36C25018B0818-0003001.docx

DOCX document 13 KB Posted

Attached to
Remove Building 12, Relocate Parking 610-17-102 Federal contract opportunity
Solicitation number
36C25018B0818
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0818 0003 RFI Responses.docx

View the file

Other files for this federal contract opportunity

Other files attached to Remove Building 12, Relocate Parking 610-17-102, newest first.
File Type Posted
36C25018B0818-0004001.pdf PDF
36C25018B0818-0004000.docx DOCX document
36C25018B0818-0003000.docx DOCX document
36C25018B0818-0003002.pdf PDF
36C25018B0818-0002000.docx DOCX document
36C25018B0818-0001000.docx DOCX document
36C25018B0818-003.pdf PDF
36C25018B0818-008.doc DOC document
36C25018B0818-006.pdf PDF
36C25018B0818-002.docx DOCX document
36C25018B0818-009.pdf PDF
36C25018B0818-004.pdf PDF
36C25018B0818-007.docx DOCX document
36C25018B0818-005.pdf PDF
36C25018B0818-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Responses Remove Bldg 12 & Relocate Parking

Question: Can the owner provide copies of the asbestos & lead survey that was completed for this project?

Response: Surveys have been included as attachment.

Question: Can you please clarify the sequence of work for this project?

Phase 1 - New West Parking Lot Phase 2 - New West Sidewalk Phase 3 - New East Parking Lot

Can any of the new west sidewalk be installed in conjunction with Phase 1? If not, how long will the time period be between the completion of the new west parking lot and the beginning of phase 2?

Response: All work on the West parking lot including site prep, asphalt, sidewalks, street lighting, storm drainage, etc… may be completed in phase 1. Work is permitted on the B-12 site during phase 1 as long as no parking areas are disrupted due to construction.

Question: Are truck drivers hauling material from the project site required to have the 10 Hour OSHA training?

Response: No, As long as they remain in their truck.

Question: The plans and specs identifies items to be return to the Owner. Will these items be picked up at the Building 12 Site, or are they to be delivered to another location. If delivery is required, please show the site location for delivery to the Owner.

Response: It will be the Contractors responsibility to deliver all items to the basement of building 51. This building is shown on the site map on page 4 of the drawing documents. The freight elevator in building 51 will be accessible for use.

Question: Are truck drivers required the have on PPE while on site, if they remain in their trucks?

Response: No PPE is required as long as the driver remains in the truck. If truck drivers are outside of their vehicle, they will be required to have all PPE and a 10 hours OSHA card.

Question: Is there a route the Owner wants the Contractor to utilize for trucks and mobilization of equipment to the work site?

Response: Since this project site is located near the main entrance, The Contractor will be permitted to use the main entrance as their egress route.