36C25018B0093-002.pdf

PDF 11 MB Posted

Attached to
North Parking Structure 506-331 Federal contract opportunity
Solicitation number
36C25018B0093
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

36C25018B0093 S02 - Specifications Final-1.pdf

View the file

Other files for this federal contract opportunity

Other files attached to North Parking Structure 506-331, newest first.
File Type Posted
36C25018B0093-00005002.pdf PDF
36C25018B0093-00003002.pdf PDF
36C25018B0093-00002003.pdf PDF
36C25018B0093-00002005.pdf PDF
36C25018B0093-00001004.pdf PDF
36C25018B0093-00001041.pdf PDF
36C25018B0093-00001034.pdf PDF
36C25018B0093-00001024.pdf PDF
36C25018B0093-00001017.pdf PDF
36C25018B0093-00001102.pdf PDF
36C25018B0093-00001030.pdf PDF
36C25018B0093-00001106.pdf PDF
36C25018B0093-00001083.pdf PDF
36C25018B0093-00001051.pdf PDF
36C25018B0093-00001012.pdf PDF
36C25018B0093-00001110.pdf PDF
36C25018B0093-00001084.pdf PDF
36C25018B0093-00001035.pdf PDF
36C25018B0093-00001099.pdf PDF
36C25018B0093-00001096.pdf PDF
36C25018B0093-00001086.pdf PDF
36C25018B0093-00001112.pdf PDF
36C25018B0093-00001101.pdf PDF
36C25018B0093-00001029.pdf PDF
36C25018B0093-00001015.pdf PDF
36C25018B0093-00001009.pdf PDF
36C25018B0093-00001069.pdf PDF
36C25018B0093-00001070.pdf PDF
36C25018B0093-00001037.pdf PDF
36C25018B0093-00001107.pdf PDF
36C25018B0093-00001079.pdf PDF
36C25018B0093-00001053.pdf PDF
36C25018B0093-00001019.pdf PDF
36C25018B0093-00001089.pdf PDF
36C25018B0093-00001048.pdf PDF
36C25018B0093-00001098.pdf PDF
36C25018B0093-00001073.pdf PDF
36C25018B0093-00001055.pdf PDF
36C25018B0093-00001000.docx DOCX document
36C25018B0093-017.docx DOCX document
36C25018B0093-008.pdf PDF
36C25018B0093-011.pdf PDF
36C25018B0093-007.pdf PDF
36C25018B0093-003.pdf PDF
36C25018B0093-012.pdf PDF
36C25018B0093-009.pdf PDF
36C25018B0093-016.docx DOCX document
36C25018B0093-001.docx DOCX document
36C25018B0093-010.pdf PDF
36C25018B0093-006.pdf PDF
Show all 50

North Parking Structure 506-331 has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Specifications

VA Ann Arbor Healthcare System

2215 Fuller Road

Ann Arbor, Michigan 48105

Construct North Parking Structure

Station Project No. 506-331

Bancroft-AE Project No. 16-121

Divisions 00-33

Appendix

100% Final Bid Documents

August 18, 2017

Ann Arbor, MI 48105

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

Station Project No. 506-331

Bancroft-AE Project No. 16-121 08-18-2017

- BLANK -

DIVISION 00

SPECIAL SECTIONS

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

01-01-17

Station Project No. 506-331

Bancroft-AE Project No. 16-121 00 01 10-1 08-18-2017

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

SECTION 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 11-15

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 04-13

01 33 23 Shop Drawings, Product Data, and Samples 07-15

01 35 26 Safety Requirements 09-16

01 42 19 Reference Standards 05-16

01 45 29 Testing Laboratory Services 06-16

01 57 19 Temporary Environmental Controls 01-11

01 74 19 Construction Waste Management 09-13

DIVISION 02 – EXISTING CONDITIONS – NOT USED

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 12-15

03 41 33 Precast Structural Pretension Concrete 07-11

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 02-16

04 05 16 Masonry Grouting 02-16

04 20 00 Unit Masonry 02-16

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 02-16

05 31 00 Steel Decking 02-16

05 50 00 Metal Fabrications 07-14

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-15

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 11 13 Bituminous Dampproofing 02-16

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

01-01-17

Station Project No. 506-331

Bancroft-AE Project No. 16-121 00 01 10-2 08-18-2017

07 18 00 Traffic Coatings

07 19 16.01 Silane Water Repellents

07 22 00 Roof and Deck Insulation 02-16

07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 02-16

07 60 00 Flashing and Sheet Metal 07-14

07 92 00 Joint Sealants 10-15

07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 41 13 Aluminum-Framed Entrances and Storefronts 08-16

08 71 00 Door Hardware 01-16

08 80 00 Glazing 10-15

DIVISION 09 – FINISHES

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES – NOT USED

DIVISION 11 – EQUIPMENT – NOT USED

DIVISION 12 – FURNISHINGS – NOT USED

DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED

DIVISION 14– CONVEYING EQUIPEMENT – NOT USED

DIVISION 21- FIRE SUPPRESSION

21 12 00 Manual Dry Standpipe Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 12 General Motor Requirements for Plumbing Equipment 09-15

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 13 00 Facility Sanitary and Vent Piping 09-15

22 13 23 Sanitary Waste Interceptors 09-15

22 14 00 Facility Storm Drainage 09-15

22 14 36 Packaged, Submersible, Drainage Pump Units 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 34 00 HVAC Fans 02-15

23 82 00 Convection Heating and Cooling Units 04-11

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

01-01-17

Station Project No. 506-331

Bancroft-AE Project No. 16-121 00 01 10-3 08-18-2017

DIVISION 25 – INTEGRATED AUTOMATION – NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 05-14

26 09 23 Lighting Controls 05-14

26 22 00 Low-Voltage Transformers 12-15

26 24 16 Panelboards 05-14

26 27 26 Wiring Devices 01-16

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 41 00 Facility Lightning Protection 01-17

26 51 00 Interior Lighting 08-14

26 56 00 Exterior Lighting 05-14

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 06-15

27 10 00 Control, Communication and Signal Wiring 06-15

27 31 31 Voice Communications Switching and Routing Equipment -

Extension

06-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 09-11

28 05 13 Conductors and Cables for Electronic Safety and

Security

09-11

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

28 52 31 Emergency Call System 06-15

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

31 23 19 Dewatering 10-12

31 62 16 Steel Sheet Piles

31 63 16 Auger Cast Grout Piles 10-12

31 66 16.53 Soldier Pile-Lagging Walls

DIVISION 32 – EXTERIOR IMPROVEMENTS

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

01-01-17

Station Project No. 506-331

Bancroft-AE Project No. 16-121 00 01 10-4 08-18-2017

32 05 23 Cement and Concrete for Exterior Improvements 08-16

32 17 23 Pavement Markings 08-16

DIVISION 33 – UTILITIES

33 30 00 Sanitary Sewer Utilities 06-13

33 40 00 Storm Sewer Utilities 10-11

33 46 13 Foundation Drainage 10-11

DIVISION 34 – TRANSPORTATION – NOT USED

DIVISION 48 – ELECTRICAL POWER GENERATION – NOT USED

APPENDIX

Appendix A Geotechnical Evaluation Report 02-06-2017

Appendix B Expansion 1-Existing Deck Level Elevation 01-20-17

Appendix C Existing Floor Elevations 06-30-17

Appendix D Existing Lightning Protection System – Level D 08-18-17

Appendix E Masonry Restoration Work 08-18-17

Appendix F Extra Material | Attic Stock 08-18-17

Appendix G Existing Parking Garage Miscellaneous Work 08-18-17

Appendix H Existing Security Camera Conduit System 08-18-17

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

07-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 00 01 15-1 08-18-2017

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

DRAWING INDEX

DRAWING NUMBER PDF PAGE

NUMBER

DRAWING TITLE

GENERAL

G-001 01 COVER SHEET

G-002 02 GENERAL NOTES AND SYMBOLS

G-004 03 PROJECT CONSTRUCTION SCHEDULE

G-004A 04 CONSTRUCTION PHASING PLAN – PHASE I

LEVEL E

G-004B 05 CONSTRUCTION PHASING PLAN – PHASE

II PARKING GARAGE ADDITION

G-005 06 CODE ANALYSIS NOTES

G-006 07 CODE ANALYSIS PLANS

CIVIL

CD-101 08 EXISTING CONDITIONS AND DEMOLITION

PLAN

CS-101 09 DIMENSIONAL SITE PLAN

CG-101 10 GRADING PLAN

CG-102 11 SOIL EROSION CONTROL PLAN

CG-103 12 STORM WATER MANAGEMENT PLAN

CU-101 13 UTILITY PLAN

C-501 14 SITE DETAILS

LP-101 15 LANDSCAPE PLAN

L-501 16 LANDSCAPE DETAILS

STRUCTURAL

S-001 17 GENERAL NOTES AND DETAILS

S-100 18 FOUNDATION PLAN

S-101 19 LEVEL A PLAN

S-102 20 LEVEL B PLAN

S-103 21 LEVEL C PLAN

S-104 22 LEVEL D PLAN

S-105 23 LEVEL E PLAN

S-210 24 SHEARWALL ELEVATIONS AND DETAILS

S-220 25 LIGHTWALL ELEVATIONS AND DETAILS

S-401 26 STAIR DETAILS

S-501 27 FOUNDATION SCHEDULE AND DETAILS

S-502 28 FOUNDATION DETAILS

S-503 29 FOUNDATION DETAILS

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

07-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 00 01 15-2 08-18-2017

S-504 30 FOUNDATION DETAILS

S-510 31 COLUMN AND BEAM DETAILS

S-515 32 TEE DETAILS

S-520 33 STRUCTURAL DETAILS

S-521 34 STRUCTURAL DETAILS

S-522 35 STRUCTURAL DETAILS

S-601 36 LAP SPLICE SCHEDULES

ARCHITECTURAL

AD-101 37 LEVELS A AND B – DEMOLITION PLANS

AD-102 38 LEVELS C AND D – DEMOLITION PLANS

AD-103 39 LEVELS A, B, C AND D – TEMPORARY

BARRIER PLANS AND DETAILS

AD-104 40 LEVEL D – EXISTING STAIR 2

TEMPORARY BARRIER PLAN AND SECTION

AD-201 41 DEMOLITION ELEVATION

AD-202 42 DEMOLITION ELEVATIONS

AD-301 43 DEMOLITION SECTIONS

A-101 44 LEVEL A – CONSTRUCTION PLAN

A-102 45 LEVEL B – CONSTRUCTION PLAN

A-103 46 LEVEL C – CONSTRUCTION PLAN

A-104 47 LEVEL D – CONSTRUCTION PLAN

A-105 48 LEVEL E – CONSTRUCTION PLAN

A-201 49 BUILDING ELEVATIONS

A-202 50 BUILDING ELEVATIONS

A-203 51 BUILDING ELEVATIONS

A-204 52 DEDUCT ALTERNATE CONSTRUCTION PLAN

AND SECTION/ELEVATION

A-301 53 BUILDING SECTIONS

A-302 54 EXTERIOR AND INTERIOR WALL SECTIONS

A-303 55 EXTERIOR AND INTERIOR WALL SECTIONS

A-304 56 STAIR ENCLOSURE ELEVATIONS

A-305 57 RAILING ELEVATIONS AND DETAILS

A-401 58 ENLARGED DETAIL PLANS – STAIR UNITS

A-402 59 ENLARGED PLANS AND DETAILS

A-403 60 STAIR ENCLOSURE SECTIONS

A-404 61 ENLARGED DETAIL PLANS – STEEL PIPE

BOLLARDS

A-405 62 STAIR ENCLOSURE DETAILS

A-501 63 ARCHITECTURAL DETAILS

A-502 64 ARCHITECTURAL DETAILS

A-503 65 ARCHITECTURAL DETAILS

A-504 66 STAIR DETAILS

A-505 67 STAIR DETAILS

A-801 68 DOOR SCHEDULE, DOOR AND FRAME

TYPES, DOOR DETAILS

A-802 69 ALUMINUM STOREFRONT FRAME

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

07-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 00 01 15-3 08-18-2017

ELEVATIONS

APD-101 70 LEVELS A AND B EXISTING PAVEMENT

MARKINGS DEMOLITION PLANS

APD-102 71 LEVELS C AND D EXISTING PAVEMENT

MARKINGS DEMOLITION PLANS

AP-101 72 SIGN SCHEDULE AND DETAILS, STRIPING

DETAIL AND PARKING SUMMARY

AP-102 73 EXTERIOR SIGNAGE

AP-103 74 TRAFFIC COATING SYSTEM | WATER

REPELLENT SYSTEM PLANS

FIRE PROTECTION

FP-001 75 FIRE PROTECTION GENERAL NOTES,

SYMBOLS AND LEGENDS

FP-002 76 LEVEL A – EXISTING FIRE PROTECTION

PLAN

FP-101 77 LEVEL A – FIRE PROTECTION PLAN

FP-102 78 LEVEL B – FIRE PROTECTION PLAN

FP-103 79 LEVEL C – FIRE PROTECTION PLAN

FP-104 80 LEVEL D – FIRE PROTECTION PLAN

FP-105 81 LEVEL E – FIRE PROTECTION PLAN

PLUMBING

P-001 82 PLUMBING GENERAL NOTES, SYMBOLS AND

ABBREVIATIONS

P-101 83 LEVEL A – PLUMBING PLAN

P-102 84 LEVEL B – PLUMBING PLAN

P-103 85 LEVEL C – PLUMBING PLAN

P-104 86 LEVEL D – PLUMBING PLAN

P-105 87 LEVEL E – PLUMBING PLAN

P-201 88 PLUMBING ISOMETRICS

P-301 89 PLUMBING DETAILS

ELECTRICAL

E-001 90 ELECTRICAL GENERAL NOTES, SYMBOLS

AND ABBREVIATIONS

ED-101 91 LEVEL D – EXISTING ELECTRICAL

DEMOLITION PLAN

E-101 92 LEVEL A – ELECTRICAL LIGHTING AND

POWER PLAN

E-102 93 LEVEL B – ELECTRICAL LIGHTING AND

POWER PLAN

E-103 94 LEVEL C – ELECTRICAL LIGHTING AND

POWER PLAN

E-104 95 LEVEL D – ELECTRICAL LIGHTING AND

POWER PLAN

E-105 96 LEVEL E – ELECTRICAL LIGHTING AND

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

07-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 00 01 15-4 08-18-2017

POWER PLAN

E-106 97 LEVEL E – ELECTRICAL LIGHTNING

PROTECTION PLAN

E-201 98 LEVEL A AND LEVEL B – OVERALL

ELECTRICAL PLAN

E-401 99 ENLARGED ELECTRICAL POWER PLANS

E-601 100 ELECTRICAL PANEL SCHEDULES

E-701 101 ELECTRICAL RISER DIAGRAMS, FEEDER &

LIGHTING FIXTURE SCHEDULE

E-801 102 ELECTRICAL DETAILS

EC-101 103 LEVEL A – COMMUNICATION,

SURVEILLANCE AND FIRE ALARM

EC-102 104 LEVEL B – COMMUNICATION,

SURVEILLANCE AND FIRE ALARM

EC-103 105 LEVEL C – COMMUNICATION,

SURVEILLANCE AND FIRE ALARM

EC-104 106 LEVEL D – COMMUNICATION,

SURVEILLANCE AND FIRE ALARM

EC-105 107 LEVEL E – COMMUNICATION,

SURVEILLANCE AND FIRE ALARM

EC-106 108 AREA A – COMMUNICATION,

SURVEILLANCE AND FIRE ALARM PLAN

EC-701 109 MISCELLANEOUS RISER DIAGRAMS

EC-801 110 MISCELLANEOUS DETAILS

- - - END - - -

DIVISION 01

GENERAL REQUIREMENTS

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 i 08-18-2017

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SURVEYING SERVICES

1.13 LAYOUT OF WORK

1.14 AS-BUILT DRAWINGS

1.15 USE OF ROADWAYS

1.16 RESIDENT ENGINEER'S FIELD OFFICE (NOT USED)

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.18 TEMPORARY USE OF EXISTING ELEVATORS (NOT USED)

1.19 TEMPORARY USE OF NEW ELEVATORS (NOT USED)

1.20 TEMPORARY TOILETS

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

1.22 NEW TELEPHONE EQUIPMENT (NOT USED)

1.23 TESTS

1.24 INSTRUCTIONS

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 ii 08-18-2017

1.25 GOVERNMENT-FURNISHED PROPERTY

1.26 RELOCATED EQUIPMENT

1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT (NOT USED). 23

1.28 CONSTRUCTION SIGN

1.29 SAFETY SIGN

1.30 PHOTOGRAPHIC DOCUMENTATION (NOT USED)

1.31 FINAL ELEVATION DIGITAL IMAGES (NOT USED)

1.32 HISTORIC PRESERVATION (NOT USED)

1.33 VA TRIRIGA CPMS (NOT USED)

1.34 INDUSTRY STANDARDS

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-1 08-18-2017

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to Section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for the construction of the new precast concrete parking garage structure including all civil, structural, architectural, fire protection, plumbing, mechanical and electrical work as required by drawings and specifications.

B. Visits to the site by offerors shall be as specified in solicitation provision 52.236-27 Site Visit (Construction).

C. Offices of Bancroft Architects + Engineers, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer.

D. Prior to commencing work, general contractor shall provide proof that a

OSHA certified “competent person” (CP) (29 CFR 1926.20(b(2) shall maintain a presence at the work site at any time work is being performed.

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-2 08-18-2017

F. Training:

1. All on-site workers of the prime and sub-contractors shall have completed and received a certificate of completion of the 10 hour OSHA certified Construction Safety course or other equivalent competency training. The Construction Superintendent shall have completed and received certification of completing the 30 hour OSHA Construction

Safety course.

2. Submit OSHA certifications for all on-site workers to the COR prior to any worker beginning on-site work.

1.3 STATEMENT OF BID ITEM(S)

A. The Statement of Bid Item(s) is located within the solicitation

Information and Instructions to Bidder section.

B. ALL PRICING IS TO BE ENTERED IN BLOCK 17 OF THE SF1442 SOLICITATION

OFFER PAGE (BLOCK 17) OR THE BID SCHEDULE IF SO INCLUDED WITH THE

SOLICITATION.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all

Subcontractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-3 08-18-2017

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security escort arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this Section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

5. For working outside the “regular hours” as defined in the contract, the contractor shall give 5 working days prior notice to the COR so that security and any necessary escort arrangements can be provided for the workers. This notice is separate from any notices required for any required utility shutdown as described elsewhere in this specification.

C. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting Officers Representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-4 08-18-2017

D. Document Control:

1. The General Contractor is responsible for safekeeping of all drawings, project manuals and other project information. This information shall be shared only with those with a specific need to accomplish the project.

2. Should any documents, drawings, specifications, photographs, or other project documents are marked “Law Enforcement Sensitive” or

“Sensitive Unclassified”, secure such information in separate containers and limit the access to only those who will need it for the project. Any such marked security documents shall not be removed or transmitted from the project site without the written approval of

Contracting Officer. All shall be returned to the Contracting

Officer upon project completion.

a. Notify the Contracting Officer immediately when there is a loss or compromise of “sensitive information”.

b. AT THE PRE-CONSTRUCTION CONFERENCE ALL PROCEDURES INVOLVING

THE STORAGE, ENCRYPTION, SECURITY, VA STANDARDS, ETC. OF SENSITIVE

DOCUMENTS AS WELL AS THE SAFEKEEPING OF ALL CONSTRUCTION DOCUMENTS

NOT CLASSIFIED AS SENSITIVE, WILL BE DISCUSSED IN DETAIL AND

APPROPRIATE DOCUMENTATION PROVIDED FOR CONTRACTOR’S USE AND

COMPLIANCE.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-5 08-18-2017

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

C. Working space and space available for storing materials shall be as shown on the drawings.

D. Workmen are subject to rules of Medical Center applicable to their conduct.

E. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to

COR and Contractor, as follows:

Phase I: Refer to Drawing G-004 for description.

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-6 08-18-2017

Phase II: Refer to Drawing G-004 for description.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans

Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting, etc., to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

1. Immediate areas of alterations not mentioned in preceding paragraph will be temporarily vacated while alterations are performed.

F. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1 m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375 mm (15 inches). Bottom of fences shall extend to 25 mm

(one inch) above grade. Remove the fence when directed by COR.

G. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-7 08-18-2017 site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

H. Utilities Services: Maintain existing utility services for existing

Parking Garage at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems

(including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR, Chief Engineer and Chief of Facilities Management. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the

Medical Center Director’s prior knowledge and written approval.

Refer to specification Sections 26 05 11, REQUIREMENTS FOR

ELECTRICAL INSTALLATIONS; 27 05 11, REQUIREMENTS FOR COMMUNICATIONS

INSTALLATIONS; and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC

SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of existing Parking Garage. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-8 08-18-2017

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

I. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

J. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-9 08-18-2017

K. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of areas of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Prior to the furnishing of any new items and any related work thereof, a mutual agreement between the Contractor and Contracting Officer on the total cost shall first be negotiated and a contract modification executed incorporating the changed work. Contractor is cautioned only

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-10 08-18-2017 the Contracting Officer has the authority to make changes to the contract related to this section. Any changed work performed or new items provided prior to Contracting Officer authorization shall result in no adjustment to the contract price.

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-11 08-18-2017

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

B. Refer to FAR clause 52.236-7, "Permits and Responsibilities," which is included in General Conditions. A National Pollutant Discharge

Elimination System (NPDES) permit is required for this project. The

Contractor is considered an "operator" under the permit and has extensive responsibility for compliance with permit requirements. VA

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-12 08-18-2017 will make the permit application available at the VA Engineering Office

Bldg 3 Ann Arbor VA Medical Center. The contractor and affected subcontractors shall furnish all information and certifications that are required to comply with the permit process and permit requirements.

Many of the permit requirements will be satisfied by completing construction as shown and specified. Some requirements involve the

Contractor's method of operations and operations planning and the

Contractor is responsible for employing best management practices. The affected activities often include, but are not limited to the following:

- Designating areas for equipment maintenance and repair;

- Providing waste receptacles at convenient locations and provide regular collection of wastes;

- Locating equipment wash down areas on site, and provide appropriate control of wash-waters;

- Providing protected storage areas for chemicals, paints, solvents, fertilizers, and other potentially toxic materials; and

- Providing adequately maintained sanitary facilities.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-13 08-18-2017 electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

1.11 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

1. The indications of physical conditions on the drawings and in the specifications are the result of site investigations by an independent third-party professional firm.

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

C. A copy of the soil report is included in Appendix A and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Bidders shall be thoroughly familiar with the geographical and geophysical conditions of the site of work and also

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-14 08-18-2017

1.12 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor and approved by the contracting officer shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.13 LAYOUT OF WORK

A. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, roads, are in accordance with lines and elevations shown on contract drawings.

B. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

the geotechnical requirements for this project. No additional allowance shall be made for a bidder’s failure to comply with this requirement.

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-15 08-18-2017

C. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.

Furnish such certification to the COR before any major items of concrete work are placed. In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

2. Elevations of bottoms of footings and tops of floors of each building and/or addition.

3. Lines and elevations of sewers and of all outside distribution systems.

4. Lines of elevations of all swales and interment areas.

5. Lines and elevations of roads, streets and parking lots.

D. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

E. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

CONSTRUCT NORTH PARKING STRUCTURE

Bancroft Architects + Engineers

11-01-15

Station Project No. 506-331

Bancroft-AE Project No. 16-121 01 00 00-16 08-18-2017

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR’s review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.

C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.

1.16 RESIDENT ENGINEER'S FIELD OFFICE (NOT USED)

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

Bancroft-AE Project No. 16-121 01 00 00-17 08-18-2017

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e., transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

Bancroft-AE Project No. 16-121 01 00 00-18 08-18-2017

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the Contractor at the Contractor’s expense.

1.18 TEMPORARY USE OF EXISTING ELEVATORS (NOT USED)

1.19 TEMPORARY USE OF NEW ELEVATORS (NOT USED)

1.20 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

A. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the

Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR’s discretion) of use of water from Medical Center's system.

Bancroft-AE Project No. 16-121 01 00 00-19 08-18-2017

1.22 NEW TELEPHONE EQUIPMENT (NOT USED)

1.23 TESTS

A. As per specification Section 23 05 93, the Contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The Contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer.

Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a

Bancroft-AE Project No. 16-121 01 00 00-20 08-18-2017 reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system.

1.24 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous operation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to diagrams and illustrations. Illustrations shall include "exploded" views showing and identifying each separate item. Emphasis shall be placed on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly and thoroughly explained. All necessary precautions for the operation of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of the piece of equipment and system being furnished. Manuals referencing equipment similar to but of a different model, style, and size than that furnished will not be accepted.

C. Instructions: Contractor shall provide qualified, factory-trained manufacturers' representatives to give detailed…