36C25019B0025-013.pdf
PDF 3 MB Posted
- Attached to
- Pharmacy IV Prep Room Upgrade Chillicothe VA Medical Center 17273 St. Rt. 104 Chillicothe, OH Federal contract opportunity
- Solicitation number
- 36C25019B0025
About this file
36C25019B0025 S02. Chilli IV Prep Rm Bid Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019C0185-000.docx | DOCX document | |
| 36C25019B0025-0003004.docx | DOCX document | |
| 36C25019B0025-0002001.pdf | ||
| 36C25019B0025-0002000.docx | DOCX document | |
| 36C25019B0025-0001000.docx | DOCX document | |
| 36C25019B0025-012.pdf | ||
| 36C25019B0025-014.pdf | ||
| 36C25019B0025-011.docx | DOCX document | |
| 36C25019B0025-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A1
P1 P1OR
A1
OH
P2
B
P2
GENERAL FLOOR PLAN NOTES
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
FIRE SUPPRESSION HAZARD CLASSIFICATION AND HAZARD
CLASSIFICATION GROUP
SECTION: 1 = SECTION DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER
DESIGNATIONS REFER TO SCHEDULES.
CONNECT TO EXISTING
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN
UNLESS NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
10" 10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOE: 3' - 0"
BOE: 0' - 6"
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR
BOTTOM OF EQUIPMENT, UNLESS NOTED OTHERWISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE
OF PIPE, UNLESS NOTED OTHERWISE
FIRE SUPPRESSION SYMBOLS
DOUBLE LINE SINGLE LINE
CONCEALED PENDENT SPRINKLER
FS
PIV
S
FIRE HYDRANT
FLOW SWITCH
GATE VALVE OS&Y
INSTITUTIONAL PENDENT SPRINKLER
PENDENT SPRINKLER
POST INDICATOR VALVE
RECESSED PENDENT SPRINKLER
SIDE WALL SPRINKLER
SUPERVISED VALVE
UPRIGHT SPRINKLER
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
DD
RR
SPECIALTY GAS SYMBOLS
AIR OUTLET - LAB TYPE
VC
VC
CARBON DIOXIDE OUTLET - HOSPITAL TYPE
MEDICAL AIR OUTLET - HOSPITAL TYPE
MEDICAL VACUUM INLET - HOSPITAL TYPE
NITROGEN OUTLET - HOSPITAL TYPE
NITROUS OXIDE OUTLET - HOSPITAL TYPE
OXYGEN OUTLET - HOSPITAL TYPE
WAGD INLET - HOSPITAL TYPE
NATURAL GAS OUTLET - LAB TYPE
VACUUM OUTLET - LAB TYPE
VACUUM CLEANING STATION - WALL
VACUUM CLEANING STATION - FLOOR
PLUMBING AND FIRE SUPPRESSION
PIPING DESIGNATIONS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
HOT WATER PIPE (140 DEGS. F.)
HOT WATER PIPE (180 DEGS. F.)
HOT WATER RETURN PIPE (140 DEGS. F.)
HOT WATER RETURN PIPE (180 DEGS. F.)
ARGON PIPE
COMPRESSED AIR PIPE
MEDICAL CARBON DIOXIDE PIPE
COMBINATION FIRE SUPPRESSION AND DOMESTIC
WATER SERVICE
DIESEL FUEL PIPE
SPRINKLER PIPE (DRY)
FIRE SUPPRESSION (STANDPIPE / SPRINKLER MAIN)
FIRE SERVICE
FUEL OIL FLOW LINE
FUEL OIL GAUGE LINE
FUEL OIL RETURN LINE
FUEL OIL SUPPLY LINE
NATURAL GAS PIPE
GARAGE DRAINAGE PIPE
GAS SERVICE
HYDROGEN PIPE
HELIUM PIPE
MEDICAL INSTRUMENT AIR PIPE
KITCHEN WASTE PIPE
LABORATORY COMPRESSED AIR PIPE
LABORATORY VENT PIPE
LABORATORY VACUUM PIPE
LABORATORY WASTE PIPE
MEDICAL NITROGEN PIPE
MEDICAL COMPRESSED AIR PIPE
MEDICAL-SURGICAL VACUUM PIPE
GASOLINE PIPE (NON-LEAD)
MEDICAL NITROUS OXIDE PIPE
NON-POTABLE
MEDICAL OXYGEN PIPE
(OVERFLOW) SECONDARY STORM DRAINAGE PIPE
PROPANE GAS PIPE
PUMP DISCHARGE PIPE
PRE-ACTION / DELUGE SPRINKLER PIPE
PURE WATER PIPE
SPRINKLER PIPE (WET)
SANITARY DRAINAGE PIPE
SOFT COLD WATER
SPRINKLER DRAIN PIPE
STORM DRAINAGE PIPE
FUEL TANK VENT PIPE
TRAP PRIMER DISCHARGE PIPE
TEMPERED WATER PIPE
SANITARY SEWER VENT
WASTE ANESTHESIA GAS DISPOSAL PIPE
WATER SERVICE
LV
140R
180R
AR
CA
CO2
CWS
DF
DS
F
FS
FOF
FOG
FOR
FOS
G
GD
GS
H2
HE
IA
IV
IW
LA
LV
LW
N2
MA
MV
NG
NO
NPW
O2
OD
P
PD
PS
PW
S
SAN
SCW
SD
STM
T
TP
TW
V
WAGD
WS
INDIRECT VENT PIPE
INDIRECT WASTE PIPE
K
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
UNION
CLEANOUT
STRAINER
STRAINER WITH A BLOW DOWN VALVE AND HOSE
CONNECTION
DRAIN VALVE WITH HOSE END CONNECTION
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG
IN AND OUT
EXPANSION JOINT
PRESSURE REGULATING VALVE
SAFETY RELIEF VALVE. PIPE DISCHARGE AIR
GAPPED TO FLOOR DRAIN UNLESS NOTED
OTHERWISE.
PRESSURE AND TEMPERATURE TEST PLUG
TRAP PRIMER
VACUUM GAUGE WITH STOP
CLEANOUT TO GRADE OR FINISHED FLOOR
END CAP
MIXING FAUCET
PLUG
HOSE BIB
WALL HYDRANT
PLUG VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
V
VB
TP
CO
COMBINATION SHUTOFF AND BALANCING
VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
VALVES AND FITTINGS
DOUBLE LINE SINGLE LINE
SOLENOID VALVE
S
P/T PRESSURE AND TEMPERATURE SAFETY RELIEF
VALVE. PIPE DISCHARGE AIR GAPPED TO FLOOR
DRAIN UNLESS NOTED OTHERWISE.
FIRE DEPARTMENT VALVE
WATER METERM
ACID VENT PIPEAV
ACID WASTE PIPEAW
ABBREVIATIONS
AAP - AREA ALARM PANEL (MEDICAL GAS)
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACC - ACCESS
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
AR - AIR RECEIVER OR ARGON
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
AV - ACID VENT
AW - ACID WASTE
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BT - BATHTUB
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
BTWN - BETWEEN
CA - COMPRESSED AIR
CB - CATCH BASIN
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CI - CAST IRON
CK - CLINICAL SINK
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - MEDICAL CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
COR - CONTRACTING OFFICER'S REPRESENTATIVE
CORR - CORRIDOR
CS - CLINICAL SINK OR COLD SOFT WATER
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWS - COMBINATION WATER SERVICE
OR CONDENSER WATER SUPPLY
CWR - CONDENSER WATER RETURN
D - DEPTH OR DRAIN LINE
DD - DECK DRAIN
DET - DETAIL
DF - DRINKING FOUNTAIN OR WATER COOLER
OR DIESEL FUEL
DFU - DRAINAGE FIXTURE UNIT
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DS - DOWN SPOUT OR SPRINKLER (DRY)
DT - PERFORATED DRAIN TILE
DWG - DRAWING
EA - EACH
EC - ELECTRICAL CONTRACTOR (DIVISION 26)
EEW - EMERGENCY EYE WASH
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQ - EQUAL
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
ES - EMERGENCY SHOWER
EQS - EQUIPMENT SUPPLIER
EWC - ELECTRICAL WATER COOLER
EXH - EXHAUST AIR
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)
FCE - FIRE CONTROL EQUIPMENT
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FDC - FIRE DEPARTMENT CONNECTION
FDV - FIRE DEPARTMENT VALVE
FF - FINISHED FLOOR ELEVATION
FHC - FIRE HOSE CABINET
FLR - FLOOR
FM - FORCE MAIN
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FR - FIRE RISER
FS - FLOOR SINK OR FIRE SERVICE
FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GD - GARAGE DRAINAGE
GPM - GALLONS PER MINUTE
GS - GAS SERVICE
GW - GREASE WASTE
H2 - HYDROGEN
HB - HOSE BIBB
HC - HVAC CONTRACTOR (DIVISION 23)
HD - HUB DRAIN
HE - HELIUM
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER OR HIGH POINT
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HPW - HIGH PURITY WATER
HPWR - HIGH PURITY WATER RETURN
HR - HOSE REEL
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
IA - MEDICAL INSTRUMENT AIR
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
IV - INDIRECT VENT
IW - INDIRECT WASTE
JS - JANITOR SINK
K - KITCHEN WASTE
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LA - LABORATORY COMPRESSED AIR
LAV - LAVATORY
LBS - POUNDS
LCW - LABORATORY COLD WATER
LEC - LABORATORY EQUIPMENT CONTRACTOR
LHW - LABORATORY HOT WATER
LHWR - LABORATORY HOT WATER RETURN
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LV - LABORATORY VACUUM OR LABORATORY VENT
LW - LABORATORY WASTE
MA - MEDICAL COMPRESSED AIR
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MB - MOP BASIN
MC - MECHANICAL CONTRACTOR (DIVISION 23)
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
MV - MEDICAL SURGICAL VACUUM
N2 - MEDICAL NITROGEN
N/C - NORMALLY CLOSED
NG - GASOLINE (NON-LEAD)
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NO - MEDICAL NITROUS OXIDE
NOM - NOMINAL
NPW - NON-POTABLE WATER
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
02 - MEDICAL OXYGEN
OA - OUTDOOR AIR
OD - OUTSIDE DIAMETER OR OVERFLOW DRAIN
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING CONTRACTOR (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PD - PUMP DISCHARGE OR PARAPET DRAIN
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PS - PRE-ACTION/DELUGE SPRINKLER
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSV - PRESSURE SUSTAINING VALVE
PSIG - POUNDS PER SQUARE INCH GAUGE
PW - PURE WATER
RA - RETURN AIR
RAD - RADIUS
RCP - REINFORCED CONCRETE PIPE
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
RV - RELIEF VALVE
S - SPRINKLER (WET)
SA - SHOCK ARRESTOR OR SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SD - SPRINKLER DRAIN OR SUBSOIL DRAIN
SH - SHOWER
SHT - SHEET
SK - SINK
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SS - SANITARY STACK (SOIL OR WASTE) OR
STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
T - FUEL TANK VENT
TD - TRENCH DRAIN
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TF - TRAP FILLER
TP - TRAP PRIMER OR TRAP PRIMER DISCHARGE
TW - TEMPERED WATER
TYP - TYPICAL
UR - URINAL
UNO - UNLESS NOTED OTHERWISE
V - VENT OR SANITARY SEWER VENT
VAC - VACUUM
VC - VACUUM CLEANING
VCV - VACUUM CLEANING VALVE
VE - VACUUM EXHAUST
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
VP - VACUUM PUMP
VS - VENT STACK
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/0 - WITHOUT
W - WASTE
WAGD - WASTE ANESTHESIA GAS DISPOSAL
WC - WATER CLOSET
WCO - WALL CLEANOUT
WH - WALL HYDRANT OR WATER HEATER
WIV - WALL INDICATOR VALVE
WS - WATER SERVICE
YCO - YARD CLEANOUT
ZVC - ZONE VALVE CABINET
PIPE RISER
NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT
TO MODIFICATIONS ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT
NECESSARILY BE USED ON THIS PROJECT.
FIRE SUPPRESSION DESIGN NOTES
A PROVIDE A COMPLETE FIRE SUPPRESSION SPRINKLER SYSTEM IN THE RENOVATED AREA
AS INDICATED ON THE DRAWINGS.
B COORDINATE WORK WITH VAMC, PHASING PLAN AND OTHER TRADES. CONTRACTOR
SHALL BE RESPONSIBLE FOR OFFSETTING AND/OR RELOCATING EXISTING SERVICES TO
ACCOMMODATE NEW WORK.
C FOLLOW ALL VA STANDARD DESIGN PRACTICES, DETAILS, SPECIFICATIONS AND SITE
SPECIFIC COR REQUIREMENTS AS WELL AS WORK SHOWN ON THESE DOCUMENTS. ALL
DEVIATIONS FROM AFOREMENTIONED REQUIREMENTS SHALL BE APPROVED BY THE
COR.
D VERIFY THAT THERE IS ADEQUATE SPACE TO INSTALL ALL NEW PIPING REQUIRED TO
COMPLETE THIS WORK.
E ALL SPRINKLER PIPING IS LOCATED ABOVE THE CEILING (AT THE BOTTOM OF STRUCTURE
IN EXPOSED STRUCTURAL AREAS) UNLESS OTHERWISE INDICATED.
F THE BASIS OF DESIGN OF SPACING AND SIZING FOR THE COMPLETE FIRE SUPPRESSION
SPRINKLER SYSTEM SHALL BE FORE A WET PIPE SYSTEM HYDRAULICALLY CALCULATED
FOR A :
1 LIGHT HAZARD AREA LIMITED TO A MAXIMUM OF 225 SQ. FT. PER SPRINKLER WITH
THE DENSITY OF 0.10 GPM/SQ. FT. OVER THE MOST REMOTE 1500 SQ. FT. PROVIDE
AN ADDITION OF 100 GPM HOSE ALLOWANCE.
2 ALL MECHANICAL, ELECTRICAL AND SIMILAR SPACE AREAS SHALL BE ORDINARY
HAZARD (GROUP 1) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER SPRINKLER WITH A
DENSITY OF 015 GPM/ SQ. FT. PROVIDE AN ADDITIONAL OF 250 GPM HOSE
ALLOWANCE.
3 ALL PHARMACY, STORAGE, TRASH, FILE STORAGE AND SIMILAR SPACE AREAS SHALL
BE ORDINARY HAZARD (GROUP 2) LIMITED TO A MAXIMUM OF 130 SQ. FT. PER
SPRINKLER WITH A DENSITY OF 0.20 GPM/ SQ. FT. PROVIDE AN ADDITION OF 250 GPM
HOSE ALLOWANCE.
G PROVIDE ALL SPRINKLER LOCATIONS AND RELATED PIPING.
H THE ENTIRE SPRINKLER SYSTEM SHALL CONFORM TO VAMC, LOCAL, STATE AND NFPA
STANDARD, RULES AND REGULATIONS.
I CAREFULLY COORDINATE THE LOCATION OF ALL SPRINKLERS AND PIPING WITH ALL
OTHER TRADES AND THE ARCHITECT.
J VERIFY THE LOCATION OF ALL LIGHTING FIXTURES AND AIR DEVICES BEFORE
INSTALLATION OF SPRINKLERS.
K PROVIDE SPRINKLER PIPING LAYOUT AND SIZING.
L ALL SPRINKLER LOCATIONS MUST BE COORDINATED WITH ALL EQUIPMENT KINDRED TO
OTHER TRADES. SPRINKLER LOCATIONS MUST BE APPROVED BY THE ARCHITECT
BEFORE WORK COMMENCES. REFER TO THE ARCHITECTURAL AND REFLECTIVE CEILING
PLANS FOR ADDITIONAL INFORMATION ON ALL CEILING TYPES, HEIGHTS AND OTHER
ARCHITECTURAL FEATURES.
M MAKE NECESSARY FLOW TESTS, LAYOUT SYSTEMS, OBTAIN APPROVALS FROM THE
AUTHORITIES HAVING JURISDICTION PRIOR TO BEGINNING ANY FABRICATION OR
INSTALLATION WORK.
N SPRINKLER PIPING SHALL BE 1" MINIMUM SIZE.
O SPRINKLERS (UNLESS OTHER NOTED):
EXPOSED AREAS - UPRIGHT OR PENDENT TYPE - STANDARD BRASS
CEILING AREA - RECESSED PENDENT TYPE
ALL SPRINKLERS SHALL BE UL LISTED AND FM APPROVED.
P SPRINKLERS SHALL BE "QUICK RESPONSE" TYPE IN ALL AREAS EXCEPT HIGH
TEMPERATURE AREAS.
Q ALL PENDENT TYPE SPRINKLERS LOCATED IN SUSPENDED CEILING TILE AREAS SHALL BE
LOCATED IN THE CENTER OF THE CEILING TILE.
R ANNULAR SPACE AT PIPE AND OTHER SIMILAR PENETRATIONS OF FIRE RATED
ASSEMBLIES SHALL BE FIRESTOPPED. REFER TO SPECIFICATION SECTION 07 84 00
FIRESTOPPING. REFER TO ARCHITECTURAL DRAWINGS FOR CONSTRUCTION, LAYOUT
AND FIRE RATING OF FLOORS, WALLS AND PARTITIONS AND OTHER BUILDING ELEMENTS.
S A FLOW TEST IS REQUIRED. REFER TO SPECIFICATION SECTION 21 13 13 FOR FLOW
TEST INFORMATION.
T ALL EXISTING SMOKE COMPARTMENTS SHALL BE MAINTAINED. ALL NEW SPRINKLER
ZONES SHALL MATCH SMOKE COMPARTMENTS.
U REFER TO ARCHITECTURAL DRAWINGS FOR INFORMATION ON SMOKE COMPARTMENTS,
SMOKE PARTITIONS AND FIRE BARRIERS.
V PHASING: REFER TO ARCHITECTURAL DRAWINGS FOR AN OUTLINE OF PROJECT
PHASING. ADDITIONAL NOTES DESCRIBING PHASING DETAILS MAY BE INCLUDED
THROUGHOUT THIS DRAWING SET.
W ANY NEW OR RENOVATION WORK REQUIRED OUTSIDE OF THE BOUNDARIES/ EXTENTS
OF SPECIFIC PHASE (OR TEMPORARY CONSTRUCTION WALLS PER DIVISION 1) SHALL BE
BID AS "NIGHT WORK" AND SHALL BE AS DIRECTED BY THE COR.
X ALL CORE DRILL AND PIPE EXTENSIONS THROUGH EXISTING STRUCTURAL FLOOR SLAB
OR STRUCTURAL WALLS SHALL BE X-RAYED TO DETERMINE THE EXACT LOCATION OF
"RE-BARS" IN STRUCTURAL FLOOR/ WALL. THE CONTRACTOR SHALL NOT CUT THE
LOWER (BOTTOM) "RE-BARS" IN THE STRUCTURAL FLOOR SLAB.
Y REQUIRED SHUT-DOWNS OF THE SMOKE DETECTION SYSTEM AND FIRE SUPPRESSION
SPRINKLER SYSTEM SHALL NOT OCCUR CONCURRENTLY AND SHALL COMPLY WITH THE
JOINT COMMISSION ON ACCREDITATION OF HEALTHCARE ORGANIZATIONS (JCAHO)
INTERIM LIFE SAFETY MEASURES (ILSM). COORDINATION BETWEEN THE COR AND ALL
TRADES SHALL BE REQUIRED BEFORE SHUT-DOWN OF THE SMOKE DETECTION SYSTEM
OR FIRE SUPPRESSION SPRINKLER SYSTEM.
Z AUTOMATIC SPRINKLER SYSTEM SHALL BE MAINTAINED IN FULLY OPERATIONAL
CONDITION. SPRINKLER SYSTEM MAY BE TAKEN OFF-LINE FOR UP TO 8 HOURS, AS
REQUIRED TO MAKE MODIFICATIONS/CONNECTIONS TO EXISTING SYSTEM. SYSTEM SHALL
BE BROUGHT BACK ON-LINE AT THE END OF EVERY WORK SHIFT. COORDINATE ALL
DOWNTIME AND FIREWATCH WITH COR MINIMUM 2 WEEKS IN ADVANCE.
MATTHEW S.
OHAT
S T
E OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
EN
R E
Drawing Title
Reviewed for Concept Only
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
FULLY SPRINKLERED
Revision Date HEAPY PROJECT No.: 2018-05066 OHIO COA FIRM No.: 01528
10.23.18
/1
6/
2:
:5
P M
Pharmacy IV Prep Room Renovation
10/23/2018
LEGEND, ABBREVIATIONS, INDEX
OF DRAWINGS
FX001
KMBEWL
18003.00
538-18-201
Chillicothe VA
INDEX OF DRAWINGS - FIRE SUPPRESSION
Sheet Number Sheet Name
FX001 LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS
FX102 PARTIAL SECOND FLOOR PLAN
BASIS OF DESIGN FLOW TEST DATA
LOCATION: HYDRANT #3 NEAR BUILDING 31
STATIC PRESSURE: 490 kPa (71 PSI) RESIDUAL PRESSURE: 427 kPa (62 PSI) FLOW: 78 L/s (1,233 GPM)
DATE: 07/07/2015 TIME: 2:30 PM
NOTE: PERFORM A FLOW TEST OF HYDRANTS #2 & #3 TO VERIFY AVAILABLE
PRESSURE AND FLOW.
12 14 15 13
2-307
Non Hazardous
Drug Compounding
2-303B Ante
2-303C
Sterile Hazardous
Drug Compounding
2-303A
Hazardous Drug
Storage
OH
OH
OH
OH
OH
Entry 2-303
MATTHEW S.
OHAT
S T
E OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
EN
R E
Drawing Title
Reviewed for Concept Only
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
FULLY SPRINKLERED
Revision Date HEAPY PROJECT No.: 2018-05066 OHIO COA FIRM No.: 01528
10.23.18
/1
6/
2:
:5
P M
Pharmacy IV Prep Room Renovation
10/23/2018
PARTIAL SECOND FLOOR PLAN
FX102
KMBEWL
18003.00
538-18-201
Chillicothe VA
N
Scale:
PROJECT
1/4" = 1'-0"
PARTIAL SECOND FLOOR PLAN
GENERAL NOTES
A REFER TO SHEET FX001 FOR LEGEND, ABBREVIATIONS & INDEX OF
DRAWINGS.
PLAN NOTES
1 EXISTING TO REMAIN.
2 LIMITS OF RENOVATED AREA REQUIRING EXISTING SPRINKLER SYSTEM
MODIFICATIONS. MODIFICATIONS INCLUDE, BUT ARE NOT LIMITED TO,
REPLACING ALL SPRINKLERS AND BRANCH PIPING TO CONFORM TO NEW
ARCHITECTURAL LAYOUT WHERE NECESSARY. EXISTING PIPING SHALL BE
RE-USED AS MUCH AS POSSIBLE.
A1
P1 P1OR
A1
OH
P2
B
P2
GENERAL FLOOR PLAN NOTES
RISER OR STACK NUMBER
DETAIL: B = DETAIL DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
FIRE SUPPRESSION HAZARD CLASSIFICATION AND HAZARD
CLASSIFICATION GROUP
SECTION: 1 = SECTION DESIGNATION
P2 = SHEET WHERE DETAIL IS LOCATED
EQUIPMENT REFERENCE. LETTER DESIGNATION VARIES. REFER TO
SCHEDULES.
EQUIPMENT, DEVICE, OR PLUMBING FIXTURE MARK. LETTER
DESIGNATIONS REFER TO SCHEDULES.
CONNECT TO EXISTING
PLAN NOTE. APPLIES ONLY TO THE SHEET WHICH IT IS SHOWN
UNLESS NOTED OTHERWISE.
DETAIL NOTE. APPLIES ONLY TO THE ASSOCIATED DETAIL.
"UP TO" SYMBOL (ITEM ON FLOOR ABOVE)
10" 10"
ELEV: 8' - 0"ELEV: 8' - 0"
TOE: 3' - 0"
BOE: 0' - 6"
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO TOP OR
BOTTOM OF EQUIPMENT, UNLESS NOTED OTHERWISE
APPROXIMATE DIMENSION ABOVE FINISHED FLOOR TO CENTERLINE
OF PIPE, UNLESS NOTED OTHERWISE
FIRE SUPPRESSION SYMBOLS
DOUBLE LINE SINGLE LINE
CONCEALED PENDENT SPRINKLER
FS
PIV
S
FIRE HYDRANT
FLOW SWITCH
GATE VALVE OS&Y
INSTITUTIONAL PENDENT SPRINKLER
PENDENT SPRINKLER
POST INDICATOR VALVE
RECESSED PENDENT SPRINKLER
SIDE WALL SPRINKLER
SUPERVISED VALVE
UPRIGHT SPRINKLER
PIPING SYMBOLS
DOUBLE LINE SINGLE LINE
BOTTOM CONNECTION (45°)
BRANCH TEE CONNECTION (NOTE:
BULLHEAD TEE'S ARE NOT PERMITTED)
DIRECTION OF PITCH
DROP
ELBOW DOWN
ELBOW UP
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN
FLOW DIRECTION DESIGNATION
PUMP
RISE
TOP CONNECTION (45°)
TOP CONNECTION (90°)
BOTTOM CONNECTION (90°)
DD
RR
SPECIALTY GAS SYMBOLS
AIR OUTLET - LAB TYPE
VC
VC
CARBON DIOXIDE OUTLET - HOSPITAL TYPE
MEDICAL AIR OUTLET - HOSPITAL TYPE
MEDICAL VACUUM INLET - HOSPITAL TYPE
NITROGEN OUTLET - HOSPITAL TYPE
NITROUS OXIDE OUTLET - HOSPITAL TYPE
OXYGEN OUTLET - HOSPITAL TYPE
WAGD INLET - HOSPITAL TYPE
NATURAL GAS OUTLET - LAB TYPE
VACUUM OUTLET - LAB TYPE
VACUUM CLEANING STATION - WALL
VACUUM CLEANING STATION - FLOOR
PLUMBING AND FIRE SUPPRESSION
PIPING DESIGNATIONS
DOMESTIC COLD WATER
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
EXISTING PIPE TO REMAIN
EXISTING PIPE TO BE REMOVED
HOT WATER PIPE (140 DEGS. F.)
HOT WATER PIPE (180 DEGS. F.)
HOT WATER RETURN PIPE (140 DEGS. F.)
HOT WATER RETURN PIPE (180 DEGS. F.)
ARGON PIPE
COMPRESSED AIR PIPE
MEDICAL CARBON DIOXIDE PIPE
COMBINATION FIRE SUPPRESSION AND DOMESTIC
WATER SERVICE
DIESEL FUEL PIPE
SPRINKLER PIPE (DRY)
FIRE SUPPRESSION (STANDPIPE / SPRINKLER MAIN)
FIRE SERVICE
FUEL OIL FLOW LINE
FUEL OIL GAUGE LINE
FUEL OIL RETURN LINE
FUEL OIL SUPPLY LINE
NATURAL GAS PIPE
GARAGE DRAINAGE PIPE
GAS SERVICE
HYDROGEN PIPE
HELIUM PIPE
MEDICAL INSTRUMENT AIR PIPE
KITCHEN WASTE PIPE
LABORATORY COMPRESSED AIR PIPE
LABORATORY VENT PIPE
LABORATORY VACUUM PIPE
LABORATORY WASTE PIPE
MEDICAL NITROGEN PIPE
MEDICAL COMPRESSED AIR PIPE
MEDICAL-SURGICAL VACUUM PIPE
GASOLINE PIPE (NON-LEAD)
MEDICAL NITROUS OXIDE PIPE
NON-POTABLE
MEDICAL OXYGEN PIPE
(OVERFLOW) SECONDARY STORM DRAINAGE PIPE
PROPANE GAS PIPE
PUMP DISCHARGE PIPE
PRE-ACTION / DELUGE SPRINKLER PIPE
PURE WATER PIPE
SPRINKLER PIPE (WET)
SANITARY DRAINAGE PIPE
SOFT COLD WATER
SPRINKLER DRAIN PIPE
STORM DRAINAGE PIPE
FUEL TANK VENT PIPE
TRAP PRIMER DISCHARGE PIPE
TEMPERED WATER PIPE
SANITARY SEWER VENT
WASTE ANESTHESIA GAS DISPOSAL PIPE
WATER SERVICE
LV
140R
180R
AR
CA
CO2
CWS
DF
DS
F
FS
FOF
FOG
FOR
FOS
G
GD
GS
H2
HE
IA
IV
IW
LA
LV
LW
N2
MA
MV
NG
NO
NPW
O2
OD
P
PD
PS
PW
S
SAN
SCW
SD
STM
T
TP
TW
V
WAGD
WS
INDIRECT VENT PIPE
INDIRECT WASTE PIPE
K
CHECK VALVE
T
P
FOB
FOT
SHUTOFF VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
CONCENTRIC PIPE REDUCER
ECCENTRIC PIPE REDUCER
PRESSURE GAUGE
TEMPERATURE GAUGE OR THERMOMETER
UNION
CLEANOUT
STRAINER
STRAINER WITH A BLOW DOWN VALVE AND HOSE
CONNECTION
DRAIN VALVE WITH HOSE END CONNECTION
AUTOMATIC FLOW CONTROLLER WITH P/T PLUG
IN AND OUT
EXPANSION JOINT
PRESSURE REGULATING VALVE
SAFETY RELIEF VALVE. PIPE DISCHARGE AIR
GAPPED TO FLOOR DRAIN UNLESS NOTED
OTHERWISE.
PRESSURE AND TEMPERATURE TEST PLUG
TRAP PRIMER
VACUUM GAUGE WITH STOP
CLEANOUT TO GRADE OR FINISHED FLOOR
END CAP
MIXING FAUCET
PLUG
HOSE BIB
WALL HYDRANT
PLUG VALVE
SHUTOFF VALVE AND BOX
SHUTOFF VALVE ON RISER
V
VB
TP
CO
COMBINATION SHUTOFF AND BALANCING
VALVE (REFER TO SPECIFICATIONS FOR
REQUIRED TYPE BASED ON APPLICATIONS)
BALL VALVE
BUTTERFLY VALVE
GATE VALVE
VALVES AND FITTINGS
DOUBLE LINE SINGLE LINE
SOLENOID VALVE
S
P/T PRESSURE AND TEMPERATURE SAFETY RELIEF
VALVE. PIPE DISCHARGE AIR GAPPED TO FLOOR
DRAIN UNLESS NOTED OTHERWISE.
FIRE DEPARTMENT VALVE
WATER METERM
ACID VENT PIPEAV
ACID WASTE PIPEAW
ABBREVIATIONS
AAP - AREA ALARM PANEL (MEDICAL GAS)
AC - AIR COMPRESSOR OR AIR CONDITIONER
ACC - ACCESS
ACCU - AIR COOLED CONDENSING UNIT
AD - ACCESS DOOR OR AREA DRAIN
ADB - ACID DILUTION BASIN
ADJ - ADJUSTABLE
AFF - ABOVE FINISHED FLOOR
AFG - ABOVE FINISHED GRADE
ALT - ALTERNATE
AP - ACCESS PANEL
APPROX - APPROXIMATE
AR - AIR RECEIVER OR ARGON
ARCH - ARCHITECT OR ARCHITECTURAL
ASSY - ASSEMBLY
AV - ACID VENT
AW - ACID WASTE
BDD - BACK DRAFT DAMPER
BFP - BACKFLOW PREVENTER
BLDG - BUILDING
BOB - BOTTOM OF BEAM
BOD - BOTTOM OF DUCT
BOE - BOTTOM OF EQUIPMENT
BOF - BOTTOM OF FOOTING
BOG - BOTTOM OF GRILLE
BOP - BOTTOM OF PIPE
BOT - BOTTOM
BT - BATHTUB
BTU - BRITISH THERMAL UNIT
BTUH - BRITISH THERMAL UNIT PER HOUR
BTWN - BETWEEN
CA - COMPRESSED AIR
CB - CATCH BASIN
CBD - COUNTER BALANCED BACKDRAFT DAMPER
CFCI - CONTRACTOR FURNISHED CONTRACTOR INSTALLED
CFM - CUBIC FEET PER MINUTE
CHS - CHILLED WATER SUPPLY
CHR - CHILLED WATER RETURN
CI - CAST IRON
CK - CLINICAL SINK
CLG - CEILING
CMU - CONCRETE MASONRY UNIT
CO - CLEAN OUT
CO2 - MEDICAL CARBON DIOXIDE
CONN - CONNECT OR CONNECTION
CONTR - CONTRACTOR
COR - CONTRACTING OFFICER'S REPRESENTATIVE
CORR - CORRIDOR
CS - CLINICAL SINK OR COLD SOFT WATER
CTR - CENTER
CU - COPPER
CW - COLD WATER
CWS - COMBINATION WATER SERVICE
OR CONDENSER WATER SUPPLY
CWR - CONDENSER WATER RETURN
D - DEPTH OR DRAIN LINE
DD - DECK DRAIN
DET - DETAIL
DF - DRINKING FOUNTAIN OR WATER COOLER
OR DIESEL FUEL
DFU - DRAINAGE FIXTURE UNIT
DI - DEIONIZED WATER
DIA - DIAMETER
DIM - DIMENSION
DN - DOWN
DS - DOWN SPOUT OR SPRINKLER (DRY)
DT - PERFORATED DRAIN TILE
DWG - DRAWING
EA - EACH
EC - ELECTRICAL CONTRACTOR (DIVISION 26)
EEW - EMERGENCY EYE WASH
EJ - EXPANSION JOINT
ELEC - ELECTRICAL
ELEV - ELEVATOR
EQ - EQUAL
EQUIP - EQUIPMENT
ET - EXPANSION TANK
ETR - EXISTING TO REMAIN
ES - EMERGENCY SHOWER
EQS - EQUIPMENT SUPPLIER
EWC - ELECTRICAL WATER COOLER
EXH - EXHAUST AIR
EXP - EXPANSION
EXT - EXTERIOR
EX - EXISTING
F - FIRE SUPPRESSION (STANDPIPE/SPRINKLER MAIN)
FCE - FIRE CONTROL EQUIPMENT
FCO - FLOOR CLEANOUT
FD - FLOOR DRAIN
FDC - FIRE DEPARTMENT CONNECTION
FDV - FIRE DEPARTMENT VALVE
FF - FINISHED FLOOR ELEVATION
FHC - FIRE HOSE CABINET
FLR - FLOOR
FM - FORCE MAIN
FOB - FLAT ON BOTTOM
FOF - FUEL OIL FLOW
FOG - FUEL OIL GAUGE
FOR - FUEL OIL RETURN
FOS - FUEL OIL SUPPLY
FOT - FLAT ON TOP
FPM - FEET PER MINUTE
FR - FIRE RISER
FS - FLOOR SINK OR FIRE SERVICE
FSC - FIRE SUPPRESSION CONTRACTOR (DIVISION 21)
FT - FEET
FTG - FOOTING
G - GAS OR NATURAL GAS
GA - GAUGE
GAL - GALLON
GALV - GALVANIZED
GC - GENERAL TRADES CONTRACTOR
GD - GARAGE DRAINAGE
GPM - GALLONS PER MINUTE
GS - GAS SERVICE
GW - GREASE WASTE
H2 - HYDROGEN
HB - HOSE BIBB
HC - HVAC CONTRACTOR (DIVISION 23)
HD - HUB DRAIN
HE - HELIUM
HG - REFRIGERANT HOT GAS
HP - HORSEPOWER OR HIGH POINT
HPC - HIGH PRESSURE CONDENSATE RETURN
HPS - HIGH PRESSURE STEAM SUPPLY
HPW - HIGH PURITY WATER
HPWR - HIGH PURITY WATER RETURN
HR - HOSE REEL
HT - HEAT TRACE
HTR - HEATER
HVAC - HEATING, VENTILATING, AND AIR CONDITIONING
HW - HOT WATER
HWR - HEATING HOT WATER RETURN
HWS - HEATING HOT WATER SUPPLY
IA - MEDICAL INSTRUMENT AIR
ID - INSIDE DIAMETER
INV - INVERT ELEVATION
IN - INCHES
IV - INDIRECT VENT
IW - INDIRECT WASTE
JS - JANITOR SINK
K - KITCHEN WASTE
KEC - KITCHEN EQUIPMENT CONTRACTOR
L - LENGTH
LA - LABORATORY COMPRESSED AIR
LAV - LAVATORY
LBS - POUNDS
LCW - LABORATORY COLD WATER
LEC - LABORATORY EQUIPMENT CONTRACTOR
LHW - LABORATORY HOT WATER
LHWR - LABORATORY HOT WATER RETURN
LPC - LOW PRESSURE CONDENSATE RETURN
LPS - LOW PRESSURE STEAM SUPPLY
LV - LABORATORY VACUUM OR LABORATORY VENT
LW - LABORATORY WASTE
MA - MEDICAL COMPRESSED AIR
MAP - MASTER ALARM PANEL (MEDICAL GAS)
MAX - MAXIMUM
MB - MOP BASIN
MC - MECHANICAL CONTRACTOR (DIVISION 23)
MEZZ - MEZZANINE
MFR - MANUFACTURER
MH - MANHOLE
MIN - MINIMUM OR MINUTE
MISC - MISCELLANEOUS
MTD - MOUNTED
MTG - MOUNTING
MPC - MEDIUM PRESSURE CONDENSATE RETURN
MPS - MEDIUM PRESSURE STEAM SUPPLY
MU - WATER MAKE-UP
MV - MEDICAL SURGICAL VACUUM
N2 - MEDICAL NITROGEN
N/C - NORMALLY CLOSED
NG - GASOLINE (NON-LEAD)
NIC - NOT IN CONTRACT
N/O - NORMALLY OPEN
NO - MEDICAL NITROUS OXIDE
NOM - NOMINAL
NPW - NON-POTABLE WATER
NPT - NATIONAL PIPE THREAD
NTS - NOT TO SCALE
02 - MEDICAL OXYGEN
OA - OUTDOOR AIR
OD - OUTSIDE DIAMETER OR OVERFLOW DRAIN
OFCI - OWNER FURNISHED CONTRACTOR
INSTALLED
OFOI - OWNER FURNISHED OWNER INSTALLED
P - PROPANE GAS
PC - PLUMBING CONTRACTOR (DIVISION 22)
OR PUMPED CONDENSATE RETURN
PD - PUMP DISCHARGE OR PARAPET DRAIN
PIV - POST INDICATOR VALVE
PLBG - PLUMBING
PS - PRE-ACTION/DELUGE SPRINKLER
PRESS - PRESSURE
PRV - PRESSURE REGULATING VALVE
PSF - POUNDS PER SQUARE FOOT
PSI - POUNDS PER SQUARE INCH
PSV - PRESSURE SUSTAINING VALVE
PSIG - POUNDS PER SQUARE INCH GAUGE
PW - PURE WATER
RA - RETURN AIR
RAD - RADIUS
RCP - REINFORCED CONCRETE PIPE
RD - ROOF DRAIN
REC - RECESSED
REQD - REQUIRED
RI - ROUGH IN
RL - REFRIGERANT LIQUID
ROS - REVERSE OSMOSIS WATER SUPPLY
ROR - REVERSE OSMOSIS WATER RETURN
RPM - REVOLUTIONS PER MINUTE
RS - REFRIGERANT SUCTION
RV - RELIEF VALVE
S - SPRINKLER (WET)
SA - SHOCK ARRESTOR OR SUPPLY AIR
SAN - SANITARY OR SANITARY DRAIN
SCH - SCHEDULE
SCW - SOFT COLD WATER
SD - SPRINKLER DRAIN OR SUBSOIL DRAIN
SH - SHOWER
SHT - SHEET
SK - SINK
SPEC - SPECIFICATIONS
SQ - SQUARE
SR - SUPPLY RISER
SS - SANITARY STACK (SOIL OR WASTE) OR
STAINLESS STEEL
STD - STANDARD
STM - STORM OR STORM DRAINAGE
STRUC - STRUCTURAL OR STRUCTURE
SUC - SITE UTILITY CONTRACTOR
T - FUEL TANK VENT
TD - TRENCH DRAIN
TEMP - TEMPERATURE
TOB - TOP OF BEAM
TOD - TOP OF DUCT
TOE - TOP OF EQUIPMENT
TOF - TOP OF FOOTING
TOJ - TOP OF JOIST
TOP - TOP OF PIPE
TOS - TOP OF SLAB OR TOP OF STEEL
TF - TRAP FILLER
TP - TRAP PRIMER OR TRAP PRIMER DISCHARGE
TW - TEMPERED WATER
TYP - TYPICAL
UR - URINAL
UNO - UNLESS NOTED OTHERWISE
V - VENT OR SANITARY SEWER VENT
VAC - VACUUM
VC - VACUUM CLEANING
VCV - VACUUM CLEANING VALVE
VE - VACUUM EXHAUST
VEL - VELOCITY
VIB - VALVE IN BOX
VOL - VOLUME
VP - VACUUM PUMP
VS - VENT STACK
VTR - VENT THROUGH ROOF
VR - VENT RISER
W/ - WITH
W/0 - WITHOUT
W - WASTE
WAGD - WASTE ANESTHESIA GAS DISPOSAL
WC - WATER CLOSET
WCO - WALL CLEANOUT
WH - WALL HYDRANT OR WATER HEATER
WIV - WALL INDICATOR VALVE
WS - WATER SERVICE
YCO - YARD CLEANOUT
ZVC - ZONE VALVE CABINET
PIPE RISER
NOTE: ALL SYMBOLS AND ABBREVIATIONS ARE SUBJECT
TO MODIFICATIONS ON OTHER DRAWINGS.
ALL SYMBOLS OR ABBREVIATIONS MIGHT NOT
NECESSARILY BE USED ON THIS PROJECT.
GENERAL NOTES
A INSTALL ALL PIPING ABOVE THE CEILING (AT THE UNDERSIDE OF STRUCTURE IN EXPOSED
STRUCTURAL AREAS), UNLESS OTHERWISE NOTED.
B REFER TO SCHEDULES, DETAILS AND DIAGRAMS FOR PIPING, PIPE SIZES AND PIPELINE
DEVICES NOT INDICATED ON THE FLOOR PLAN.
C EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON VISUAL OBSERVATION AND/ OR
AVAILABLE DRAWING INFORMATION, AND MAY BE A VARIANCE WITH ACTUAL WORK IN
PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD
VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES
BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS
WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION
OF THE CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH
THE WORK.
D ABOVE CEILING UTILITY SPACE IS LIMITED. COORDINATION WITH ALL TRADES IS CRITICAL, PRIOR TO INSTALLATION OF ANY WORK.
E FIELD VERIFY EXISTING CONDITIONS, INCLUDING EXACT LOCATIONS, ELEVATIONS, INVERTS, SIZES, DIRECTION OF FLOW, ETC., SHALL BE REQUIRED PRIOR TO BEGINNING NEW WORK.
F ALL EXISTING PIPING, EQUIPMENT, FIXTURES, ETC., SHOWN ON REMOVAL PLANS SHALL BE
REMOVED. THE MAJORITY OF THE WORK TO BE REMOVED IS SHOWN. REMOVE ALL
INCIDENTAL AND/ OR ABANDON PIPING, ETC., THAT MAY NOT BE SHOWN BUT IS
ASSOCIATED WITH THE REMOVAL WORK. ALL PIPING REQUIRING REMOVAL SHALL BE
REMOVED BACK TO ACTIVE MAINS AND CAPPED, OR REMOVED BACK TO POINTS OF NEW
WORK. INACCESSIBLE PIPING, WHERE SO NOTED, TO BE ABANDONED SHALL BE
DISCONNECTED FROM ACTIVE MAINS AND CAPPED OR PLUGGED IN CONCEALED
LOCATIONS. ACCESSIBLE PIPING, WHERE SO NOTED, TO BE ABANDONED SHALL BE
REMOVED.
G NEW CONNECTIONS TO EXISTING PIPING SHALL BE WITH THE SAME SIZE AS THE EXISTING
PIPING UNLESS OTHERWISE NOTED.
H THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL
OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE WORK IN
ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH
CAN BE ANTICIPATED.
I ALL REMOVED MATERIAL AND EQUIPMENT SO DESIGNATED BY THE COR, SHALL BE TURNED
OVER TO AND PLACED WHERE DIRECTED. ALL MATERIAL AND EQUIPMENT, WHICH THE COR
DOES NOT WISH TO RETAIN, SHALL BECOME THE PROPERTY OF THE CONTRACTOR
RESPONSIBLE FOR THE REMOVAL.
J CUT, PATCH AND REMOVE ALL WORK, AS REQUIRED, FOR THE INSTALLATION OF PLUMBING
WORK.
K REFER TO THE ARCHITECTURAL DRAWINGS FOR PROJECT PHASING REQUIREMENTS.
L WORK ON EXISTING FLOORS WITH LIMITED/NO ARCHITECTURAL SCOPE, THE CONTRACTOR
SHALL PROVIDE ALL REQUIRED FLOOR/ WALL PROTECTION (AS REQUIRED) AND REPLACE
ANY DAMAGED TILES WITH NEW. RETURN AREA BACK TO ORIGINAL CONDITION UPON
COMPLETION OF WORK.
M ANY NEW WORK OR RENOVATION WORK REQUIRED "OUTSIDE" OF THE BOUNDARIES/
EXTENTS OF A SPECIFIC PHASE OF WORK (OR TEMPORARY CONSTRUCTION WALLS PER
DIVISION 1) SHALL BE BID AS "NIGHT WORK" AND SHALL BE AS DIRECTED BY THE COR.
N PHASING: REFER TO THE ARCHITECTURAL DRAWINGS FOR AN OUTLINE OF THE PROJECT
PHASING. ADDITIONAL NOTES DESCRIBING THE PHASING DETAILS ARE INCLUDED
THROUGHOUT THE DRAWING SET.
MATTHEW S.
OHAT
S T
E OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
EN
R E
Drawing Title
Reviewed for Concept Only
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
FULLY SPRINKLERED
Revision Date HEAPY PROJECT No.: 2018-05066 OHIO COA FIRM No.: 01528
10.23.18
/2
4/
:3 4:
A
M
Pharmacy IV Prep Room Renovation
10/23/2018
LEGEND, ABBREVIATIONS, INDEX
OF DRAWINGS
P001
KMBEWL
18003.00
538-18-201
Chillicothe VA
INDEX OF DRAWINGS - PLUMBING
Sheet Number Sheet Name
P001 LEGEND, ABBREVIATIONS, INDEX OF DRAWINGS
P102 PARTIAL FIRST & SECOND FLOOR PLANS
FAUCET, REFER
TO SPECIFICATIONS
NON-AERATED FLOW
CONTROL DEVICE
LOOSE KEY / STOP
ESCUTCHEON
FINISHED FLOOR
ASSE 1070
THERMOSTATIC
MIXING VALVE
OFFSET WASTE
TRAP PARALLEL
TO WALL
LAV SHIELD ENCLOSURE
BY DIVISION 22
6". 10
8" .
[8 m m
[3 m m
[200mm] 8" .
12 14 15 13
1 1
0.5" 0.5"
AV
AW
12 14 15 13
2-307
Non Hazardous
Drug Compounding
2-304 Elect.
2-303B Ante
2-303C
Sterile Hazardous
Drug Compounding
2-303A
Hazardous Drug
Storage
AV
0.5" 0.5"
1 1
0.5" 0.5"
AV
P-418
Entry 2-303
Outpatient Pharmacy 2-300
P-418
AV
AV
AW
AW
1.5"
1.5"
1.5"
1.5"
1.5"
1.5"
P-418
0.5"
0.5"0.5"
0.5"
0.5"
0.5"
12 14
AW
AW
P-418
AW
MATTHEW S.
OHAT
S T
E OF
I O
GRAHAM
E-72670
IEF
O
R P
A
SS
NOI GNEL
SIGER DERET
EN
R E
Drawing Title
Reviewed for Concept Only
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number
Dwg. of on e-ei gh th in ch o ne fo ot on e-qu ar te r i nc h on e fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e-ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
F E
D C
B A
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
ARCHITECT/ENGINEERS:CONSULTANTS:
Office of Construction and Facilities Management
JPA Project No.
FULLY SPRINKLERED
Revision Date HEAPY PROJECT No.: 2018-05066 OHIO COA FIRM No.: 01528
10.23.18
/2
4/
:3 4:
A
M
Pharmacy IV Prep Room Renovation
10/23/2018
PARTIAL FIRST & SECOND FLOOR
PLANS
P102
KMBEWL
18003.00
538-18-201
Chillicothe VA
N
Scale:
PROJECT
1/4" = 1'-0"
PARTIAL SECOND FLOOR PLAN - REMOVALS N
Scale:
PROJECT
1/4" = 1'-0"
PARTIAL SECOND FLOOR PLAN
GENERAL NOTES
A REFER TO SHEET P001 FOR LEGEND, ABBREVIATIONS & INDEX OF
DRAWINGS.
PLAN NOTES
1 EXISTING TO REMAIN.
2 REMOVE EXISTING FIXTURE OR ITEM OF EQUIPMENT (TYPE AS INDICATED)
AND ALL EXTRANEOUS DOMESTIC WATER PIPING BACK TO WITH-IN TWO (2)
PIPE DIAMETERS OF ACTIVE MAIN AND CAP OR POINT OF NEW CONNECTION.
REMOVE ALL EXTRANEOUS ACID WASTE AND VENT PIPING BACK TO ACTIVE
MAIN AND CAP OR BACK TO WHERE WALLS ARE TO REMAIN OR ABOVE
CEILING WHERE WALLS ARE TO BE REMOVED. NO PIPE STUBS SHALL
REMAIN VISIBLE IN FINISHED AREAS.
3 REMOVE EXISTING DOMESTIC WATER PIPING BACK TO WITH-IN TWO (2) PIPE
DIAMETERS OF ACTIVE MAIN AND CAP OR POINT OF NEW CONNECTION.
REMOVE ACID WASTE AND VENT PIPING BACK TO ACTIVE MAIN AND CAP OR
BACK TO WHERE WALLS ARE TO REMAIN OR ABOVE CEILING OR BELOW
FLOOR SLAB WHERE WALLS ARE TO BE REMOVED. NO PIPE STUBS SHALL
REMAIN VISIBLE IN FINISHED AREAS.
SCALE: NONE
SOIL WASTE & VENT DIAGRAM
SCALE: NONE
WATER RISER DIAGRAM
FIXTURE SCHEDULE
SYMBOL
MOUNTING
HEIGHT DESCRIPTION
FLOW FIXTURE UNITS SUPPLY WASTE & VENT
REMARKSGPM GPF DRAINS
WATER
COLD HOT TEPID OUTLET VENT DIRECT INDIRECTCOLD HOT
P-418 34" TO RIM LAVATORY/ WALL HUNG/ 20" x 18"/ ADA / SPEAKMAN FAUCET
MODEL #SEF-1800-CA
0.5 - 1 1.5 1.5 0.5" 0.5" 1.25" 1.5" WALL HUNG/ WRISTBLADES/ GOOSENECK SPOUT WITH INTEGRATED EYEWASH/
T'STATIC MIXING VALVE/ LAV SHIELD
SCALE: NONE
P-418A
2-303B
2-303B
N
Scale:
PROJECT
1/4" = 1'-0"
PARTIAL FIRST FLOOR PLAN
DUCT THERMOSTAT WITH AVERAGING ELEMENT
DUCT STATIC PRESSURE SENSOR
DUCT HUMIDITY SENSOR
ROOM SENSOR: TEMPERATURE, HUMIDITY
LENGTH IN DUCT WHEN SPACE PERMITS)
REMOTE BULB THERMOSTAT
ROOM CONTROL: THERMOSTAT, HUMIDISTAT
DIFFERENTIAL PRESSURE SWITCH
DUCT TEMPERATURE SENSOR WITH AVERAGING ELEMENT
SMOKE DETECTOR (SEE ELECTRICAL SPECIFICATIONS)
DUCT OR PIPE TEMP. SENSOR (SEE NOTE 1 ABOVE)
DUCT OR PIPE THERMOSTAT (NOTE 1: PROVIDE 12" MIN.
AFTER FILTER
CURRENT SENSING RELAY
AIR FOIL WHEEL (FAN)
AIR HANDLING UNIT
ANALOG INPUT
AIR PRESSURE DROP
ANALOG OUTPUT
AUTOMATIC TEMPERATURE CONTROLS
BACKWARD INCLINED WHEEL (FAN)
AIR FLOW MEASURING DEVICE
ABOVE FINISHED FLOOR
DIFFERENTIAL OR STATIC PRESSURE TRANSMITTER
COOLING COIL
CONVECTOR
CLEAN OUT
CEILING GRILLE
CENTRIFUGAL FAN
CEILING DIFFUSER
BOTTOM REGISTER (WALL TYPE)
BOTTOM GRILLE (WALL TYPE)
CEILING REGISTER
COLD WATER (POTABLE)
DIGITAL OUTPUT
DIGITAL INPUT
DIRECT DIGITAL CONTROLS
DRY BULB TEMPERATURE, DEG. F
AUTOMATIC CONTROL DAMPER
EXHAUST FAN
ENGINEERING CONTROL CENTER
DOOR UNDERCUT
ITEM. (TO BE USED AS AN AID IN COORDINATING THE
LISTED SIZE OF DUCT, PIPE, DEVICE OR EQUIPMENT
APPROXIMATE ELEVATION FROM FLOOR TO MIDDLE OF
MANUAL VOLUME DAMPER
U/C
VARIOUS TRADES.)
FIRE DAMPER
BUTTERFLY VALVE
CIRCUIT SETTER
BALL VALVE
COMBINATION BALANCING/SHUT-OFF VALVE
MANUAL AIR VENT
AUTOMATIC FLOW CONTROL VALVE
TEST PLUG (PRESSURE/TEMPERATURE)
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
STRAIGHT-THRU TWO-POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
STRAIGHT-THRU MODULATING CONTROL VALVE
EX.
EF
EXISTING
ECC
DI
DO
DB
DDC
D
Db
DECIBELS
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
EQUIPMENT ABBREVIATION (SUPPLY FAN)
SUPPLY FAN NO.3 IN BUILDING NO.1
DRAWING NUMBER WHERE DRAWN
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
RETURN DUCT (UP & DOWN)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
EXHAUST OR RETURN TOP REGISTER OR GRILLE,
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE,
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
SUPPLY DUCT (UP & DOWN)
INCLINED RISE, IN DIRECTION OF AIR FLOW
NEW DUCT - WIDTH X DEPTH
RECTANGULAR ELBOWS WITH VANES EVEN IF
VANED ELBOW (PROVIDE ALL SQUARE OR
INCLINED DROP, IN DIRECTION OF AIR FLOW
ACOUSTICAL DUCT LINING
STANDARD RADIUS ELBOW
R
10/8
FC
D
SYMBOL IS MISSING)
FLEXIBLE CONNECTION
UP
(WALL TYPE)
(WALL TYPE)
DN
UP
2-2-01
1-SF3
AIR HANDLING UNIT NUMBER
BUILDING FLOOR
TYPICAL UNIT NO.
DN
SECTION LETTER
ECCENTRIC REDUCER
DIRECTION OF FLOW
CAPPED OUTLET
SIDE CONNECTION
EXISTING WORK.
ACCESSORIES (SEE STANDARD DETAIL)
INVERTED BUCKET TRAP SET INCLUDING PIPING
POINT OF CONNECTION BETWEEN NEW AND
RISE OR DROP IN PIPE
BOTTOM CONNECTION, 45 DEG. OR 90 DEG.
TOP CONNECTION, 45 DEG. OR 90 DEG.
REDUCER OR INCREASER
DIRECTION OF PIPE PITCH (DOWN)
THERMOMETER
THERMOSTATIC TRAP
STRAINER
GATE VALVE
PRESSURE GAGE
CHECK VALVE
GLOBE VALVE
PIPING ACCESSORIES (SEE STANDARD DETAIL)
FLOAT AND THERMOSTATIC TRAP SET INCLUDING
GATE VALVE WITH 3/4" HOSE END ADAPTER
EXISTING PIPE TO BE REMOVED
DRAIN LINE
UNION
D
CONV
CW
CR
CO
CG
CF
CD
CC
BR
BIW
BG
ATC
AFW
AI
APD
AO
AHU
AFMD
AFF
AF
VENT LINE
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG & BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
NUMBER INDICATES STEAM PRESSURE
NUMBER INDICATES STEAM PRESSURE
LPR
V
HWS
HWR
LPS (5)
MPS (30)
MPR
HEATING
SP
S F
T
H
T
T H
WET BULB TEMPERATURE, DEG. FWb
MAXIMUM
OUTSIDE AIR
(16 PSIG THRU 59 PSIG)
PRE-FILTER
PUMPED CONDENSATE
PREHEAT COIL
RELATIVE HUMIDITY
SUPPLY FAN
STEAM HUMIDIFIER
TRANSFER GRILLE
UNIT HEATER
STATIC PRESSURE (INCHES OF WATER)
PRESSURE REDUCING VALVE
MEDIUM PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE RETURN
PRESSURE DROP (FEET OF WATER)
TOP REGISTER (WALL TYPE)
VARIABLE FREQUENCY DRIVE
STATIC PRESSURE SENSOR
DOOR UNDERCUT BY GENERAL CONTRACTOR
SPS
TR
U/C
VFD
UH
V
TG
VALVE
S.P.
SH
SF
Rh
PD
PF
PH
PRV
MPR
MAX
O.A.
NOM
MIN
PC
MPS
NOMINAL
MINIMUM
HEATING COIL
HORSEPOWER
POUNDS PER HOUR
HIGH PRESSURE STEAM SUPPLY (60 PSIG & ABOVE)
LOW PRESSURE STEAM SUPPLY (15 PSIG & BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM CONDENSATE RETURNHPR
HPS
LPR
LBS/HR
LPS
HC
HP
BLOW UNLESS OTHERWISE NOTED)
CEILING DIFFUSERS (FOUR WAY
CHILLED WATER RETURN
CHILLED WATER SUPPLYCHS
CHR
AIR CONDITIONING
CONTROL CIRCUIT CONN.H1 N
ETCHED CLEAR LACQUERE.C.L.
WHITE BAKED ENAMELW.B.E.
BRAKE HORSEPOWERBHP
BRITISH THERMAL UNIT PER HOURBTUH
CUBIC FEET PER MINUTECFM
DEGREEDEG
DIAMETERDIA
DIFFERENTIAL PRESSURE SENSORDPS
ENTERINGENT
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
GALLONS PER MINUTEGPM
HEADHD
CHILLED WATER RETURNCHR
CHILLED WATER SUPPLYCHS
HEATING HOT WATER RETURNHWR
HEATING HOT WATER SUPPLYHWS
INCHESIN
INCHES WATER COLUMNIN WC
INCHES WATER GAUGEIN WG
LEAVING AIR TEMPERATURELAT
LEAVINGLVG
MBH 1000 BTUH
MERV MINIMUM EFFICIENCY REPORTING VALUE
NC NOISE CRITERIA
REVOLUTIONS PER MINUTERPM
VARIABLE AIR VOLUMEVAV
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
NUMBER INDICATES STEAM PRESSURE
HPS (125)
HPR
PIPE UP
PIPE DOWN
IN-LINE CENTRIFUGAL FANICF
T
T
T
T
H dP
CS
DP SP
A 14M301
9'-6"
MV MANUAL AIR VENT
EXHAUST DUCT (UP & DOWN)UP DN
PUMPED CONDENSATE RETURNPC
EXPANSION TANK PIPEET
CONDENSATE PUMPCP
CABINET UNIT HEATERCUH
FCU FAN COIL UNIT
EXPANSION TANKET
PUMPP
PROPELLER UNIT HEATERPUH
RETURN FANRF
WATER FILTERWF
COR
RETURN AIRR.A.
SUPPLY AIRS.A.
FD FLOOR DRAIN
FC FLEXIBLE CONNECTION
ENERGY EFFICIENCY RATIOEER
EXHAUST AIRE.A.
CONTRACTING OFFICERS REPRESENTATIVE
BOTTOM GRILLE (WALL TYPE)BG
AIR SEPARATORAS
ANGLE GLOBE VALVE
PIPE GUIDE
PIPE ANCHOR
ORIFICE UNION
TREATED DOMESTIC MAKE-UP WATER
STAINLESS STEEL DUCT
MU
UTILITY SET FANUSF
DOMESTIC COLD WATERDCW
REFRIGERANT PIPINGR
TERMINAL UNIT DESIGNATION
AIR COOLED CHILLERACCH
SMOKE DAMPER
SD
FIN TUBE RADIATION
FLR.
FTR
FLOOR
FPM FEET PER MINUTE
FT FEET
SMOKE DAMPERSD
1. THESE NOTES APPLY EQUALLY TO THE FULL SET OF DOCUMENTS.
2. INCLUDE ALL WORK NECESSARY TO ACCOMMODATE PHASING. REFER TO ARCHITECTURAL DRAWINGS AND GENERAL REQUIREMENTS SECTION 01 00 00.
3. INSULATE DUCTWORK AND PIPING WHERE EXISTING INSULATION HAS BEEN DAMAGED AND/OR REMOVED IN THE PERFORMANCE OF WORK IN THIS PROJECT.
4. PROVIDE ALL ROOFING PENETRATION, REPAIR & REINFORCEMENT IN THE EXISTING BUILDING FOR WORK INDICATED. ENGAGE A ROOFING SUBCONTRACTOR TO PERFORM THE ROOFING WORK. WHERE ROOFING WORK IS REQUIRED, THE EXISTING ROOFING MEMBRANE AND INSULATION SHALL BE CUT, REMOVED AND RESTORED AS REQUIRED TO ATTAIN A WATERTIGHT CONDITION. THE ROOFING SUB-CONTRACTOR SHALL BE A CERTIFIED INSTALLER FOR SUCH INSTALLATION TO MAINTAIN THE EXISTING WARRANTY ON
THE ROOF.
5. THE CONTRACTOR SHALL REFER TO ALL SPECIFICATION SECTIONS AND THESE DRAWINGS FOR DETAILS OF BUILDING CONSTRUCTION TO ENSURE SPACE AND SATISFACTORY ARRANGEMENT FOR THEIR WORK. THE VARIOUS DRAWINGS COMPRISING THE SET ARE INTERDEPENDENT AND MUST BE USED JOINTLY AT ALL TIMES. THE CONTRACTOR SHALL REFER TO THE GENERAL REQUIREMENTS OF THE CONTRACT. THE NOTES AND SYMBOLS INDICATED ON THE DRAWINGS ARE FOR THE GUIDANCE OF ALL TRADES INVOLVED IN THE PROJECT AND MUST BE FOLLOWED TO EXECUTE THE WORK AS INTENDED. IF DISCREPANCIES OCCUR, CONTACT THE COR THRU THE CONTRACTING OFFICER
FOR CLARIFICATION BEFORE PROCEEDING.
6. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR WILL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS ON THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING PERFORMANCE OF THE WORK. THIS WILL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL
WORKING HOURS. SEE SPECIFICATIONS FOR MORE SPECIFIC DETAILS ON RESPONSIBILITIES.
7. ALL WORK MUST BE COORDINATED WITH THE CONTRACTING OFFICER AND COR TO MAINTAIN OPERATION OF THE EXISTING FACILITY.
8. THE CONTRACTOR SHALL COORDINATE HIS WORK WITH THE WORK OF OTHERS. HE SHALL KEEP HIMSELF INFORMED OF THE PROGRESS AND DETAIL DEVELOPMENT OF THE WORK OF OTHERS AND SHALL BE RESPONSIBLE FOR COORDINATING AND EXPEDITING HIS WORK WITH OTHERS SO THAT THE PROGRESS OF THE TOTAL WORK SHALL BE KEPT
ON SCHEDULE.
9. ALL WORK SHALL BE PERFORMED IN COMPLETE COMPLIANCE WITH ALL GOVERNING CODES AND STANDARDS.
10. EXISTING CONDITIONS SHOWN HAVE BEEN BASED UPON AVAILABLE DRAWING INFORMATION, AND MAY BE AT VARIANCE WITH ACTUAL WORK IN PLACE. THE CONTRACTOR SHALL TAKE ALL NECESSARY FIELD MEASUREMENTS AND FIELD VERIFY ALL CONDITIONS AFFECTING THE EXECUTION OF THE WORK. ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND THE WORK SHOWN ON THE CONTRACT DOCUMENTS WHICH MAY IMPACT THE PROGRESS OF THE WORK SHALL BE BROUGHT TO THE ATTENTION OF THE
CONTRACTING OFFICER IN WRITING FOR RESOLUTION BEFORE PROCEEDING WITH THE WORK.
11. EACH CONTRACTOR AND/OR TRADE, FITTING OR PLACING HIS WORK INTO OR ON THE WORK OF OTHERS DOES SO WITH THE UNDERSTANDING THAT THE INSTALLATION OF HIS WORK CONSTITUTES HIS ACCEPTANCE OF THE SUITABILITY OF THE WORK IN PLACE. IF THE WORK OF OTHERS IS NOT ACCEPTABLE, HE SHALL NOTIFY THE COR AND SUCH WORK SHALL BE CORRECTED. ANY NEW WORK INSTALLED IN UNSUITABLE EXISTING WORK SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR OR TRADE INSTALLING THE NEW WORK. NO CLAIMS FOR ADDITIONAL COMPENSATION FOR CORRECTING WORK INSTALLED IN UNSUITABLE EXISTING CONDITIONS WILL BE CONSIDERED.
12. ABATEMENT, REMOVAL OR ENCAPSULATION OF EXISTING MATERIALS CONTAINING ASBESTOS IS INCLUDED IN THIS CONSTRUCTION CONTRACT. REFER TO DRAWINGS AND/OR SPECIFICATIONS FOR LOCATION OF ASBESTOS. ANY ASBESTOS WORK PERFORMED AS PART OF THIS PROJECT SHALL BE COMPLETED PRIOR TO STARTING ANY OTHER
PROJECT SITE WORK. REFER TO SPECIFICATIONS FOR ASBESTOS ABATEMENT.
13. IF, IN THE PERFORMANCE OF THIS WORK, MATERIALS ARE OBSERVED WHICH ARE SUSPECTED TO CONTAIN ASBESTOS, THE CONTRACTOR SHALL IMMEDIATELY INFORM THE COR. WORK THAT WOULD EXPOSE WORKERS TO THE INHALATION OF ASBESTOS PARTICLES SHALL BE TERMINATED. WORK MAY BE RESUMED ONLY AFTER A DETERMINATION HAS BEEN MADE AND UNSAFE MATERIALS HAVE BEEN REMOVED OR ENCAPSULATED AND THE AREA DECLARED SAFE.
14. SOME AREAS MAY BE NOTED ON FLOOR PLANS THAT ASBESTOS IS PRESENT. CONTRACTORS SHALL TAKE SPECIAL CARE WHILE WORKING ADJACENT TO ASBESTOS MATERIALS AND MUST BE PROPERLY PROTECTED WITH CLOTHING, BREATHING APPARATUS, ETC. VERIFY REQUIREMENTS OF VAMC'S INFECTION CONTROL RISK ASSESSMENT TEAM (ICRA).
15. REFER TO ARCHITECTURAL FIRE-RATED PARTITION PLAN(S) FOR LOCATIONS AND FIRE-RATINGS OF NEW AND EXISTING WALL ASSEMBLIES. ALL PENETRATIONS THROUGH FIRE-RATED ASSEMBLIES SHALL BE PROTECTED AND/OR FIRE CAULKED AS REQUIRED TO MAINTAIN FIRE-RATINGS INDICATED. COORDINATE WITH ALL TRADES TO ENSURE
FIRE-RATED PENETRATION REQUIREMENTS AND DETAILS ARE MET.
16. ANNULAR SPACE OF ALL PIPE, CONDUIT, DUCT & OTHER SIMILAR PENETRATIONS OF FIRE RATED ASSEMBLIES SHALL BE FIRESTOPPED. IN ADDITION, PENETRATIONS THROUGH
0-HOUR RATED WALLS & FLOORS SHALL BE FIRE CAULKED TO RETARD PASSAGE OF SMOKE.
17. ALL PIPING, DUCTS, CONDUITS, ETC. IN FINISHED ROOMS, CORRIDORS, ETC. SHALL BE CONCEALED IN A FURRED CHASE OR ABOVE THE SUSPENDED CEILING.
18. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE DIMENSIONS.
19. PROVIDE DUCT ACCESS PANELS AS REQUIRED BY 23 31 00 FOR ACCESS TO FIRE DAMPERS, SMOKE DAMPERS, SMOKE DETECTORS, AUTOMATIC CONTROL DAMPERS, AND HUMIDIFIER DISPERSION TUBES. REFER TO DETAIL ON SHEET M0.3. COORDINATE SIZES AND LOCATIONS WITH ACCESSORIES PROVIDED BY OTHER TRADES.
20. ACCESS PANELS IN NON ACCESSIBLE SUSPENDED CEILINGS SHALL BE PROVIDED FOR ALL VALVES, TRAPS, DAMPERS, CLEANOUTS, FLOW METERS, CONTROLS, ETC.
COORDINATE SIZES AND LOCATIONS WITH OTHER TRADES.
21. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC.
22. FOR TYPICAL STEAM, WATER AND REFRIGERANT PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD DETAILS AND PIPING SCHEMATICS.
23. DIFFUSER, REGISTER AND GRILLE SIZES SHOWN ON FLOOR PLANS ARE NECK SIZES.
24. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN WATER AND AIR.
25. WALL TYPE EXHAUST REGISTERS NOTED AS "BR" ON DRAWINGS ARE TO BE INSTALLED WITH BOTTOM OF REGISTERS SEVEN INCHES ABOVE FINISHED FLOOR.
26. REFER TO ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATION OF CEILING DIFFUSERS, REGISTERS, AND GRILLES.
27. WHERE DUCTS OR PIPES ARE REMOVED THRU WALL/FLOOR/ROOF THAT IS TO REMAIN, PATCH WALL/FLOOR/ROOF OPENING TO MATCH EXISTING WHERE OPENING IS NOT
RE-USED.
28. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
29. ALL CUTTING AND PATCHING REQUIRED FOR THIS PROJECT SHALL BE INCLUDED IN THE CONTRACT. REFINISH ANY SURFACE DISTURBED UNDER THIS WORK TO MATCH
EXISTING.
30. IN GENERAL, KEEP DUCT AND PIPING MAINS NEXT TO UNDERSIDE OF STRUCTURE.
31. ANY REMOVED EQUIPMENT SHALL BE TURNED OVER TO THE VA. ITEMS NOT DESIRED BY THE VA SHALL BE REMOVED FROM THE PREMISES AND DISPOSED OF PROPERLY BY
THE CONTRACTOR.
32. THE CONTRACT DRAWINGS ARE NOT INTENDED TO SHOW EVERY VERTICAL OR HORIZONTAL OFFSET WHICH MAY BE NECESSARY TO COMPLETE THE SYSTEMS. COORDINATE WORK IN ADVANCE WITH ALL OTHER TRADES AND REPORT IMMEDIATELY ANY DIFFICULTIES WHICH CAN BE ANTICIPATED.
33. FIELD VERIFY EXISTING CONDITIONS, INCLUDING DUCT, PIPE AND EQUIPMENT SIZES, SERVICES AND LOCATIONS PRIOR TO PERFORMING WORK.
34. HEPA FILTERED EXHAUST IS REQUIRED TO MAINTAIN A MINIMUM OF 0.01" W.G. NEGATIVE PRESSURE IN CONSTRUCTION AREAS.
35. ALL ABANDONED EXTRANEOUS PIPING, DUCTWORK, SUPPORTS, CONTROLS, ETC. SHALL BE REMOVED.
36. TERMINATE PIPING AND DUCTWORK BELOW FLOORS, ABOVE CEILINGS, ETC., IN CONCEALED SPACES. ALL CUTTING AND PATCHING SHALL MATCH EXISTING FINISHES.
37. WHERE CONTROL DEVICES ARE REMOVED, PNEUMATIC LINES SHALL BE REMOVED BACK TO MAIN AND CAPPED; AND CONTROL WIRING AND CONDUIT SHALL BE REMOVED BACK
TO SOURCE.
38. ALL EXISTING DUCTWORK, PIPING, EQUIPMENT, CONTROLS, ETC. SHOWN DASHED SHALL BE REMOVED. THE MAJORITY OF WORK TO BE REMOVED IS SHOWN. REMOVE ALL INCIDENTAL AND/OR ABANDONED DUCTWORK, PIPING, ETC. THAT MAY NOT BE SHOWN BUT IS ASSOCIATED WITH THE REMOVAL WORK.
39. ALL ITEMS THAT REQUIRE ACCESS, SUCH AS FOR OPERATING, CLEANING, SERVICING, MAINTENANCE, AND CALIBRATION, SHALL BE EASILY AND SAFELY ACCESSIBLE BY PERSONS STANDING AT FLOOR LEVEL, OR STANDING ON PERMANENT PLATFORMS, WITHOUT THE USE OF PORTABLE LADDERS. EXAMPLES OF THESE ITEMS INCLUDE, BUT ARE NOT LIMITED TO: ALL TYPES OF VALVES, FILTERS AND STRAINER, TRANSMITTERS, CONTROL DEVICES, ETC.
40. WHERE EXISTING HVAC UTILITIES IN SERVICE WILL BE DISRUPTED DURING THE CONSTRUCTION OF THIS PROJECT, THIS WORK SHALL BE PERFORMED ON WEEKENDS OR WEEK NIGHTS, IF REQUIRED BY THE COR. DOWNTIME SHALL BE KEPT TO A MINIMUM, AND SHALL BE COORDINATED AND SCHEDULED 3 WEEKS (15 WORKING DAYS) IN ADVANCE WITH
THE COR.
41. WHEN NEW SUPPLY AND RETURN AIR DUCTS ARE CONNECTED TO EXISTING DUCTWORK, CLEAN BOTH NEW AND EXISTING DUCTWORK BY MOPPING AND VACUUM CLEANING INSIDE AND OUTSIDE BEFORE OPERATION. CLEANING OF EXISTING DUCTWORK SHALL BE LIMITED TO THE IMMEDIATE AREA WITHIN REACH OF THE OPEN END OF THE DUCT.