPED
VACUUM, WASH AREA WITH A DETERGENT SOLUTION, AND HEPA VACUUM AGAIN
WHEN AREA IS DRY.
GENERAL NOTES:
1 PROVIDE "STICKY" MAT FLOOR PADS IMMEDIATELY OUTSIDE INFECTION/ DUST
CONTROL PARTITION TO ENSURE THAT FLOOR CLEANLINESS IS MAINTAINED
THROUGHOUT THE DURATION OF CONSTRUCTION.
2 INFECTION/ DUST CONTROL PARTITION SURROUNDING EACH PHASE AREA. PARTITION
SHALL BE SECURED, SEALED, AND PROTECTED FOR DURATION OF CONSTRUCTION.
COORDINATE INFECTION CONTROL RISK ASSESSMENT (ICRA) AND EGRESS
REQUIREMENTS WITH COR. COORDINATE ADDITIONAL REQUIREMENTS WITH COR.
SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
3 PATH OF DEMOLITION / TRASH REMOVAL TRAVEL FROM RENOVATED AREA. ALL
CONSTRUCTION DEBRIS REMOVED AS PART OF DEMOLITION SHALL BE REMOVED IN
ENCLOSED / SEALED CONTAINERS AND FOLLOW THE INFECTION CONTROL RISK
ASSESSMENT (ICRA) REQUIREMENTS AS COORDINATED WITH THE COR.
4 EXISTING DOOR ADJACENT TO THE WORK AREA SHALL BE SECURED, W/ LIMITED,
ZIPPERED ACCESS, AND MASKED OFF/ SEALED & PROTECTED PER INFECTION CONTROL
AND EGRESS REQUIREMENTS WHERE APPLICABLE. PROVIDE AND INSTALL SIGN(S) AT
DOORS AS INDICATED. COORDINATE ALL REQUIREMENTS WITH COR. SEE
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
NOTE:
ALL PERMITS SHALL BE POSTED ON JOB SITE.
CONTRACTOR TO ACQUIRE THE FOLLOWING PERMITS FROM COR:
1. CONSTRUCTION WORK PERMIT
2. FIRE AND SMOKE WALLS PERMIT
3. UTILITY OUTAGE PERMIT
4. ABOVE CEILING WORK PERMIT
5. INFECTION CONTROL RISK ASSESSMENT (ICRA)
6. INTERIM LIFE-SAFETY MEASURES (ILSM)
NOTE:
ALL WORK SHALL BE PERFORMED DURING REGULAR BUSINESS
HOURS MONDAY THROUGH FRIDAY. COORDINATE WITH COR.
APPLICABILITY OF GENERAL CONSTRUCTION NOTES:
THESE NOTES APPLY TO ALL WORK DESCRIBED IN THESE DRAWINGS AND
SPECIFICATIONS AND TO ALL CONTRACTORS AND/OR SUBCONTRACTORS THAT
WORK IN, ON, OR AROUND THIS BUILDING OR THE ADJACENT SITE. FOR ADDITIONAL
SCOPE OF WORK DESCRIBED IN DETAIL, SEE THE RESPECTIVE DISCIPLINE DRAWINGS
AND SPECIFICATIONS.
1. EXISTING BUILDING UTILITIES: PRIOR TO THE COMMENCEMENT OF ANY/ ALL
WORK, VERIFY THE LOCATION AND INSURE THE OBVIOUS MARKING OF ALL
EXISTING UTILITIES AND RELATED EQUIPMENT ON, ABOVE, OR BENEATH THE
ADJACENT WORK AREA, WHETHER INDICATED TO REMAIN, TO BE MODIFIED, OR
TO BE REMOVED. COORDINATE ALL VERIFICATION AND MARKING WORK WITH THE
COR.
2. BUILDING DUST AND INFECTION CONTROL: THE BUILDING WILL REMAIN FULLY
OCCUPIED DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL,
AND MAINTAIN ALL CONSTRUCTION DUST, DEBRIS AND INFECTION CONTROL
MEASURES OUTLINED. SEE INFECTION CONTROL PLAN AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION. COORDINATE SPECIFIC INFORMATION WITH THE COR.
3. BUILDING ACCESS AND SECURITY: THE BUILDING WILL REMAIN FULLY OCCUPIED
DURING ALL PHASES OF THIS WORK. THEREFORE, PROVIDE, INSTALL, AND
MAINTAIN ALL TEMPORARY MEASURES REQUIRED TO MAINTAIN ACCESS AND
SECURITY OF THE EXISTING BUILDING AND THE WORK AREA FOR THE DURATION
OF THE CONSTRUCTION PROJECT. COORDINATE SPECIFIC INFORMATION WITH
THE COR. SEE SPECIFICATIONS FOR ADDITIONAL INFORMATION.
4. EXISTING WORK AREA AND BUILDING CONDITION: PROVIDE, INSTALL, AND
MAINTAIN PROTECTIVE MEASURES TO KEEP THE EXISTING BUILDING ADJACENT TO
THE WORK AREA AND PATH OF DEMOLITION TRAVEL FROM CONSTRUCTION
DAMAGE DURING WORK. RESTORE ANY PORTION OF THE EXISTING BUILDING OR
ADJACENT SITE INADVERTENTLY DAMAGED BY, OR AS A RESULT OF THIS WORK,
AT NO ADDITIONAL COST TO THE VA. SEE SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
5. GENERAL DEMOLITION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS
AND SPECIFICATIONS FOR GENERAL DEMOLITION NOTES AND INFORMATION
INCLUDING DISPOSAL AND/ OR SALVAGE OF DEMOLISHED MATERIALS.
COORDINATE SPECIFIC INFORMATION WITH THE COR.
6. GENERAL CONSTRUCTION NOTES AND INFORMATION: SEE DISCIPLINE DRAWINGS
AND SPECIFICATIONS FOR GENERAL CONSTRUCTION NOTES AND INFORMATION
INCLUDING STORAGE AND STAGING OF CONSTRUCTION MATERIALS. COORDINATE
SPECIFIC INFORMATION WITH THE COR.
7. EXISTING PLUMBING SUPPLY AND DWV SYSTEMS AND EQUIPMENT: THE BUILDING
WILL REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE,
COORDINATE ALL TEMPORARY AND PERMANENT DISCONNECTING,
MODIFICATIONS TO, REROUTING OF, AND RECONNECTING OF EXISTING
PLUMBING SUPPLY AND DRAIN WASTE VENT SYSTEMS (DWV) AND EQUIPMENT
WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL, ELECTRICAL,
AND SPECIFICATIONS FOR ADDITIONAL INFORMATION.
8. EXISTING MECHANICAL SYSTEMS AND EQUIPMENT: THE BUILDING WILL REMAIN
FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL
TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING
MECHANICAL SYSTEMS AND EQUIPMENT WITH THE COR. SEE DEMOLITION,
ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND SPECIFICATIONS FOR
ADDITIONAL INFORMATION.
9. EXISTING ELECTRICAL POWER SUPPLIES AND EQUIPMENT: THE BUILDING WILL
REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL
TEMPORARY AND PERMANENT DISCONNECTING AND RECONNECTING OF EXISTING
POWER SUPPLIES AND EQUIPMENT WITH THE COR. SEE DEMOLITION,
ARCHITECTURAL, MECHANICAL, AND ELECTRICAL DRAWINGS, AND
SPECIFICATIONS FOR ADDITIONAL INFORMATION.
10.EXISTING FIRE-PROTECTION SYSTEMS AND EQUIPMENT: THE BUILDING WILL
REMAIN FULLY OCCUPIED DURING CONSTRUCTION. THEREFORE, COORDINATE ALL
TEMPORARY AND PERMANENT DISCONNECTING, MODIFICATIONS TO, REROUTING
OF, AND RECONNECTING OF EXISTING FIRE-PROTECTION SYSTEMS AND
EQUIPMENT WITH THE COR. SEE DEMOLITION, ARCHITECTURAL, MECHANICAL,
AND ELECTRICAL DRAWINGS, AND SPECIFICATIONS FOR ADDITIONAL
INFORMATION.
SERVER ROOM PHASING PLAN
GENERAL PHASING ITEMS LISTED BELOW. CONTRACTOR TO COMPLETE ALL WORK
AS OUTLINED WITHIN THE CONSTRUCTION DOCUMENTS.
PHASE I:
· VAMC IT TO RELOCATE EXISTING IT EQUIPMENT FROM AREA SHOWN.
· CONTRACTOR TO INSTALL TEMPORARY 20 TONS WORTH OF COOLING TO AREA
OUTSIDE OF PHASE 1.
· CONTRACTOR TO INSTALL IRCA BARRIERS TO SEPARATE PHASING AREA AND
PROTECT EQUIPMENT REMAINING IN AREA.
· CONTRACTOR TO COMPLETE SCOPE OF WORK OUTLINE IN THE DOCUMENTS
FOR THE AREA.
· CONTRACTOR TO CLEAN, REMOVE BARRIERS, AND TURN OVER AREA TO VAMC
IT TO INSTALL IT EQUIPMENT.
EACH OF PHASE II THROUGH PHASE IV:
· VAMC IT TO RELOCATE EXISTING IT EQUIPMENT FROM AREA SHOWN.
· CONTRACTOR TO ENSURE A MINIMUM OF 40 TONS WORTH OF PERMANENT
COOLING TO AREA OUTSIDE OF PHASE.
· CONTRACTOR TO INSTALL IRCA BARRIERS TO SEPARATE PHASING AREA AND
PROTECT EQUIPMENT REMAINING IN AREA.
· CONTRACTOR TO COMPLETE SCOPE OF WORK OUTLINE IN THE DOCUMENTS
FOR THE AREA.
· CONTRACTOR TO CLEAN, REMOVE BARRIERS, AND TURN OVER AREA TO VAMC
IT TO INSTALL IT EQUIPMENT.
NOT TO SCALE
BASEMENT KEY PLAN
N
RICHARD L. ROUDEBUSH
VA MEDICAL CENTER
RENOVATION
AREA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
JLH
AutoCAD SHX Text
TWT
AutoCAD SHX Text
ARCHITECTURAL
AutoCAD SHX Text
GI004
AutoCAD SHX Text
AutoCAD SHX Text
INFECTION-CONTROL-AND
AutoCAD SHX Text
ILSM-PLAN
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text Approved: Project Director
AutoCAD SHX Text Project Title
AutoCAD SHX Text Date
AutoCAD SHX Text Location
AutoCAD SHX Text Checked
AutoCAD SHX Text Building Number
AutoCAD SHX Text Project Number
AutoCAD SHX Text Drawing Number
AutoCAD SHX Text Drawn
AutoCAD SHX Text Dwg. of 28
AutoCAD SHX Text Revisions:
AutoCAD SHX Text Date
AutoCAD SHX Text
CONSULTANTS:
AutoCAD SHX Text
ARCHITECT/ENGINEERS:
AutoCAD SHX Text one eighth inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text one and one half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 6"
AutoCAD SHX Text 6"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three quarters inch = one foot
AutoCAD SHX Text one half inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one quarter inch = one foot
AutoCAD SHX Text
VA FORM 08-6231
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Office of Construction and Facilities Management
AutoCAD SHX Text
INDIANAPOLIS, INDIANA
AutoCAD SHX Text
OIT SERVER ROOM HVAC DESIGN
AutoCAD SHX Text 583-16-122
AutoCAD SHX Text 05/23/2018
AutoCAD SHX Text
C-WING
AutoCAD SHX Text
CERTIFICATION:
AutoCAD SHX Text
%%USYMBOL LEGEND
AutoCAD SHX Text
INFECTION CONTROL PLAN NOTES
AutoCAD SHX Text
PLAN NOTES
AutoCAD SHX Text
GENERAL CONSTRUCTION NOTES
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text D
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text A
AutoCAD SHX Text H
AutoCAD SHX Text R
AutoCAD SHX Text C
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text C
AutoCAD SHX Text R
AutoCAD SHX Text
STATE OF
AutoCAD SHX Text 10800038
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text No.
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text W.
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text A
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text B
AutoCAD SHX Text N
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text Y
AutoCAD SHX Text T
04_583-16-122.C.GI004
File details come from the government source that posted it. Updated .