603-20-707 Combined Set Correct Pharmacy Physical Security Deficiencies RFI.pdf

PDF 9 MB Posted

Attached to
Project 603-20-707, Correct Pharmacy Physical Security Federal contract opportunity
Solicitation number
36C24922R0019
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9

About this file

This federal contract opportunity notice seeks proposals for hospital construction services to correct pharmacy physical security deficiencies at the Robley Rex VA Medical Center. The requirement includes specifications and drawings for Project 603-20-707. This is a 100% set-aside for Service Disabled Veteran Owned Business in accordance with U.S.C. 38 section 8127(d). The procurement will use Lowest Price Technically Acceptable source selection pursuant to FAR Part 15. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is the contracting agency. Response and award dates are not provided.

View the file

Other files for this federal contract opportunity

Other files attached to Project 603-20-707, Correct Pharmacy Physical Security, newest first.
File Type Posted
Q-A-Amendment_02-36C24922R0019.pdf PDF
36C24922R0019_0002-AddDrawing_Q A_responses.pdf PDF
S04-SiteVisit_Sign-In_Sheet (603-20-707).pdf PDF
36C24922R0019_0001_FixCSinfo.pdf PDF
S02-603-20-707 Specifications Set.pdf PDF
S02-Price Schedule Project 603-20-707.xlsx XLSX spreadsheet
P07-Wage Determination (KY20210093 03.05.2021).pdf PDF
RFIs Questions_Answers from Sol 36C24921B0016.zip ZIP file
S02-603-20-707-Drawings CombinedSet.pdf PDF
S02-36C24922R0019 (Solicitation).pdf PDF
S03-OPPORTUNITIES-DESCRIPTION (36C24922R0019).pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SEE GENERAL PROJECT NOTES FOR NEW WORK FOR ADDITIONAL REQUIREMENTS FOR WORK WITHIN THE EXISTING FACILITY.

2. THE GENERAL CONTRACTOR SHALL VERIFY ALL EXISTING DIMENSIONS AND FIELD CONDITIONS PRIOR TO DEMOLITION AND CONSTRUCTION. IF PROVIDED, THE GENERAL CONTRACTOR SHALL CAREFULLY EXAMINE EXISTING BUILDING DOCUMENTS. THE CONTRACTOR SHALL BRING ANY DISCREPANCIES TO THE IMMEDIATE ATTENTION OF THE

ARCHITECT AND C.O.R.

3. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION.

4. MAINTAIN EXIT EGRESS PATHS TO EXISTING EXIT DOORS DURING CONSTRUCTION.

5. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK AND THE ROUTES MUST BE RETURNED TO

THEIR ORIGINAL CONDITION AT THE END OF THE PROJECT.

6. MAINTAIN THE BUILDING IN A WEATHERTIGHT CONDITION AT ALL TIMES.

7. ALL DEMOLITION AND CONSTRUCTION ACTIVITIES SHALL BE COORDINATED WITH THE C.O.R. TO MINIMIZE DISRUPTIONS OF NORMAL FUNCTIONS OF THE VA'S OCCUPIED AREAS.

8. IF CONSTRUCTION NOISE IS ANTICIPATED, SUBMIT A WRITTEN REQUEST TO THE C.O.R. 48 HOURS BEFORE THE SCHEDULED TIME OF THE CONSTRUCTION ACTIVITIES. NO WORK SHALL BE DONE WITHOUT THE WRITTEN APPROVAL OF THE C.O.R. THE C.O.R. RESERVES THE RIGHT TO DISCONTINUE NOISY CONSTRUCTION AT ANY TIME. NO RADIOS SHALL BE

PERMITTED AT ANY TIME IN WORK AREAS ADJACENT TO OCCUPIED SPACES.

9. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVED BY THEM. COORDINATE ALL DISRUPTIONS OR DISCONTINUATIONS OF UTILITIES AND SERVICES WITH THE C.O.R. NO SHUT DOWN OF EXISTING SERVICES IS ALLOWED TO OCCUR UNTIL RECEIVING THE C.O.R.'S WRITTEN APPROVAL OF THE SHUT DOWN SCHEDULE. PROVIDE TEMPORARY SERVICES AND/OR UTILITIES DURING INTERRUPTIONS AS REQUIRED AND APPROVED BY

THE C.O.R.

10. THE GENERAL CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO THE VA'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED. IN THESE AREAS, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY LACK OF SUFFICIENT PROTECTION FROM THE WEATHER AND FROM THE RESULTS OF ALL CONSTRUCTION ACTIVITY INCLUDING BUT NOT LIMITED TO DUST AND

WATER.

11. THE GENERAL CONTRACTOR SHALL RECEIVE WRITTEN APPROVAL FROM THE C.O.R. BEFORE GRINDING, USING OPEN FLAMES, WELDING RODS AND TORCHES. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL MEANS AND METHODS TO PROHIBIT THE MIGRATION OF SMOKE AND OTHER PRODUCTS OF COMBUSTION INTO OCCUPIED AREAS OF THE EXISTING BUILDING AND FOR OBTAINING ALL REQUIRED PERMITS RELATED TO HOT WORK.

12. PROVIDE FIRE PROTECTION IN ACCORDANCE WITH THE REQUIREMENTS OF THE GOVERNING AUTHORITY.

13. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS, AT ANY EXISTING LOCATIONS WHICH ARE VOID OF PROTECTION WITHIN THE AREA OF WORK AND AT NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING MUST BE CONTINUOUS AND UNOBSTRUCTED.

14. DO NOT OVERLOAD THE EXISTING BUILDING STRUCTURE. MAINTAIN THE STRUCTURAL INTEGRITY OF ALL STRUCTURAL FRAMING MEMBERS AND SYSTEMS AT ALL TIMES.

15. ALL DEMOLISHED MATERIAL, EXCEPT MATERIAL THAT IS LISTED OR MARKED BY THE ARCHITECT OR THE C.O.R. FOR RETENTION, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND IT SHALL BE DISPOSED OF. NO DEBRIS RESULTING FROM WORK SHALL BE LEFT IN THE CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK. THE WEIGHT AND COST OF DISPOSAL FOR ALL CONTROLLED SUBSTANCES SUCH AS LEAD AND ASBESTOS SHALL BE TRACKED AND REPORTED. THE GENERAL CONTRACTOR SHALL NOT USE

THE VA TRASH COMPACTOR.

G E N E R A L N O T E S F O R E X I S T I N G F A C I L I T I E S :

16. REMOVAL OF A PARTICULAR ITEM IS TO INCLUDE ALL RELATED ITEMS, SUCH AS REMOVAL OF WALLS WOULD INCLUDE ASSOCIATED DOORS, HARDWARE, ELECTRICAL, PLUMBING, MECHANICAL, ETC. REFER TO DEMOLITION DRAWINGS FOR MORE INFORMATION. FOR ALL REMOVALS, THE GENERAL CONTRACTOR SHALL COORDINATE WITH ALL OTHER DISCIPLINES INCLUDING BUT NOT LIMITED TO MECHANICAL, ELECTRICAL AND PLUMBING.

17. WHERE CEILINGS ARE SHOWN TO BE REMOVED, ALL UNUSED SUSPENDED EQUIPMENT, WIRES, ANGLES, ETC. SHALL BE REMOVED. SEE DEMOLITION DRAWINGS FOR ADDITIONAL INFORMATION. EXISTING LIGHTS MAY BE MAINTAINED AS TEMPORARY CONSTRUCTION LIGHTING.

18. THE CONTRACTOR SHALL PROVIDE TEMPORARY SUPPORT FOR ITEMS NOT DEMOLISHED OR REMOVED AS REQUIRED UNTIL PERMANENT SUPPORT IS PROVIDED

IN THE FINAL CONSTRUCTION.

19. ALL OPENINGS IN EXISTING WALLS, CEILINGS AND FLOORS, WHICH ARE THE RESULT OF REMOVALS AND OTHER NEW CONSTRUCTION ACTIVITY, SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH.

20. ALL EXISTING OPENINGS IN CEILINGS, FLOORS AND WALLS DISCOVERED IN THE EXISTING STRUCTURE SHALL BE PATCHED WITH NEW MATERIALS THAT MATCH THE EXISTING MATERIALS. IF THE PATCH IS TO BE MADE IN FIRE RATED CONSTRUCTION, THE PATCH MUST ACHIEVE THE REQUIRED FIRE RATING. THE PATCH SHALL BE FINISHED TO A LIKE NEW CONDITION TO MATCH THE EXISTING FINISH. USE ONE FIRE STOPPING SYSTEM FOR ALL SUB-CONTRACTORS.

21. WHERE EXISTING SURFACES ARE TO BE REFINISHED OR ARE TO SERVE AS SUBSTRATE FOR THE ATTACHMENT OR APPLICATION OF NEW MATERIALS OR CONSTRUCTION, PREPARE OR ALTER THE EXISTING SURFACES AS NECESSARY TO PROPERLY ACCOMMODATE THE NEW MATERIALS.

22. FIELD VERIFY SIZES AND DIMENSIONS OF ALL EXISTING UTILITIES THAT IMPACT THE NEW WORK. DETERMINE THE SIZE AND LOCATION THE PENETRATIONS FROM THE EXISTING UTILITIES WITHIN THE NEW WORK. SEAL TIGHT TO ALL PENETRATIONS AND CAULK.

23. PENETRATIONS THROUGH EXISTING FIRE RATED CONSTRUCTION MUST BE PROPERLY CLOSED AND FIRE SAFE'D TO ACHIEVE THE PROPER FIRE RATING BY THE

END OF CONSTRUCTION OPERATIONS FOR EACH DAY.

24. NEW HOLES IN EXISTING ELEVATED FLOOR AND ROOF STRUCTURES FOR NEW WORK MUST BE COORDINATED WITH THE EXISTING STRUCTURE SO THAT

CRITICAL STRUCTURAL MEMBERS ARE NOT DAMAGED.

25. UNLESS OTHERWISE NOTED, THE GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING NEW MATERIAL.

1. ALL WORK SHALL COMPLY WITH ALL APPLICABLE NATIONAL, STATE AND LOCAL CODES, RULES, ORDINANCES AND REGULATIONS INCLUDING THE AMERICAN DISABILITIES ACT (ADA), ARCHITECTURAL BARRIERS ACT(ABA), THE VA BARRIER FREE DESIGN GUIDELINES AND THE AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) GUIDELINES.

2. THE C.O.R. SHALL WORK WITH THE CONTRACTOR TO PROVIDE ACCESS TO TEMPORARY SERVICES REQUIRED TO PROVIDE THE WORK INDICATED. SEE SPECIFICATION SECTION 01 00 00

FOR ADDITIONAL REQUIREMENTS ON TEMPORARY ACCESS TO VA UTILITIES.

3. THE GENERAL CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE PROVISIONS OF THE SPECIFICATIONS, INCLUDING ALL GENERAL CONDITIONS, SUPPLEMENTARY GENERAL CONDITIONS, AND MATERIAL AND CONSTRUCTION PROVISIONS, WHICH APPLY TO MATERIALS OR CONSTRUCTION METHODS REQUIRED BY THIS PROJECT.

4. PRIOR TO BIDDING, THE GENERAL CONTRACTOR SHALL VISIT THE SITE, EXAMINE, AND ACCEPT ALL EXISTING CONDITIONS. DATES FOR SITE VISITS WILL BE POSTED IN THE CONTRACT DOCUMENTS AS POSTED ON THE FEDERAL BUSINESS OPPORTUNITIES WEBPAGE FOR THIS PROJECT. UNSCHEDULED VISITS WILL NOT BE ALLOWED.

5. DO NOT PAINT ANY CAULKING OR SEALANTS WHICH ARE SUBJECT TO MOVEMENT - CONTROL JOINTS SHALL BE CAULKED AFTER PAINT AND SPECIAL COATING APPLICATIONS. PROVIDE

CAULKING OR SEALANTS IN COLORS WHICH MATCH ADJACENT FINISHED SURFACE COLORS.

6. VERIFY ALL CONDITIONS AND DIMENSIONS IN THE FIELD BEFORE FABRICATING ANY MATERIALS.

7. IT IS THE INTENT OF THE DOCUMENTS TO INDICATE COMPLETE AND OPERATIONAL SYSTEMS (I.E. STRUCTURAL, HVAC, PLUMBING, ELECTRICAL) THE CONTRACTOR SHALL PROVIDE THE SYSTEMS AS OPERATIONAL SYSTEMS WHICH COMPLY WITH APPLICABLE CODES AND REGULATIONS. THIS NOTE SHALL BE LIMITED TO THE SYSTEMS AS INDICATED BY THE DOCUMENTS AND SHALL NOT INCLUDE CHANGES TO THE SYSTEMS WHICH ALTER INDICATED CAPACITIES, OPERATIONAL CHARACTERISTICS.

8. THE GENERAL CONTRACTOR SHALL VERIFY THE SIZES OF ALL EQUIPMENT OR FIXTURES TO BE INSTALLED IN THE BUILDING THROUGH THE SUBMITTAL PROCESS, AND SHALL MAKE SPECIAL PROVISIONS FOR INSTALLATION OF ANY EQUIPMENT WHICH IS TOO LARGE TO FIT THROUGH A FINISHED OPENING.

9. ALL CONTRACTORS SHALL BE RESPONSIBLE TO PATCH AND REPAIR ALL SURFACES WHERE EXISTING CONSTRUCTION IS REMOVED OR DISTURBED BY WORK UNDER THEIR CONTRACT.

10. ALL SUSPENDED ITEMS SUCH AS CEILINGS, DUCTS, PIPES, CONDUITS, SHALL BE SUSPENDED (ATTACHED) DIRECTLY TO STRUCTURE AND SHALL NOT BE ATTACHED OR ANCHORED TO

EXISTING PLASTER, ACOUSTIC TILE.

11. NEW PENETRATIONS SUCH AS DUCTS, CONDUITS, PIPING, ELECTRICAL OUTLETS, LIGHT SWITCHES, RECESSED DEVICES OR ITEMS, HOLES, VOIDS, CRACKS. IN MODIFIED AND NEW CORRIDOR WALLS, SMOKE PARTITIONS, AND FLOOR SLABS SHALL BE SEALED TO PREVENT PASSAGE OF ANY SMOKE, FLAME, GASES. AS INDICATED IN THE CONTRACT DOCUMENTS.

12. WHERE NEW CONSTRUCTION REQUIRES CORE DRILLING THROUGH EXISTING STRUCTURAL CONCRETE FLOOR SLABS, AND WALLS THE CONTRACTOR SHALL COORDINATE HIS DRILLING WORK TO AVOID DRILLING INTO A STRUCTURAL ELEMENT, INCLUDING JOISTS, BEAMS, COLUMN. ALSO SEE ELECTRICAL. DRAWINGS AND SPECIFICATIONS.

13. WHERE NEW CONSTRUCTION IS INDICATED TO BE INSTALLED IN EXISTING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS FOR PROPER FIT AND FOR ACCESS INTO THE

BUILDING PRIOR TO SHOP DRAWING SUBMITTAL, ORDERING AND DELIVERING TO THE SITE.

14. FOR INFECTION CONTROL REASONS, WORK CONDUCTED IN THE CORRIDOR THAT DOES NOT GENERATE DUST MAY ONLY REMOVE UP TO 16 SQUARE FEET OF CEILING TILE AT ONCE. AS LONG AS THIS STANDARD IS FOLLOWED NEGATIVE AIR AND BARRIERS ARE NOT REQUIRED BY THE INFECTION CONTROL NURSES. IF DUST IS GENERATED AND GREATER THAN 16 SF OF CEILING TILES ARE DISTURBED AT ONCE THEN THE WORK AREA SHALL BE SEALED OFF WITH 6 MIL FIRE RETARDANT POLYETHYLENE AND NEGATIVE AIR PROVIDED. MAINTAIN 5' MINIMUM ACCESS IN CORRIDORS AT ALL TIMES. CLEAN THOROUGHLY PRIOR TO COMPLETION OF A GIVEN WORK AREA BY HEPA VACUUM AND WET MOP. REFER TO SPECIFICATION 01 35 26 FOR

ADDITIONAL INFORMATION.

15. NO PARKING ON VA CAMPUS.

G E N E R A L N O T E S F O R N E W W O R K :

PROJECT EXTENT

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EXP. 12/31/2021

C U s e rs

\d u n n t\ D o c u m e n ts \F

F E

L o u is v ill e C o rr e c t P h a rm a c y D e fi c ie n c ie s

C o m b in e d tj .d u n n

.r v t

/3

/2

:3

:1

P M

GI000

COVER SHEET

Owner

08/02/2021 PQ TD

CORRECT PHARMACY

DEFICIENCIES

603-20-707

LOUISVILLE, KENTUCKY

BID DOCUMENTSROBLEY REX VA

MEDICAL

CENTER

DRAWING INDEX

SHEET NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI001 ABBREVIATIONS AND SYMBOLS

GI002 OVERALL FLOOR PLAN

GI003 ICRA CLASS III REQUIREMENTS

GI004 ICRA CLASS IV REQUIREMENTS

GI103 PHASING PLANS

ARCHITECTURAL

AD101 DEMOLITION FLOOR PLANS

AD141 DEMOLITION REFLECTED CEILING PLAN

AE101 FLOOR PLANS

AC141 REFLECTED CEILING PLAN

AE411 INTERIOR ELEVATIONS, SECTIONS AND DETAILS

AE601 DOOR SCHEDULE AND DETAILS

ELECTRICAL

EE001 LEGEND AND ABBREVIATIONS

EY100 BASEMENT ELECTRICAL PLAN

EY101 FIRST FLOOR ELECTRICAL PLAN

EE501 DETAILS

ROBLEY REX VAMC

CORRECT PHARMACY DEFICIENCIES

DEPARTMENT OF VETERANS AFFAIRS

800 ZORN AVE.

LOUISVILLE, KY 40206

603-20-707

REGIONAL VICINITY MAP VICINITY MAP

N N

SITE LOCATION MAP

N

No. Revisions: Date:

10'-0"

A101

SIM

A101

SIM

A101

SIM

A101

SIM

A B B R E V I A T I O N S

LEVEL NAME W/ ELEVATION

GRID HEAD

CALL OUT HEAD W/ SHEET NUMBER

ROOM NAME W/ ROOM NUMBER, AREA & OCCUPANCY

BUILDING SECTION NUMBER W/ SHEET NUMBER

WALL SECTION NUMBER W/ SHEET NUMBER

DOOR NUMBER

WALL TAG

KEYNOTE

REVISION TAG

CEILING TAG WITH HEIGHT

DETAIL SECTION NUMBER W/ SHEET NUMBER

NORTH ARROW

A.D.

A.C.T.

ACOUS.

A/C

A.C.P.

A.B.

AREA DRAIN

ACOUSTICAL CEILING TILE

ACOUSTIC

AIR CONDITIONING

ASPHALT CONCRETE

ANCHOR BOLT

PAVING

POUND OR NUMBER

PROPERTY LINE

FLOOR LINE

ANGLE

DIAMETER

CENTERLINE

AT

AND

BD.

APPROX.

ARCH.

ASPH.

ALT.

AL.

AGG.

BLDG.

BLK.

BLKG.

BM.

BRG.

BRK.

BOT.

BITUM.

CEM.

C.B.

CARP.

CAB.

B.U.R.

BTWN.

CLKG.

CLG.J.

CLG.

C.J.

CIR.

C.I.

CER.T.

CER.

BRZ.

COMB.

COL.

C.O.

CNTR.

CMU

CLS.

CLR.

C.W.

CTR.

CONV.O.

CONT.

CONST.

CONN.

CONC.

COMP.

DF.

D.F.

DIAG.

DIA.

DIM.

DISP.

DET.

DN.

D.O.

DR.

D.S.

D.T.

D.W.

DWR.

DIV.

CLO.

DOUGLAS FIR

DRINKING FOUNTAIN

DIAMETER

DIAGONAL

DIMENSION

DISPOSAL

DIVISION

DOWN

DOOR OPENING

DOOR

DOWN SPOUT

DRAIN TILE

DISHWASHER

DRAWER

DETAIL

COLD WATER

CENTER

CONVECTION OVEN

CONTINUOUS

CONSTRUCTION

CONNECTION

CONCRETE

COMPOSITION

BENCH MARK or BEAM

BOARD

BITUMINOUS

BUILDING

BLOCK

BLOCKING

APPROXIMATE

ARCHITECT

ASPHALT

CONCRETE MASONRY

COMBINATION

COLUMN

CLEAN OUT

COUNTER

CLOSURE

CLEAR

CLOSET

CAULKING

CEILING JOIST

UNIT

CEILING

BRICK

BEARING

CONSTRUCTION JOINT

CIRCLE

CAST IRON

CERAMIC TILE

CERAMIC

CEMENT

CATCH BASIN

CARPET

CABINET

BUILT-UP ROOFING

BETWEEN

BRONZE

BOTTOM

ALTERNATE

ALUMINUM

AGGREGATE

EA.

E.E.

E.F.

E.J.

ELEC.

ELEV.

E.N.

EXISTING

EACH

EACH END

EXHAUST FAN

EXPANSION JOINT

ELECTRICAL

ELEVATION

EDGE NAIL

(E)

ADJUSTABLEADJ.

LP

LC

LF

Ø

ABOVE FINISH FLOORAFF

CONTRACTOR FURNISH/

OWNER INSTALL

C.F.O.I.

C.F.C.I. CONTRACTOR FURNISH/

CONTRACTOR INSTALL

E.C. ELECTRICAL CONTRACTOR

C.HK. COAT HOOK

C.B.B. CEMENTITIOUS BACKER

BOARD

A.C.M. ASBESTOS CONTAINING

MATERIALS

CW. CURTAINWALL

DWG(S). DRAWING(S)

FACE OF BUILDINGF.O.B.

FIXTURE

FACE OF CONCRETE

FLOOR

FLOOR JOIST

FLOOR LINE

FLASHING

FACE NAIL

GAUGE

FOOTING

FUTURE

FACE OF STUD

FIRE RETARDANT

TREATED WOOD

FACE OF MASONRY

FACE OF FINISH

F.O.S.

F.R.T.W.

FTG.

FUT.

GA.

FIXT.

F.J.

F.L.

FLASH.

FLR.

F.N.

F.O.C.

F.O.F.

F.O.M.

BEAM

GLASS

GLUE LAMINATED

GALVANIZED IRON

GRATE ELEVATION

GRAB BAR

GARBAGE DISPOSAL

GRADE

HOSE BIB

SHEET METAL

GYPSUM BOARD

HANDICAPPED

GALVANIZED

GROUND

HC.

GYP.BD.

H.B.

G.B.

G.D.

G.S.M.

GR.

GND.

GLB.

GL.

G.I.

G.E.

HEIGHT

HOUR

HEATING

HIGH POINT

HORIZONTAL

HOLLOW METAL

HARDWARE

HARDWOOD

INTERIOR

INVERT

HOT WATER

INSULATION

INSIDE DIAMETER

& AIR CONDITIONING

HEATING, VENTILATION

H.W.

INV.

INT.

INSUL.

I.D.

HDWE.

HDWD.

H.V.A.C.

HTG.

HR.

H.P.

HORIZ.

H.M.

HGT.

HDR. HEADER

JOIST

JANITOR

KITCHEN

JOINT

LABORATORY

JOIST HANGER

LAG BOLT

LAVATORY

LAMINATE

J.H.

JAN.

L.B.

LAV.

LAM.

LAB.

KIT.

JT.

JST.

EQUIV.

E.S.

E.W.

EXP.

EXP.B.

EXPO.

EXT.

F.

ENCL.

F.B.

F.BD.

F.BELL

F.B.O.

F.D.

FDN.

F.E.

FH.M.S.

F.HORN

F.F.

F.G.

FGL.

F.H.

F.E.C.

F.A.

FH.W.S.

FIN.

F.H.S.

ENCLOSURE

EQUIVALENT

EACH SIDE

EACH WAY

EXPANSION

EXPANSION BOLT

EXPOSURE

EXTERIOR

FLAT HEAD MACHINE

SCREW

SCREW

FIRE HORN

FIRE HOSE STATION

FLAT HEAD WOOD

FINISH

FLOOR DRAIN

FOUNDATION

FIRE EXTINGUISHER

FIRE EXTINGUISHER

FINISH FLOOR

FINISH GRADE

FIBERGLASS

FIRE HYDRANT

CABINET

FIRE ALARM

FACE BRICK

FIREBOARD

FIRE BELL

FURNISHED BY OTHERS

FACE

GALV. GALVANIZED

HOLLOW STRUC. STL.H.S.S.

FLUORESCENTFLOUR.

GENERAL CONTRACTORG.C.

E.W.C. ELECTRIC WATER CLOSET

FIRE VALVE CABINETF.V.C.

FOOD SERVICE EQUIPMENT

CONTRACTOR

F.S.E.C.

H.V.A.C. CONTRACTORH.C.

FIRE SUPPRESSION

CONTRACTOR

F.S.C.

PLASTIC LAMINATEP.LAM.

O.H.W.S.

SCREW

OVAL HEAD WOOD

APPROVAL)

PAPER TOWEL DISPENSER

PAPER TOWEL

PARTITION

DOUGLAS FIR

PRESSURE TREATED

REFLECTED CEILING

RADIUS

RUBBER BASE

QUARRY TILE

POLYVINYL-CHLORIDE

RECEPTACLE

R.C.P.

Q.T.

RAD.

R.B.

P.T.D.

PTN.

P.T.R.

P.V.C.

P.T.D.F.

REDWOOD

REFERENCE

REINFORCING

ROOF HATCH

ROUND HEAD METAL

RESILIENT

REFRIGERATOR

ROOF DRAIN

SCREW

ROOM

RAIN WATER LEADER

ROUGH OPENING

ROUND HEAD WOOD

SCREW

RDWD.

R.H.W.S.

R.W.L.

R.O.

RM.

R.H.M.S.

R.H.

RESIL.

REINF.

REFR.

REF.

R.D.

LIGHT

MATERIAL

LOW POINT

LIVE LOAD

LEFT HAND

MAT.

LT.

L.P.

L.L.

L.H.

MANHOLE

MINIMUM

MEDIUM

MANUFACTURER

MEMBRANE

MECHANICAL

MEDICINE CABINET

MACHINE BOLT

METAL

MASONRY OPENING

METAL THRESHOLD

MISCELLANEOUS

MODULAR

MOISTURE RESISTANT

MIRROR

M.C.

M.B.

MIN.

MH.

MFG.

MEMB.

MED.

MECH.

MIR.

MISC.

M.O.

MOD.

M.R.

M.T.

MTL.

MAX. MAXIMUM

NORTH

NATURAL

OVER

NUMBER

NOMINAL

NOT TO SCALE

NOT IN CONTRACT

OBSCURE

OUTSIDE DIAMETER

STUD

OFFICE

OUTSIDE FACE OF

ON CENTER

OVERFLOW

OVERALL

N.T.S.

O/ O.A.

OBS.

O.C.

O.D.

O.F.

OFF.

O.F.S.

(NOT PART OF OSA

N.

NAT.

N.I.C.

NO.

NOM.

PAINT

PLATE

PERFORATED

FOOT

POUNDS PER CUBIC

PANEL EDGE NAILING

PRESSED METAL

PAIR

FRAME

FOOT

POUNDS PER LINEAR

PLYWOOD

POUNDS PER SQUARE

PROPERTY

PLASTER

P.

P.C.F.

P.E.N.

PERF.

PL.

PLAS.

P.L.F.

PLYWD.

P.M.F.

PR.

P.S.F.

PROP.

OPP. OPPOSITE

POINT

PULL STATION

POUNDS PER SQUARE

INCH

P.STA.

PT.

P.S.I.

FOOT

(N) NEW

PLAN

REQUIREDREQD.

NON-COMBUSTIBLENON/COM

PLUMBING CONTRACTORP.C.

MECHANICAL, ELECTRICAL,

PLUMBING

M.E.P.

FRAMED MIRRORMR.

ROBE HOOKR.HK.

MOP HOLDERMP.H.

MOUNTEDMTD.

PAINTEDPTD.

TONGUE AND GROOVE

DRAWINGS

SOUTH

SEE CIVIL DRAWINGS

STORM DRAIN

SOLID CORE WOOD DOOR

DRAWINGS

SHEET

SIMILAR

SLIDING

SHEATHING

SHOWER

SECTION

SEALANT

SEE ELECTRICAL

SOLID BLOCKING

SOAP DISPENSER

SEE ARCHITECTURAL

S.E.D.

SHR.

SHT.

SIM.

SL.

SHTG.

S.BLKG.

S.A.D.

S.

SECT.

SEAL.

S.DISP.

S.D.

S.C.D.

SCWD

SQUARE

DRAWINGS

SPECIFICATION

SOUNDPROOF

DRAWINGS

STATION

STEEL

STORAGE

STANDARD

SUSPENDED

STRUCTURAL

DRAWINGS

STAINLESS STEEL

SEE MECHANICAL

SANITARY SEWER

SEE STRUCTURAL

SQUARE FOOT (FEET)

THICK

TEMPERED

TELEPHONE

TERRAZZO

TACKBOARD

TOP OF CURB

TRANSOM

TOP OF PLATE

TOP OF WALL

TOILET PAPER DISPENSER

TOE NAIL

TOOL JOINT

TOP OF PAVEMENT

TOP AND BOTTOM

T.O.C.

T.O.P.

T.O.PL.

T.O.W.

T.P.D.

TRN.

S.M.D.

SPEC.

S.P.

SQ.

S.S.D.

S. STL.

STO.

STL.

STD.

STA.

S.S.

SQ. FT.

T.B.

T&B.

TEL.

TEMP.

TER.

T&G.

SUSP.

T.J.

T.N.

THK.

STRUC.

S.L.D. SEE LANDSCAPE

TYPICAL

UNLESS NOTED OTHERWISE

URINAL

UNFINISHED

TELEVISION

VENT TO ROOF

VERTICAL

VESTIBULE

VERIFY IN FIELD

VINYL TILE

VINYL COMPOSITION

TILE

VERTICAL GRAIN

WEST

WITH

WINDOW

WOOD

WATER CLOSET

VINYL WALL COVERING

WITHOUT

WEIGHT

YARD

WATER PROOF

WATER HEATER

WATER COOLER

WELDED WIRE FABRIC

WATER RESISTANT

W/O

W.W.F.

W.P.

W.R.

WT.

YD.

T.V.

TYP.

UNF.

U.N.O.

V.C.T.

VERT.

VEST.

V.G.

V.I.F.

UR.

V.W.C.

W.

W/

W.C.

V.T.R.

W.F.

W.H

WDW.

WD.

V.T.

T.S. TUBE STEEL

SELF ADHERED SHEET

MEMBRANE

S.A.S.M.

SELF ADHERED FLEXIBLE

FLASHING

S.A.F.F.

WITHINW/IN

UNDERSIDEU/S

SANITARY NAPKIN

DISPOSAL

S.N.D.

T.S.C.D. TOILET SEAT COVER

DISPENSER

SANITARY NAPKIN

DISPENSER

S.N.V.

TOP OF SEATT.O.S.

SOUND ATTENUATION

BATT

S.A.B.

Name

Elevation

Room name

150 SF

S Y M B O L S

V.A. FURNISHED / CONTRACTOR

INSTALLED

(VC)

V.A. FURNISHED AND INSTALLED(VV)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EXP. 12/31/2021

C U s e rs

\d u n n t\ D o c u m e n ts \F

F E

L o u is v ill e C o rr e c t P h a rm a c y D e fi c ie n c ie s

C o m b in e d tj .d u n n

.r v t

/3

/2

:3

:1

P M

GI001

ABBREVIATIONS AND SYMBOLS

Owner

08/02/2021 PQ TD

CORRECT PHARMACY

DEFICIENCIES

603-20-707

LOUISVILLE, KENTUCKY

BID DOCUMENTSROBLEY REX VA

MEDICAL

CENTER

BVA

ELEVATOR

3/4" MP

/4

M

P

/4

M

P /4

M

P

/4

M

P

/4

M

P

1-1/4" MP

3/4" MP

3/4" MP

NINA TURNER

CRAWFORD/LIVERS

ALEXANDER, 2 QA FOLKS

GARY SMITH

SMITH/GUDGEON

EAGLE/TACKETT

SHERRELL PAYNE

FERNANDO RIOS

ED GREGORY

CAROLYN LANHAMWALT CARPENTER TERE SCHOEMEHL

ANDERSON/MADDOX/ORR

6 STAFF

TOM WHALEN ET AL

MARYJANE CROWDER

RHONDA SMITH DON PFANNENSTIEL SVC OFFICERS

BROWN/HOLLAND

LARRY MARTIN

JOHN TALLEY

CRUZ/CROUCH

SHELLY HOUSE

TOM HAYDEN

THOMPSON/HEAD/TURPIN

JOHN KOENIG

MARCIA SMITH

SERVICE OFFICERS

RITA FLOWERS

MYRA SMITH

SANDY COOPER

UP DOWN

UP

UP

UP

UP

UP

FIRE

EQUIPMENT

CLOSET

A-021

F.A.C.

A-020

H.A.C.

H.V.A.C.

EQUIPMENT

ROOM

A-005c

A-012

CLOSET

ELECTRIC

A-001

A&MM

A-017a

REPRODUCTION

MAIL ROOM

D-002b

CLOSET

TELE.

D-002a

CLOSET

ELECT.

B-002d

BASEMENT

SUB-

M-001

M-002a

STORAGE

SPD

B-004

DUMBWAITER

MACHINE

ROOM

B-002g

B-002c

ROOM

SEWING

B-002b

STORAGE

EMS

B-002

ROOM

LINEN

A.C.

EQUIPMENT

ROOM

B-002f

B-002e

RESTROOM

B-001a

STORAGE

B-001

OFFICE

B-002a

ROOM

LOCKER

B-003

LINEN

SOILED

B-008

CLOSET

ELECTRIC

M-002

STORAGE

MECH RM/

B-005

SPD

M-003

ROOM

MECHANICAL

D-004

TREATMENT CENTER

CHIEF, PROSTHETIC

D-001

STORAGE

ORTHO

STAIRWELL

#8

D-002

MAIL ROOM

BREAK/

D-005a

OFFICE

LAB

D-010

CLASSROOM

D-005

P & O

D-010c

VESTIBULE

D-010d

RESTROOM

D-010b

#9

STAIRWELL

A-018

ROOM

DECONTAMINATION

A-031d

STORAGE

A-033b

CLOSET

NARCOTICS

H.V.A.C.

EQUIPMENT

ROOM

A-033a

INCOMING

INSPECTION

ROOM

A-027

A-033h

CLOSET

ELECTRIC

A-033e

AREA

WORK

A-034

ROOM

BREAK

S-5

S-5

P-4

A-022

LOBBY

ELEVATOR

A-022a

CLOSET

ELECTRIC

A-033f

OFFICE

A-033g

OFFICE

A-024

ROOM

EQUIPMENT

A-025

STORAGE

SAFETY

P-3

P-2

P-1

A-033

PHARMACY

IN-PATIENT

A-032

LINEN

SOILED

A-026

STORAGE

A-028

BREAK ROOM

PHARMACY

A-031e

STORAGE

A-029

#6

STAIRWELL

F.A.C.

A-029a

BASEMENT

SUB-

A-030

ROOM

EQUIP.

A-031c

A-031

VENDING STORAGE

CANTEEN

A-031b

STORAGE

A-031a

STORAGE

B-016c1

ROOM

LOCKER

B-016c

LOUNGE

B-018

ADMIN

A&MM

B-019a

CLOSET

TELEPHONE

B-006a

BASEMENT

SUB-

B-039a

OFFICE

SPD

A-018a

STORAGE

B-042a

STORAGE

B-041

SHOWER

WOMEN'S

B-009

STORAGE

ENG

B-042

SHOWER

MEN'S

B-007

CLOSET

ELECTRIC

B-006

#3

STAIRWELL

B-010

ROOM

EQUIPMENT

BREAK

ROOM

B-040

HAZARDOUS

MATERIAL

STORAGE

B-039b

INSTRUMENT

PREPARATION

ROOM

B-039

TELEPHONE

EQUIPMENT

ROOM

B-019

B-005b

SPD

B-005c

OFFICE

P-7 P-8 P-9

F.A.C.

B-011b

STORAGE

ENGINEERING

A&MM

STORAGE

B-021

B-038

HOLDING

LIFT

B-037

MORGUE

B-020

RECOVERY

SILVER

B-036

ROOM

SPECIMEN

F.A.C.

B-022

SUPERVISER

MAINT. OPERATION

EMS

EQUIPMENT

STORAGE

B-017

B-015

STORAGE

ENGINEERING

B-013

EQUIPMENT

ELECTRICAL

B-016

SHOP/STORAGE

ENGINEERING

M-004

ROOM

GENERATOR

B-034

SECRETARY

EMS

B-036b

STORAGE

B-035

OFFICE

CHIEF, EMS

B-036a

RESTROOM

EMS

SIGNAGE

ROOM

B-023

EMS

OFFICE

B-024

B-025a

BASEMENT

SUB-

INTERIOR

DESIGNER'S

OFFICE

B-034a

EMS

SUPERVISOR'S

OFFICE

B-032

B-031

RESTROOM

WOMEN'S

B-033

ROOM

MULTIPURPOSE

MEN'S

LOCKER

ROOM

B-026

B-026a

RESTROOM

B-025

#5

STAIRWELL

B-026b

SHOWERS

B-027

ENGINEERING

BIOMEDICAL

WOMEN'S

LOCKER

ROOM

B-030

B-030a

SHOWERS

B-029

ENGINEERING

BIOMEDICAL

B-027a

STORAGE

BIOMED

P.M. & R.

FITNESS

ROOM

B-028

PATIENT

SERVICES

SECTION

D-003

M-005

ROOM

GENERATOR

B-016a

CLOSET

COMMUNICATIONS

PHARMACY DRUG

VAULT

CLOSET

ENG

A-017d

B-002a1

ARMORY

D-010a

STORAGE

CAGE

STORAGE

A-005

SOILED

LINEN

A-004

MEN'S

RESTROOM

A-003

WOMEN'S

RESTROOM

A-002

VOLUNTEER

ESCORT

A-006

VOLUNTER

SIGN IN

A-007

LOUNGE

A-008k PHARMACY

STORAGE

A-011

CAGE

A-011a

STAIRWELL #1

A-014

COMM

CLOSET

A-013

TELEPJONE

CLOSET

A-015

OFFICE

A-017c

MAIL

ROOM

A-017b

STORAGE

A-008f

STORAGE

A-008l

SUB-BAS

A-010a

STAIRWELL #2

A-010

CHIEF

VOLUNTARY SERVICE

OFFICE

A-008g

VOLUNTARY

OFFICE

A-008h

VOLUNTARY

OFFICE

A-008i

OFFICE

A-008j

OFFICE

A-009

D-007

RECEPTION

D-008

ROOM

CAST

D-009

FITTING

EXAM

D-006

AREA

WALK

D-006a

FABRICATION

ORTHO

D-005b

SEWING ROOM

LEATHER &

D-006b

ROOM

WORK

P.M. & R.

FITNESS

ROOM

B-028

B-016d

OFFICE

BUILDING MGR

B-016e

LOCKSMITH

A-017e

STORAGE

MAIL

ROOM

A-017

A-016f

HOLDING

A-016e

ROOM

BREAK

HVAC

EQUIP

A-016g

A-016c

STORAGE

A-016d

ASSISTANT

PROGRAM

A-016a

ROOM

RADIO

POLICE

OFFICE

A-016

A-016b

OFFICE

CHIEF POLICE

STERILE

SUPPLY

STORAGE

A-019b

A-023a

OFFICE

A-023

WAREHOUSE

A-019d

OFFICE

A-019c

AREA

BREAKDOWN

A-019

STORAGE

MATERIALS MANAGEMENT

A-019a

ROOM

EQUIPMENT

CART

WASH

A-018b

B-029a

OFFICE

BIOMED SUPVR

A-008b

OFFICE

A-008a

WAITINGA-008c

OFFICE

DAV

A-008e

ROOM

MULTI PURPOSE

B-005a

SPD

STERILIZERS

B-039c

SILVER

RECOVERY

A-005a

STORAGE

A-005b

#7

STAIRWELL

ELECTRIC

CLOSET

B-028a

OFFICE

B-028b

B-016b

ROOM

EQUIPMENT

STORAGE

A-011a

A-030a

COMPACTOR

TRASH

PROGRAM

ASSISTANT

OFFICE

A-008d

P-10

ELEVATOR

VOLUNTARY

SUITE

A-008

B-011

SHOP VESTIBULE

ENGINEERING

E-002

RECEPTION

A-033d

ROOM

CLEAN

A-033c1

ROOM

CHEMO

A-033c

ROOM

ANTE

B-011c

OFFICE

ENGINEERING

A-001a

ELECTRICAL

B-001

SUPERVISOR OFFICE

SUPPORT SERVICES

B-039a

OFFICE

SPD

B-011a

SHOP

A.C.

E-003

VESTIBULE

E-001

LOBBY

WEST ENTRANCE

E-005

GROUP THERAPY

E-004

STAIR

B-016d

STORAGE

ENGINEERING

E-007

MEN E-008

WOMEN

E-006

MECH

E-005a

STORAGE

B-011d

OFFICE

ENGINEERING

B-016d1

ELECTRICAL

LOADING DOCK

ENGINEERING

Basement Floor

JOAN NORMAN

DICKERSON

BARBARA HUFFINES

KELLY MONTGOMERY LINDA BRASHEARS

GLASS CANOPY ABOVE

OPAQUE CANOPY

ELEVATOR

SNACKFROZEN PEPSI

MICRO

WAVE

CHANGE

P E

P S

I

UP

B-122

ROOM

EXAM

F.A.C.

B-130

CLOSET

ELECTRIC

A-113b

SPECIALIST OFFICE

HEALTH SYSTEM

A-113a

OFFICE

PUBLIC AFFAIRS

A-104f

OFFICE

MED SVC

A-104e

OFFICE

MED SVC

A-104m

STORAGE

A-104l

STORAGE

A-120

CLOSET

TELEPHONE

A-111

OFFICE

COMPLIANCE OFFICER

ACTIVATION

OFFICE

A-112

A-104h

EXAM ROOM

OCCUPATIONAL HEALTH

A-104g

OFFICE

OCCUPATIONAL HEALTH

A-104i

OFFICE

OCCUPATIONAL HEALTH

DECEDENT

AFFAIRS

A-109

COMPLIANCE

OFFICE

A-110

A-104k

OFFICE

OCCUPATIONAL HEALTH

A-104j

MULTIPURPOSE ROOM

OCCUPATIONAL HEALTH

A-108

STORAGE

EEO

A-109a

CLOSET

A-113c

OFFICE

PATIENT ADVOCATE

A-114

CLOSET

ELECTRIC

A-118

#2

STAIRWELL

A-117a

STORAGE

A-117

ROOM

STORAGE

F.A.C.

A-126

CLOSET

ELECTRIC

A-102b

ROOM

MULTIPURPOSE

A-102

OPERATOR

TELEPHONE

A-104c

OFFICE

INFECTION CONTROL

A-104d

OFFICE

MED SVC

A-103

OFFICE

A-104

A-107

H.A.C.

A-102a

RESTROOM

A-101a

AREA

VENDING

A-154

CLOSET

ELECTRIC

A-131

LOUNGE

STAFF

A-130

CLOSET

COMM

H.V.A.C.

EQUIPMENT

ROOM

A-125

A-127

#1

STAIRWELL

F.A.C.

A-128

H.A.C. A-129

CLOSET

TELEPHONE

B-104c

CLOSET

TELEPHONE

B-104a

OFFICE

NEUROPSYCH

B-104b

OFFICE

PSYCH-TECH

B-102a

HOLDING ROOM

B-102

VA POLICE

B-103

VENDING

B-104

OFFICE

NEUROPSYCHOLOGY

B-106

CLOSET

COMPUTER

B-105

CLOSET

ELECTRIC

B-172

WAITING

EYE CLINIC

B-107

#8

STAIRWELL

D-102

CLOSET

TELE.

D-101

CLOSET

ELECTRIC

D-105

RESTROOM

STAFF

B-108

STORAGE

B-109

STORAGE

CYLINDER

D-125

RECEPTION

D-121

H.A.C.

D-129

STORAGE

D-128

UTILITY

SOILED

D-118

EXAM ROOM

SCI

B-121

ROOM

CONSULT

D-119

RESTROOM

PATIENT

D-117

LOUNGE

STAFF

D-116

#9

STAIRWELL

CONTROLLED

SUBSTANCE

AREA

A-156g

A-175e

OFFICE

CHIEF OF STAFF

A-175f

OFFICE

DIRECTOR'S

DIRECTOR'S

CONFERENCE

ROOM

A-160

A-175a

H.A.C.

A-157a

CLOSET

ELECTRIC

A-101

LOBBY

MAIN

A-175h

ROOM

MULTIPURPOSE

ASSOCIATE

DIRECTOR'S

OFFICE

A-175g

COMPLIANCE OFFICER

OFFICE

A-177 A-176

OFFICE

COMPLIANCE

A-175i

SPECIALIST

HEATH SYSTEM

A-156

PHARMACY

P-3

A-157

LOBBY

SERVICE ELEVATOR

S-5

S-6

P-4

P-2

P-1

A-159

RESTROOM

WOMEN'S

H.V.A.C.

EQUIPMENT

ROOM

A-156k

A-175

SUITE

DIRECTOR'S

A-175c

STORAGE

A-175b

ROOM

MULTIPURPOSE

AO TO

AD OF OPERATIONS

A-173

FACILITY PLANNER

OFFICE

A-174 A-171

OFFICE

NURSING

A-172

OFFICE

NURSING

A-170

ROOM

BREAK

F.A.C.

A-162

RESTROOM

MEN'S

A-161

#6

STAIRWELL

A-165

CLOSET

ELECTRIC

A-163

CLOSET

ELECTRIC

A-164

CONFERENCE ROOM

H.V.A.C.

EQUIPMENT

ROOM

A-167

A-169

OFFICE

NURSING

A-168

OFFICE

NURSING

A-166

OFFICE

NURSING

C-134

ROOM

BREAK

C-149

#5

STAIRWELL

C-139

ROOM

EXAM

C-137

ROOM

EXAM

C-138

ROOM

EXAM

C-135

ROOM

EXAM

C-136

ROOM

EXAM

C-114

RESTROOM

WOMEN'S

C-103

UTILITY

SOILED

C-126

ROOM

EXAM

C-125

ROOM

EXAM

C-123

STATION

NURSE'S

C-124

ROOM

CONSULT

B-137

ROOM

X-RAY

B-154

AREA

RECEPTION

B-155

CASHIER

AGENT

B-157

OFFICE

TRAVEL

B-149

ROOM

X-RAY

B-151

ROOM

DRESSING

A-156i

VAULT

FLAME

A-156h

VAULT

NARCOTICS

B-152

H.A.C. B-150

ROOM

DRESSING

B-148

ROOM

DRESSING

B-153

RESTROOM

B-138a

ROOM

BREAK

B-138

ROOM

BREAK/PROCESSING

B-126

TRIAGE

B-129

#3

STAIRWELL

C-155a

CLOSET

ELECTRIC

FEC

B-125

ROOM

CONSULT

B-124

ROOM

EXAM

P-7 P-8

C-100

ROOM

TREATMENT

B-135

ROOM

DRESSING

BIOMEDICAL

ENGINEERING

OFFICE

B-134

B-136

ROOM

DRESSING

P-9

C-130

RECEPTION

POD B

C-129

ROOM

CONSULT

C-128

TRIAGE

NURSE

C-127

ROOM

EXAM

B-141

ROOM

STERIS

B-143

EXAM

ENT

B-140

ROOM

EXAM

B-142

ROOM

STORAGE

B-147

EXAM

ENT

B-146

EXAM

ENT

B-144

EXAM

ENT

C-116

OFFICE

NURSE'S

B-139

ROOM

X-RAY

C-120

ROOM

EXAM

C-121

ROOM

EXAM

C-122

ROOM

CONSULT

C-131

RECEPTION

POD C

C-117

ROOM

CONSULT

C-118

ROOM

EXAM

C-119

ROOM

EXAM

B-145

EXAM

ENT

C-150

OFFICE

SURGERY ADPAC

FEC

C-132a

CLOSET

ELECTRIC

C-132b

CLOSET

COMPUTER

C-115

OFFICE

ATTENDING

C-132c2

CLOSET

TELEPHONE

C-132

POD D

C-105

ROOM

EXAM

B-123

ROOM

EXAM

C-104

UTILITY

CLEAN

C-106

ROOM

EXAM

C-107

ROOM

EXAM

C-108

ROOM

EXAM

C-110

ROOM

EXAM

C-109

ROOM

EXAM

C-111

ROOM

EXAM

C-113

RESTROOM

MEN'S

C-112

ROOM

EXAM

C-140

#7

STAIRWELL

C-148

H.A.C.

C-146

STORAGE

CLERK

OFFICE

C-147

C-145

RESTROOM

MEN'S

C-144

RESTROOM

WOMEN'S

FEC

C-143

ROOM

EXAM

C-141

ROOM

PROCEDURE

C-142

ROOM

MULTIPURPOSE

OFFICE

A-104a

A-126a

CLOSET

COMM.

VIS

COORDINATOR

OFFICE

A-116

A-113

SUITE

PATIENT ADVOCATE

A-104b

OFFICE

INFECTION CONTROL

A-158

AREA

PHARMACY CONSULT

A-156c

OFFICE

A-156d

OFFICE

A-156b

OFFICE A-156f

OFFICE

A-156e

OFFICE

A-156j

BREAK AREA

A-156i

OPTIFILL

PHARMACY

CHIEF'S OFFICE/

CONFERENCE

A-156a

RESTROOM

A-175f1

STORAGE

A-175f2

A-166A

RECEPTION

NURSING

B-154a

WAITING

C-154

WAITING

POD A/B

C-153

WAITING

POD C

C-152

WAITING

POD C

C-151

WAITING

POD D/E

C-133

OFFICE

RN SUPERVISOR

C-132c

OFFICE

C-132c1

CLOSET

MECH

D-100

WAITING

MEN'S

RESTROOM

A-124

WOMEN'S

RESTROOM

A-121

NURSE

OFFICE

A-119

B-111

OPTICIAN

B-113e

STORAGE

B-113c

ROOM

EXAM

B-113d

ROOM

EXAM

B-113b

ROOM

LASER

B-113f

ROOM

EXAM

B-113h

FIELDS

VISUAL

B-113g

ROOM

EXAM

B-114

OFFICE

SURGERYB-112

OFFICE

TECHNICIANS

B-116

SHOP

COFFEE

B-115a

STORAGEB-113a

ROOM

WAITING

B-113s

H.A.C.

B-113i

ROOM

PROCEDURE

B-113q

RESTROOM

STAFF

B-115

ROOM

CAST

B-117

OFFICE

CLINIC

B-119

ROOM

EXAM

B-118

ROOM

EXAM

ATTENDING

OFFICE

B-113r

B-110

OFFICE

BROS

B-113k

ROOM

EXAM

B-113j

ROOM

EXAM

B-113l

ROOM

EXAM B-113p

RESTROOM

B-113m

ROOM

EXAM

B-113n

ROOM

EXAM

B-113o

OFFICE

RESIDENT

B-113t

OFFICE/RECEPTION

CLINIC

TRAINING ROOM

HR LINKS

JT USE COPIER

A-115

C-101

TRIAGE

NURSE

C-102

TRIAGE

NURSE

B-128

RESTROOM

C-115a

STORAGE

CLEAN

A-100

VESTIBULE

B-100

VESTIBULE

B-101

INFORMATION

PATIENT

B-113

SUITE

EYE CLINIC

A-131a

RESTROOM

STAFF

A-153k

BAY

ISOLATION

A-153i

OFFICE

STAFF

A-153j

RESTROOM

STAFF

A-153h

BAY

ISOLATION

A-153f

BAY

ER

A-153g

BAY

ER

A-153e

BAY

ER

A-155

H.A.C.

A-153d

BAY

ER

B-159

COORDINATORS

TRANSFER

BRINK, MONTGOMERY

B-156

CLERK

FEE

B-133

WORKER

SOCIAL

B-132

H.A.C.

MEN'S

RESTROOM

B-131

WOMEN'S

RESTROOM

C-155

A-153

NURSES' STATION

EMERGENT CARE

A-153c

RESTROOM

B-158

OFFICE

MEANS

B-171

UTILITY

SOILED

B-170

OFFICE

SUPERVISOR

B-165b

OFFICE

B-165a

ROOM

FILE

B-165

ADMISSIONS

B-166

ROOM

ADMISSIONS

B-167

ROOM

ADMISSIONS

B-168

ROOM

MEANS

B-169

ROOM

PHOTO ID

B-160

OFFICE

ELIGIBILITY

B-161

OFFICE

ELIGIBILITY

B-162

OFFICE

ELIGIBILITY

B-163

OFFICE

NURSING

A-139

WAITING

URGENT

B-164

WAITING

ER

A-140

TRIAGE

A-141

OFFICE

A-142

H.A.C. A-143

UTILITY

SOILED

A-153a

BAY

ER

A-153b

BAY

ER

A-153n

BAY

ER

A-153m

BAY

ER

A-153l

BAY

ER

A-144

UTILITY

CLEAN

A-149

EQUIPMENT

CLEAN

A-148

NURSES' STATION

URGENT CARE

A-147

RESTROOM

A-146

PHLEBOTOMY

A-145

WORKROOM

DOCTORS'

A-138

DECONTAMINATION

A-137

EQUIPMENT

DECONTAMINATION

A-135

ROOM

EXAM

A-136

ROOM

EXAM

A-134

ROOM

EXAM

A-133

ROOM

EXAM

SS1-1

SHELTER-FRONT

SMOKING

A-132

VESTIBULE

AMBULANCE

P-10

ELEVATOR

A-113d

OFFICE

PATIENT ADVOCATE

D-126

RESIDENTS

UofL

D-124

ROOM

EXAM

D-111

EXAM

POLY/MED

D-110

EXAM ROOM

POLY/MED

D-109

EXAM ROOM

POLYD-108

OFFICE

POLY

D-107

EXAM ROOM

POLY

D-106

OFFICE

POLY

D-103

OFFICE

D-104

OFFICE

POLY

D-115

ROOM

EXAM

D-114

OFFICE

SCI

D-113

EXAM ROOM

MED

D-112

EXAM ROOM

POLY/MED

D-131

ROOM

EXAM

D-130

ROOM

EXAM

D-120

ROOM

TA

D-122

ROOM

EXAM

D-127

ROOM

TREATMENT

D-132

ROOM

EXAM

EXAM

ROOM

D-123

B-120

OFFICE

CLINIC MGR

B-127

OFFICE

CLINIC COORDINATOR

ASSOC. DIRECTOR

PATIENT CARE SVCS

OFFICE

A-176a

AO TO

CHIEF OF STAFF

A-175d

E-002

RECEPTION

E-003

VESTIBULE

E-001

LOBBY

WEST ENTRANCE

E-005

GROUP THERAPY

E-004

STAIR

B-016d

STORAGE

ENGINEERING

E-007

MEN E-008

WOMEN

E-006

MECH

E-005a

STORAGE

B-016d1

ELECTRICAL

First Floor

AE101

AE101

AE101

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EXP. 12/31/2021

C U s e rs

\d u n n t\ D o c u m e n ts \F

F E

L o u is v ill e C o rr e c t P h a rm a c y D e fi c ie n c ie s

C o m b in e d tj .d u n n

.r v t

/3

/2

:3

:1

P M

GI002

OVERALL FLOOR PLAN

Owner

08/02/2021 PQ TD

CORRECT PHARMACY

DEFICIENCIES

603-20-707

LOUISVILLE, KENTUCKY

BID DOCUMENTS

ROBLEY REX VA

MEDICAL

TYPICAL IDEAL

CONSTRUCTION LAYOUT

CLASS III

SCALE: 1/2"=1'-0"

A A

SUSPENDED PLASTIC ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE INSPECTION SHEETS

VISIBLE TO PUBLIC

PROVIDE STICKY MATS (CHANGED END OF

SHIFT OR MORE IF NECESSARY TO MAINTAIN

CLEANLINESS)

INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY DAILY).

IF NOT, VERIFY ALL OPENINGS, SUCH AS DOORS, ARE

CLOSED AND / OR CHANGE OUT NEGATIVE AIR PRE-FILTER

PROVIDE A 6'-0" x 4'-0" WALK OFF MAT

INSIDE OF WORK AREA (CHANGE

WHEN NECESSARY TO MAINTAIN

CLEANLINESS)

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

TAPE ALL SERVICES TO PROTECT

AGAINST CONTAMINATION

OPTIONAL EXHAUST DUCTS (COVER

THE GRATES AND THE DIFFUSERS)

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT

COVER ALL RETURNS AT THE

GRATE / DIFFUSERS

OUTSIDE OF BUILDING

E

A

O

V

MONTHLY CHANGED HEPA

FILTER

HEPA NEGATIVE AIR UNIT

WEEKLY CHANGED (OR

MORE AS NEEDED) PRE-

FILTER

FIRE RATED PLYWOOD (REFER TO

ELEVATION)

F

LE

X D

U C

T

CROSS-SECTION 'A-A'

SCALE: 1/2"=1'-0"

CLASS III

FINISHED FLOORING TO BE KEPT CLEAN. FLOORS

NOT BEING REPLACED TO BE PROTECTED OR

COVERED WITH ROSEN PAPER / FIRE RATED

PLYWOOD

EXISTING CEILING

EXISTING FIRE

SPRINKLER SYSTEM

EXISTING WALLEXISTING WALL

EXISTING CONCRETE SLAB FLOORING

HEATED DETECTOR CUT-OFF

HEPA NEGATIVE AIR UNIT

FIRE RATED PLYWOOD

(TEMP. REMOVE GLASS

PANEL)

EXISTING WINDOW FRAME

MOBILE CONTAINMENT CART

SCALE: 1/2"=1'-0"

(CONST. BARRIER TYPES)

EXISTING CONCRETE SLAB FLOORING

FLEX DUCT

HEPA NEGATIVE AIR UNIT

FLEX DUCT

PLASTIC WINDOW (ON

ALL SIDES

ZIPPER SIDE ENTRY

MOBILE CONTAINMENT CART WITH

CANVAS / 1-1/4" SQUARE STEEL

TUBULAR FRAME

SWIVEL CASTERS TWO WITH

LOCKING OUTTER BRAKES

A D

JU

S

T A

B

LE

H

E

IG

H T

A D

JU

S

T A

IG

H T

ROOM ELEVATION

POST ICRA, ILSM, FIRE

INSPECTION SHEETS VISIBLE

TO PUBLIC

SUSPENDED PLASTIC ZIPPER WALL

CURTAIN BARRIER

A P

P R

O X

A

.F .F

INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY

DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,

ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-

FILTER.

INDICATOR (REFER TO PLAN

& ELEVATION)

FRAMED PICTURE OF

C.O.R. WITH CONTACT

INFO

CONST. SUPERVISOR

NAME AND CELL

PHONE

CHILLER PLANT AFTER HOURS

CONTACT PHONE NUMBER FIRE

EMERGENCY DIAL 911

COMING SOON!!!

- DESCRIPTION OF NEWLY PROPOSED OCCUPANCY -

PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES

AND PROPER I.D.

THIS IS A

RESTRICTED AREA

AREA UNDER CONSTRUCTION

PAPER CADDY

ICRA, ILSM, FIRE WATCH,

MISC. FORMS

FRAMED COPY OF C.O.R.

CERTIFICATION

C L A

S S

I

II

1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO

PREVENT CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS IF INDICATED.

4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL

DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES

DEPARTMENT.

1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

4. WET MOP AREA WITH DISINFECTANT.

5. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

PRIOR TO ANY CONSTRUCTION

POST CONSTRUCTION

7. PLACE A WALK-OFF MAT AND A STICKY MAT AT ENTRANCE AND EXIT WORK AREAS.

3. REMOVE AND DISCARD WALK-OFF MAT AND STICKY MAT AT ENTRY AND WORK AREAS.

8. PROVIDE INSPECTED/DATED FIRE EXTINGUISHER(S) IN THE WORK AREAS.

CLASS III WORK ITEMS NOTES:

GENERAL NOTES:

ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT AND SAFETY GLASSES ALONG

WITH ANY OTHER PPE REQUIRED IN THAT AREA.

ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.

PERMITS TO INCLUDE:

ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES, UTILITY SHUT-DOWN, FIRE / SMOKE

WALL, FIRE ALARM SYSTEM.

THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION. NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS. (WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY. CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT.

MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.

CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.

DURING CONSTRUCTION BE CERTAIN THAT:

• BARRIER ARE INTACT AND MAINTAINED.

• PARTICLE COUNT METER IS AVAILABLE.

• NEGATIVE INDICATOR IS AVAILABLE

• INSPECTED / DATED FIRE EXTINGUISHER(S) ARE AVAILABLE & MOUNTED PROPERLY.

• ICRA REQUIREMENTS ARE INTACT AND VERIFY THEY ARE BEING MAINTAINED.

• WALK-OFF MATS AND STICKY MATS ARE MAINTAINED PROPERLY.

LOW RISK

OFFICE AREAS

PATIENT RISK GROUPS

MEDIUM RISK HIGH RISK HIGHEST RISK

CARDIOLOGY CCU ANY AREA CARING FOR

ECHOCARDIOGRAPHY

ENDOSCOPY

NUCLEAR MEDICINE

PHYSICAL THERAPY

RADIOLOGY/MRI

RESPIRATORY THERAPY

EMERGENCY ROOM

LABOR & DELIVERY

LABORATORY (SPECIMEN)

NEWBORN NURSERY

OUTPATIENT SURGERY

PEDIATRICS

IMMUNOCOMPROMISED PATIENTS

BURN UNIT

CARDIAC CATH LAB

CENTRAL STERILE SUPPLY

INTENSIVE CARE UNITS

MEDICAL UNIT

PHARMACY

POST ANESTHESIA CARE UNIT

SURGICAL UNITS

NEGATIVE PRESSURE ISOLATION ROOMS

ONCOLOGY

OPERATING ROOMS INCLUDING

C-SECTION ROOMS

LOW RISK GROUP

CONSTRUCTION PROJECT TYPE

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D

I II II III/IV

II

II III/IV

III/IV

III

III/IV

IV

IV

IV

I

I

II

CONSTRUCTION PROJECT BY PATIENT RISK

IC MATRIX - CLASS OF PRECAUTIONS:

INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK

NOTE:

LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

WALL CONST. TYPES (DETAILS)

ON FLOOR PLAN.

ROOF METAL DECKING

2' x 4' SUSPENDED ACOUSTICAL CEILING AS

SCHEDULED ON FLOOR PLAN

3 5/8" INSULATED WALL WITH 16 GA. METAL

STUD AT 16" O.C. WITH 5/8" GYPSUM BOARD

EACH SIDE. WALL TO EXTEND TO ROOF

METAL DECKING

4 7/8"

4" RUBBER COVE TO MATCH EXISTING

AREA BASE @ BOTH SIDES

ATYPE BTYPE

C E

IL

IN

G H

E

IG

H T

W A

L L H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

C E

IL

IN

G H

E

IG

H T

W A

L L H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

3 5/8" INSULATED WALL WITH 16 GA. METAL

STUD AT 16" O.C. WITH 5/8" GYPSUM BOARD

EACH SIDE.

2' x 4' SUSPENDED ACOUSTICAL CEILING AS

SCHEDULED ON FLOOR PLAN

4 7/8"

4" RUBBER COVE TO MATCH EXISTING

AREA BASE @ BOTH SIDES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EXP. 12/31/2021

C U s e rs

\d u n n t\ D o c u m e n ts \F

F E

L o u is v ill e C o rr e c t P h a rm a c y D e fi c ie n c ie s

C o m b in e d tj .d u n n

.r v t

/3

/2

:3

:1

P M

GI003

ICRA CLASS III REQUIREMENTS

Owner

08/02/2021 PQ TD

CORRECT PHARMACY

DEFICIENCIES

603-20-707

LOUISVILLE, KENTUCKY

BID DOCUMENTSROBLEY REX VA

MEDICAL

CROSS-SECTION 'A-A'

SCALE: 1/2"=1'-0"

CLASS IV

FINISHED FLOORING TO BE KEPT CLEAN. FLOORS

NOT BEING REPLACED TO BE PROTECTED OR

COVERED WITH ROSEN PAPER / FIRE RATED

PLYWOOD

EXISTING CEILINGEXISTING FIRE

SPRINKLER SYSTEM

EXISTING WALLEXISTING WALL

EXISTING CONCRETE SLAB FLOORING

HEATED DETECTOR CUT-OFF

HEPA NEGATIVE AIR UNIT

FIRE RATED PLYWOOD

(TEMP. REMOVE GLASS

PANEL)

EXISTING WINDOW FRAME

TYPICAL IDEAL

CONSTRUCTION LAYOUT

CLASS IV

SCALE: 1/2"=1'-0"

A A

POST ICRA, ILSM, FIRE INSPECTION SHEETS

VISIBLE TO PUBLIC

INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY DAILY).

IF NOT, VERIFY ALL OPENINGS, SUCH AS DOORS, ARE

CLOSED AND / OR CHANGE OUT NEGATIVE AIR PRE-FILTER

(TYPICAL REGULATOR INSTALLATION)

PROVIDE A 6'-0" x 4'-0" WALK OFF MAT

INSIDE THE TEMPORARY ANTE ROOM

(CHANGE WHEN NECESSARY TO

MAINTAIN CLEANLINESS)

ABC TYPE FIRE EXTINGUISHER ON

PORTABLE FLOOR BRACKET. ILSM MAY

REQUIRE MORE THAN ONE OR WALL

MOUNTED. NEED INSPECTION TAG AND

MONTHLY INSPECTION. INITIALS / DATED

TAPE ALL SERVICES TO PROTECT

AGAINST CONTAMINATION

OPTIONAL EXHAUST DUCTS (COVER

THE GRATES AND THE DIFFUSERS)

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT

COVER ALL RETURNS AT THE

GRATE / DIFFUSERS

OUTSIDE OF BUILDING

E

A

O

V

MONTHLY CHANGED HEPA

FILTER

HEPA NEGATIVE AIR UNIT

WEEKLY CHANGED (OR

MORE AS NEEDED) PRE-

FILTER

FIRE RATED PLYWOOD (REFER TO

ELEVATION)

F

LE

X D

U C

T

ATYPE

BTYPE

TEMPORARY ANTE ROOM

HARD BARRIER

BLUE CORE LOCKSET

(LOCKED AT ALL TIMES)

PROVIDE STICKY MATS (CHANGED END OF

SHIFT OR MORE IF NECESSARY TO MAINTAIN

CLEANLINESS)

ELEVATION

(REFER TO ELEV.

DETAIL)

ANTE ROOM

ELEVATION

POST ICRA, ILSM, FIRE INSPECTION

SHEETS VISIBLE TO PUBLIC

A P

P R

O X

A

.F .F

INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY

DAILY), IF NOT VERIFY ALL OPENINGS, SUCH AS DOORS,

ARE CLOSED AND/OR CHANGE OUT NEGATIVE AIR PRE-

FILTER.

PAPER CADDY

ICRA, ILSM, FIRE WATCH,

MISC. FORMS

COMING SOON!!!

- DESCRIPTION OF NEWLY PROPOSED OCCUPANCY -

PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY GLASSES

AND PROPER I.D.

THIS IS A

RESTRICTED AREA

AREA UNDER CONSTRUCTION

FRAMED PICTURE OF

C.O.R. WITH CONTACT

INFO

CONST. SUPERVISOR

NAME AND CELL

PHONE

CHILLER PLANT AFTER HOURS

CONTACT PHONE NUMBER FIRE

EMERGENCY DIAL 911

INDICATOR (REFER TO PLAN

& ELEVATION)

MOBILE CONTAINMENT CART

SCALE: 1/2"=1'-0"

(CONST. BARRIER TYPES)

EXISTING CONCRETE SLAB FLOORING

FLEX DUCT

HEPA NEGATIVE AIR UNIT

FLEX DUCT

PLASTIC WINDOW (ON

ALL SIDES

ZIPPER SIDE ENTRY

MOBILE CONTAINMENT CART WITH

CANVAS / 1-1/4" SQUARE STEEL

TUBULAR FRAME

SWIVEL CASTERS TWO WITH

LOCKING OUTTER BRAKES

A D

JU

S

T A

IG

H T

A D

JU

S

T A

IG

H T

C L A

S S

I V

1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT

CONTAMINATION OF DUCT SYSTEM.

2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL

AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH

PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR

VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.

3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR

FILTRATION UNITS IF INDICATED.

4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM

7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS

INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL.

9. ROOM AND/OR SHALL BE THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL

SERVICES DEPARTMENT.

2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS

ASSOCIATED WITH CONSTRUCTION.

5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.

6. WET MOP AREA WITH DISINFECTANT.

SO THEY CAN BE VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS.

SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.

SITE OR THEY CAN WEAR CLOTH OR PAPER COVERALLS THAT ARE REMOVED EACH

TIME THEY LEAVE THE WORK SITE.

3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.

7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

PRIOR TO ANY CONSTRUCTION

POST CONSTRUCTION

1. OBTAIN APPROVAL BY MCOT TEAM TO REMOVE BARRIERS.

8. PLACE A WALK-OFF MAT AND A STICKY MAT AT ENTRANCE AND EXIT WORK AREAS.

8. REMOVE AND DISCARD WALK-OFF MAT AND STICKY MAT AT ENTRY AND WORK AREAS.

9. PROVIDE INSPECTED/DATED FIRE EXTINGUISHER(S) IN THE WORK AREAS.

CLASS IV WORK ITEMS NOTES:

GENERAL NOTES:

ALL PERSONNEL ENTERING THE CONSTRUCTION SITE AREA MUST WEAR A HARD HAT AND SAFETY GLASSES ALONG

WITH ANY OTHER PPE REQUIRED IN THAT AREA.

ALL APPLICABLE FORMS TO BE COMPLETED AND APPROVED PRIOR TO STARTING WORK.

PERMITS TO INCLUDE:

ICRA, ILSM, ABOVE CEILING, FIRE SPRINKLER SYSTEM, MEDICAL GASES, UTILITY SHUT-DOWN, FIRE / SMOKE

WALL, FIRE ALARM SYSTEM.

THE CONSTRUCTION AREA MUST MAINTAIN A NEGATIVE PRESSURE VENTILATION. NEGATIVE AIR UNIT TO BE MAINTAINED WITH FILTER(S) REPLACEMENT PER SPECIFICATIONS. (WEEKLY REPLACEMENT OF PRE-FILTER OR AS NECESSARY. HEPA FILTER REPLACED MONTHLY. CLEAN ALL EXTERIOR SURFACES OF CARTS AND TOOLS AT THE END OF EACH SHIFT.

MONITOR NEGATIVE PRESSURE AND POST LOG AT THE END OF EACH SHIFT.

CONSTRUCTION CLASS WILL BE DETERMINED BY THE CONSTRUCTION SAFETY COMMITTEE.

DURING CONSTRUCTION BE CERTAIN THAT:

• BARRIER ARE INTACT AND MAINTAINED.

• PARTICLE COUNT METER IS AVAILABLE.

• NEGATIVE INDICATOR IS AVAILABLE

• INSPECTED / DATED FIRE EXTINGUISHER(S) ARE AVAILABLE & MOUNTED PROPERLY.

• ICRA REQUIREMENTS ARE INTACT AND VERIFY THEY ARE BEING MAINTAINED.

• WALK-OFF MATS AND STICKY MATS ARE MAINTAINED PROPERLY.

LOW RISK GROUP

CONSTRUCTION PROJECT TYPE

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D

I II II III/IV

II

II III/IV

III/IV

III

III/IV

IV

IV

IV

I

I

II

CONSTRUCTION PROJECT BY PATIENT RISK

IC MATRIX - CLASS OF PRECAUTIONS:

INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK

NOTE:

LEVEL INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.

LOW RISK

OFFICE AREAS

PATIENT RISK GROUPS

MEDIUM RISK HIGH RISK HIGHEST RISK

CARDIOLOGY CCU ANY AREA CARING FOR

ECHOCARDIOGRAPHY

ENDOSCOPY

NUCLEAR MEDICINE

PHYSICAL THERAPY

RADIOLOGY/MRI

RESPIRATORY THERAPY

EMERGENCY ROOM

LABOR & DELIVERY

LABORATORY (SPECIMEN)

NEWBORN NURSERY

OUTPATIENT SURGERY

PEDIATRICS

IMMUNOCOMPROMISED PATIENTS

BURN UNIT

CARDIAC CATH LAB

CENTRAL STERILE SUPPLY

INTENSIVE CARE UNITS

MEDICAL UNIT

PHARMACY

POST ANESTHESIA CARE UNIT

SURGICAL UNITS

NEGATIVE PRESSURE ISOLATION ROOMS

ONCOLOGY

OPERATING ROOMS INCLUDING

C-SECTION ROOMS

WALL CONST. TYPES (DETAILS)

ON FLOOR PLAN.

ROOF METAL DECKING

2' x 4' SUSPENDED ACOUSTICAL CEILING AS

SCHEDULED ON FLOOR PLAN

3 5/8" INSULATED WALL WITH 16 GA. METAL

STUD AT 16" O.C. WITH 5/8" GYPSUM BOARD

EACH SIDE. WALL TO EXTEND TO ROOF

METAL DECKING

4 7/8"

4" RUBBER COVE TO MATCH EXISTING

AREA BASE @ BOTH SIDES

ATYPE BTYPE

C E

IL

IN

G H

E

IG

H T

W A

L L H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

C E

IL

IN

G H

E

IG

H T

W A

L L H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

3 5/8" INSULATED WALL WITH 16 GA. METAL

STUD AT 16" O.C. WITH 5/8" GYPSUM BOARD

EACH SIDE.

2' x 4' SUSPENDED ACOUSTICAL CEILING AS

SCHEDULED ON FLOOR PLAN

4 7/8"

4" RUBBER COVE TO MATCH EXISTING

AREA BASE @ BOTH SIDES

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EXP. 12/31/2021

C U s e rs

\d u n n t\ D o c u m e n ts \F

F E

L o u is v ill e C o rr e c t P h a rm a c y D e fi c ie n c ie s

C o m b in e d tj .d u n n

.r v t

/3

/2

:3

:1

P M

GI004

ICRA CLASS IV REQUIREMENTS

Owner

08/02/2021 PQ TD

CORRECT PHARMACY

DEFICIENCIES

603-20-707

LOUISVILLE, KENTUCKY

BID DOCUMENTSROBLEY REX VA

MEDICAL

SOILED LINEN

A-004

MEN'S RESTROOM

A-003

SILVER RECOVERY

A-005a

STORAGE

A-005b

H.V.A.C. EQUIPMENT ROOM

A-005c

STORAGE

A-005d

PHARMACY DRUG VAULT

A-005e

PHASE I

CONTROLLED SUBSTANCE

AREA

A-156g

NARCOTICS VAULT

A-156h

OFFICE

A-156e

OFFICE

A-156f

BREAK AREA

A-156jPHARMACY

A-156

PHASE II

PHARMACY OPTIFILL

A-156d

SERVICE ELEVATOR LOBBY

A-157 PHARMACY CONSULT AREA

A-158

PHASE IB

PHASE IA

P H A S I N G N O T E S :

PHASE I: INCLUDES ALL WORK ASSOCIATED WITH ROOM A-005d, STORAGE, AND ROOM A-005e, PHARMACY DRUG VAULT. WORK IS PERMITTED TO COINCIDE WITH PHASE

IA AND/OR PHASE IB.

PHASE IA: INCLUDES SHEET METAL AND GYPSUM BOARD INSTALLATION AT SERVICE

ELEVATOR LOBBY, A-157. WORK IS PERMITTED TO COINCIDE WITH PHASE I.

PHASE IB: INCLUDES WINDOW INSTALLATION IN ROOM A-156d, PHARMACY OPTIFILL AND ALL WORK ASSOCIATED WITH ROOM A-156h. WORK IS PERMITTED TO COINCIDE WITH

PHASE I AND SHALL NOT START UNTIL THE COMPLETION OF PHASE IA.

PHASE II: INCLUDES ALL WORK ASSOCIATED WITH ROOM A-156g, CONTROLLED SUBSTANCE AREA, AND ROOM A-156h, NARCOTICS VAULT. AT THE BEGINNING OF

PHASE II, THE VA SHALL TEMPORARILY RELOCATE ALL NARCOTICS AND

SUPPLIES TO A-005e, PHARMACY DRUG VAULT. ALL REMAINING EQUIPMENT

SHALL BE TEMPORARILY RELOCATED BY THE VA UNTIL COMPLETION OF PHASE.

WORK MUST BE PRECEDED BY PHASE I, BUT MAY COINCIDE WITH PHASE IA AND

PHASE IB. ALL TEMPORARY WALLS SHALL COMPLY WITH ICRA LEVEL IV DURING

THIS PHASE - REFER TO SHEET "GI004 - ICRA CLASS IV REQUIREMENTS".

DAYGATE PANEL OF DOOR-04 SHALL BE THE LAST ITEM INSTALLED IN THIS

PHASE.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EXP. 12/31/2021

C U s e rs

\d u n n t\ D o c u m e n ts \F

F E

L o u is v ill e C o rr e c t P h a rm a c y D e fi c ie n c ie s

C o m b in e d tj .d u n n

.r v t

/3

/2

:3

:2

P M

GI103

PHASING PLANS

Owner

08/02/2021 PQ TD

CORRECT PHARMACY

DEFICIENCIES

603-20-707

LOUISVILLE, KENTUCKY

BID DOCUMENTS

ROBLEY REX VA

MEDICAL

CENTER

1/4" = 1'-0"

ENLARGED BASEMENT FLOOR PLAN

1/4" = 1'-0"

ENLARGED FIRST FLOOR PLAN - CONTROLLED SUBSTANCE

1/4" = 1'-0"

ENLARGED FIRST FLOOR PLAN - PHARMACY OPTIFILL

KEYPLAN - 1ST FLOOR

KEYPLAN - BASEMENT

SOILED LINEN

A-004

MEN'S RESTROOM

A-003

SILVER RECOVERY

A-005a

STORAGE

A-005b

H.V.A.C. EQUIPMENT ROOM

A-005c

STORAGE

A-005d

PHARMACY DRUG VAULT

A-005e

HOLD

1' - 6" 4' - 0" 25

CONTROLLED SUBSTANCE

AREA

A-156g

NARCOTICS VAULT

A-156h

OFFICE

A-156e

OFFICE

A-156f

BREAK AREA

A-156j

PHARMACY

A-156

FLAME VAULT

A-156i

/2

/2

HOLD

6"

TEMPORARY

ANTE ROOM

TEMPORARY

ANTE ROOM

/8

15 26

15 26

PHARMACY OPTIFILL

A-156d

SERVICE ELEVATOR LOBBY

A-157 PHARMACY CONSULT AREA

A-158

ELEV. 5

15 16

P H A S I N G N O T E S :

PHASE I: INCLUDES ALL WORK ASSOCIATED WITH ROOM A-005d, STORAGE, AND ROOM A-005e, PHARMACY DRUG VAULT. WORK IS PERMITTED TO COINCIDE WITH PHASE

IA AND/OR PHASE IB.

PHASE IA: INCLUDES SHEET METAL AND GYPSUM BOARD INSTALLATION AT SERVICE

ELEVATOR LOBBY, A-157. WORK IS PERMITTED TO COINCIDE WITH PHASE I.

PHASE IB: INCLUDES WINDOW INSTALLATION IN ROOM A-156d, PHARMACY OPTIFILL AND ALL WORK ASSOCIATED WITH ROOM A-156h. WORK IS PERMITTED TO COINCIDE WITH

PHASE I AND SHALL NOT START UNTIL THE COMPLETION OF PHASE IA.

PHASE II: INCLUDES ALL WORK ASSOCIATED WITH ROOM A-156g, CONTROLLED SUBSTANCE AREA, AND ROOM A-156h, NARCOTICS VAULT. AT THE BEGINNING OF

PHASE II, THE VA SHALL TEMPORARILY RELOCATE ALL NARCOTICS AND

SUPPLIES TO A-005e, PHARMACY DRUG VAULT. ALL REMAINING EQUIPMENT

SHALL BE TEMPORARILY RELOCATED BY THE VA UNTIL COMPLETION OF PHASE.

WORK MUST BE PRECEDED BY PHASE I, BUT MAY COINCIDE WITH PHASE IA AND

PHASE IB. ALL TEMPORARY WALLS SHALL COMPLY WITH ICRA LEVEL IV DURING

THIS PHASE - REFER TO SHEET "GI004 - ICRA CLASS IV REQUIREMENTS".

DAYGATE PANEL OF DOOR-04 SHALL BE THE LAST ITEM INSTALLED IN THIS

PHASE.

G E N E R A L N O T E S :

A. ALL WORK SHALL BE DONE DURING NORMAL V.A. BUSINESS HOURS. CONTRACTOR SHALL

SCHEDULE ALL DISRUPTIVE WORK AFTER HOURS AT THE COR'S DISCRETION.

B. CONTRACTOR SHALL PROVIDE TEMPORARY SIGNAGE TO MAINTAIN PATH OF EGRESS.

C. ALL WORK AREAS SHALL COMPLY WITH ICRA LEVEL III UNLESS NOTED OTHERWISE. MAINTAIN

NEGATIVE AIR PRESSURE WITHIN WORK SITE. REFER TO SHEET "GI003 - ICRA CLASS III

REQUIREMENTS".

D. CONTRACTOR SHALL PROVIDE TEMPORARY LIGHTING AS REQUIRED TO PROVIDE FUNCTIONAL

LIGHTING LEVELS WITHIN AND OUTSIDE OF TEMPORARY WALL CONSTRUCTION.

E. CONTRACTOR SHALL VERIFY ALL MEASUREMENTS PRIOR TO CONSTRUCTION.

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

U.S. Department of Veterans Affairs

B

C

D

E

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

EXP. 12/31/2021

C U s e rs

\d u n n t\ D o c u m e n ts \F

F E

L o u is v ill e C o rr e c t P h a rm a c y D e fi c ie n c ie s

C o m b in e d tj .d u n n

.r v t

/3

/2

:3

:5

P M

AD101

DEMOLITION FLOOR PLANS

Owner

08/02/2021 PQ TD

CORRECT PHARMACY

DEFICIENCIES

603-20-707

LOUISVILLE, KENTUCKY

BID DOCUMENTS

ROBLEY REX VA

MEDICAL

CENTER

1/4" = 1'-0"

ENLARGED BASEMENT DEMOLITION PLAN

1/4" = 1'-0"

ENLARGED FIRST FLOOR DEMOLITION PLAN - CONTROLLED SUBSTANCE

D R A W I N G N O T E S

1 REMOVE EXISTING CHAIN-LINK FENCE AND ALL ASSOCIATED SUPPORTS.

2 REMOVE EXISTING CHAIN-LINK GATE.

3 CONTRACTOR WILL MOVE AND STORE FULL HEIGHT CASEWORK DURING CONSTRUCTION. LOCATE

WITHIN SAME ROOM AS DIRECTED BY THE COR.

4 REMOVE PHARMACY WINDOW SHOWN AS DASHED.

5 EXISTING BULLET RESISTANT PHARMACY WINDOW TO REMAIN.

6 REMOVE EXISTING WINDOW, FRAME AND STEEL BARS - PREPARE OPENING FOR INFILL AT NEW

WORK - SEE NEW WORK DRAWINGS.

7 REMOVE EXISTING HOLLOW METAL DOOR AND FRAME SHOWN AS DASHED.

8 EXISTING CMU WALL TO REMAIN.

9 REMOVE CMU AT JAMB OF EXISTING OPENING TO ACCOMMODATE NEW VAULT DOOR SIZE - REUSE

EXISTING HEAD HEIGHT AND CONCRETE LINTEL.