36C25018B0432-00004000.docx
DOCX document 28 KB Posted
- Attached to
- Address and Resolve Hazmat Deficiencies Federal contract opportunity
- Solicitation number
- 36C25018B0432
About this file
36C25018B0432 00004 36C25018B0432 00004.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25018B0432-017.docx | DOCX document | |
| 36C25018B0432-018.pdf | ||
| 36C25018B0432-00005000.docx | DOCX document | |
| 36C25018B0432-00003000.docx | DOCX document | |
| 36C25018B0432-00002006.pdf | ||
| 36C25018B0432-00002005.pdf | ||
| 36C25018B0432-00002007.pdf | ||
| 36C25018B0432-00002004.docx | DOCX document | |
| 36C25018B0432-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 00004 04-24-2018 538-16-103
701HL
Department of Veterans Affairs Service Area Office Central Network Contracting Office (NCO) 10 3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337 Department of Veterans Affairs Dayton VA Medical Center 3140 Governor’s Place Blvd. Suite 210 Kettering OH 45409-1337 To all Offerors/Bidders
36C25018B0432 03-22-2018
X x X The purpose of this amendment is to provide answers to Requests for Information (RFI). See attached.
1. If the plaster stabilization in Bldg. 8 does not need repaired then likewise you do not require this to be painted as well, correct?
Correct if repairs/stabilization is not required then painting the areas will also not be required.
1. One of our subcontractors would like to see the site again, is there any chance of this?
A second site visit opportunity was scheduled for 4/25/2018. No other site visits are anticipated; however, as with any project information, changes will be posted to FebBizOpps (www.fbo.gov).
1. Section 02 82 11, paragraph 3.6.6. Specifications call for TEM analyses of 13 samples for areas where this is more than 260 LF or 160 SF. Is this requirement limited to friable materials (like it is under AHERA regulations)? For example, if the quantity of floor tile mastic (non-friable) to be removed exceed these quantities, will the VPIH be procuring samples for TEM analyses within these work areas?
Any material considered to be asbestos containing materials (greater than 1% asbestos by point count) regardless of the material being friable or non-friable will require TEM analyses if the materials exceed 260 LF or 160 SF.
1. Section 02 82 11, paragraph 3.6.6. Since the clearance criteria is specified in this Section as 70 AHERA structures per square millimeter, would procuring 5 samples inside the work area be sufficient (in lieu of the 13 samples specified)?
5 samples would be sufficient inside the containment.
1. Are any of the crawlspaces identified as confined spaces?
Applicable OSHA guidelines and regulations shall be in effect for this work. VA has not specifically identified whether any of the work areas in this project are, or are not, confined spaces as defined by OSHA.
1. The scope of work says some of the hard plaster systems and gypsum board systems (as a composite) contain less than 1% asbestos and are therefore not regulated under EPA NESHAPs; one of the notes goes on the say that the gypsum board systems are ACM per OSHA regulations. In addition to “comply with OSHA 29 CFR 1926.1101” will work disturbing these materials also be completed per other requirements of 02 82 11?. For example, will the VPIH be required to perform clearance sampling at completion of work?
Since this is not considered an abatement activity and fall under only OSHA and not OEPA then the VPIH is not required.
1. What is the anticipated start date for project?
Immediately upon receipt of an awardable bid, VA will proceed with standard construction contract award proceedings including scheduling a Pre-Construction Conference. It is anticipated that Notice to Proceed will be issued at the Pre-Construction Conference.
1. Amendment 2 issued new drawings and specifications for abatement quantities, several of the buildings crawl spaces require 4” of concrete slab to be poured level. Are we to use the square footages shown on the abatement quantities for the concrete square footage?
Yes, use the dirt crawl space areas listed on the documents.
1. Will there be a spec section for concrete issued?
No. The contractor may use an LSM 100 low strength material.
1. Is there any reinforcing required?
No. The crawl spaces won’t see any traffic or loading.
1. what is the finish of the concrete to be?
A float finish that a person can crawl over without tripping.