36C25018B0818-0003002.pdf
PDF 9 MB Posted
- Attached to
- Remove Building 12, Relocate Parking 610-17-102 Federal contract opportunity
- Solicitation number
- 36C25018B0818
About this file
36C25018B0818 0003 Marion IN VAMC Asbestos LBP 2018 04.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0818-0004001.pdf | ||
| 36C25018B0818-0004000.docx | DOCX document | |
| 36C25018B0818-0003000.docx | DOCX document | |
| 36C25018B0818-0003001.docx | DOCX document | |
| 36C25018B0818-0002000.docx | DOCX document | |
| 36C25018B0818-0001000.docx | DOCX document | |
| 36C25018B0818-006.pdf | ||
| 36C25018B0818-002.docx | DOCX document | |
| 36C25018B0818-009.pdf | ||
| 36C25018B0818-003.pdf | ||
| 36C25018B0818-008.doc | DOC document | |
| 36C25018B0818-007.docx | DOCX document | |
| 36C25018B0818-005.pdf | ||
| 36C25018B0818-004.pdf | ||
| 36C25018B0818-000.docx | DOCX document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS & LEAD PAINT SURVEY REPORT
for
MARION VA MEDICAL CENTER
MARION, IN
PROJECT:
VACANT BUILDING DUE DILIGENCE
ZONE 3
PROJECT NO.:
VA-17-902700
TASK ORDER:
36E77618N0032
INSPECTION DATES:
APRIL 2-5, 2018
PRIME CONTRACTOR:
CASTLE HILL ASSOCIATES, LLC
218-A MECHANIC ST.
WATERVILLE, OH 43566
419-708-7680
MARION VA MEDICAL CENTER – MARION, IN
VACANT BUILDING DUE DILIGENCE - ZONE 3
ASBESTOS & LEAD PAINT INSPECTION REPORT
APRIL 2018
TABLE OF CONTENTS
1.0 ASBESTOS INSPECTION SUMMARY
Table 1 – List of Acronyms
Table 2 - Removal Priority Protocols
2.0 APPENDICES
Appendix A – Asbestos Sampling Data
Appendix B – Lead Paint Sampling Data
Appendix C – Asbestos Material Quantities & Assessments by Building
Appendix D – Cost Estimates for Remediation by Building
Appendix E – Photographs Asbestos Materials
Appendix F – Photographs Lead-based Paint Components
Appendix G – Asbestos Laboratory Report
Appendix H – Lead Chip Laboratory Report
Appendix I - Inspector & Lab Certifications
Appendix J – Scope of Work from VA PWS
1.0 EXECUTIVE SUMMARY
From April 2-5, 2018, Castle Hill Associates, LLC was contracted by the U.S. Department of Veterans Affairs (VA) to perform an asbestos and lead paint inspection of 28 vacant buildings on the campus of the Marion VA Medical Center in Marion, IN. The surveys were performed as part of the Vacant Building Due Diligence (VBDD) for Zone 3 (Project Number VA-17-902700) and VA Task Order 36E77618N0032. The Performance Work Statement (PWS) issued by the VA defined the scope of work for the asbestos and lead surveys as detailed in Appendix C of the PWS. The buildings that were surveyed as part of this project included:
Building Number
Vacant Building Name Year Built
Total Square Footage
1 Ward 1889 20,288
3 Ward 1889 20,289
4 Ward 1889 20,286
7 Ward 1893 24,116
9 Print Shop/Mail Room 1923 13,419
10 Ward 1898 26,452
11 Ward 1898 26,124
12 Mental Health 1898 24,435
18 Ward 1896 19,058
24 Ward 1896 17,380
25 Ward 1930 32,892
35 Quarters 1908 4,490
37 Quarters 1916 3,170
42 Supply Service 1905 5,025
47 Theatre (Stinson Memorial) 1891 10,023
49 Library 1915 5,873
50 Canteen 1890 10,765
60 Admin. Offices 1890 18,126
75 Sewage Plant Lab 1905 350
94 Single Garage 1915 400
95 Single Garage 1903 400
105 Gate House 1897 250
119 Incinerator 1934 815
120 Pump House, Well No. 3 1936 169
122 Mess Hall and Kitchen 1937 37,135
128 Transformer 1940 24
149 Transformer 1969 59
CC-2 Connecting Corridor 1979 7,492
The inspection was conducted by Brett Brumbaugh and Sam Ansara. The project manager was Mr.
Brumbaugh who has been conducting asbestos surveys, sampling, and asbestos management planning work since 1987. There were no previous sampling results or surveys provided by the VA prior to these inspections. There were no limitations or exceptions to the PWS for the surveys conducted.
2.0 STATE AND LOCAL REGULATIONS
The State of Indiana asbestos and lead inspection and licensing regulations are similar to the Federal regulations. State asbestos regulations include requirements for licensing and certification of personnel who will perform asbestos-related work activities. All personnel who engage in asbestos-related activities must comply with the state licensing/certification requirements as well as with all Federal requirements. State Lead regulations mirror the US HUD guidelines for lead-based paint in child occupied facilities, which do not apply to the scope of work for this project.
3.0 ANALYTICAL METHODS AND LIMITATIONS
3.1 Asbestos Sampling Protocol
EPA and OSHA define an ACBM as any material which contains greater than 1 percent asbestos. The ACBM inspection and bulk sampling were performed in accordance with the methods outlined in the EPA guidance document titled Guidance for Controlling Asbestos-Containing Materials in Buildings (Document No. 560/5-85/024). In addition, bulk sampling of asbestos was performed in accordance with 40 CFR Part 763, AHERA requirements for number of samples and types of ACBM to be sampled. According to these requirements, materials are classified as either surfacing (e.g., decorative plaster, spray-applied fireproofing), thermal system insulation (e.g., pipe insulation, pipe fitting insulation, boiler insulation), or miscellaneous materials (e.g., floor tile, ceiling tile, plaster, wallboard, mastics).
The number of samples collected from each material varies based on the classification of the material and increases as the potential for a non-uniform mixture of asbestos in the material increases. Typically, regulations require a minimum number of samples to be collected from the different classifications of suspect ACBM.
All bulk samples were analyzed utilizing current EPA methods for PLM (Polarized Light Microscopy) by EMLab P&K in Marlton, NJ. EMLab is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory
3.2 Lead Paint Sampling Protocol
Paint chip samples were collected on distinctly painted components inside and outside the building and submitted to the laboratory for analysis for lead content. All sampling was conducted in accordance with current regulatory and industry standards for lead-based paint chip sampling. All samples were analyzed utilizing current EPA methods for Lead by EMSL Analytical, Inc. in Indianapolis, IN. The laboratory is accredited by the NIST, NVLAP program (National Institute of Standards and Technology, National Voluntary Laboratory Accreditation Program) and also an American Industrial Hygiene Association (AIHA) accredited laboratory.
Paint containing less than 0.5% lead is not considered to be “lead-based paint” according the US EPA, HUD however according to the OSHA Lead in Construction Standard (1926.62), contractors who might create a dust by disturbing paint with any concentration of lead are required to conduct an initial exposure assessment of their workers or rely on historical data from a previous project to determine whether the action level (30 ug/m3) for airborne Pb will be exceeded during the project, then take appropriate measures to protect workers from lead exposure.
4.0 SUMMARY OF FINDINGS
4.1 Asbestos-Containing Building Materials
The following is a summary of the asbestos containing materials, locations, quantities of materials in each inspected building for this project:
BUILDING 1
ASBESTOS MATERIAL
BUILDING
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 64 window units
Black mastic under 12” floor tile
1st and 2nd floors 13,332 sf
Mag. block pipe insulation in tunnels to adjacent buildings
Tunnels 240 lf
Mag. block risers in plaster wall chases
1st floor wall chases 980 lf
BUILDING 3
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 64 window units
Black mastic under 12” floor tile
1st and 2nd floors 13,336 sf
Mag. block pipe insulation in tunnels to adjacent buildings
Tunnels 240 lf
Mag. block risers in plaster
BUILDING 4
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 64 window units
Black mastic under 12” floor tile
1st and 2nd floors 13,330 sf
Mag. block pipe insulation in tunnels to adjacent buildings
Tunnels 240 lf
Mag. block risers in plaster
BUILDING 7
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 82 window units
Black mastic under 12” floor tile
1st and 2nd floors 16,114 sf
Wood fire doors 1st and 2nd floors 12 doors
Mag. block risers in plaster
BUILDING 9
LOCATIONS
QUANTITY
9” and 12” floor tile and black mastic
1st and 2nd floors 14,224 sf
BUILDING 10
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 82 window units
Black mastic under 12” floor tile
1st and 2nd floors 16,114 sf
Wood fire doors 1st and 2nd floors 12 doors
Mag. block risers in plaster wall chases
1st floor wall chases 980 lf
Hot water tank insulation Basement mech. room 220 sf
Mag. block and aircell pipe insulation
Basement 1,420 lf
BUILDING 11
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 82 window units
Black mastic under 12” floor tile
1st and 2nd floors 18,984 sf
Wood fire doors 1st and 2nd floors 12 doors
Mag. block risers in plaster wall chases
1st floor wall chases 980 lf
Mag. block and aircell pipe insulation
Basement 1,860 lf
Asbestos debris in soil Basement crawl spaces (both ends of building)
160 CY of soil
BUILDING 12
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 64 window units
Black mastic under 12” floor tile
1st and 2nd floors 13,336 sf
Mag. block pipe insulation in tunnels to adjacent buildings
Tunnels 240 lf
Mag. block risers in plaster wall chases
1st floor wall chases 940 lf
Asphalt/tar exterior foundation coating
Basement foundation 5,040 sf
BUILDING 18
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 82 window units
Black mastic under 12” floor tile
1st and 2nd floors 12,668 sf
Wood fire doors 1st and 2nd floors 12 doors
Mag. block risers in plaster wall chases
1st floor wall chases 920 lf
Asbestos debris in soil Basement crawl spaces (both ends of building)
BUILDING 24
LOCATIONS
QUANTITY
9” and 12” floor tile and black mastic
1st and 2nd floors 17,228 sf
Wood fire doors 1st and 2nd floors 12 doors
Mag. block risers in plaster wall chases
1st floor wall chases 960 lf
Mag. block and aircell pipe insulation
Basement & Attic 2,660 lf
Hot water tank insulation Basement mech. room 220 sf
Asbestos debris in soil Basement crawl spaces (both ends of building)
BUILDING 25
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 144 window units
12” floor tile and black mastic 1st and 2nd floors 28,220 sf
Linoleum sheet flooring Elevator 60 sf
Wood fire doors 1st and 2nd floors 12 doors
Mag. block risers in plaster wall chases
1st floor wall chases 920 lf
Mag. block and aircell pipe insulation
Basement 2,490 lf
Hot water tank insulation Basement mech. room 220 sf
BUILDING 37
LOCATIONS
QUANTITY
Tan and Yellow Linoleum sheet flooring
Kitchen, Laundry, and 2nd Bathroom
310 sf
BUILDING 42
LOCATIONS
QUANTITY
Mag block steam pipe
Basement 305 sf
BUILDING 50
LOCATIONS
QUANTITY
9” gray floor tile 1st floor 5,510 sf
12” floor tile and black mastic 1st floor 5,510 sf
Asbestos cement transite ceiling sheets
Basement electrical vault
320 sf
BUILDING 60
LOCATIONS
QUANTITY
Mag. block risers in plaster wall chases
1st floor wall chases 575 lf
Mag. block and aircell pipe
Attic 620 lf
BUILDING 95
LOCATIONS
QUANTITY
Window glazing All windows 5 windows
BUILDING 120
LOCATIONS
QUANTITY
Window glazing All windows 3 windows
BUILDING 122
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 116 window units
12” floor tile and black mastic 1st floor 18,520 sf
Wood fire doors Basement & 1st floors 10 doors
Black mastic for cork freezer insulation
Basement & 1st floor 820 sf
Transite/Ebony components Elevator Mech. Room 70 sf
BUILDING CC-2 CONNECTING CORRIDORS
LOCATIONS
QUANTITY
Window and door frame caulk (gray rubber)
1st and 2nd floors 156 units
Black mastic under 12” floor tile
1st floor 7,492 sf
4.2 Lead-based Paint Components
The following is a summary of the components, condition, and results of lead-based paint tested in each building for this project:
LEAD-BASED PAINT COMPONENTS PAINT CONDITION
Exterior door building trim Fair
Interior window sills, sashes, and trim Poor
Interior doors and trim Poor
Interior plaster walls and ceilings Poor
Exterior door building trim Fair
Interior window sills, sashes, and trim Poor
Exterior door building trim Fair
Interior window sills, sashes, and trim Poor
Exterior door building trim Fair
Interior window sills, sashes, and trim Poor
BUILDING 10
Exterior window sashes, door, and building trim Poor
Interior window sills, sashes, and trim Poor
BUILDING 11
Exterior window sashes, door, and building trim Poor
Interior window sills, sashes, and trim Poor
BUILDING 12
Exterior window sashes, door, and building trim Poor
Interior window sills, sashes, and trim Poor
BUILDING 18
Exterior window sashes, door, and building trim Poor
BUILDING 24
Exterior window sashes, door, and building trim Poor
BUILDING 25
Exterior window sashes, door, and building trim Poor
BUILDING 35
LEAD-BASED PAINT COMPONENTS PAINT CONDITION
Exterior window sashes, door, and building trim Poor
Interior window sills, sashes, and trim Poor
BUILDING 37
Exterior window sashes, door, and building trim Poor
Interior window sills, sashes, and trim Poor
BUILDING 42
Exterior window sashes, door, and building trim Poor
Interior window sills, sashes, and trim Poor
BUILDING 47
Exterior window sashes, door, and building trim Poor
Interior window sills, sashes, and trim Poor
BUILDING 49
Exterior door and building trim Poor
BUILDING 50
Exterior door and building trim Poor
BUILDING 60
Exterior window, door and building trim Poor
BUILDING 75
Exterior window, door and building trim Poor
BUILDING 94
Exterior window, door and building siding Poor
BUILDING 95
Exterior window, door and building siding Poor
BUILDING 105
Exterior window and doors Poor
BUILDING 122
Exterior door and trim Poor
BUILDING 128
Exterior door, windows, block walls, and trim Poor
5.0 Explanation of Assessment of Asbestos Containing Materials
Re-inspection protocol is based on the Asbestos Hazard Emergency Response Act (AHERA), Environmental Protection Act’s (EPA’s) revised Asbestos Model Accreditation Plan (MAP) mandated by the Asbestos School Hazard Abatement Reauthorization Act (ASHARA), and the Department of Veterans Affairs (VA) Directive 7700. The tabular listing included in this report contains Building Number, Floor, Room Number, Material Category (i.e., TSI, SM or MM), Material Type, quantity, a numerical priority ranking, condition, potential for damage, potential for human exposure, drawing number, hazard ranking, recommended response action and associated cost estimate for implementation of those response actions.
The material assessment categories of the ACM identified in the building is formatted in the following order for the summary tables enclosed in this report:
• Material Category - Surfacing Material (SUR); Thermal System Insulation (TSI); Miscellaneous (MM)
• Material Type - Friable (F); Non-Fable (NF)
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
• Recommended Response Action - 1 through 7
Material category is the type of material such as surfacing material (SUR), thermal system insulation (TSI), and miscellaneous (MM)
• Surfacing Material (SUR) - Surfacing ACM means surfacing material that is ACM. Surfacing material means material in a school building that is sprayed-on, troweled-on, or otherwise applied to surfaces, such as acoustical plaster on ceilings and fireproofing materials on structural members, or other materials on surfaces for acoustical, fireproofing, or other purposes.
• Thermal System Insulation (TSI) - Thermal system insulation ACM means thermal system insulation that is ACM. Thermal system insulation means material in a school building applied to pipes, fittings, boilers, breeching, tanks, ducts, or other interior structural components to prevent heat loss or gain, or water condensation, or for other purposes.
• Miscellaneous (MM) - Miscellaneous ACM means miscellaneous material that is ACM Miscellaneous material means interior building material on structural components, structural members or fixtures, such as floor and ceiling tiles, and does not include surfacing material or thermal system insulation.
Material type refers to the hardness of a material to be crumbled, pulverized, or reduced to powder by hand pressure as friable (F), and includes previously non-friable (NF) material after such previously non-friable material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure.
• Condition of Material - Good; Fair; Poor
• Potential for Damage - Low; Medium; High
• Physical Assessment - Low; Medium; High
Seven Categories define in the AHERA regulation one of which must be assigned to each friable surfacing and miscellaneous ACBM and each asbestos-containing TSI during the inspection/re-inspection.
1. Damaged or significantly damaged TSI ACBM - Damaged or significantly damaged thermal system insulation ACM means thermal system insulation ACM on pipes, boilers, tanks, ducts, and other thermal system insulation equipment where the insulation has lost its structural integrity, or its covering, in whole or in part, is crushed, water-stained, gouged, punctured, missing, or not intact such that it is not able to contain fibers. Damage may be further illustrated by occasional punctures, gouges or other signs of physical injury to ACM; occasional water damage on the protective coverings/jackets; or exposed ACM ends or joints.
Asbestos debris originating from the ACBM in question may also indicate damage.
2. Damaged friable surfacing ACBM - Damaged friable surfacing ACM means friable surfacing ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or which has delaminated such that its bond to the substrate (adhesion) is inadequate, or which, for any other reason, lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers; separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage; significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM. Asbestos debris originating from the ACBM in question may also indicate damage.
3. Significantly damaged friable surfacing ACBM - Significantly damaged friable surfacing ACM means damaged friable surfacing ACM in a functional space where the damage is extensive and severe.
4. Damaged or significantly damaged friable miscellaneous ACBM - Damaged friable miscellaneous ACM means friable miscellaneous ACM which has deteriorated or sustained physical injury such that the internal structure (cohesion) of the material is inadequate or, if applicable, which has delaminated such that its bond to the substrate (adhesion) is inadequate or which for any other reason lacks fiber cohesion or adhesion qualities. Such damage or deterioration may be illustrated by the separation of ACM into layers;
separation of ACM from the substrate; flaking, blistering, or crumbling of the ACM surface; water damage;
significant or repeated water stains, scrapes, gouges, mars or other signs of physical injury on the ACM.
Asbestos debris originating from the ACBM in question may also indicate damage.
5. ACBM with Potential for Damage - Potential damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
6. ACBM with potential for significant damaged - Potential significant damage means circumstances in which:
(1) Friable ACBM is in an area regularly used by building occupants, including maintenance personnel, in the course of their normal activities.
(2) There are indications that there is a reasonable likelihood that the material or its covering will become significantly damaged, deteriorated, or delaminated due to factors such as changes in building use, changes in operations and maintenance practices, changes in occupancy, or recurrent damage.
7. Any remaining friable ACBM or Friable Suspected ACBM
6.0 CONCLUSION/RECOMMENDATIONS
Asbestos: The asbestos containing materials must be handled in accordance with current OSHA, EPA, and Indiana (IDEM) regulations. All friable asbestos materials must be removed by a licensed asbestos contractor prior to any disturbance at renovation or demolition. Non-friable materials can be removed by qualified contractors with properly trained workers in accordance with OSHA regulations for each class of material. Asbestos materials which will not be disturbed can be left in-place indefinitely until they will be disturbed at renovation or demolition. In addition, all abatement and demolition projects must first submit a 10-day notification to IDEM. As with any demolition project, should any suspect asbestos containing materials be discovered during demolition, the contractor should stop work until the materials can be tested to determine if they are asbestos containing.
Lead paint: The lead-based painted surfaces must be treated in accordance with the OSHA Lead in Construction Standard. According to the OSHA Lead in Construction Standard (1926.62), contractors who will disturb the paint will be required to conduct an initial exposure assessment of their workers to determine whether the action level (30 ug/m3) for airborne Pb will be exceeded during the project, or rely on historical sampling data from past projects to comply with the OSHA standard.
Respectfully Submitted:
Brett L. Brumbaugh – Project Manager Certified Asbestos Inspector/Management Planner IDEM License 192916010 EPA Lead Risk Assessor
TABLE 1
LIST OF ACRONYMS
ACBM Asbestos Containing Building Material ACM Asbestos Containing Material AHERA Asbestos Hazard Emergency Response Act AIHA American Industrial Hygiene Association CAA Clean Air Act CFR Code of Federal Regulations EPA United States Environmental Protection Agency HazCom Hazard Communication HEPA High Efficiency Particulate Air Filter HVAC Heating, Ventilation, and Air Conditioning LBP Lead Based Paint MISC Miscellaneous Asbestos Containing Material NESHAP National Emission Standards for Hazardous Air Pollutants NIOSH National Institute for Occupational Safety and Health NIST National Institute of Standards and Technology NOB Non-friable Organically Bound NVLAP National Voluntary Laboratory Accreditation Program OSHA Occupational Safety and Health Administration PAT AIHA Proficiency Analytical Testing Program PCM Phase Contrast Microscopy PEL Permissible Exposure Limit PLM Polarized Light Microscopy TEM Transmission Electron Microscopy TSCA Toxic Substances Control Act TSI Thermal Systems Insulation Castle Hill Castle Hill Associates, LLC VA United States Department of Veterans Affairs VAMC VA Medical Center XRD X-Ray Diffraction
TABLE 2
ASBESTOS REMOVAL PRIORITY PROTOCOLS
HAZARD
RANK
REMOVAL
PRIORITY
AHERA
CATEGORY
RESPONSE ACTION
RECOMMENDATION
7 1 Significantly Damaged
Evacuate or isolate the area.
Remove or repair if feasible.
O&M for all friable ACM.
6 2 Damaged with potential for significant damage
Evacuate or isolate the area.
Remove, encapsulate, or repair if feasible. O&M for all friable
ACM.
5 3 Damaged with potential for damage
Remove, encapsulate, or repair. O&M for all friable ACM.
4 4 Damaged Remove, encapsulate, or repair. O&M for all friable ACM.
3 5 Potential for significant damage
Take steps to reduce potential for damage. O&M for all friable
ACM.
2 6 Potential for damage O&M for all friable ACM.
1 7 No problem O&M for all friable ACM.
APPENDIX A
ASBESTOS BULK SAMPLING DATA
ASBESTOS BULK SAMPLING INFORMATION
Facility: Marion VA Medical Center – Marion, IN Building: Building 1 – Ward Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh Accreditation: IDEM – Asbestos Inspector/Management Planner #192916010
SAMPLE
NUMBER
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
22 Exterior window frame caulk Porch on S.W. corner No asbestos detected
23 Asphalt roofing shingle Middle of roof No asbestos detected
24 Exterior door frame caulk (grey) S. entry door 3% Chrysotile Asbestos
25a 12” tan floor tile 1 st floor middle stairwell No asbestos detected
25b Black floor tile mastic “” No asbestos detected
26 Drywall mud 1 st floor N. lobby No asbestos detected
27a 12” blue floor tile Room 116 No asbestos detected
27b Black floor tile mastic “” 2% Chrysotile Asbestos
28a 12” white floor tile Room 116 No asbestos detected
28b Black floor tile mastic “” 2% Chrysotile Asbestos
29 Hard plaster (base and finish coats) Room 117 No asbestos detected
30 Hard plaster (base and finish coats) Room 107 No asbestos detected
31 Hard plaster (base and finish coats) Room 210 No asbestos detected
32 Hard plaster (base and finish coats) Room 201 No asbestos detected
33 Hard plaster (base and finish coats) Room 213 No asbestos detected
34 2x2 fissured ceiling tile Hall by Room 211 No asbestos detected
35 2x4 worm pattern ceiling tile Room 211 No asbestos detected
36a 12” white floor tile Hall by Room 200 No asbestos detected
36b Black floor tile mastic “” 3% Chrysotile Asbestos
37 Gray wall patch Basement Room 5 No asbestos detected
38 White foundation paint Basement Room 5 No asbestos detected
39 Mag. block steam pipe insulation Tunnel W. of Room 2 20% Chrysotile Asbestos
40 Cloth jacket on steam pipe insul. “” 70% Chrysotile Asbestos
40A Window glazing Attic window No asbestos detected
EPA Definition of an asbestos containing material: Greater than 1% asbestos
Building: Building 3 – Ward Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
41a 12” white floor tile Room 116 No asbestos detected
41b Black floor tile mastic “” 2% Chrysotile Asbestos
42 Drywall mud Room 117 No asbestos detected
43 2x4 lay-in ceiling tile Room 117 No asbestos detected
44 Hard plaster (base and finish coats) 1 st floor N.W. stairwell No asbestos detected
45 Hard plaster (base and finish coats) 1 st hall by Room 102 No asbestos detected
46 Asphalt roofing shingle Middle of roof No asbestos detected
47 Hard plaster (base and finish coats) Room 107 No asbestos detected
48 Hard plaster (base and finish coats) 2 nd hall by 210 No asbestos detected
49 Hard plaster (base and finish coats) Room 201 No asbestos detected
50 Door frame caulk (gray) S. entry door frame 3% Chrysotile Asbestos
51a 12” white floor tile 1 st floor S. stairwell No asbestos detected
51b Black floor tile mastic “” 2% Chrysotile Asbestos
52 Textured wall foundation coating Basement room 5 No asbestos detected
53 Mortar wall patch in foundation Basement room 5 No asbestos detected
54 Window glazing Attic No asbestos detected
55 Mag block pipe insulation Tunnel/tile (E. side) 55% Chrysotile Asbestos
56 Hard plaster (base and finish coats) Basement by stairs No asbestos detected
57a 12” white floor tile 1 st floor N. lobby No asbestos detected
57b Black floor tile mastic “” 3% Chrysotile Asbestos
58a 12” white floor tile 1 st hallway by 117 No asbestos detected
58b Black floor tile mastic “” 3% Chrysotile Asbestos
59 2x2 lay-in ceiling tile 1 st floor N. lobby No asbestos detected
60 2x4 lay-in ceiling tile Room 108 No asbestos detected
Building: Building 4 – Ward Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
1a 12” white floor tile Room 115 No asbestos detected
1b Black floor tile mastic “” 3% Chrysotile Asbestos
2 Window frame caulk Window frame of Rm. 115 No asbestos detected
3 Hard plaster (base and finish coats) Room 115 No asbestos detected
4 Drywall mud Room 115 No asbestos detected
5 2x4 lay-in ceiling tile Room 115 No asbestos detected
6 2x2 lay-in ceiling tile Hall by 100A No asbestos detected
7a 12” beige floor tile Hall by 102 No asbestos detected
7b Black floor tile mastic “” 3% Chrysotile Asbestos
8 Hard plaster (base and finish coats) Room 106 No asbestos detected
9 Drywall mud Room 118 No asbestos detected
10 Mag. block pipe insulation Tunnel to Bldg. 5 40% Chrysotile Asbestos
11 Layered paper pipe insulation Tunnel to Bldg. 5 65% Chrysotile Asbestos
12 Hard plaster (base and finish coats) Stairwell 216 No asbestos detected
13 Hard plaster (base and finish coats) Stairwell by 210 No asbestos detected
14 Hard plaster (base and finish coats) Hall by 201 No asbestos detected
15 Hard plaster (base and finish coats) Stairwell by 204 No asbestos detected
16a 12” tan floor tile 2 nd hall by 215 2% Chrysotile Asbestos
16b Black floor tile mastic “” No asbestos detected
17a 12” white floor tile 2 nd floor, hall by 202 No asbestos detected
17b Black floor tile mastic “” 3% Chrysotile Asbestos
18 2x4 lay-in ceiling tile “” No asbestos detected
19 Window glazing Attic No asbestos detected
20 Window frame caulk (gray) Window of Room 118 3% Chrysotile Asbestos
21 Asphalt roofing shingle Roof No asbestos detected
Building: Building 7 – Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
126a 12” tan floor tile Room 111 No asbestos detected
126b Black floor tile mastic “” No asbestos detected
127 Hard plaster (base and finish coats) Room 111 No asbestos detected
128 Hard plaster (base and finish coats) Room 105 No asbestos detected
129 Hard plaster (base and finish coats) Room 204 No asbestos detected
130 Hard plaster (base and finish coats) Room 212 No asbestos detected
131 Hard plaster (base and finish coats) Hall by middle stairwell on 2 No asbestos detected
132 2x4 lay-in ceiling tile Room 108 No asbestos detected
133 Drywall mud Room 108 No asbestos detected
134 Hard plaster (base and finish coats) 1 st middle stairwell No asbestos detected
135 Fire door interior Stairs to basement 35% Chrysotile Asbestos
136a 12” tan floor tile 2 nd hallway by 216 No asbestos detected
136b Black floor tile mastic “” 3% Chrysotile Asbestos
137 Window glazing Attic No asbestos detected
138 Window frame caulk Kitchen window 4% Chrysotile Asbestos
139 Door frame caulk Kitchen door 4% Chrysotile Asbestos
Building: Building 9 – Print Shop/Mail Room Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
165a 12” tan floor tile 1 st floor print shop office 2% Chrysotile Asbestos
165b Black mastic “” 2% Chrysotile Asbestos
166a 12” brown floor tile 1 st floor lobby by elevator 2% Chrysotile Asbestos
166b Black mastic “” No asbestos detected
167a 9” green floor tile 2 nd floor – Vacant W. room 3% Chrysotile Asbestos
167b Black mastic “” No asbestos detected
Building: Building 10 – Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
140a 12” tan floor tile 1 st floor hall by N. entry No asbestos detected
140b Black mastic “” No asbestos detected
141 2x2 lay-in ceiling tile 1 st floor hall by stairs No asbestos detected
142a 12” tan floor tile 1 st floor hall by 109 No asbestos detected
142b Black mastic “” 3% Chrysotile Asbestos
143 Hard plaster (base and finish coats) Room 109 No asbestos detected
144 Hard plaster (base and finish coats) 1 st floor middle stairwell No asbestos detected
145 Hard plaster (base and finish coats) 2 nd floor E. stairwell No asbestos detected
146 Hard plaster (base and finish coats) 2 nd hall by W. stairs No asbestos detected
147 Hard plaster (base and finish coats) Room 213 No asbestos detected
148 Foundation paint coating Basement room 2 No asbestos detected
149 Hot water storage tank insulation Basement Tank Room 40% Chrysotile Asbestos
150 Aircell pipe insulation Basement hallway 65% Chrysotile Asbestos
151 Asphalt roofing shingle Roof No asbestos detected
152 Window glazing Attic No asbestos detected
Building: Building 11 – Ward Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
107 Window frame caulk E. side, south entry window No asbestos detected
108 Asphalt shingle Roof No asbestos detected
109a 12” tan floor tile 1 st floor Room 104 No asbestos detected
109b Black mastic “” 3% Chrysotile Asbestos
110 2x4 lay-in ceiling tile Room 104 No asbestos detected
111a 12” green floor tile 1 st floor hallway by 104 No asbestos detected
111b Black mastic “” 3% Chrysotile Asbestos
112 Hard plaster (base and finish coats) Room 104 No asbestos detected
113 Hard plaster (base and finish coats) Room 117 No asbestos detected
114 Hard plaster (base and finish coats) N.W. stairwell No asbestos detected
115 Hard plaster (base and finish coats) N.E. stairwell No asbestos detected
116 Hard plaster (base and finish coats) 2 nd hallway by 215 No asbestos detected
117 Drywall mud Room 214 No asbestos detected
118a 12” pink and tan floor tile 2 nd hallway by 202 No asbestos detected
118b Black mastic “” 5% Chrysotile Asbestos
119 Aircell pipe insulation Basement hallway 70% Chrysotile Asbestos
120 Hard plaster (base and finish coats) Basement hall by stairs No asbestos detected
121 Foundation white wall paint Basement – E. side No asbestos detected
Building: Building 12 – Mental Health Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
219 Hard plaster (base and finish coats) Front (W. Lobby) on 1 st No asbestos detected
220 Hard plaster (base and finish coats) Hallway C101 No asbestos detected
221 Hard plaster (base and finish coats) 1 st S. stairwell No asbestos detected
222 Hard plaster (base and finish coats) 2 nd
N. stairwell No asbestos detected
223 Hard plaster (base and finish coats) Basement boiler room No asbestos detected
224a 12” tan floor tile Front (W. Lobby) on 1 st No asbestos detected
224b Black mastic “” 3% Chrysotile Asbestos
225 2x4 lay-in ceiling tile “” No asbestos detected
226 Drywall mud Room 205 No asbestos detected
227a 12” tan floor tile Room 211 2% Chrysotile Asbestos
227b Black mastic “” 3% Chrysotile Asbestos
228 Window frame caulk Window of Room 120 3% Chrysotile Asbestos
229 Asphalt roofing shingle Roof No asbestos detected
230 Exterior asphalt foundation coating W. side of Bldg. by stairs 6% Chrysotile Asbestos
231 Window glazing Attic No asbestos detected
Building: Building 18 – Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
153a 12” red floor tile Room 103 No asbestos detected
153b Black mastic “” 2% Chrysotile Asbestos
154 2x2 lay-in ceiling tile Room 103 No asbestos detected
155a 12” tan floor tile Room 111 No asbestos detected
155b Black mastic “” No asbestos detected
156 Hard plaster (base and finish coats) Room 103 No asbestos detected
157 Hard plaster (base and finish coats) 1 st N. stairwell No asbestos detected
158 Hard plaster (base and finish coats) 1 st hall by 110 No asbestos detected
159 Hard plaster (base and finish coats) 2 nd
S. stairwell No asbestos detected
160 Hard plaster (base and finish coats) 2 nd hall by 200 No asbestos detected
161a 12” tan floor tile 1 st hallway by 116 No asbestos detected
161b Black mastic “” 2% Chrysotile Asbestos
162 Window frame caulk Window frame of 114 4% Chrysotile Asbestos
163 Door frame caulk E. entry door No asbestos detected
164 Asphalt roofing shingle Roof No asbestos detected
Building: Building 24 - Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
174 Asphalt roofing shingle Roof No asbestos detected
175 Window glazing 1 st floor room 111 No asbestos detected
176 Hard plaster (base and finish coats) 1 st stairwell (middle) No asbestos detected
177 Hard plaster (base and finish coats) 1 st hall by 105 No asbestos detected
178 Hard plaster (base and finish coats) 1 st hall by 120 No asbestos detected
179 Hard plaster (base and finish coats) 2 nd hall by stairwell No asbestos detected
180 Hard plaster (base and finish coats) Attic stairs No asbestos detected
181a 9” tan floor tile 1 st hallway by 127 2% Chrysotile Asbestos
181b Black mastic “” 2% Chrysotile Asbestos
182 Hot water tank insulation Basement mech. room 40% Chrysotile Asbestos
183 Aircell pipe insulation Basement hallway 70% Chrysotile Asbestos
184 Pyrobar interior wall block 2 nd floor room 211 No asbestos detected
Building: Building 25 - Ward Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
185 Door frame caulk Front entry door No asbestos detected
186a 12” red floor tile 1 st hall by front entry 2% Chrysotile Asbestos
186b Black mastic “” 3% Chrysotile Asbestos
187 Hard plaster (base and finish coats) 1 st hall by 118 No asbestos detected
187A 12” tan floor tile 1 st hall by 129 No asbestos detected
187M Black mastic “” 3% Chrysotile Asbestos
188 Hard plaster (base and finish coats) Room 129 No asbestos detected
189 Hard plaster (base and finish coats) Room 111 No asbestos detected
190 Hard plaster (base and finish coats) Room 230 No asbestos detected
191 Hard plaster (base and finish coats) Room 211 No asbestos detected
192a 12” orange floor tile Room 129 2% Chrysotile Asbestos
192b Black mastic “” 3% Chrysotile Asbestos
193 2x4 lay-in ceiling tile Room 129 No asbestos detected
194a 12” green floor tile Room 111 2% Chrysotile Asbestos
194b Black mastic “” 3% Chrysotile Asbestos
195a 12” yellow floor tile Room 229 2% Chrysotile Asbestos
195b Black mastic “” 3% Chrysotile Asbestos
196a Tan linoleum sheet flooring Elevator 15% Chrysotile Asbestos
196b Yellow mastic “” No asbestos detected
Building: Building 35 - Quarters Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
261 Window glazing Living room window No asbestos detected
262 Roof shingle Roof No asbestos detected
263 Tan linoleum sheet flooring Kitchen No asbestos detected
264 Hard plaster (base and finish coats) Kitchen No asbestos detected
265 Hard plaster (base and finish coats) Stairs to 2 nd floor No asbestos detected
266 Hard plaster (base and finish coats) 2 nd floor bathroom No asbestos detected
267 2x2 lay-in ceiling tile 1 st floor living room No asbestos detected
Building: Building 37 - Quarters Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
240 Window glazing Kitchen window No asbestos detected
241 Cellulose ceiling tile and tan glue pod Living room No asbestos detected
242 Yellow linoleum (lower layer) Kitchen 2% Chrysotile Asbestos
243 Tan linoleum (upper layer) Kitchen No asbestos detected
244 Hard plaster (base and finish coats) Kitchen No asbestos detected
245 Hard plaster (base and finish coats) Living room No asbestos detected
246 Hard plaster (base and finish coats) 2 nd floor hall by bathroom No asbestos detected
247a 12” tan floor tile 1 st floor bathroom No asbestos detected
247b Yellow mastic “” No asbestos detected
248 Tan linoleum sheet flooring 2 floor bathroom 10% Chrysotile Asbestos
Building: Building 42 – Supply Service Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
80 Window glazing Room 100 window No asbestos detected
81 Asphalt roofing shingle Roof No asbestos detected
82 2x2 lay-in ceiling tile Room 100 No asbestos detected
83a 12” brown floor tile Room 100 under carpet No asbestos detected
83b Black mastic “” No asbestos detected
84 Mag block pipe insulation Basement 45% Chrysotile Asbestos
85 Hard plaster (base and finish coats) Room 102 No asbestos detected
86 Hard plaster (base and finish coats) Room 105 No asbestos detected
87 Hard plaster (base and finish coats) 2 nd stairs No asbestos detected
88 Hard plaster (base and finish coats) Room 200 No asbestos detected
89 Hard plaster (base and finish coats) Room 200B (bathroom) No asbestos detected
90 Wall panel Room 100 No asbestos detected
Building: Building 47 – Theatre (Stinson Memorial) Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
61 2x4 lay-in ceiling tile Front lobby No asbestos detected
62 Drywall mud Stage No asbestos detected
63 Battleship flooring (tan) and mastic Stage sound booth No asbestos detected
64 12” ceiling tile Theatre ceiling No asbestos detected
65a Hard plaster (base and finish coats) Basement (E. side) No asbestos detected
65b Glue pod on plaster “” No asbestos detected
66a Hard plaster (base and finish coats) Basement (E. side) No asbestos detected
66b Glue pod on plaster “” No asbestos detected
67a Hard plaster (base and finish coats) Basement (E. side) No asbestos detected
67b Glue pod on plaster “” No asbestos detected
68 Hard plaster (base and finish coats) Balcony (N. side) No asbestos detected
69 Hard plaster (base and finish coats) Balcony (S. side) No asbestos detected
70 Window glazing Window above lobby door No asbestos detected
Building: Building 49 - Library Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
71 Popcorn decorative ceiling texture Basement (S. room) No asbestos detected
72 Popcorn decorative ceiling texture Basement middle area No asbestos detected
73 Popcorn decorative ceiling texture Basement – N. side by RR No asbestos detected
74 Hard plaster (base and finish coats) Basement (S. room) No asbestos detected
75 Hard plaster (base and finish coats) Basement E. entry No asbestos detected
76 Hard plaster (base and finish coats) 1 st floor above entry door No asbestos detected
77 Hard plaster (base and finish coats) 1 st floor stairwell No asbestos detected
78 Hard plaster (base and finish coats) 2 nd floor storage closet No asbestos detected
79 Floor leveling and black mastic Basement middle area No asbestos detected
Building: Building 50 - Canteen Sampling Date: April 2, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
91 Asphalt roofing shingle Roof No asbestos detected
92a 9” gray floor tile (under 12” tile) 1 st floor lobby 4% Chrysotile Asbestos
92b Black mastic “” No asbestos detected
93a 12” tan floor tile (over 9” tile) 1 st floor lobby No asbestos detected
93b Black mastic “” No asbestos detected
94 Tar paper under 9” floor tile “” No asbestos detected
95 2x4 lay-in ceiling tile 1 st floor lobby No asbestos detected
96 Drywall mud Kitchen office No asbestos detected
97 Hard plaster (base and finish coats) Kitchen (1 st floor N. side) No asbestos detected
98 Hard plaster (base and finish coats) Dining area (S. side) No asbestos detected
99 Hard plaster (base and finish coats) Office area in S.W. corner No asbestos detected
100 Hard plaster (base and finish coats) Stairs to basement No asbestos detected
101 Hard plaster (base and finish coats) Lobby No asbestos detected
102 12” cellulose ceiling tile Kitchen No asbestos detected
103a 12” white floor tile Kitchen 2% Chrysotile Asbestos
103b Black mastic “” 3% Chrysotile Asbestos
104 Cellulose ceiling panel Basement No asbestos detected
105 Transite cement ceiling panel Basement Elect. Vault 20% Chrysotile Asbestos
106 Basement interior wall paint Basement – E. wall No asbestos detected
Building: Building 60 – Admin. Offices Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
197 Window glazing Window on front porch No asbestos detected
198 Hard plaster (base and finish coats) 1 st floor main lobby No asbestos detected
199 Hard plaster (base and finish coats) 1 st floor – Middle stairwell No asbestos detected
200 Hard plaster (base and finish coats) 1 st floor – E. stairwell No asbestos detected
201 Hard plaster (base and finish coats) 1 st floor – W. stairwell No asbestos detected
202 Hard plaster (base and finish coats) 2 nd floor – W. stairwell No asbestos detected
203 2x4 lay-in ceiling tile 1 st floor hall by lobby No asbestos detected
204a 9” tan floor tile (under 12” tile) 1 st floor hall by E. stairwell No asbestos detected
204b Black mastic “” No asbestos detected
204c 12” tan floor tile (over 9” tile) “” No asbestos detected
204d Black mastic “” No asbestos detected
205 Basement interior wall paint Basement – E. side No asbestos detected
206 Asphalt roofing shingle Roof No asbestos detected n/a Mag. block pipe insulation Wall chases Known asbestos
Building: Building 75 – Sewage Plant Lab Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
168 Red exterior block paint S. side of building No asbestos detected
169 Window glazing E. window No asbestos detected
170 Hard plaster (base and finish coats) N. side of building No asbestos detected
171 Hard plaster (base and finish coats) Middle of building No asbestos detected
172 Hard plaster (base and finish coats) S. side of building No asbestos detected
173 Asphalt roofing shingle Roof No asbestos detected
Building: Building 94 – Single Garage Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
258 Window glazing S. window No asbestos detected
259 Asphalt roofing shingle Roof No asbestos detected
Building: Building 95 – Single Garage Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
249 Asphalt roofing shingle Roof No asbestos detected
250 Window glazing S. window 2% Chrysotile Asbestos
Building: Building 105 – Gate House Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
269 Window glazing W. window by door No Asbestos Detected
Building: Building 119 - Incinerator Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
273 Door frame caulk N. entry door No Asbestos Detected
Building: Building 120 – Pump House Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
270 Asphalt roofing shingle Roof No asbestos detected
271 Window glazing S. window 2% Chrysotile Asbestos
272 Cellulose ceiling panel N. wall by window No asbestos detected
Building: Building 122 – Mess Hall Sampling Date: April 3, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
RESULT
207 Window frame caulk W. window by dock 4% Chrysotile Asbestos
208 Hard plaster (base and finish coats) Kitchen office area No asbestos detected
209 Hard plaster (base and finish coats) N. office area off kitchen No asbestos detected
210 Hard plaster (base and finish coats) 1 st hall by dining room No asbestos detected
211 Hard plaster (base and finish coats) E. dining room No asbestos detected
212 Hard plaster (base and finish coats) Basement W. stairwell No asbestos detected
213 Black cork mastic inside freezer Basement freezer 5% Chrysotile Asbestos
214 Gray cement over cork in freezer Basement freezer No asbestos detected
215a 12” tan floor tile Freight elevator 2% Chrysotile Asbestos
215b Black mastic “” 3% Chrysotile Asbestos
216 2x4 lay-in ceiling tile N. office area No asbestos detected
217 Drywall mud N. office area No asbestos detected
218a 12” tan floor tile Dining room 2% Chrysotile Asbestos
219b Black mastic “” 3% Chrysotile Asbestos
Building: Building 128 - Transformer Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler: Brett Brumbaugh
MATERIAL SAMPLE LOCATION
LABORATORY ANALYSIS
268 Roofing shingle Roof No Asbestos Detected
Building: Building 149 - Transformer Sampling Date: April 4, 2018 Analysis Date: April 6-11, 2018 Laboratory: EMLab P&K – Marlton, NJ Accreditation: NVLAP Asbestos Bulk Accredited Laboratory # 201060-0 Sampler:…