36C25018B0818 0003 Marion IN VAMC Asbestos LBP 2018 04.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Remove Building 12, Relocate Parking 610-17-102, newest first.
File Type Posted
36C25018B0818-0004001.pdf PDF
36C25018B0818-0004000.docx DOCX document
36C25018B0818-0003000.docx DOCX document
36C25018B0818-0003001.docx DOCX document
36C25018B0818-0002000.docx DOCX document
36C25018B0818-0001000.docx DOCX document
36C25018B0818-006.pdf PDF
36C25018B0818-002.docx DOCX document
36C25018B0818-009.pdf PDF
36C25018B0818-003.pdf PDF
36C25018B0818-008.doc DOC document
36C25018B0818-007.docx DOCX document
36C25018B0818-005.pdf PDF
36C25018B0818-004.pdf PDF
36C25018B0818-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASBESTOS & LEAD PAINT SURVEY REPORT

for

MARION VA MEDICAL CENTER

MARION, IN

PROJECT:

VACANT BUILDING DUE DILIGENCE

ZONE 3

PROJECT NO.:

VA-17-902700

TASK ORDER:

36E77618N0032

INSPECTION DATES:

APRIL 2-5, 2018

PRIME CONTRACTOR:

CASTLE HILL ASSOCIATES, LLC

218-A MECHANIC ST.

WATERVILLE, OH 43566

419-708-7680

MARION VA MEDICAL CENTER – MARION, IN

VACANT BUILDING DUE DILIGENCE - ZONE 3

ASBESTOS & LEAD PAINT INSPECTION REPORT

APRIL 2018

TABLE OF CONTENTS

1.0 ASBESTOS INSPECTION SUMMARY

Table 1 – List of Acronyms

Table 2 - Removal Priority Protocols

2.0 APPENDICES

Appendix A – Asbestos Sampling Data

Appendix B – Lead Paint Sampling Data

Appendix C – Asbestos Material Quantities & Assessments by Building

Appendix D – Cost Estimates for Remediation by Building

Appendix E – Photographs Asbestos Materials

Appendix F – Photographs Lead-based Paint Components

Appendix G – Asbestos Laboratory Report

Appendix H – Lead Chip Laboratory Report

Appendix I - Inspector & Lab Certifications

Appendix J – Scope of Work from VA PWS

1.0 EXECUTIVE SUMMARY

From April 2-5, 2018, Castle Hill Associates, LLC was contracted by the U.S. Department of Veterans Affairs (VA) to perform an asbestos and lead paint inspection of 28 vacant buildings on the campus of the Marion VA Medical Center in Marion, IN. The surveys were performed as part of the Vacant Building Due Diligence (VBDD) for Zone 3 (Project Number VA-17-902700) and VA Task Order 36E77618N0032. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos and lead surveys as detailed in Appendix C of the PWS. The buildings that were surveyed as part of this project included:

Building Number

Vacant Building Name Year Built

Total Square Footage

1 Ward 1889 20,288

3 Ward 1889 20,289

4 Ward 1889 20,286

7 Ward 1893 24,116

9 Print Shop/Mail Room 1923 13,419

10 Ward 1898 26,452

11 Ward 1898 26,124

12 Mental Health 1898 24,435

18 Ward 1896 19,058

24 Ward 1896 17,380

25 Ward 1930 32,892

35 Quarters 1908 4,490

37 Quarters 1916 3,170

42 Supply Service 1905 5,025

47 Theatre (Stinson Memorial) 1891 10,023

49 Library 1915 5,873

50 Canteen 1890 10,765

60 Admin. Offices 1890 18,126

75 Sewage Plant Lab 1905 350

94 Single Garage 1915 400

95 Single Garage 1903 400

105 Gate House 1897 250

119 Incinerator 1934 815

120 Pump House, Well No. 3 1936 169

122 Mess Hall and Kitchen 1937 37,135

128 Transformer 1940 24

149 Transformer 1969 59

CC-2 Connecting Corridor 1979 7,492

The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.

Brumbaugh who has been conducting asbestos surveys, sampling, and asbestos management planning work since 1987. There were no previous sampling results or surveys provided by the VA prior to these inspections. There were no limitations or exceptions to the PWS for the surveys conducted.

2.0 STATE AND LOCAL REGULATIONS

The State of Indiana asbestos and lead inspection and licensing regulations are similar to the Federal regulations. State asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements. State Lead regulations mirror the US HUD guidelines for lead-based paint in child occupied facilities, which do not apply to the scope of work for this project.

3.0 ANALYTICAL METHODS AND LIMITATIONS

3.1 Asbestos Sampling Protocol

EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5-85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).

The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect ACBM.

All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMLab P&K in Marlton, NJ. EMLab is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory

3.2 Lead Paint Sampling Protocol

Paint chip samples were collected on distinctly painted components inside and outside the building and submitted to the laboratory for analysis for lead content. All sampling was conducted in accordance with current regulatory and industry standards for lead-based paint chip sampling. All samples were analyzed utilizing current EPA methods for Lead by EMSL Analytical, Inc. in Indianapolis, IN. The laboratory is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.

Paint containing less than 0.5% lead is not considered to be “lead-based paint” according the US EPA, HUD however according to the OSHA Lead in Construction Standard (1926.62), contractors who might create a dust by disturbing paint with any concentration of lead are required to conduct an initial exposure assessment of their workers or rely on historical data from a previous project to determine whether the action level (30 ug/m3) for airborne Pb will be exceeded during the project, then take appropriate measures to protect workers from lead exposure.

4.0 SUMMARY OF FINDINGS

4.1 Asbestos-Containing Building Materials

The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:

BUILDING 1

ASBESTOS MATERIAL

BUILDING

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 64 window units

Black mastic under 12” floor tile

1st and 2nd floors 13,332 sf

Mag. block pipe insulation in tunnels to adjacent buildings

Tunnels 240 lf

Mag. block risers in plaster wall chases

1st floor wall chases 980 lf

BUILDING 3

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 64 window units

Black mastic under 12” floor tile

1st and 2nd floors 13,336 sf

Mag. block pipe insulation in tunnels to adjacent buildings

Tunnels 240 lf

Mag. block risers in plaster

BUILDING 4

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 64 window units

Black mastic under 12” floor tile

1st and 2nd floors 13,330 sf

Mag. block pipe insulation in tunnels to adjacent buildings

Tunnels 240 lf

Mag. block risers in plaster

BUILDING 7

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 82 window units

Black mastic under 12” floor tile

1st and 2nd floors 16,114 sf

Wood fire doors 1st and 2nd floors 12 doors

Mag. block risers in plaster

BUILDING 9

LOCATIONS

QUANTITY

9” and 12” floor tile and black mastic

1st and 2nd floors 14,224 sf

BUILDING 10

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 82 window units

Black mastic under 12” floor tile

1st and 2nd floors 16,114 sf

Wood fire doors 1st and 2nd floors 12 doors

Mag. block risers in plaster wall chases

1st floor wall chases 980 lf

Hot water tank insulation Basement mech. room 220 sf

Mag. block and aircell pipe insulation

Basement 1,420 lf

BUILDING 11

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 82 window units

Black mastic under 12” floor tile

1st and 2nd floors 18,984 sf

Wood fire doors 1st and 2nd floors 12 doors

Mag. block risers in plaster wall chases

1st floor wall chases 980 lf

Mag. block and aircell pipe insulation

Basement 1,860 lf

Asbestos debris in soil Basement crawl spaces (both ends of building)

160 CY of soil

BUILDING 12

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 64 window units

Black mastic under 12” floor tile

1st and 2nd floors 13,336 sf

Mag. block pipe insulation in tunnels to adjacent buildings

Tunnels 240 lf

Mag. block risers in plaster wall chases

1st floor wall chases 940 lf

Asphalt/tar exterior foundation coating

Basement foundation 5,040 sf

BUILDING 18

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 82 window units

Black mastic under 12” floor tile

1st and 2nd floors 12,668 sf

Wood fire doors 1st and 2nd floors 12 doors

Mag. block risers in plaster wall chases

1st floor wall chases 920 lf

Asbestos debris in soil Basement crawl spaces (both ends of building)

BUILDING 24

LOCATIONS

QUANTITY

9” and 12” floor tile and black mastic

1st and 2nd floors 17,228 sf

Wood fire doors 1st and 2nd floors 12 doors

Mag. block risers in plaster wall chases

1st floor wall chases 960 lf

Mag. block and aircell pipe insulation

Basement & Attic 2,660 lf

Hot water tank insulation Basement mech. room 220 sf

Asbestos debris in soil Basement crawl spaces (both ends of building)

BUILDING 25

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 144 window units

12” floor tile and black mastic 1st and 2nd floors 28,220 sf

Linoleum sheet flooring Elevator 60 sf

Wood fire doors 1st and 2nd floors 12 doors

Mag. block risers in plaster wall chases

1st floor wall chases 920 lf

Mag. block and aircell pipe insulation

Basement 2,490 lf

Hot water tank insulation Basement mech. room 220 sf

BUILDING 37

LOCATIONS

QUANTITY

Tan and Yellow Linoleum sheet flooring

Kitchen, Laundry, and 2nd Bathroom

310 sf

BUILDING 42

LOCATIONS

QUANTITY

Mag block steam pipe

Basement 305 sf

BUILDING 50

LOCATIONS

QUANTITY

9” gray floor tile 1st floor 5,510 sf

12” floor tile and black mastic 1st floor 5,510 sf

Asbestos cement transite ceiling sheets

Basement electrical vault

320 sf

BUILDING 60

LOCATIONS

QUANTITY

Mag. block risers in plaster wall chases

1st floor wall chases 575 lf

Mag. block and aircell pipe

Attic 620 lf

BUILDING 95

LOCATIONS

QUANTITY

Window glazing All windows 5 windows

BUILDING 120

LOCATIONS

QUANTITY

Window glazing All windows 3 windows

BUILDING 122

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 116 window units

12” floor tile and black mastic 1st floor 18,520 sf

Wood fire doors Basement & 1st floors 10 doors

Black mastic for cork freezer insulation

Basement & 1st floor 820 sf

Transite/Ebony components Elevator Mech. Room 70 sf

BUILDING CC-2 CONNECTING CORRIDORS

LOCATIONS

QUANTITY

Window and door frame caulk (gray rubber)

1st and 2nd floors 156 units

Black mastic under 12” floor tile

1st floor 7,492 sf

4.2 Lead-based Paint Components

The following is a summary of the components, condition, and results of lead-based paint tested in each building for this project:

LEAD-BASED PAINT COMPONENTS PAINT CONDITION

Exterior door building trim Fair

Interior window sills, sashes, and trim Poor

Interior doors and trim Poor

Interior plaster walls and ceilings Poor

Exterior door building trim Fair

Interior window sills, sashes, and trim Poor

Exterior door building trim Fair

Interior window sills, sashes, and trim Poor

Exterior door building trim Fair

Interior window sills, sashes, and trim Poor

BUILDING 10

Exterior window sashes, door, and building trim Poor

Interior window sills, sashes, and trim Poor

BUILDING 11

Exterior window sashes, door, and building trim Poor

Interior window sills, sashes, and trim Poor

BUILDING 12

Exterior window sashes, door, and building trim Poor

Interior window sills, sashes, and trim Poor

BUILDING 18

Exterior window sashes, door, and building trim Poor

BUILDING 24

Exterior window sashes, door, and building trim Poor

BUILDING 25

Exterior window sashes, door, and building trim Poor

BUILDING 35

LEAD-BASED PAINT COMPONENTS PAINT CONDITION

Exterior window sashes, door, and building trim Poor

Interior window sills, sashes, and trim Poor

BUILDING 37

Exterior window sashes, door, and building trim Poor

Interior window sills, sashes, and trim Poor

BUILDING 42

Exterior window sashes, door, and building trim Poor

Interior window sills, sashes, and trim Poor

BUILDING 47

Exterior window sashes, door, and building trim Poor

Interior window sills, sashes, and trim Poor

BUILDING 49

Exterior door and building trim Poor

BUILDING 50

Exterior door and building trim Poor

BUILDING 60

Exterior window, door and building trim Poor

BUILDING 75

Exterior window, door and building trim Poor

BUILDING 94

Exterior window, door and building siding Poor

BUILDING 95

Exterior window, door and building siding Poor

BUILDING 105

Exterior window and doors Poor

BUILDING 122

Exterior door and trim Poor

BUILDING 128

Exterior door, windows, block walls, and trim Poor

5.0 Explanation of Assessment of Asbestos Containing Materials

Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.

The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:

• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)

• Material Type - Friable (F); Non-Fable (NF)

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

• Recommended Response Action - 1 through 7

Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)

• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.

• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.

• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.

Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.

• Condition of Material - Good; Fair; Poor

• Potential for Damage - Low; Medium; High

• Physical Assessment - Low; Medium; High

Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.

1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints.

Asbestos debris originating from the ACBM in question may also indicate damage.

2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.

3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.

4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers;

separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage;

significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM.

Asbestos debris originating from the ACBM in question may also indicate damage.

5. ACBM with Potential for Damage - Potential damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:

(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.

(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.

7. Any remaining friable ACBM or Friable Suspected ACBM

6.0 CONCLUSION/RECOMMENDATIONS

Asbestos: The asbestos containing materials must be handled in accordance with current OSHA, EPA, and Indiana (IDEM) regulations. All friable asbestos materials must be removed by a licensed asbestos contractor prior to any disturbance at renovation or demolition. Non-friable materials can be removed by qualified contractors with properly trained workers in accordance with OSHA regulations for each class of material. Asbestos materials which will not be disturbed can be left in-place indefinitely until they will be disturbed at renovation or demolition. In addition, all abatement and demolition projects must first submit a 10-day notification to IDEM. As with any demolition project, should any suspect asbestos containing materials be discovered during demolition, the contractor should stop work until the materials can be tested to determine if they are asbestos containing.

Lead paint: The lead-based painted surfaces must be treated in accordance with the OSHA Lead in Construction Standard. According to the OSHA Lead in Construction Standard (1926.62), contractors who will disturb the paint will be required to conduct an initial exposure assessment of their workers to determine whether the action level (30 ug/m3) for airborne Pb will be exceeded during the project, or rely on historical sampling data from past projects to comply with the OSHA standard.

Respectfully Submitted:

Brett L. Brumbaugh – Project Manager Certified Asbestos Inspector/Management Planner IDEM License 192916010 EPA Lead Risk Assessor

TABLE 1

LIST OF ACRONYMS

ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning LBP Lead Based Paint MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction

TABLE 2

ASBESTOS REMOVAL PRIORITY PROTOCOLS

HAZARD

RANK

REMOVAL

PRIORITY

AHERA

CATEGORY

RESPONSE ACTION

RECOMMENDATION

7 1 Significantly Damaged

Evacuate or isolate the area.

Remove or repair if feasible.

O&M for all friable ACM.

6 2 Damaged with potential for significant damage

Evacuate or isolate the area.

Remove, encapsulate, or repair if feasible. O&M for all friable

ACM.

5 3 Damaged with potential for damage

Remove, encapsulate, or repair. O&M for all friable ACM.

4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.

3 5 Potential for significant damage

Take steps to reduce potential for damage. O&M for all friable

ACM.

2 6 Potential for damage O&M for all friable ACM.

1 7 No problem O&M for all friable ACM.

APPENDIX A

ASBESTOS BULK SAMPLING DATA

ASBESTOS BULK SAMPLING INFORMATION

Facility: Marion VA Medical Center – Marion, IN Building: Building 1 – Ward Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh Accreditation: IDEM – Asbestos Inspector/Management Planner #192916010

SAMPLE

NUMBER

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

22 Exterior window frame caulk Porch on S.W. corner No asbestos detected

23 Asphalt roofing shingle Middle of roof No asbestos detected

24 Exterior door frame caulk (grey) S. entry door 3% Chrysotile Asbestos

25a 12” tan floor tile 1 st floor middle stairwell No asbestos detected

25b Black floor tile mastic “” No asbestos detected

26 Drywall mud 1 st floor N. lobby No asbestos detected

27a 12” blue floor tile Room 116 No asbestos detected

27b Black floor tile mastic “” 2% Chrysotile Asbestos

28a 12” white floor tile Room 116 No asbestos detected

28b Black floor tile mastic “” 2% Chrysotile Asbestos

29 Hard plaster (base and finish coats) Room 117 No asbestos detected

30 Hard plaster (base and finish coats) Room 107 No asbestos detected

31 Hard plaster (base and finish coats) Room 210 No asbestos detected

32 Hard plaster (base and finish coats) Room 201 No asbestos detected

33 Hard plaster (base and finish coats) Room 213 No asbestos detected

34 2x2 fissured ceiling tile Hall by Room 211 No asbestos detected

35 2x4 worm pattern ceiling tile Room 211 No asbestos detected

36a 12” white floor tile Hall by Room 200 No asbestos detected

36b Black floor tile mastic “” 3% Chrysotile Asbestos

37 Gray wall patch Basement Room 5 No asbestos detected

38 White foundation paint Basement Room 5 No asbestos detected

39 Mag. block steam pipe insulation Tunnel W. of Room 2 20% Chrysotile Asbestos

40 Cloth jacket on steam pipe insul. “” 70% Chrysotile Asbestos

40A Window glazing Attic window No asbestos detected

EPA Definition of an asbestos containing material: Greater than 1% asbestos

Building: Building 3 – Ward Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

41a 12” white floor tile Room 116 No asbestos detected

41b Black floor tile mastic “” 2% Chrysotile Asbestos

42 Drywall mud Room 117 No asbestos detected

43 2x4 lay-in ceiling tile Room 117 No asbestos detected

44 Hard plaster (base and finish coats) 1 st floor N.W. stairwell No asbestos detected

45 Hard plaster (base and finish coats) 1 st hall by Room 102 No asbestos detected

46 Asphalt roofing shingle Middle of roof No asbestos detected

47 Hard plaster (base and finish coats) Room 107 No asbestos detected

48 Hard plaster (base and finish coats) 2 nd hall by 210 No asbestos detected

49 Hard plaster (base and finish coats) Room 201 No asbestos detected

50 Door frame caulk (gray) S. entry door frame 3% Chrysotile Asbestos

51a 12” white floor tile 1 st floor S. stairwell No asbestos detected

51b Black floor tile mastic “” 2% Chrysotile Asbestos

52 Textured wall foundation coating Basement room 5 No asbestos detected

53 Mortar wall patch in foundation Basement room 5 No asbestos detected

54 Window glazing Attic No asbestos detected

55 Mag block pipe insulation Tunnel/tile (E. side) 55% Chrysotile Asbestos

56 Hard plaster (base and finish coats) Basement by stairs No asbestos detected

57a 12” white floor tile 1 st floor N. lobby No asbestos detected

57b Black floor tile mastic “” 3% Chrysotile Asbestos

58a 12” white floor tile 1 st hallway by 117 No asbestos detected

58b Black floor tile mastic “” 3% Chrysotile Asbestos

59 2x2 lay-in ceiling tile 1 st floor N. lobby No asbestos detected

60 2x4 lay-in ceiling tile Room 108 No asbestos detected

Building: Building 4 – Ward Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

1a 12” white floor tile Room 115 No asbestos detected

1b Black floor tile mastic “” 3% Chrysotile Asbestos

2 Window frame caulk Window frame of Rm. 115 No asbestos detected

3 Hard plaster (base and finish coats) Room 115 No asbestos detected

4 Drywall mud Room 115 No asbestos detected

5 2x4 lay-in ceiling tile Room 115 No asbestos detected

6 2x2 lay-in ceiling tile Hall by 100A No asbestos detected

7a 12” beige floor tile Hall by 102 No asbestos detected

7b Black floor tile mastic “” 3% Chrysotile Asbestos

8 Hard plaster (base and finish coats) Room 106 No asbestos detected

9 Drywall mud Room 118 No asbestos detected

10 Mag. block pipe insulation Tunnel to Bldg. 5 40% Chrysotile Asbestos

11 Layered paper pipe insulation Tunnel to Bldg. 5 65% Chrysotile Asbestos

12 Hard plaster (base and finish coats) Stairwell 216 No asbestos detected

13 Hard plaster (base and finish coats) Stairwell by 210 No asbestos detected

14 Hard plaster (base and finish coats) Hall by 201 No asbestos detected

15 Hard plaster (base and finish coats) Stairwell by 204 No asbestos detected

16a 12” tan floor tile 2 nd hall by 215 2% Chrysotile Asbestos

16b Black floor tile mastic “” No asbestos detected

17a 12” white floor tile 2 nd floor, hall by 202 No asbestos detected

17b Black floor tile mastic “” 3% Chrysotile Asbestos

18 2x4 lay-in ceiling tile “” No asbestos detected

19 Window glazing Attic No asbestos detected

20 Window frame caulk (gray) Window of Room 118 3% Chrysotile Asbestos

21 Asphalt roofing shingle Roof No asbestos detected

Building: Building 7 – Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

126a 12” tan floor tile Room 111 No asbestos detected

126b Black floor tile mastic “” No asbestos detected

127 Hard plaster (base and finish coats) Room 111 No asbestos detected

128 Hard plaster (base and finish coats) Room 105 No asbestos detected

129 Hard plaster (base and finish coats) Room 204 No asbestos detected

130 Hard plaster (base and finish coats) Room 212 No asbestos detected

131 Hard plaster (base and finish coats) Hall by middle stairwell on 2 No asbestos detected

132 2x4 lay-in ceiling tile Room 108 No asbestos detected

133 Drywall mud Room 108 No asbestos detected

134 Hard plaster (base and finish coats) 1 st middle stairwell No asbestos detected

135 Fire door interior Stairs to basement 35% Chrysotile Asbestos

136a 12” tan floor tile 2 nd hallway by 216 No asbestos detected

136b Black floor tile mastic “” 3% Chrysotile Asbestos

137 Window glazing Attic No asbestos detected

138 Window frame caulk Kitchen window 4% Chrysotile Asbestos

139 Door frame caulk Kitchen door 4% Chrysotile Asbestos

Building: Building 9 – Print Shop/Mail Room Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

165a 12” tan floor tile 1 st floor print shop office 2% Chrysotile Asbestos

165b Black mastic “” 2% Chrysotile Asbestos

166a 12” brown floor tile 1 st floor lobby by elevator 2% Chrysotile Asbestos

166b Black mastic “” No asbestos detected

167a 9” green floor tile 2 nd floor – Vacant W. room 3% Chrysotile Asbestos

167b Black mastic “” No asbestos detected

Building: Building 10 – Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

140a 12” tan floor tile 1 st floor hall by N. entry No asbestos detected

140b Black mastic “” No asbestos detected

141 2x2 lay-in ceiling tile 1 st floor hall by stairs No asbestos detected

142a 12” tan floor tile 1 st floor hall by 109 No asbestos detected

142b Black mastic “” 3% Chrysotile Asbestos

143 Hard plaster (base and finish coats) Room 109 No asbestos detected

144 Hard plaster (base and finish coats) 1 st floor middle stairwell No asbestos detected

145 Hard plaster (base and finish coats) 2 nd floor E. stairwell No asbestos detected

146 Hard plaster (base and finish coats) 2 nd hall by W. stairs No asbestos detected

147 Hard plaster (base and finish coats) Room 213 No asbestos detected

148 Foundation paint coating Basement room 2 No asbestos detected

149 Hot water storage tank insulation Basement Tank Room 40% Chrysotile Asbestos

150 Aircell pipe insulation Basement hallway 65% Chrysotile Asbestos

151 Asphalt roofing shingle Roof No asbestos detected

152 Window glazing Attic No asbestos detected

Building: Building 11 – Ward Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

107 Window frame caulk E. side, south entry window No asbestos detected

108 Asphalt shingle Roof No asbestos detected

109a 12” tan floor tile 1 st floor Room 104 No asbestos detected

109b Black mastic “” 3% Chrysotile Asbestos

110 2x4 lay-in ceiling tile Room 104 No asbestos detected

111a 12” green floor tile 1 st floor hallway by 104 No asbestos detected

111b Black mastic “” 3% Chrysotile Asbestos

112 Hard plaster (base and finish coats) Room 104 No asbestos detected

113 Hard plaster (base and finish coats) Room 117 No asbestos detected

114 Hard plaster (base and finish coats) N.W. stairwell No asbestos detected

115 Hard plaster (base and finish coats) N.E. stairwell No asbestos detected

116 Hard plaster (base and finish coats) 2 nd hallway by 215 No asbestos detected

117 Drywall mud Room 214 No asbestos detected

118a 12” pink and tan floor tile 2 nd hallway by 202 No asbestos detected

118b Black mastic “” 5% Chrysotile Asbestos

119 Aircell pipe insulation Basement hallway 70% Chrysotile Asbestos

120 Hard plaster (base and finish coats) Basement hall by stairs No asbestos detected

121 Foundation white wall paint Basement – E. side No asbestos detected

Building: Building 12 – Mental Health Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

219 Hard plaster (base and finish coats) Front (W. Lobby) on 1 st No asbestos detected

220 Hard plaster (base and finish coats) Hallway C101 No asbestos detected

221 Hard plaster (base and finish coats) 1 st S. stairwell No asbestos detected

222 Hard plaster (base and finish coats) 2 nd

N. stairwell No asbestos detected

223 Hard plaster (base and finish coats) Basement boiler room No asbestos detected

224a 12” tan floor tile Front (W. Lobby) on 1 st No asbestos detected

224b Black mastic “” 3% Chrysotile Asbestos

225 2x4 lay-in ceiling tile “” No asbestos detected

226 Drywall mud Room 205 No asbestos detected

227a 12” tan floor tile Room 211 2% Chrysotile Asbestos

227b Black mastic “” 3% Chrysotile Asbestos

228 Window frame caulk Window of Room 120 3% Chrysotile Asbestos

229 Asphalt roofing shingle Roof No asbestos detected

230 Exterior asphalt foundation coating W. side of Bldg. by stairs 6% Chrysotile Asbestos

231 Window glazing Attic No asbestos detected

Building: Building 18 – Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

153a 12” red floor tile Room 103 No asbestos detected

153b Black mastic “” 2% Chrysotile Asbestos

154 2x2 lay-in ceiling tile Room 103 No asbestos detected

155a 12” tan floor tile Room 111 No asbestos detected

155b Black mastic “” No asbestos detected

156 Hard plaster (base and finish coats) Room 103 No asbestos detected

157 Hard plaster (base and finish coats) 1 st N. stairwell No asbestos detected

158 Hard plaster (base and finish coats) 1 st hall by 110 No asbestos detected

159 Hard plaster (base and finish coats) 2 nd

S. stairwell No asbestos detected

160 Hard plaster (base and finish coats) 2 nd hall by 200 No asbestos detected

161a 12” tan floor tile 1 st hallway by 116 No asbestos detected

161b Black mastic “” 2% Chrysotile Asbestos

162 Window frame caulk Window frame of 114 4% Chrysotile Asbestos

163 Door frame caulk E. entry door No asbestos detected

164 Asphalt roofing shingle Roof No asbestos detected

Building: Building 24 - Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

174 Asphalt roofing shingle Roof No asbestos detected

175 Window glazing 1 st floor room 111 No asbestos detected

176 Hard plaster (base and finish coats) 1 st stairwell (middle) No asbestos detected

177 Hard plaster (base and finish coats) 1 st hall by 105 No asbestos detected

178 Hard plaster (base and finish coats) 1 st hall by 120 No asbestos detected

179 Hard plaster (base and finish coats) 2 nd hall by stairwell No asbestos detected

180 Hard plaster (base and finish coats) Attic stairs No asbestos detected

181a 9” tan floor tile 1 st hallway by 127 2% Chrysotile Asbestos

181b Black mastic “” 2% Chrysotile Asbestos

182 Hot water tank insulation Basement mech. room 40% Chrysotile Asbestos

183 Aircell pipe insulation Basement hallway 70% Chrysotile Asbestos

184 Pyrobar interior wall block 2 nd floor room 211 No asbestos detected

Building: Building 25 - Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

185 Door frame caulk Front entry door No asbestos detected

186a 12” red floor tile 1 st hall by front entry 2% Chrysotile Asbestos

186b Black mastic “” 3% Chrysotile Asbestos

187 Hard plaster (base and finish coats) 1 st hall by 118 No asbestos detected

187A 12” tan floor tile 1 st hall by 129 No asbestos detected

187M Black mastic “” 3% Chrysotile Asbestos

188 Hard plaster (base and finish coats) Room 129 No asbestos detected

189 Hard plaster (base and finish coats) Room 111 No asbestos detected

190 Hard plaster (base and finish coats) Room 230 No asbestos detected

191 Hard plaster (base and finish coats) Room 211 No asbestos detected

192a 12” orange floor tile Room 129 2% Chrysotile Asbestos

192b Black mastic “” 3% Chrysotile Asbestos

193 2x4 lay-in ceiling tile Room 129 No asbestos detected

194a 12” green floor tile Room 111 2% Chrysotile Asbestos

194b Black mastic “” 3% Chrysotile Asbestos

195a 12” yellow floor tile Room 229 2% Chrysotile Asbestos

195b Black mastic “” 3% Chrysotile Asbestos

196a Tan linoleum sheet flooring Elevator 15% Chrysotile Asbestos

196b Yellow mastic “” No asbestos detected

Building: Building 35 - Quarters Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

261 Window glazing Living room window No asbestos detected

262 Roof shingle Roof No asbestos detected

263 Tan linoleum sheet flooring Kitchen No asbestos detected

264 Hard plaster (base and finish coats) Kitchen No asbestos detected

265 Hard plaster (base and finish coats) Stairs to 2 nd floor No asbestos detected

266 Hard plaster (base and finish coats) 2 nd floor bathroom No asbestos detected

267 2x2 lay-in ceiling tile 1 st floor living room No asbestos detected

Building: Building 37 - Quarters Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

240 Window glazing Kitchen window No asbestos detected

241 Cellulose ceiling tile and tan glue pod Living room No asbestos detected

242 Yellow linoleum (lower layer) Kitchen 2% Chrysotile Asbestos

243 Tan linoleum (upper layer) Kitchen No asbestos detected

244 Hard plaster (base and finish coats) Kitchen No asbestos detected

245 Hard plaster (base and finish coats) Living room No asbestos detected

246 Hard plaster (base and finish coats) 2 nd floor hall by bathroom No asbestos detected

247a 12” tan floor tile 1 st floor bathroom No asbestos detected

247b Yellow mastic “” No asbestos detected

248 Tan linoleum sheet flooring 2 floor bathroom 10% Chrysotile Asbestos

Building: Building 42 – Supply Service Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

80 Window glazing Room 100 window No asbestos detected

81 Asphalt roofing shingle Roof No asbestos detected

82 2x2 lay-in ceiling tile Room 100 No asbestos detected

83a 12” brown floor tile Room 100 under carpet No asbestos detected

83b Black mastic “” No asbestos detected

84 Mag block pipe insulation Basement 45% Chrysotile Asbestos

85 Hard plaster (base and finish coats) Room 102 No asbestos detected

86 Hard plaster (base and finish coats) Room 105 No asbestos detected

87 Hard plaster (base and finish coats) 2 nd stairs No asbestos detected

88 Hard plaster (base and finish coats) Room 200 No asbestos detected

89 Hard plaster (base and finish coats) Room 200B (bathroom) No asbestos detected

90 Wall panel Room 100 No asbestos detected

Building: Building 47 – Theatre (Stinson Memorial) Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

61 2x4 lay-in ceiling tile Front lobby No asbestos detected

62 Drywall mud Stage No asbestos detected

63 Battleship flooring (tan) and mastic Stage sound booth No asbestos detected

64 12” ceiling tile Theatre ceiling No asbestos detected

65a Hard plaster (base and finish coats) Basement (E. side) No asbestos detected

65b Glue pod on plaster “” No asbestos detected

66a Hard plaster (base and finish coats) Basement (E. side) No asbestos detected

66b Glue pod on plaster “” No asbestos detected

67a Hard plaster (base and finish coats) Basement (E. side) No asbestos detected

67b Glue pod on plaster “” No asbestos detected

68 Hard plaster (base and finish coats) Balcony (N. side) No asbestos detected

69 Hard plaster (base and finish coats) Balcony (S. side) No asbestos detected

70 Window glazing Window above lobby door No asbestos detected

Building: Building 49 - Library Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

71 Popcorn decorative ceiling texture Basement (S. room) No asbestos detected

72 Popcorn decorative ceiling texture Basement middle area No asbestos detected

73 Popcorn decorative ceiling texture Basement – N. side by RR No asbestos detected

74 Hard plaster (base and finish coats) Basement (S. room) No asbestos detected

75 Hard plaster (base and finish coats) Basement E. entry No asbestos detected

76 Hard plaster (base and finish coats) 1 st floor above entry door No asbestos detected

77 Hard plaster (base and finish coats) 1 st floor stairwell No asbestos detected

78 Hard plaster (base and finish coats) 2 nd floor storage closet No asbestos detected

79 Floor leveling and black mastic Basement middle area No asbestos detected

Building: Building 50 - Canteen Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

91 Asphalt roofing shingle Roof No asbestos detected

92a 9” gray floor tile (under 12” tile) 1 st floor lobby 4% Chrysotile Asbestos

92b Black mastic “” No asbestos detected

93a 12” tan floor tile (over 9” tile) 1 st floor lobby No asbestos detected

93b Black mastic “” No asbestos detected

94 Tar paper under 9” floor tile “” No asbestos detected

95 2x4 lay-in ceiling tile 1 st floor lobby No asbestos detected

96 Drywall mud Kitchen office No asbestos detected

97 Hard plaster (base and finish coats) Kitchen (1 st floor N. side) No asbestos detected

98 Hard plaster (base and finish coats) Dining area (S. side) No asbestos detected

99 Hard plaster (base and finish coats) Office area in S.W. corner No asbestos detected

100 Hard plaster (base and finish coats) Stairs to basement No asbestos detected

101 Hard plaster (base and finish coats) Lobby No asbestos detected

102 12” cellulose ceiling tile Kitchen No asbestos detected

103a 12” white floor tile Kitchen 2% Chrysotile Asbestos

103b Black mastic “” 3% Chrysotile Asbestos

104 Cellulose ceiling panel Basement No asbestos detected

105 Transite cement ceiling panel Basement Elect. Vault 20% Chrysotile Asbestos

106 Basement interior wall paint Basement – E. wall No asbestos detected

Building: Building 60 – Admin. Offices Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

197 Window glazing Window on front porch No asbestos detected

198 Hard plaster (base and finish coats) 1 st floor main lobby No asbestos detected

199 Hard plaster (base and finish coats) 1 st floor – Middle stairwell No asbestos detected

200 Hard plaster (base and finish coats) 1 st floor – E. stairwell No asbestos detected

201 Hard plaster (base and finish coats) 1 st floor – W. stairwell No asbestos detected

202 Hard plaster (base and finish coats) 2 nd floor – W. stairwell No asbestos detected

203 2x4 lay-in ceiling tile 1 st floor hall by lobby No asbestos detected

204a 9” tan floor tile (under 12” tile) 1 st floor hall by E. stairwell No asbestos detected

204b Black mastic “” No asbestos detected

204c 12” tan floor tile (over 9” tile) “” No asbestos detected

204d Black mastic “” No asbestos detected

205 Basement interior wall paint Basement – E. side No asbestos detected

206 Asphalt roofing shingle Roof No asbestos detected n/a Mag. block pipe insulation Wall chases Known asbestos

Building: Building 75 – Sewage Plant Lab Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

168 Red exterior block paint S. side of building No asbestos detected

169 Window glazing E. window No asbestos detected

170 Hard plaster (base and finish coats) N. side of building No asbestos detected

171 Hard plaster (base and finish coats) Middle of building No asbestos detected

172 Hard plaster (base and finish coats) S. side of building No asbestos detected

173 Asphalt roofing shingle Roof No asbestos detected

Building: Building 94 – Single Garage Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

258 Window glazing S. window No asbestos detected

259 Asphalt roofing shingle Roof No asbestos detected

Building: Building 95 – Single Garage Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

249 Asphalt roofing shingle Roof No asbestos detected

250 Window glazing S. window 2% Chrysotile Asbestos

Building: Building 105 – Gate House Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

269 Window glazing W. window by door No Asbestos Detected

Building: Building 119 - Incinerator Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

273 Door frame caulk N. entry door No Asbestos Detected

Building: Building 120 – Pump House Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

270 Asphalt roofing shingle Roof No asbestos detected

271 Window glazing S. window 2% Chrysotile Asbestos

272 Cellulose ceiling panel N. wall by window No asbestos detected

Building: Building 122 – Mess Hall Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

RESULT

207 Window frame caulk W. window by dock 4% Chrysotile Asbestos

208 Hard plaster (base and finish coats) Kitchen office area No asbestos detected

209 Hard plaster (base and finish coats) N. office area off kitchen No asbestos detected

210 Hard plaster (base and finish coats) 1 st hall by dining room No asbestos detected

211 Hard plaster (base and finish coats) E. dining room No asbestos detected

212 Hard plaster (base and finish coats) Basement W. stairwell No asbestos detected

213 Black cork mastic inside freezer Basement freezer 5% Chrysotile Asbestos

214 Gray cement over cork in freezer Basement freezer No asbestos detected

215a 12” tan floor tile Freight elevator 2% Chrysotile Asbestos

215b Black mastic “” 3% Chrysotile Asbestos

216 2x4 lay-in ceiling tile N. office area No asbestos detected

217 Drywall mud N. office area No asbestos detected

218a 12” tan floor tile Dining room 2% Chrysotile Asbestos

219b Black mastic “” 3% Chrysotile Asbestos

Building: Building 128 - Transformer Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh

MATERIAL SAMPLE LOCATION

LABORATORY ANALYSIS

268 Roofing shingle Roof No Asbestos Detected

Building: Building 149 - Transformer Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler:…