36C25018B0093-00002004.pdf
PDF 139 KB Posted
- Attached to
- North Parking Structure 506-331 Federal contract opportunity
- Solicitation number
- 36C25018B0093
About this file
36C25018B0093 00002 S06 - Guardrail Sketch.pdf
View the file
Other files for this federal contract opportunity
Show all 50
North Parking Structure 506-331 has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
3" Concrete Topping Slab
Precast
Relieve Stone As Needed To Accommodate Base Plate And Anchors
4.15 in
4.15 in
2.00 in
2.00 in
Cross tube spacing as shown matches typical spacing at all other locations
3/8" expansion anchors 4 per post 3" min. embedment
4.15 in
Protect paint from damage during stone installation
Varies
21.00 in Min
24.50 in Max
FCD
3" Concrete Wash
5.00 "
10.00 "
5.00 "
8.00 "
23.94 " typ
4.00 "
I.F. Metalworks 16680 Industrial St Roseville, MI 48066 586-776-8311
Ann Arbor VA Parking Deck Expansion
Proposed handrail at stone cap
Level B Along A Line 26 posts total
Typ End Post Typ Mid Post
Varies
42.20 " At min condition
45.70 in at max condition
POST SPACING TO MATCH
LEVELS ABOVE
V E
R
IF
Y E
D G
E D
IS
T
A N
C E
F O
R
/8
E X
P A
N C
H O
R H
A S
B E
E N
P R
O V
ID
E
D
EQUAL SPACING. SPACES SHALL NOT ALLOW A 4"
SPHERE TO PASS THRU. VERIFY BOTTOM SPACE
MEETS THIS REQUIREMENT (CAN'T SIMPLY BE
MEASURED VERTICALLY).
BASE PLATE
THICKNESS?
42.00" MIN
WELD ALL
AROUND
Project Submittal Number:
No Exception Taken
Rejected
Submittal Not Required No Review Performed
Drawings have been reviewed for design intent and general compliance with the information given in the contract documents. Deviations from contract documents shall be clearly identified and are not reviewed nor accepted unless identified. Contractor is responsible for dimensions, quantities, fabrication, processes, and techniques of construction, coordination of its work with that of all other trades and satisfactory performance of its work.
KJW
Make Corrections Noted Resubmittal not Required
Revise and Resubmit
Walker
Date: 02/03/2017 By:
DESIGN TO MEET LOADING
REQUIREMENTS - SEE SPECS
File details come from the government source that posted it.