36C25019B0015-021.pdf
PDF 2 MB Posted
- Attached to
- Repair Outdoor Ductwork Federal contract opportunity
- Solicitation number
- 36C25019B0015
About this file
36C25019B0015 Combined 100 CD PDF Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25019C0218-000.docx | DOCX document | |
| 36C25019B0015-0001000.docx | DOCX document | |
| 36C25019B0015-023.docx | DOCX document | |
| 36C25019B0015-019.docx | DOCX document | |
| 36C25019B0015-024.docx | DOCX document | |
| 36C25019B0015-020.pdf | ||
| 36C25019B0015-022.pdf | ||
| 36C25019B0015-000.docx | DOCX document | |
| 36C25019B0015-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
74490
L.D. HENDRIX, JR
GN
SS
AION EL
T
F EGE
P R O R
SI NRE I
E E R
D
E
ATS
ET O
OI
HOF
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
CONSULTANTS:
Drawing Title
Approved: Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
18057100% CD SUBMISSION 10/12/18
CONSULTANTS:
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT
OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
REPAIR OUTDOOR
DUCTWORK
INSULATION
541-18-511
DMLLDH
MECHANICAL LEGEND, GENERAL
NOTES, AND DETAILS
1-M0 10/12/18
A. LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTWORK AND EQUIPMENT IS PRESUMED FROM EXISTING DRAWINGS. AND FIELD SURVEYING MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS WHICH WILL NOT PERMIT
THE WORK TO BE PERFORMED AS INDICATED ON THESE DRAWINGS.
B. COORDINATE ALL SHUT-DOWNS OF EXISTING MECHANICAL SYSTEMS WITH VA A MINIMUM OF
SEVEN WORKING DAYS IN ADVANCE.
C. PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL MECHANICAL EQUIPMENT.
D. CONTRACTOR SHALL TAKE NECESSARY PRECAUTIONS WHILE PERFORMING WORK ON ROOF.
CONTRACTOR SHALL MAINTAIN ROOFING WARRANTY. CONTACT VA C.O.R. FOR ROOFING
WARRANTY/CONTRACTOR INFORMATION.
DUCTWORK SYMBOLS:
ABBREVIATIONS:
CALL OUTS: DEMOLITION SYMBOLS:
MANUAL BALANCING DAMPER ON DUCT
ROUND DUCT SIZE
AD ACCESS DOOR
12"Ø
RECTANGULAR DUCT SIZE24x18
ELECTRICAL CONTRACTOR
GENERAL TRADES CONTRACTOR
TEMPERATURE CONTROL CONTRACTOR
HVAC CONTRACTOR
FIRE SUPPRESSION CONTRACTOR
PLUMBING CONTRACTOR
CONNECT TO EXISTING
EC
GC
FC
PC
TC
HC
CTE
TO
SUPPLY AIR DUCT
TO BE MOUNTED OVER ACCESSIBLE CEILING
ABOVE FINISHED FLOOR
EXHAUST AIR
RETURN AIR
SUPPLY AIR
AFF
EA
RA
SA
ROOF OPENINGRO
TEMPERATURE CONTROL PANELTCP
COMBINATION FIRE/SMOKE DAMPER IN DUCT
MOTOR OPERATED DAMPERMOD
FSD
RETURN AIR DUCT
EXHAUST AIR DUCT
EXISTING TO REMAIN
EXISTING TO BE REMOVED
X
XR
EXISTING TO BE RELOCATEDXRL
FIRE DAMPER IN DUCTFDD
LIMIT OF DEMOLITIONLOD
EXISTING NEW LOCATIONXNL
NOTE: THIS LEGEND IS INTENDED TO AID IN THE UNDERSTANDING OF SHORTHAND, SYMBOLS AND ABBREVIATIONS SHOWN IN THESE CONSTRUCTION DOCUMENTS. IT IS NOT THE INTENTION TO DESCRIBE THE PROJECT SCOPE OF WORK, FOR DETAILED SCOPE OF WORK PLEASE REFER TO THE SUBSEQUENT DRAWINGS.
OPENING IN TOP OF DUCT. SHALL BE A MINIMUM 1.5 TIMES
GREATER THAN THE CROSS-SECTIONAL AREA OF DUCT.
HVAC GENERAL NOTES
REFERENCE TO CODED NOTE
SECTION / DETAIL / ELEVATION MARK
DETAIL NO.
EQUIPMENT OR FIXTURE MARK
DRAWING
EQUIPMENT
TYPE
UNIT NUMBER
H4-1
X - #
MECHANICAL LEGEND
ROOF MOUNTED DUCT SUPPORT DETAIL
NOT TO SCALE
UNISTRUT SUPPORT
(TYPICAL)
ANCHOR UNISTRUT
SUPPORT TO CURB
(TYPICAL)
12" ROOF CURB
METAL DECK
ROOF INSULATION
ROOF MEMBRANE
2" RIGID POLYISOCYANURATE
INSULATION WITH 30 MIL PVC
JACKET (TYPICAL)
TAPERED RIGID POLYISOCYANURATE
ROOF INSULATION ON TOP OF 2"
INSULATION PITCH 1" PER FOOT. LOW
POINT 2" THICK AT EDGES.
(TYPICAL)
NOTES:
1. ADJUST ROOF SUPPORTS AND ANGLES SO THAT THERE IS NO PENETRATION OF
DUCT INSULATION OR JACKETING.
2. DETAIL IS TYPICAL. WHERE OTHER SUPPORT TYPES EXIST, ADJUSTMENTS SHALL
BE MADE TO AVOID PENETRATION OF INSULATION OR JACKETING.
3. TWO (2) SIDE-BY-SIDE DUCTS MAY OCCUR ON SAME FRAMES.
2" INSULATION SIDES AND BOTTOM OF
DUCTS.
A. REFER TO DWG 1-M3 FOR NOTES REGARDING DEDUCT ALTERNATE NO. 1.
B. REFER TO DWG 1-M2A FOR NOTES REGARDING DEDUCT ALTERNATE NO. 2.
C. AS PART OF DEDUCT ALTERNATE NO. 3, DELETE ALL TOPSIDE REINFORCEMENT OF DUCT (SEE DETAIL) THAT IS INDICATED ON PLANS. IN LIEU OF TOPSIDE REINFORCEMENT, PROVIDE TAPERED INSULATION AND
JACKET ONLY (PER ROOF MOUNTED DUCT SUPPORT DETAIL).
DEDUCT ALTERNATE NOTES:
EXTERIOR DUCT TOP-SIDE REINFORCEMENT DETAIL
NOT TO SCALE
ALL MATERIAL SHALL BE 18 GA.
GALVANIZED SHEET STEEL
NEW CAP
1" LIP 1" LIP
EXISTING DUCTWORK
SUPPORT X 3
W
H
1" LIP ON EACH SIDE
L=60"
W
H
3 SUPPORTS
SHEET METAL CAP WITH 1" LIP ON EACH SIDE. TACK WELD 3 SUPPORTS.
A. "H" SHALL BE HEIGHT NECESSARY TO PROVIDE 1" PITCH PER FOOT. "W" IS EXISTING DUCT WIDTH.
B. 18 GA GALVANIZED STEEL CONSTRUCTION.
C. DUCT SYSTEMS SHALL BE DRIED PRIOR TO INSULATION.
D. TACK WELD AS REQUIRED.
NOTES:
2" POLYISOCYANURATE
INSULATION W/30 MIL PVC
JACKETING. REFER TO
OTHER DETAILS FOR
ADDITIONAL INFORMATION.
E. DETAIL ILLUSTRATES TYPICAL 60" LENGTH. PROVIDE 1" OVERLAP FOR JOINED LENGTHS. TACK
WELD AND SEAL AT JOINED LENGTHS.
C
E
H
J
K
L
N
F
D D
B
G
5a 6.33B 3C3D 3E 3G
3H
3I
3J
3O 3Q 3R3V3MM 3NN
3OO
3QQ F.1F.9
X-RTU
X - 60 x 20 RA
X - 60 x 20 SA
LAB WAREHOUSE PENTHOUSE
EXISTING TPO ROOFING
74490
L.D. HENDRIX, JR
GN
SS
AION EL
T
F EGE
P R O R
SI NRE I
E E R
D
E
ATS
ET O
OI
HOF
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
18057100% CD SUBMISSION 10/12/18
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT
OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
REPAIR OUTDOOR
DUCTWORK
INSULATION
541-18-511
DMLLDH
PARTIAL ROOF / SECOND FLOOR
DUCTWORK PLAN - AREA A
1-M2A 10/12/18
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL ROOF / SECOND FLOOR DUCTWORK PLAN
- AREA A
1N
REMOVE EXISTING EXTERIOR INSULATION AND JACKETING COMPLETELY. INSTALL NEW 2"
THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. ON TOP SURFACE, PROVIDE
TAPERED POLYISOCYANURATE ROOF INSULATION, PITCHED FROM THE MIDDLE. PROVIDE
30 MIL THICK PVC JACKETING ON EXTERIOR OF INSULATION, WHITE COLOR. DUCT
SUPPORTS, UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR INSULATION. ADJUST
SUPPORT / UNISTRUT AS NEEDED.
A. AS PART OF DEDUCT ALTERNATE NO. 2, ALL WORK ON THIS PLAN SHALL BE DELETED.
DEDUCT ALTERNATE NO. 2 NOTE:
LEGEND
14a 15b 16b 17c 18d
L1
L2
Q
R
L3
18a
N1 N1
1c
Z1
Y1
5a
R1
6.3E.0 C.03D 3O 3Q 3R3V B.3C.7D.5E.2F.1F.9
X-ACCESS DOOR
X-ACCESS DOOR
X-ACCESS DOOR
X-ACCESS DOOR
X-ACCESS DOOR
X x
S A
X x
R A
X x
S A
X x
S A
X x
S A
WEST PENTHOUSE
P
T
V
W
Y
U
M
EXISTING ROOF PAVER
SYSTEM OVER ROOFING
EXISTING ROOF PAVER
SYSTEM OVER ROOFING
74490
L.D. HENDRIX, JR
GN
SS
AION EL
T
F EGE
P R O R
SI NRE I
E E R
D
E
ATS
ET O
OI
HOF
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
CONSULTANTS:
Drawing Title
Approved: Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
18057100% CD SUBMISSION 10/12/18
CONSULTANTS:
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT
OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
REPAIR OUTDOOR
DUCTWORK
INSULATION
541-18-511
DMLLDH
PARTIAL ROOF / SECOND FLOOR
DUCTWORK PLAN - AREA B
1-M2B 10/12/18
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL ROOF / SECOND FLOOR DUCTWORK PLAN
- AREA B
1N
REMOVE EXISTING EXTERIOR INSULATION AND JACKETING COMPLETELY. INSTALL NEW
2" THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. ON TOP SURFACE,
PROVIDE TAPERED POLYISOCYANURATE ROOF INSULATION, PITCHED FROM THE
MIDDLE. PROVIDE 30 MIL THICK PVC JACKETING ON EXTERIOR OF INSULATION, WHITE
COLOR. DUCT SUPPORTS, UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR
INSULATION. ADJUST SUPPORT / UNISTRUT AS NEEDED.
REMOVE EXISTING INSULATION AND JACKETING COMPLETELY. PROVIDE TOP-SIDE
REINFORCEMENT (PER DETAIL, DWG 1-M0) WITH PITCH FROM MIDDLE. INSTALL NEW 2"
THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. PROVIDE 30 MIL THICK
PVC JACKETING ON EXTERIOR OF INSULATION, WHITE COLOR. DUCT SUPPORTS,
UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR INSULATION. ADJUST
SUPPORT/UNISTRUT AS NEEDED.
2924a
C
E
H
J
L
Z
CC
F
D
B
G
Y2
CC1
AA2
X x
S A
X x
R A
X - 48 x 18 RA
X - 30 x 16 SA X - 50 x 22 SA
X - 50 x 22 RA
X x
R A
X x
S A
X - 20 x 22 RA DN
X - 24 x 12 SA DNX - 58 x 10 SA DN
X - 38 x 14 RA DN
X - 66 x 24
SA DN
X - 66 x 24 RA DN
X - 30 x 16 SA DN
X - 30 x 16 RA DN
X - ACCESS DOOR
X - ACCESS DOOR
EAST PENTHOUSE
302725 26 32 33 34 35 36 39
AA
BB
EXISTING ROOF PAVER
SYSTEM OVER ROOFING
74490
L.D. HENDRIX, JR
GN
SS
AION EL
T
F EGE
P R O R
SI NRE I
E E R
D
E
ATS
ET O
OI
HOF
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
CONSULTANTS:
Drawing Title
Approved: Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
18057100% CD SUBMISSION 10/12/18
CONSULTANTS:
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT
OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
REPAIR OUTDOOR
DUCTWORK
INSULATION
541-18-511
DMLLDH
PARTIAL ROOF / SECOND FLOOR
DUCTWORK PLAN - AREA C
1-M2C 10/12/18
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL ROOF / SECOND FLOOR DUCTWORK PLAN
- AREA C
1N
REMOVE EXISTING EXTERIOR INSULATION AND JACKETING COMPLETELY. INSTALL NEW
2" THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. ON TOP SURFACE,
PROVIDE TAPERED POLYISOCYANURATE ROOF INSULATION, PITCHED FROM THE
MIDDLE. PROVIDE 30 MIL THICK PVC JACKETING ON EXTERIOR OF INSULATION, WHITE
COLOR. DUCT SUPPORTS, UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR
INSULATION. ADJUST SUPPORT / UNISTRUT AS NEEDED.
REMOVE EXISTING INSULATION AND JACKETING COMPLETELY. PROVIDE TOP-SIDE
REINFORCEMENT (PER DETAIL, DWG 1-M0) WITH PITCH FROM MIDDLE. INSTALL NEW 2"
THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. PROVIDE 30 MIL THICK
PVC JACKETING ON EXTERIOR OF INSULATION, WHITE COLOR. DUCT SUPPORTS,
UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR INSULATION. ADJUST
L2
Q
Z
L3
N1
R2
V1
Y2
V2
R1
36a
X - ACCESS DOOR
X - 64 x 30 RA
X - 64 x 28 SA
X x
R A
X x
S A
X x
R A
X x
R A
X - 50 x 20 RA
X - ACCESS DOOR
X - EA (LEAVE EXISTING
INSULATION)
X - 48 X 28 SA (TOP)
X - 48 X 22 RA (BOTTOM)
X x
S A
X - ACCESS DOOR (RA)
X - ACCESS DOOR (RA)
X - ACCESS DOOR (SA)
X - ACCESS DOOR (SA)
X - ACCESS DOOR (SA)
X - ACCESS DOOR (SA)
X - ACCESS DOOR
X - ACCESS DOOR
X - ACCESS DOOR
X - ACCESS DOOR
X - ACCESS DOOR
X - 54 x 24 SA
X - 54 x 24 RA
302725 26
32 33 34 35 36
P
T
V
W
Y
U
M
74490
L.D. HENDRIX, JR
GN
SS
AION EL
T
F EGE
P R O R
SI NRE I
E E R
D
E
ATS
ET O
OI
HOF
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
CONSULTANTS:
Drawing Title
Approved: Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
18057100% CD SUBMISSION 10/12/18
CONSULTANTS:
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT
OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
REPAIR OUTDOOR
DUCTWORK
INSULATION
541-18-511
DMLLDH
PARTIAL ROOF / SECOND FLOOR
DUCTWORK PLAN - AREA D
1-M2D 10/12/18
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL ROOF / SECOND FLOOR DUCTWORK PLAN
- AREA D
X x R
A(BOTTOM)
U P x S A
IN
C H W G
(TOP) AA
x
X x1
X R A
X x R A
X x
R A x
N
EAST PENTHOUSE
EXISTING ROOF PAVER
SYSTEM OVER ROOFING
EXISTING ROOF PAVER
SYSTEM OVER ROOFING
REMOVE EXISTING EXTERIOR INSULATION AND JACKETING COMPLETELY. INSTALL NEW
2" THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. ON TOP SURFACE,
PROVIDE TAPERED POLYISOCYANURATE ROOF INSULATION, PITCHED FROM THE
MIDDLE. PROVIDE 30 MIL THICK PVC JACKETING ON EXTERIOR OF INSULATION, WHITE
COLOR. DUCT SUPPORTS, UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR
INSULATION. ADJUST SUPPORT / UNISTRUT AS NEEDED.
REMOVE EXISTING INSULATION AND JACKETING COMPLETELY. PROVIDE TOP-SIDE
REINFORCEMENT (PER DETAIL, DWG 1-M0) WITH PITCH FROM MIDDLE. INSTALL NEW 2"
THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. PROVIDE 30 MIL THICK
PVC JACKETING ON EXTERIOR OF INSULATION, WHITE COLOR. DUCT SUPPORTS,
UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR INSULATION. ADJUST
L2
Q
Z
L3
N1
R2
V1
Y2
V2
R1
X x
R A
X x
S A
X x
S A
X x
R A
X - ACCESS DOOR
X - ACCESS DOOR
EAST PENTHOUSE
302725 26 32 33 34 35 36
P
T
V
W
Y
U
M
EXISTING ROOF PAVER
SYSTEM OVER ROOFING
74490
L.D. HENDRIX, JR
GN
SS
AION EL
T
F EGE
P R O R
SI NRE I
E E R
D
E
ATS
ET O
OI
HOF
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440) 546-9696
FAX: (440) 546-9699
CONSULTANTS:
Drawing Title
Approved: Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
18057100% CD SUBMISSION 10/12/18
CONSULTANTS:
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED
WITHOUT THE EXPRESSED WRITTEN CONSENT
OF
PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2004.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
REPAIR OUTDOOR
DUCTWORK
INSULATION
541-18-511
DMLLDH
PARTIAL ROOF / THIRD FLOOR
DUCTWORK PLAN - AREA E
1-M3 10/12/18
0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'0' 4' 8' 16' 32'
1/8" = 1'-0"
PARTIAL ROOF / THIRD FLOOR DUCTWORK PLAN -
AREA E
1N
AS PART OF DEDUCT ALTERNATE NO. 1, DELETE WORK INDICATED BY CODED NOTE #1.
DEDUCT ALTERNATE NO. 1 NOTE:
REMOVE EXISTING EXTERIOR INSULATION AND JACKETING COMPLETELY. INSTALL NEW
2" THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. ON TOP SURFACE,
PROVIDE TAPERED POLYISOCYANURATE ROOF INSULATION, PITCHED FROM THE
MIDDLE. PROVIDE 30 MIL THICK PVC JACKETING ON EXTERIOR OF INSULATION, WHITE
COLOR. DUCT SUPPORTS, UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR
INSULATION. ADJUST SUPPORT / UNISTRUT AS NEEDED.
REMOVE EXISTING INSULATION AND JACKETING COMPLETELY. PROVIDE TOP-SIDE
REINFORCEMENT (PER DETAIL, DWG 1-M0) WITH PITCH FROM MIDDLE. INSTALL NEW 2"
THICK POLYISOCYANURATE CLOSED CELL RIGID INSULATION. PROVIDE 30 MIL THICK
PVC JACKETING ON EXTERIOR OF INSULATION, WHITE COLOR. DUCT SUPPORTS,
UNISTRUT, ETC. SHALL NOT PENETRATE JACKET OR INSULATION. ADJUST
SUPPORT/UNISTRUT AS NEEDED.
| 1-X.1 - COVER SHT |
| 1-M0 - MECHANICAL LEGEND, GENERAL NOTES, AND DETAILS |
| R2017 FFH CF - 18057_dlevanduski |
| 1-M0 - MECHANICAL LEGEND, GENERAL NOTES, AND DETAILS |
| 1-M2A - PARTIAL ROOF SECOND FLOOR DUCTWORK PLAN - AREA A |
| R2017 FFH CF - 18057_dlevanduski |
| 1-M2A - PARTIAL ROOF / SECOND FLOOR DUCTWORK PLAN - AREA A |
| 1-M2B - PARTIAL ROOF SECOND FLOOR DUCTWORK PLAN - AREA B |
| R2017 FFH CF - 18057_dlevanduski |
| 1-M2B - PARTIAL ROOF / SECOND FLOOR DUCTWORK PLAN - AREA B |
| 1-M2C - PARTIAL ROOF SECOND FLOOR DUCTWORK PLAN - AREA C |
| R2017 FFH CF - 18057_dlevanduski |
| 1-M2C - PARTIAL ROOF / SECOND FLOOR DUCTWORK PLAN - AREA C |
| 1-M2D - PARTIAL ROOF SECOND FLOOR DUCTWORK PLAN - AREA D |
| R2017 FFH CF - 18057_dlevanduski |
| 1-M2D - PARTIAL ROOF / SECOND FLOOR DUCTWORK PLAN - AREA D |
| 1-M3 - PARTIAL ROOF THIRD FLOOR DUCTWORK PLAN - AREA E |
| R2017 FFH CF - 18057_dlevanduski |
| 1-M3 - PARTIAL ROOF / THIRD FLOOR DUCTWORK PLAN - AREA E |
File details come from the government source that posted it.