36C25019B0017-029.pdf
PDF 12 MB Posted
- Attached to
- REPLACE SURGERY SUBSTATION 541-19-504 Federal contract opportunity
- Solicitation number
- 36C25019B0017
About this file
36C25019B0017 S02 - Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019C0189-000.docx | DOCX document | |
| 36C25019B0017-0002001.docx | DOCX document | |
| 36C25019B0017-0002000.docx | DOCX document | |
| 36C25019B0017-0001000.docx | DOCX document | |
| 36C25019B0017-026.docx | DOCX document | |
| 36C25019B0017-028.pdf | ||
| 36C25019B0017-030.docx | DOCX document | |
| 36C25019B0017-027.pdf | ||
| 36C25019B0017-031.docx | DOCX document | |
| 36C25019B0017-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
B-AC-3
B-AC-2B-B2
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
EAST BLVD.
E
S
T
E A
S T
B L V
D
MAGNOLIA DR.
H A
Z E
L D
R
E . 1
S T
MT. SINAI DR.
M
AR
TIN
LU
TH
ER
K
IN
G D
R
Drawing Title
Approved: Division Chief
Location
Project Title Date
Checked Drawn DRAWING NO.Building Number
Project No.
Office of
Facilities
Management
Dwg. of o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h e s o n e f o o t th re e i n c h e s o n e f o o t
VA FORM 08-6231, OCT 1978 1
2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A B
C D
E F
FACILITY MANAGER
DATE
SHOP FOREMAN 138
APPROVALS
CHIEF Planning and Construction
DATE
CHIEF, Occupational Health & Safety
APPROVALS
DIRECTOR 00
DATE
ASSOCIATE DIRECTOR 00A (B)
APPROVALS
Approved: Service Director
CHIEF, IRMCHIEF, ENGINEERING 138
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
10701 EAST BLVD. CLEVELAND, OH. 44106
PROJECT NO.
Veterans Administration Medical Center
PROJECT AREA:
Replace substation +/-668sf Internal Mezzanine Addition +/-570sf
DESIGN CODES / CRITERIA:
VAMC Design Guide 2018 Life Safety Code (Precedence)
2018 IBC
2017 VA HVAC Design Manual
TYPE OF CONSTRUCTION: (LSC A.8.2.1.2)
Type II (222)
FIRE SUPPRESSION:
Fully Sprinklered, Existing to Remain
FIRE ALARM SYSTEM:
Existing to Remain
EXTERIOR BEARING WALLS: (LSC A.8.2.1.2)
2 Hours
INTERIOR BEARING WALLS: (LSC A.8.2.1.2)
2 Hours
STRUCTURAL FRAME / COLUMNS: (LSCA.8.2.1.2)
2 Hours (Supporting more than 1 floor)
FLOOR - CEILING ASSEMBLIES: (LSC A.8.2.1.2)
2 Hours
ROOF - CEILING ASSEMBLIES: (LSC A.8.2.1.2)
1 Hour
INTERIOR NONBEARING WALLS: (LSC A.8.2.1.2)
0 Hour
EXTERIOR NONBEARING WALLS: (LSC A.8.2.1.2)
0 Hour
EXIT ENCLOSURES: (LSC 7.1.3.2.1)
EXISTING; 1 HOUR
SMOKE BARRIERS: (LSC 18.3.7.3)
1 HOUR
EXIT ACCESS CORRIDORS: (LSC 18.3.6.2)
0 HOUR, SMOKE PARTITIONS (HEALTHCARE)
DRAWING INDEX
GENERAL
X.1 COVER SHEET
ARCHITECTURAL
1-A0 ABBREVIATIONS, SYMBOLS, GENERAL NOTES AND SITE PLAN
1-A1 PARTIAL PLANS
1-A2 PARTIAL EXTERIOR ELEVATION, BUILDING SECTIONS AND DETAILS
STRUCTURAL
1-S1 ELECTRICAL ROOM PLAN, NOTES AND DETAILS
MECHANICAL
1-M1 SURGERY PENTHOUSE MECHANICAL PLANS
ELECTRICAL
1-E1 ELECTRICAL LEGEND AND GENERAL NOTES
1-E2 PARTIAL FIRST AND SECOND FLOOR ELECTRICAL KEY PLAN
1-E3 PARTIAL THIRD FLOOR SURGERY PENTHOUSE AND ROOF ELECTRICAL KEY PLAN
1-E4 PARTIAL FIRST FLOOR ELECTRICAL PLAN
1-E5 PARTIAL SURGERY PENTHOUSE DEMO, LIGHTING, AND POWER PLANS
1-E6 ELECTRICAL ONE-LINE LEGEND AND NOTES
1-E7 ELECTRICAL ONE-LINE DIAGRAM
1-E8 SUBSTATION DETAILS
1-E9 ELECTRICAL DETAILS
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
ARCH JOB NO.:
FULLY SPRINKLERED
SITE PLAN
Scale = None
True North
Barber & Hoffman, Inc.
Structural Engineer 2217 East 9th Street, Suite 350, Cleveland, Ohio 44115
Plan North
CODE INFORMATION
Perspectus Architecture LLC Architect 13212 Shaker Square Cleveland, Ohio 44120
Fredrick, Fredrick & Heller Engineers, Inc.
Mechanical & Electrical Engineer 672 East Royalton Road, Broadview Heights, Ohio 44147
PROJECT INFORMATION
PHASING GENERAL NOTES:
1. The work shall be accomplished in one phase, however, work shall be sequenced such that traffic in newly completed areas is minimized.
2. On-site roofing work shall only be performed between April 15 and November 30, or as otherwise approved by the COR.
3. Construction schedule is to include days of inclement weather, at no additional cost to the Owner.
4. Contractor to coordinate all work with the entire set of documents.
5. Contractor to cooperate with the Owner's occupancy of the facility and shall execute the work so as to interfere as little as possible with the normal functioning of the Medical Center. See also specification 01 00 00.
PROJECT DURATION:
Duration in Days from Notice Calendar Days to Proceed (NTP)
Preconstruction Activities 60 Days 1 - 60 On-site Construction 120 Days 61 - 180
Total project duration is 180 days from Notice to Proceed.
LIFE SAFETY GENERAL NOTES:
1. See X.1 Cover Sheet for applicable code information.
Replace Surgery
Substation 541-19-504
DRRN
Cover Sheet
X.1
541-19-504
100% CONSTRUCTION DOCUMENT SUBMISSION
DECEMBER 10, 2018
DECEMBER 10, 2018
Replace Surgery Substation
18-129
10701 EAST BLVD. CLEVELAND, OHIO
KEY PLAN
Scale = None
Plan North
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
10 OFF
7 7
SYMBOLS
Building, wall and detail section mark
Interior/exterior elevation reference
Enlarged plan or detail reference
Column reference grids
Revision reference number
Wall type
Window type
New level line, control point, or datum
New door
Indicates drawing sheet on which plan/detail is shown.
Indicates detail number
Indicates drawing sheet on which elevation is shown
Indicates elevation number
Indicates drawing sheet on which section is shown
Indicates section number
Door number46
XX
A
A2-1
A2-1
A2-1
A
Crown typeXX
Wall finish
A
New Existing
XX
Floor Plan Coded Note
Demolition Coded Note anchor bolt above air conditioning acoustic(al) acoustical ceiling tile adjacent above finish floor alternate aluminum anodized approximate architect(ural) automatic
AB
ABV
A/C
ACOUS
ACT
ADJ
AFF
ALT
ALUM
ANOD
APPROX
ARCH
AUTO
board between building block(ing) bulkhead beam bottom bridging bearing brick basement built-up roofing
BD
BETW
BLDG
BLK
BLKHD
BM
BOT
BRDG
BRG
BRK
BSMT
BUR
CFM
CG
CI
CJ
CLG
CL
CLR
CLL
CNTR
CMU
CO
COL
CONC
CONN
CONST
CONT
COORD
CORR
CS
CTR
CL
cubic feet per minute corner guard cast iron control joint ceiling closet clear contract limit line counter concrete masonry unit cased opening/clean out column concrete connection construction continuous coordinate corridor course center
D
DBL
DEG
DEMO
DIA
DIM
DISP
DN
DR
DS
DET
DWG
DWR
DW
depth double degrees demolition diameter dimension dispenser down door down spout detail drawing drawer drywall each electrical contractor exterior insulation and finish system expansion joint electric elevator/elevation emergency equal equipment exposed structure existing to remain each way electric water cooler exhaust existing expansion exposed exterior
EA
EC
EIFS
EJ
ELEC
ELEV
EMERG
EQ
EQUIP
ES
ETR
EW
EWC
EXH
EXIST
EXP
EXP'D
EXT
fire alarm face brick fan coil unit face to face floor drain foundation fire extinguisher fire extinguisher cabinet fire hose cabinet finish floor fluorescent fire resistant
FA
FB
FCU
F/F
FD
FDN
FE
FEC
FHC
FIN
FLR
FLUOR
FR
FRT
GA
GALV
GC
GL
GR
GYP BD
gauge galvanized general contractor glass grade gypsum board
H
HB
HC
HDBD
HDCPD
HDWR
HDWD
HM
HORIZ
HPDL
HR
HT
HTG
HTR
HVAC
HW
HWH
high hose bibb hollow core hardboard handicapped hardware hardwood hollow metal horizontal high pressure decorative laminate hour height heating heater heating, ventilation air conditioning hot water hot water heater
ID
IN
INCL
INSUL
INT
inside diameter inch include (inclusive) insulation interior janitor joist
JAN
JST
knock down knock out
KD
KO
L
LAM
LAV
LB
LF
LIM
LT
LTG
LVR
length (long) laminate(d) lavatory pound linear feet (foot) limited light lighting louver
MARB
MAS
MAT
MAX
MECH
MEMB
MFR
MH
MIN
marble masonry material maximum mechanical membrane manufacturer manhole minimum not applicable not in contract number nominal not to scale
N/A
NIC
NO
NOM
NTS
overall on center on center above finish floor outside diameter overhead door opposite hand overflow roof drain out to out opening opposite optional
OA
OC
OCAFF
OD
OHDR
OPH
OVRD
O/O
OP'G
OPP
OPT
PLBG
PMLD
PNL
PLYWD
POL
PP
PR
PREFIN
PREFAB
PROJ
PSC
PSF
PSI
PT
PTD
PTN
PVC
PVMT
plumbing premoulded panel plywood polished push plate pair prefinished prefabricated projection pre-stress concrete pounds per square foot pounds per square inch point painted partition polyvinylchloride pavement
QTY quantity
R
RA
RAD
RAG
RD
REC
REF
REG
REINF
riser return air radius return air grille roof drain receptacle refrigerator register reinforcement solid core schedule smoke detector saddle section sheet similar stand pipe specifications speaker sprinkler single ply roofing square square inch square yard stainless steel/ slop sink standard steel storage structure(al) suspended systems
SC
SCHED
SD
SDL
SECT
SHT
SIM
SP
SPEC
SPKR
SPKLR
SPR
SQ
SQ IN
SY
SS
STD
STL
STOR
STRUC
SUCP
SYS
T T/G or T&G
TG
TD
TEL
TEMP
TEMP'D
TERR
THK
THLD
TOC
TOS
TOD
TOM
TOJ
TOP
TOW
TYP
thread tongue and groove tempered glass trench drain telephose temporary tempered terrazzo thick threshold top of concrete (top of curb) top of steel top of deck top of masonry top of joist top of parapet top of wall typical undercut underground unfinished unlimited unless noted otherwise urinal
UC
UG
UNFIN
UNLIM
UNO
UR
VERT
VEST
VIF
vertical vestibule verify in field
W W/ W/O W/W
WC
WD
WH
WIN
WG
WT
WWF
width with without wall to wall water closet wood water heater window wire glass weight welded wire fabric
YD yard
ABBREVIATIONS
C/C
CAB'T
CAD
CB
CEM
CL or center to center cabinet cadmium catch basin cement center line fire-retardant treated fire-retardant treated wood feet footing furring fire valve cabinet
FRT
FRTWD
FT
FTG
FURR
FVC
MISC
MO
MTD
MTG
MTL
MULL
miscellaneous masonry opening mounted mounting metal mullion
PBD
PCF
PERIM
PG BD
PL
PLAS
PLAM
particle board pounds per cubic foot perimeter peg board plate plastic plastic laminate
REINF
REQ'D
RES
RET
REV
RM
RO
RVS
reinforcement (reinforcing) required resilient return revised (revision) room rough opening reverse
P A R K I N G G A R A G E
S E R V I C E C O U R T
M A G N O L I A D R I V E
E A
S T
T
H
S
R E
E T
E A S T B O U L E V A R D
E A
S T
H
S
R E
E T
M A R T I N L U T H E R K I N G J R D R I V E
C L E V E L A N D M U S E U M O F N A T U R A L H I S T O R Y
C R A W F O R D A U T O A V I A T I O N M U S E U M
L O U I S S T O K E S C L E V E L A N D V A M E D I C A L C E N T E R
PROJECT
LOCATION
W A D E P A R K V A A D M I N I S T R A T I O N
B L D G M T Z I O N
C O N G R E G A T I O N A L C H U R C H
See Site Plan General Note 3
Adjacent project staging area may occur
Do not block emergency exits
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENT SUBMISSION 12/10/18
Consulting Engineers
BARBER & HOFFMAN, INC.
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
Replace Surgery Substation
541-19-504
DRRN
General Information and Site Plan
1-A0 12/10/18
SITE PLAN GENERAL NOTES
1. Contractor to obtain, and include in their bid, all necessary approvals and permits from all authorities having jurisdiction for crane location.
2. Contractor shall restore, to it's original condition, any landscaping or other site elements damaged as a result of any contractor activities.
3. Contractor dumpster,staging and portable toilet area shall be secured to deter unauthorized access to project area. Coordinate with VA and adjacent project contractor.
Scale
40' 80' 160' 1" = 80'-0"
Site Plan
GENERAL NOTES
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
UP
DN
DEMOLITION PLAN LEGEND
Existing construction to remain
Construction to be demolished
# Number represents coded demolition note
16C 18E 20A
A1
ZZ
YY
XX
UU
RR
ss
VV
P R O J E C T S C O P E
P R O J E C T S C O P E
'-0
8"
EXIST Membrane roof assembly to remain
EXIST HVAC
plenum to remain
Portion of EXIST Metal grate floor assembly to remain
52'-4" +/-
'-8
16C 18E 20A
A1
ZZ
YY
XX
UU
RR
ss
VV
1-A201
1-A2
P R O J E C T S C O P E
P R O J E C T S C O P E
1-A2
EXIST Membrane roof assembly to remain
Portion of EXIST Metal grate floor assembly to remain
EXIST HVAC
plenum to remain
3'-0"
38'-0"
'-0
K no ck O ut P an el
'-0 x
-1
3' -0
WALL LEGEND
Existing construction to remain
New construction
Number represents coded plan note#
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENT SUBMISSION 12/10/18
Consulting Engineers
BARBER & HOFFMAN, INC.
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
Replace Surgery Substation
541-19-504
DRRW
Partial Plans
1-A1 12/10/18
DEMOLITION GENERAL NOTES
A Refer to specifications section 02 41 00 - Demolition for additional requirements and information.
B The Facility's EXIST smoke and fire suppression system shall remain in operation during the entire construction phase.
C All demolition work being done outside of temporary partitions is to be appropriately sealed off to prevent the transmission of dust and debris and minimize disruption to visitors, residents, and staff. COORD location of temporary partitions with Owner.
D Some items may be indicated in the demolition drawings and demolition notes which are not necessarily demolition work but are included to describe the overall scope of the project and to aid in the demolition COORD. The contractor is responsible for all work required to complete the intended work of the overall project.
E Existing roof demolition shall include, but not be limited to, removal of existing roof membrane, insulation, cover board (where present), flashing, base flashing, counterflashing, wood blocking, walkway pads (where present) and other features to bare concrete, including the coping, edge metal and any residual adhesive. Inspect the deck for damages. Make repairs as specified, clean and repair deck, apply primer, install blocking and specified vapor retarder / temporary roof system to ensure a weathertight system at the end of each work day.
F Existing curtainwall demolition shall include, but not be limited to, removal of glazing, vertical and horizontal aluminum mullions, anchor clips, flashing, insulation and wood blocking. Prepare existing remaining surfaces for new work.
G Remove MISC items within limits of demolition. COORD with Owner any items to be salvaged.
H After removal of existing roof membrane and curtainwall, the COR must inspect substrates, such as concrete structure, decks, blocking, cant strips, etc.. The COR will determine if these concealed items must be repaired or replaced. This applies to all concealed items.
I Contractor to include as a seperate line item in Contractors Schedule of Values, the leveling of a total of 200SF of concrete roof deck. See also specification 07 55 20.
J The contractor shall keep sufficient materials available on the project site to cover work in progress in the event of an unanticipated rain event.
K Dispose of all demolition debris in accordance with the specifications and all federal, state and local codes and ordinances.
DEMOLITION CODED NOTES
1 Carefully remove portion of existing steel grate floor and associated framing. Rework and provide additional support framing at perimeter of existing to remain.
2 Remove portion of existing aluminum composite wall assembly.
3 Remove existing door, frame and associated hardware.
4 Carefully remove existing exterior stair assembly, support post and curbs, salvage for reinstall.
KEY PLAN
NTS
Scale
4' 8' 16' 1/8" = 1'-0"
Penthouse Plan - Demolition02 Scale
4' 8' 16' 1/8" = 1'-0"
Penthouse Plan - New01
FLOOR AND ROOF PLAN GENERAL NOTES
A Contractor to verify all dimensions and conditions in the field prior to commencement of work. If drawings conflict with actual field conditions, contact COR before proceeding with work.
B All dimensions are to finish face of wall unless noted otherwise.
FLOOR AND ROOF PLAN CODED NOTES
1 Existing relocated galvanized steel stair / railing assembly. Rework EXIST railing at landing and add additional GALV STL pipe / tube railing system, to match existing.
Paint entire assembly.
2 08 11 13 - 3'-0" x 7'-0" galvanized steel door and frame, paint to match existing.
3 32 31 13 - 4'-0" x 7'-10" Lockable gate.
4 Exterior wall infill, to match and be flush with existing adjacent wall to remain. Provide
10'-0" x +/-13'-8" knock out panel as shown. Field verify existing wall make-up.
5 32 31 13 - 8'-0"H chainlink fence assembly.
6 05 51 00 - Steel stair assembly with 05 52 13 - Pipe and tube railings 7 Composite deck, COORD with STRUCT DWGS 8 32 31 13 - 3'-0" x 7'-10" Lockable gate.
B-B3
B-B4
B-B5
B-C2
B-C3
B-C4
B-C5
B-D2
B-D3
B-D4
B-E3
B-E4
B-E2
B-F3
B-F4 B-C4
PROJECT
LOCATION
PENTHOUSE
696' - 5 1/4"
PENTHOUSE
ROOF
718' - 7 3/16"
ROOF
691' - 11 1/4"
YYXXUU VV
EXIST ALUM COMP wall panel system to remain
EXIST relocated GALV STL stair / railing assembly. See Floor and Roof Plan
Coded Note 1 for ADDL INFO.
08 11 13 - GALV STL door and frame, paint to match EXIST
N ew
A
LU
M C
O M
P
PN
L In fil l
8' -6
/2
N ew
A
LU
M C
O M
P Kn oc k-
O ut
P N
L
'-8
New ALUM COMP Knock-Out PNL .10'-0"
New ALUM COMP PNL Infill 7'-0"
PENTHOUSE
696' - 5 1/4"
PENTHOUSE
ROOF
718' - 7 3/16"
ROOF
691' - 11 1/4"
16C
17B 18E 20A
1-A2
Composite deck, see STRUCT DWGS
Existing floor slab to remain
Existing roof assembly to remain
Existing STL framing to remain
32 31 13 - 8'-0"H chainlink fence assembly
Existing metal grate to remain
8' -0
PENTHOUSE
696' - 5 1/4"
PENTHOUSE
ROOF
718' - 7 3/16"
ROOF
691' - 11 1/4"
XX UU ssVV
1-A2
Composite deck, see STRUCT DWGS
Existing floor slab to remain
Existing roof assembly to remain
Existing metal grate to remain
Existing STL girders / beams to remain
New EXT wall infill, to match EXIST
32 31 13 - 8'-0"H chainlink fence assembly.
New EXT wall Knock-Out PNL, to match EXIST wall make-up and finish.
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
R E G
I STERED ARC
H
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William C. Ayars, License #7259 Expiration Date 12/31/2019
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
100% CONSTRUCTION DOCUMENT SUBMISSION 12/10/18
Consulting Engineers
BARBER & HOFFMAN, INC.
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
Replace Surgery Substation
541-19-504
DRRN
Partial Exterior Elevation, Building Sections and Details
1-A2 12/10/18
KEY PLAN
NTS
Scale
2' 4' 8' 1/4" = 1'-0"
Partial Exterior Elevation01
Scale
2' 4' 8' 1/4" = 1'-0"
Building Section B03 Scale
2' 4' 8' 1/4" = 1'-0"
Building Section A02
DESIGN LOADS (IBC 2015)
Floor live load
Mezzanine ---------------------------------------------------------------------------- 100 psf
GENERAL
1. All new construction shall comply with the Contract Documents and the Building
Code.
2. Typical details and general notes apply to all parts of the work except where specifically detailed or unless otherwise noted.
3. The structural drawings illustrate structural members. Refer to architectural, mechanical, and electrical drawings for non-structural items which require special provisions during the construction of the structural members.
4. Drawings are not to be scaled.
5. Refer to architectural plans for floor depressions, openings, slopes, drains, curbs, pads, embedded items, non-bearing partitions, etc. Refer to mechanical and electrical plans for sleeves, openings, and hangers for pipes, ducts, and equipment.
6. No pipes or ducts shall be embedded into structural members unless so shown on the plans or approved by the Engineer.
7. The Contractor shall verify and be responsible for all dimensions and conditions which impact the work. Field verify sizes, elevations, hole locations, etc., prior to fabrication.
8. The Contractor shall carefully review the drawings to identify the scope of work required, visit the site to relate the scope of work to existing conditions and determine the extent to which those conditions and physical surroundings will impact the work.
9. Existing conditions as shown on these plans are for reference only. The
Contractor is required to field verify all existing conditions prior to construction.
10. Locate existing underground utilities in areas of construction. Coordinate with utility companies for any shut-off requirements of still active lines.
11. The Contractor shall resolve any conflicts on the drawings or in the specifications with the Architect/Engineer before proceeding with the work.
12. Any deviation, modification, or substitution from the approved set of structural drawings shall be submitted to the Owner, Architect, and Engineer for review/approval prior to its use or inclusion on the shop drawings.
13. The Contractor shall provide all necessary shores, braces, and guys required to support all loads to which the building structure and components, soils, other structures, and utilities may be subjected during construction. Shoring systems shall be designed, signed, and sealed by a professional engineer licensed in the jurisdiction where the project is located.
14. The Contractor shall provide means, method, techniques, sequence, and procedure of construction as required.
15. The Contractor shall protect all work, materials, and equipment from damage and shall provide proper storage facilities for materials and equipment during construction.
16. Site visits performed by the Architect/Engineer do not constitute inspections of means and methods of construction performed by the Contractor.
17. Structural observations performed by the Architect/Engineer during construction are not the continuous and special inspection services and do not waive the responsibility for the inspections required of the Building Department Inspector or the testing agency. Observations also do not guarantee the Contractor's performance and shall not be considered as supervision of construction.
18. The Contractor shall review shop drawings for completeness and compliance with contract documents. The Contractor shall stamp shop drawings prior to submission to the Architect and Engineer.
19. Review of the shop drawings by the Architect's Engineers shall not be construed as an authorization to deviate from the Contract Documents.
20. Shop drawings will not be processed if they are incomplete, lack coordination with relevant portion of contract documents, lack calculations if required, or if deviations, modifications, and substitutions are indicated without prior written approval from the
Architect/Engineer.
CONCRETE CONSTRUCTION
1. All concrete construction shall be in accordance with the latest Building Code
Requirements for Structural Concrete ACI 318 and ACI Detailing Manual.
2. Furnish bar supports where necessary during construction.
3. Provide pipe sleeves and inserts in concrete work where required. See architectural and mechanical drawings.
4. Horizontal floors shall be finished level. The slab thickness noted is minimum. Add concrete as necessary to overcome member deflections. Shored construction shall be finished to a constant depth.
5. Drawings show typical reinforcing conditions. Contractor shall prepare detailed placement drawings of all conditions showing quantity, spacing, sizes, clearances, laps, intersections, and coverage required by the structural details, applicable code, and trade standards. Contractor shall notify reinforcing inspector of any adjustments from typical conditions which are proposed in placement drawings to facilitate field placement of reinforcing steel and concrete.
6. Bar bends shall be made cold. Bars shall not be bent after any portion of the bar is encased in concrete.
7. Lap all splices 30 bar diameters.
STEEL CONSTRUCTION
1. Steel detailing, fabrication, and erection shall conform to the AISC Specification for
Structural Steel Buildings and Code of Standard Practice, and the AWS Structural
Welding Code.
2. Stresses occurring during fabrication, shipment, and erection shall be temporary and not excessive. Stresses at all times shall be less than design and allowable stresses. The full design and load-carrying capacity of the steel work shall not be impaired due to fabrication, shipment, or erection procedures. Throughout the complete process, the stability of all individual members and assembles shall be maintained.
3. The Contractor shall be responsible for the control of all erection procedures and sequences with relation to temperature differentials and weld shrinkage.
4. All additional steel required for erection purposes shall be provided at no additional cost and shall be removed unless approved by the Owner in writing.
5. Connections - welded or high strength bolted:
A. High-strength bolts shall be installed in accordance with "Specifications for
Structural Joints Using ASTM A325 or A490 Bolts".
B. A325SC or A490SC with hardened washers: use for all moment connections, wind connections, hangers, and other connections as noted on drawings.
C. A325N or A490N with hardened washers: use for all connections other than slip critical connections.
D. Provide hardened washers under nuts at all high-strength bolts, except where plate washers are used per AISC Specifications.
E. Unless snug tight connections are noted on the drawings as being permitted, all bolts should be tightened to full pretensioning load.
F. Use standard holes with the following exception: short slotted holes are permitted for shear loading perpendicular to the slot.
G. Where minimum AISC fillet weld thickness requirement exceeds welds shown on details, or weld size is not specified, provide minimum AISC weld.
H. Wherever possible, use framed beam connections as listed in Tables 10-1 to
10-3 of AISC Manual of Steel Construction, 13th edition. The length of connection shall not be less than one-half of the T distance of the beam web.
I. Where reaction is noted, develop same. Where not noted, for non-composite beams, connections shall develop one-half of the total uniform load capacity of the beam; for composite beams, see table listed in typical details.
6. Welding electrodes shall be E70XX except where other electrodes are required for compatibility with material being welded.
7. Shop drawings are required and shall note type of electrodes, size of all welds, and type and size of all bolts. Shop drawings shall be prepared under the supervision of a professional engineer licensed in the jurisdiction where the project is located.
8. Primer:
A. Clean surfaces to remove loose rust and mill scale and spatter, slag, or flux deposits. Prepare surfaces according to the following specifications and standard: SSPC-SP 2, "Hand Tool Cleaning" .
B. Do not paint beams that are encased in concrete or that are to receive sprayed-on fireproofing.
C. Omit paint at slip critical connections and areas to be welded.
D. Provide chemically active, modified alkyd primer at 2.5 mils dry thickness.
9. See all contract drawings for miscellaneous steel requirements.
10. All shop and field welding shall be performed by a recently certified welder.
11. All welding and high strength bolting must be inspected by a qualified testing laboratory. Laboratory shall be approved by the Architect and/or Engineer.
12. Do not weld to existing steel without written approval from the Engineer or as noted on drawings.
13. Provide fills at splices of parts differing by more than 1/8" in thickness.
14. Miscellaneous hanging loads such as stair stringers, pipes, mechanical units, etc., supported by steel members shall be applied in such a manner that no torsional forces are induced in the steel members, i.e., loads shall pass through the centerline of wide flange sections and through the shear center of channels.
DESIGN STRESSES
Concrete minimum compressive strength in 28 days ------------------------------- f'c = 4,000 psi
Reinforcing bars (ASTM A615, Grade 60) --------------------------------------------- Fy = 60,000 psi
Welded wire reinforcement (ASTM A1064) ------------------------------------------- Fy = 70,000 psi
Structural steel W shapes (ASTM A992 or ASTM A572/50) ---------------------- Fy = 50,000 psi
Structural steel other shapes (ASTM A36) -------------------------------------------- Fy = 36,000 psi
Metal decks (ASTM A653)
Composite floor deck --------------------------------------------------------------- Fy = 50,000 psi
#3 DOWEL
CHAMFER
CONCRETE SLAB
EXISTING SLAB
DRILL 1"ø HOLE IN
EXISTING SLAB. SET
1/2"ø DEFORMED ROD
IN NON-SHRINK GROUT
#3 AT 12" ON
CENTER - MID
DEPTH OF SLAB)
ADDED TOP BARS.
SEE SCHEDULE
FOR DETAILS
(1)#4 CONT.
EDGE SCREED
BY METAL DECK
CONTRACTOR
(SEE NOTE 5)
EXTEND DECK
TOP BAR CHAIR
SUPPORT (EACH END)
COMPOSITE DECK
ADDITIONAL BOTTOM
BARS MAY OCCUR.
SEE PLAN FOR SIZE
AND EXTENTS
WWR SUPPORT
(SEE NOTE 1)
WWR SHALL BE
CONT. OVER GIRDER
#4@12" x 5'-0"
ADDED TOP BARS.
SEE SCHEDULE FOR
DETAILS
(1)#4 CONT.
EDGE SCREED BY
METAL DECK CONTR.
(SEE NOTE 5)
GIRDER
WWR SUPPORT
TOP BAR CHAIR
SUPPORT (EACH END)
BEAMS
FOR COMPOSITE GIRDERS
WITH STUDS, STOP DECK AS
NOTED AND PROVIDE
CLOSURE PLATE AS
REQUIRED
GIRDER
/2
C L E
A R
4"
M
IN
.1
/2
C L E
A R
6" FROM CORNERS
& 3'-0" O.C. MAX.
AROUND PERIMETER
T t
T t
CANTILEVER
DIM. "A"3A
CANTILEVER
DIM. "A"3A
NOTES:
1. BASE SLAB PREPARATION:
A. NEW: CLEAN & WET SLAB PRIOR TO POURING PAD.
B. EXISTING: CLEAN & ROUGHEN SLAB AND APPLY BONDING AGENT PER
MANUFACTURER'S WRITTEN DIRECTIONS.
2. CURING - CURE FOR 7 DAYS BY EITHER OF THE FOLLOWING METHODS:
A. COVER WTIH BURLAP & KEEP CONTINUOUSLY WET.
B. COVER WITH 6 MIL POLYETHYLENE PLASTIC SHEETING. TAPE TO BASE
SLAB AND ALL JOINTS
T
MECHANICAL HOUSKEEPING PAD DETAIL
EXISTING CONSTRUCTIONNEW CONSTRUCTION
NOTES:
1. WWR MUST BE POSITIVELY SUPPORTED PRIOR TO PLACING
CONCRETE (SEE DETAIL FOR DIMENSIONS). DEPRESS WWR AS
REQUIRED AT TOP REINFORCING ONLY.
2. LAP MESH THE GREATER OF 2 WIRE SPACES (3 CROSS WIRES) OR 8".
3. PROVIDE (1) #5 x 4'-0" DIAG. TOP AT ALL RE-ENTRANT CORNERS. MAY
OMIT AT CONSTRUCTION JOINTS. (SIM. TO FLOOR OPENING DETAIL).
4. DECK GAGE SHOWN IS MINIMUM. INCREASE DECK GAGE OR SHORE
CONSTRUCTION WHERE DECK SPAN EXCEEDS THE MAXIMUM
UNSHORED CLEAR SPAN PER SDI.
5. FOR "A" GREATER THAN 11", SHORE CANTILEVER, FORM EDGE, OR
FURNISH STEEL BENT PLATE. SIZE PLATE TO CARRY WET WEIGHT OF
CONCRETE & CONSTRUCTION LIVE LOADS.
-1
/4
M A
X
C L E
A R
T O
W W
R
THICKNESS OF
CONC. OVER
DECK
/4
C
L E
A R
2" CLEAR (SINGLE
ROW OF STUDS)
5" CLEAR (2 ROWS
OF STUDS)
TOTAL
DEPTH
3"3"
A≤4"
4"<A≤16"
16"<A≤24"
/4
C
L E
A R
DIM. "A"
WWR ONLY
#3@12"
#4@12"
REINFORCING
TOP BARS AT CANT.
SLAB SCHEDULE
MARK
S-5 t
3"
T
5" LIGHT WEIGHT
CONCRETE METAL DECK
2", 20 GAUGE, GALVANIZED
REINFORCING
6x6-W2xW2 WWR
DETAILS FOR COMPOSITE DECK CONSTRUCTION
DETAILS OVER GIRDERS
(PARALLEL TO DECK)
(PERPENDICULAR TO DECK)
DETAILS OVER BEAMS
S-5 1/2 3 1/2" 5 1/2" NORMAL WEIGHT 2", 20 GAUGE, GALVANIZED 6x6-W2xW2 WWR
PLAN NOTES:
1. ELEVATIONS ARE REFERENCED FROM EXISTING FINISHED
ROOF SLAB = 691.94'± = (0'-0").
2. TOP OF STEEL AT EXISITNG PENTHOUSE = (+4'-6"±).
PLAN LEGEND:
S-X COMPOSITE CONCRETE SLAB ON METAL DECK - SEE
TYPICAL DETAIL FOR SCHEDULE.
[XX] NUMBER OF 3/4" DIAMETER HEADED SHEAR CONNECTORS
20A18E
UU
XX
E X
W x
E X
W x
EX. W14x26
EX. W14x26
EX. W14x26
EX. W14x26
EX. W14x26
EX. W16x40
EX. W24x76
EX. W16x40
EX. W16x26
EX. W14x26
EX. W14x26
EX. W14x26
E X
W x
EX. W14x26EX. W14x26
E X
C x .9
E X
W x
E X
W x
EX. W8x10 EX. W8x10
25'-8 1/4" ±
S -5
[14]
[14]
[14]
[14]
[18]
[14]
[1
[1
YY
EX. W14x26
EX. W14x26
EX. W14x26
EX. W14x26
EX. W14x26
EX. W16x40
EX. W14x26
E X
W x
E X
W x
25'-8 1/4" ±
[14]
[14]
[14]
[14]
[18]
[14]
[1
E X
W x
EX. W8x10
W x
W x 0 EX W8x10
E X
E X
REMOVE (3)
EXISTING W8x10
EI
G R
E
E E I
G
BARBER & HOFFMAN, INC.
S T
AOI
S
N
S
EL
N
OT
R P
F O
S
OHTA
HALIM
M.
SAAB
56513
R D
I
OE F
E N
E R
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS:::: ARCHITECT::::
Drawing Title
Approved: Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c o n e fo o t o n e q u a rt e r in c e fo o t th re e e ig h th s in c e fo o t o n e h a lf in c e fo o t th re e q u a rt e rs in c e fo o t o n e in c e fo o t o n e a n d o n e h a lf in c h e s e fo o t th re e in c h e s e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Consulting Engineers
BARBER & HOFFMAN, INC.
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
Revisions: Date
FULLY SPRINKLERED
NOT FOR CONSTRUCTION
12/10/1865% Construction Documents Submission 09/26/18
100% Construction Documents Submission 12/10/18
REPLACE SURGERY
SUBSTATION
541-19-504
JAMJAM
ELECTRICAL ROOM PLAN,
NOTES, AND DETAILS
1-S1
1/8" = 1'-0"
PARTIAL PENTHOUSE FRAMING PLAN
N
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833 Revisions: Date
541-19-504
12/10/18
Replace Surgery
Substation
Consulting Engineers
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
65% Construction Documents Submission 09/26/18
100% Construction Documents Submission 12/10/18
VAMC - WADE PARK
S
74490
L.D. HENDRIX, JR
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
SURGERY PENTHOUSE MEZZANINE MECHANICAL
DEMOLITION PLAN
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
SURGERY PENTHOUSE FLOOR MECHANICAL
DEMOLITION PLAN
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
SURGERY PENTHOUSE FLOOR
MECHANICAL PLAN
1-M1
LDHLDH
Surgery Penthouse
Mechanical Plans
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833 Revisions: Date
541-19-504
12/10/18
Replace Surgery
Substation
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
Consulting Engineers
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
65% Construction Documents Submission 09/26/18
100% Construction Documents Submission 12/10/18
VAMC - WADE PARK
1-E1
CPCMPL
Electrical Legend and General Notes
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833 Revisions: Date
541-19-504
12/10/18
Replace Surgery
Substation
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
Consulting Engineers
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
65% Construction Documents Submission 09/26/18
100% Construction Documents Submission 12/10/18
VAMC - WADE PARK
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL FIRST FLOOR SURGERY ELECTRICAL PLAN
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL SECOND FLOOR SURGERY ELECTRICAL PLAN
1-E2
CPCMPL
Partial First and Second
Floor Electrical Key Plan
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833 Revisions: Date
541-19-504
12/10/18
Replace Surgery
Substation
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
Consulting Engineers
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
65% Construction Documents Submission 09/26/18
100% Construction Documents Submission 12/10/18
VAMC - WADE PARK
0'
SCALE: 1/8" = 1'0"
4' 8' 16' 32'
PARTIAL THIRD FLOOR SURGERY PENTHOUSE AND ROOF PLAN
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
ENLARGED SURGERY PENTHOUSE ELECTRICAL ROOM PLAN
COORDINATION GENERAL NOTES:
1. DIMENSIONS INDICATED ARE PER BASIS OF DESIGN EQUIPMENT AND ARE INCLUDED FOR REFERENCE
ONLY. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING COORDINATION DRAWINGS WITH ELECTRICAL
EQUIPMENT SUBMITTAL FOR APPROVAL. COORDINATION DRAWINGS SHALL INCLUDE EQUIPMENT
DIMENSIONS, STRUCTURAL STEEL LAYOUT, NEW AND EXISTING ROOM WALLS, EXISTING SERVICES (HVAC, PLUMBING, ELECTRICAL, ETC) AND SHALL BE DIMENSIONED TO VERIFY REQUIRED NEC CLEARANCES.
ELECTRICAL EQUIPMENT SUBMITTALS WILL NOT BE APPROVED WITHOUT PROPER COORDINATION
DRAWINGS.
NOT TO SCALE
ROOF CONDUIT SUPPORT ELEVATION
MEDIUM
VOLTAGE
FEEDER
MEDIUM
VOLTAGE
FEEDER
N-MDP
FEEDER
N-MDP
FEEDER
B1PHN1
FEEDER
B1PHN1
FEEDER
DPHLL1
FEEDER
DPHLL1
FEEDER
UV-INHIBITED POLYCARBONATE OR
HIGH-DENSITY POLYPROPYLENE PLASTIC BLOCK,
LENGTH AS REQUIRED
CONDUIT CLAMP,
SIZE AS REQUIRED
INTEGRAL GALVANIZE LIPPED STEEL MOUNTING
CHANNEL. CREATE STRUCTURE FOR RACK
MOUNTING OF CONDUIT WITH THREADED ROD,
LOCKING SQUARE WASHER, AND LOCK NUTS
CODED NOTES:
1 LOCATION OF EXISTING PENTHOUSE FLOOR STRUCTURAL STEEL PER RECORD DRAWINGS. STRUCTURE
OUTSIDE OF NEW ROOM AREA IS NOT SHOWN. FIELD COORDINATE EXACT LOCATION AND COORDINATE
CONDUIT STUB-UP LOCATIONS INTO EQUIPMENT TO AVOID EXISTING STRUCTURAL SUPPORTS.
6" 6" 4-3/8" 4-3/8"
GROUND
MIN. MIN. MIN. MIN.
1-E3
CPCMPL
Partial Third Floor
Surgery Penthouse and Roof
Electrical Key Plan
FLASH NEW CONDUIT RACK INTO EXISTING ROOF.
PROVIDE NECESSARY ACCOMMODATIONS TO
MATCH EXISTING ROOF MEMBRANE AND RATINGS.
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833 Revisions: Date
541-19-504
12/10/18
Replace Surgery
Substation
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
Consulting Engineers
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
65% Construction Documents Submission 09/26/18
100% Construction Documents Submission 12/10/18
VAMC - WADE PARK
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
PARTIAL FIRST FLOOR SURGERY ELECTRICAL PLAN
CODED NOTES:
1 EXISTING 11.4KV INCOMING ELECTRICAL SERVICE PULLBOX. SPLICE AND EXTEND 11.4KV FEEDERS WITHIN BOX AND EXTEND CONDUIT AND CONDUCTORS ROUTE UP TO ROOF. REFER TO SECOND FLOOR
AND ROOF PLANS FOR CONTINUATION. REFER TO ELECTRICAL ONE-LINE DIAGRAM FOR FEEDER SIZE
REQUIREMENTS.
NEW FEEDERS DOWN FROM ROOF THROUGH SECOND FLOOR. OFFSET FEEDERS AND TERMINATE
CONDUITS IN NEW WIRE TROUGH.
PROVIDE NEW 16"W x 16"D' x 4'H WIRE TROUGH ON EACH SIDE OF EXISTING WALL APPROXIMATELY AT LOCATION SHOWN. PROVIDE 4" CONDUIT SLEEVES THROUGH WALL BETWEEN TROUGHS. CONTINUE
ROUTING LOW-VOLTAGE FEEDERS
CONTINUE ROUTING NORMAL POWER FEEDERS TO NEW PANELBOARD "SA-DP1" AND TO EXISTING
PANELBOARD "DPHL11" AND TERMINATE. MAINTAIN ACCESSIBILITY TO EXISTING PULLBOXES AND
CONDUIT PULL BODIES.
PROVIDE NEW 480/277V-3Ø-4W PANELBOARD "DPHL11" APPROXIMATELY AT LOCATION SHOWN.
PANELBOARD BRANCH CIRCUIT BREAKERS SHALL BE UTILIZED TO BACKFEED EXISTING AUTOMATIC
TRANSFER SWITCHES.
PROVIDE NEW NORMAL POWER FEEDERS TO EXISTING TRANSFER SWITCHES "ATS-11", "ATS-12", AND
"ATS-13".
REMOVE EXISTING NORMAL FEEDER TO TRANSFER SWITCH BACK TO SOURCE AFTER CUTOVER TO NEW
NORMAL POWER SOURCE.
EXISTING NORMAL POWER FEEDER TO LINAC ADDITION PANELBOARD "N-MDP". PROVIDE NEW
SPLICEBOX AT LOCATION INDICATED. ROUTE NEW FEEDER FROM NEW SURGERY SUBSTATION DOWN
FROM ROOF ABOVE AND INTO NEW SPLICE BOX. INTERRUPT EXISTING FEEDER AND SPLICE WITH NEW TO BACK-FEED "N-MDP". DEMOLISH EXISTING PORTION OF FEEDERS COMPLETE BACK TO EXISTING
SURGERY SUBSTATION. PLUG KNOCKOUTS IN EXISTING JUNCTION BOX AND SEAL ALL PENETRATIONS IN
EXISTING MECHANICAL PLENUM AFTER REMOVAL OF EXISTING FEEDER.
REMOVE PORTION OF EXISTING 11.4KV FEEDERS (CONDUIT AND CONDUCTORS) FROM MEDIUM
VOLTAGE PRIMARY SWITCHES BACK TO EXISTING PULLBOX AFTER CUT-OVER TO NEW SUBSTATION.
NEW GROUNDING ELECTRODE CONDUCTOR AND CONDUIT DOWN FROM ROOF. EXTEND CONDUIT TO
EXISTING GROUNDING LOCATION IN ELECTRICAL ROOM #105 AND CONNECT COMPLETE TO EXISTING
GROUNDING ELECTRODE SYSTEM. REFER TO GROUNDING DETAILS ON ELECTRICAL DETAILS DRAWING
FOR ADDITIONAL INFORMATION AND WORK REQUIREMENTS.
REMOVE EXISTING SUBSTATION COMPLETE INCLUDING PRIMARY SWITCHES, TRANSFORMERS, MAIN
SECTION, DISTRIBUTION, ETC.
1. REFER TO ELECTRICAL ONE-LINE DIAGRAM(S) FOR FEEDER SIZE REQUIREMENTS.
GENERAL NOTES:
CONDUIT ROUTING GENERAL NOTE:
1. CONDUIT ROUTING INDICATED FOR REFERENCE ONLY. CONTRACTOR IS RESPONSIBLE FOR SUBMITTING
CONDUIT ROUTING DRAWINGS WITH ELECTRICAL EQUIPMENT SUBMITTAL FOR APPROVAL. ROUTING
DRAWINGS SHALL INCLUDE BENDS, PULLBOXES, CONDUIT BODIES, PENETRATIONS, ETC. CONTRACTOR
SHALL INCLUDE EXISTING CONDITIONS WHERE NECESSARY TO CONVEY ROUTING INFORMATION.
MAINTAIN NEC REQUIRED ACCESSIBILITY TO ALL EXISTING PULLBOXES, JUNCTION BOXES, ETC. TO
REMAIN. ELECTRICAL EQUIPMENT SUBMITTALS WILL NOT BE APPROVED WITHOUT CONDUIT ROUTING
DRAWINGS.
1-E4
CPCMPL
Partial First Floor Electrical Plan
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
Dwg. of
CONSULTANTS: ARCHITECT:
o n e e ig h th in c h o n e fo o t th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321 10
F
E
D
C
B
A
Revisions: Date
Office of Facilities
ManagementDESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT OF
PERSPECTUS ARCHITECTURE.13212 Shaker Square Suite 204 Cleveland, Ohio 44120
P. 216.752.1800 F.216.752.3833 Revisions: Date
541-19-504
12/10/18
Replace Surgery
Substation
S
59459
M.P. LONG
R
ES
O F
I R
GE
NOI
S
P
E
N E
DERT
L EA
E I N
G
R
TS
TEA HF OO
IO
Consulting Engineers
1100 West 9th Street Cleveland, OH 44113-1003 216-875-0100/ (F) 216-875-0111 barberhoffman.com
65% Construction Documents Submission 09/26/18
100% Construction Documents Submission 12/10/18
VAMC - WADE PARK
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
PARTIAL THIRD FLOOR
SURGERY PENTHOUSE DEMOLITION PLAN
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
PARTIAL THIRD FLOOR
SURGERY PENTHOUSE POWER AND TECHNOLOGY PLAN
0'
SCALE: 1/4" = 1'0"
2' 4' 8' 16'
PARTIAL THIRD FLOOR
SURGERY PENTHOUSE LIGHTING AND FIRE ALARM PLAN
D1. ALL EXISTING LIGHTING FIXTURES, RECEPTACLES, SPECIAL SYSTEMS OUTLETS, CONDUIT, WIRING ETC.
THAT WILL NOT BE REUSED IN THE REMODELED INSTALLATION SHALL BE REMOVED UNLESS OTHERWISE
NOTED. THIS DEMOLITION SHALL INCLUDE ALL ELECTRICAL ITEMS SHOWN ON THIS PLAN THAT ARE
DESIGNATED BY "XR" OR "XB" AND ALL OTHER ADDITIONAL ITEMS THAT ARE NOT SHOWN BUT THAT
MUST BE REMOVED IN ORDER TO PRODUCE A NEAT, FINISHED, PROPERLY FUNCTIONING ELECTRICAL
INSTALLATION. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING REUSED ELECTRICAL SYSTEMS
COMPONENTS - PROVIDE ALL CONDUIT AND WIRING NECESSARY TO ACHIEVE THE SAME. THE
CONTRACTOR SHALL FIELD VERIFY THE NATURE AND EXTENT OF ALL DEMOLITION WORK AND SHALL
INCLUDE COST FOR THE SAME IN THE BID SUBMITTAL.
D2. ALL EXISTING REMOVED ELECTRICAL EQUIPMENT, DEVICES, ETC. THAT ARE NOT RETAINED BY THE
OWNER SHALL BE DISPOSED OF BY THE ELECTRICAL CONTRACTOR.
D3. DASHED WALLS ON PLAN INDICATE EXISTING CONSTRUCTION TO BE REMOVED.
D4. REFER TO ELECTRICAL LEGEND FOR ALL SYMBOL DESIGNATIONS. NOTE SPECIAL ATTENTION TO
SELECTED EXISTING DEVICES, WIREWAYS, ETC. MARKED XB, XRR OR XN, AND REMOVE/BLANK OFF, RELOCATE OR REPLACE THESE COMPONENTS AS REQUIRED.
D5. MAINTAIN CIRCUIT CONTINUITY TO ALL EXISTING ELECTRICAL SYSTEM COMPONENTS IN AREAS NOT
BEING REMODELED UNLESS OTHERWISE NOTED. PROVIDE ALL CONDUIT AND WIRING EXTENSIONS
NECESSARY TO ACHIEVE SAME.
D6. THE ELECTRICAL CONTRACTOR SHALL CLOSELY COORDINATE ALL ELECTRICAL DEMOLITION WORK
WITH THE GENERAL AND MECHANICAL CONTRACTORS, AND SHALL DISCONNECT ALL REQUIRED
CIRCUITS IN A TIMELY MANNER.
D7. CONTACT THE ENGINEER IF A QUESTION SHOULD ARISE CONCERNING THE STATUS OF ANY OUTLET, DEVICE, LIGHTING FIXTURE, ETC.
ELECTRICAL DEMOLITION NOTES CODED NOTES:
1 REMOVE EXISTING LIGHTING FIXTURE. MAINTAIN CIRCUIT AND EXTEND TO NEW ELECTRICAL ROOM
LIGHTING. REFER TO NEW LIGHTING AND FIRE ALARM PLAN ON THIS SHEET FOR ADDITIONAL
INFORMATION AND WORK REQUIREMENTS.
RELOCATE EXISTING LIGHTING…