36C25018B0802-008.xlsx
XLSX spreadsheet 22 KB Posted
- Attached to
- (Const) Physical Security Improvement Project 539-19-204 Federal contract opportunity
- Solicitation number
- 36C25018B0802
About this file
36C25018B0802 Attachment 6 - Construction Debris Monthly Report.xlsx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0802-0001000.docx | DOCX document | |
| 36C25018B0802-004.pdf | ||
| 36C25018B0802-005.pdf | ||
| 36C25018B0802-002.docx | DOCX document | |
| 36C25018B0802-006.pdf | ||
| 36C25018B0802-007.pdf | ||
| 36C25018B0802-003.pdf | ||
| 36C25018B0802-001.docx | DOCX document | |
| 36C25018B0802-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Construction Debris
| Construction Debris -Monthly Report | |
| Required each month per specification section; 01 74 19 "Construction Waste Management" | |
| Submit Completed Report each month with Monthly Pay Application. | |
| Contract No.: | Beginning Date of this Report: |
| Project No.: | Ending Date of this Report: |
| Title of Project: | Date Project Started: |
| From: | Designated Manager: |
| (Contractors name - must be same as on the contract) | Name: |
| Address: | Telephone: |
| City: | E-Mail: |
| State/Zip: |
| A. At a minimum the following waste categories shall be diverted from landfills. | Recycled Debris | ||||
| Weight in Pounds for Recycled Debris | Cost or Credit for Recycled Debris | ||||
| B. Attach additional sheets as required. | Disposal Costs | ||||
| 1 | Soil. | $ - 0 | $ - 0 | ||
| 2 | Inerts (e.g., concrete, masonry and asphalt). | $ - 0 | $ - 0 | ||
| 3 | Clean dimensional wood and palette wood. | $ - 0 | $ - 0 | ||
| 4 | Green waste (biodegradable landscaping materials). | $ - 0 | $ - 0 | ||
| 5 | Engineered wood products (plywood, particle board and I-joists, etc). | $ - 0 | $ - 0 | ||
| 6 | Metal products (e.g., steel, wire, beverage containers, copper, etc). | $ - 0 | $ - 0 | ||
| 7 | Cardboard, paper and packaging. | $ - 0 | $ - 0 | ||
| 8 | Bitumen roofing materials. | $ - 0 | $ - 0 | ||
| 9 | Plastics (e.g., ABS, PVC). | $ - 0 | $ - 0 | ||
| 10 | Carpet and/or pad. | $ - 0 | $ - 0 | ||
| 11 | Gypsum board. | $ - 0 | $ - 0 | ||
| 12 | Insulation. | $ - 0 | $ - 0 | ||
| 13 | Paint. | $ - 0 | $ - 0 | ||
| 14 | Fluorescent lamps. | $ - 0 | $ - 0 | ||
| 15 | Transportation Costs | $ - 0 | |||
| 16 | Weight Ticket Fees | $ - 0 | |||
| 17 | $ - 0 | $ - 0 | |||
| TOTAL: | $ - 0 | $ - 0 |
| CERTIFICATION |
| I hereby certify, to the best of my knowledge and belief that-- |
| (1) The amounts listed above are true and may be validated by the Contractor's Records that are on file at the contractor's office if requested by the VA. |
| (2) Contractors Records are maintained in accordance with LEED Reference Guide and LEED Template. (para. 1.7) |
| (3) Attached copies of all 'receiving' Parties, dates removed, transportation costs, weight tickets fees, manifests, invoices to match the time period covered. (para 3.3 C) |
| (4) Daily Reports describe any problems in complying with laws, regulations and ordinances & corrective action taken. |
(Signature) (Date of signature)
(Printed Name) (Title)
File details come from the government source that posted it.