36C24826Q0008.docx

DOCX document 110 KB Posted

Attached to
S208--Lee County Grounds Maintenance Federal contract opportunity
Solicitation number
36C24826Q0008
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

This document is a Standard Form 1449 Solicitation/Contract/Order for Commercial Products and Commercial Services issued by the Department of Veterans Affairs Network Contracting Office 8 (NCO 8) for grounds maintenance services at the Lee County Healthcare Center. The solicitation (RFQ #36C24826Q0008) is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) with a NAICS code of 561730 and a size standard of $9.5 Million. The contract will cover comprehensive landscape maintenance services including mowing, fertilization, irrigation system maintenance, pest control, pruning, and grounds cleanup.

The contract period runs from November 6, 2025, through November 5, 2026, with four 12-month option years. Quotes are due by September 25, 2025, at 2:00 PM EST and must be submitted via email. The base year and each option year will require monthly services at the Lee County Healthcare Center located in Cape Coral, FL. Offerors must be registered in the SBA certification database, provide a Limitations on Subcontracting certification, and submit quotes on an all-or-none basis. The government reserves the right to make no award, and interested SDVOSB contractors must demonstrate capability to perform detailed landscape maintenance requirements outlined in the extensive Statement of Work.

View the file

Other files for this federal contract opportunity

Other files attached to S208--Lee County Grounds Maintenance, newest first.
File Type Posted
36C24826Q0008 0002.docx DOCX document
S06 - AMENDMENT - RFQ CLOSE DATE.pdf PDF
S06 - AMENDMENT- SITE VISIT.pdf PDF
36C24826Q0008 0001.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C24826Q0008

PAGE 1 OF

1. REQUISITION NO.

2. CONTRACT NO.

3. AWARD/EFFECTIVE DATE

4. ORDER NO.

5. SOLICITATION NUMBER

6. SOLICITATION ISSUE DATE

a. NAME

b. TELEPHONE NO. (No Collect Calls)

8. OFFER DUE DATE/LOCAL

TIME

9. ISSUED BY

CODE

10. THIS ACQUISITION IS

UNRESTRICTED OR

SET ASIDE:

% FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

EDWOSB

8(A)

NAICS:

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ

IFB

RFP

15. DELIVER TO

CODE

16. ADMINISTERED BY

CODE

17a. CONTRACTOR/OFFEROR

CODE

FACILITY CODE

18a. PAYMENT WILL BE MADE BY

CODE

TELEPHONE NO.

UEI:

EFT:

PHONE:

FAX:

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER 18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK BELOW IS CHECKED

SEE ADDENDUM

19.

20.

21.

22.

23.

24.

ITEM NO.

SCHEDULE OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA

26. TOTAL AWARD AMOUNT (For Govt. Use Only) 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

ARE

ARE NOT ATTACHED

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN _______________

29. AWARD OF CONTRACT: REF. ___________________________________ OFFER

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DATED ________________________________. YOUR OFFER ON SOLICITATION

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

SET FORTH HEREIN IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER) 30b. NAME AND TITLE OF SIGNER (TYPE OR PRINT) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (TYPE OR PRINT) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

(REV. NOV 2021)

PREVIOUS EDITION IS NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.212

7. FOR SOLICITATION

INFORMATION CALL:

STANDARD FORM 1449

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

516-26-1-5059-0002 36C24826Q0008 09-18-2025 William Penhallegon 727-317-7152 09-25-2025 2:00pm

EDT

36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) William Penhallegon CS/Karina Miranda CO 10,000 Bay Pines Blvd Bay Pines

FL

33744 X X 561730 $9.5 Million Net 30 days N/A X

MCC: 90D

Department Of Veteran Affairs C.W. Bill Young VA Medical Center Bldg 100 Warehouse 10,000 Bay Pines Blvd.

Bay Pines

FL

33744 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) C.W. Bill Young VA Medical Center 10000 Bay Pines Blvd.

Bay Pines

FL

33744

Department of Veterans Affairs

FMS-VA-2(101)

Financial Services Center PO Box 149971 Austin

TX

78714-9971 See CONTINUATION Page The United States Department of Veteran Affairs Healthcare System C.W. Bill Young VAMC anticipates awarding a Firm Fixed Price Contract for Lee County Health Care Center for Grounds Maintenance as identified below.

This RFQ is a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside requirement.

See Statement of Work (SOW) B.3 PRICE/COST SCHEDULE must be filled out.

Contractor to return completed, signed VAAR clause 852.219-75 with submission.

Service must be completed within 30 days after contract award and within 30 days after each option year is exercised.

See CONTINUATION Page 516-3660162-5059-853300-2580 010056101 x X Karina Miranda Contracting Officer Table of Contents

SECTION A1
A.1 SF 1449 SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES1
SECTION B - CONTINUATION OF SF 1449 BLOCKS3
B.1 CONTRACT ADMINISTRATION DATA3
B.2 PRICE/COST SCHEDULE12
ITEM INFORMATION12
B.3 DELIVERY SCHEDULE16
SECTION C - CONTRACT CLAUSES18
C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)18
C.2 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)23
C.3 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)24
C.4 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION)24
C.5 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)27
C.6 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)29
C.7 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020)30
C.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)30
C.9 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (JAN 2025) (DEVIATION FEB 2025)31
SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS40
SECTION E - SOLICITATION PROVISIONS41
E.1 52.212-1 INSTRUCTIONS TO OFFERORS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (SEP 2023)41
E.2 52.212-2 EVALUATION—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)47
E.3 E.5 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2024) (DEVIATION FEB 2025)47

SECTION B - CONTINUATION OF SF 1449 BLOCKS

B.1 CONTRACT ADMINISTRATION DATA

1. Contract Administration: All contract administration matters will be handled by the following individuals:

a. CONTRACTOR:

b. GOVERNMENT: Contracting Officer 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) William Penhallegon CS/Karina Miranda CO 10,000 Bay Pines Blvd Bay Pines FL 33744

2. CONTRACTOR REMITTANCE ADDRESS: All payments by the Government to the contractor will be made in accordance with:

[X]
52.232-33, Payment by Electronic Funds Transfer—System For Award Management, or
[]
52.232-36, Payment by Third Party

3. INVOICES: Invoices shall be submitted in arrears:

a. Quarterly[]
b. Semi-Annually[]
c. Other[x] Upon Completion and Government Acceptance

4. GOVERNMENT INVOICE ADDRESS: All Invoices from the contractor shall be submitted electronically in accordance with VAAR Clause 852.232-72 Electronic Submission of Payment Requests.

ACKNOWLEDGMENT OF AMENDMENTS: The offeror acknowledges receipt of amendments to the Solicitation numbered and dated as follows:

AMENDMENT NO
DATE

Page 1 of Page 1 of

STATEMENT OF WORK

FOR LEE COUNTY LANDSCAPE

MAINTENANCE

General

The Contractor shall provide all supplies, materials, equipment, labor, supervision, management, disposal, and transportation to perform all lawn, plant bed, retention pond/retention sway areas; grounds landscape maintenance, sidewalks, and parking lots cleanup for the Lee County Healthcare Center (LCHC). The contractor has responsibility for and must demonstrate by an inventory that he/she has all the necessary equipment to perform the work under this contract. All trash will be picked up prior to use of lawnmowers and ground maintenance equipment or picked up afterwards if visible. All debris from grass clippings, tree trimming, palm fronds, weed control, etc. will be removed from the property at time of service at the expense of the contractor. The contractor is responsible for repairing any damage that they or all their sub-contractors may cause at the expense of the contractor.

The contractor has the responsibility for providing and applying fertilizer, soil amendments and insecticide materials. The contractor shall develop a schedule for lawn maintenance, fertilization, insect control, sidewalk, and parking lot cleanup for the approval of the contracting officer and/or his/her appointed designee prior to contract award. Schedules should be developed so as not to be a hazard to employees, customers, or visitors to the property. A supervisory official or equivalent must speak English to ensure effective communication.

The contractor is required to provide a certified arborist to conduct and document quarterly inspections on all living plants and trees throughout the property. Copies of the quarterly inspection of the property will be submitted to the Contracting Officer Representative (COR) within 30 days of completion. The contractor is required to provide a certified horticultural professional with extensive knowledge of pests, disease, and fungus of plants. Pond maintenance is required by someone who has an aquatic license in the state of Florida.

The Contractor must include with the offer package, certification, or license for any and all employees that will be handling or applying pesticides in performance of this Statement of Work to be considered for award. The Contractor shall promptly remove from the work site any supervisor or employee whose work or conduct is not satisfactory to the COR. The Contractor’s supervisor shall be in charge of the work on behalf of the Contractor. The Contractor shall enforce strict discipline and good order among the Contractor’s employees. The Contractor shall exercise the necessary supervision and control to prevent Contractor’s employees from violating any rules and regulations.

Location

All work is to be performed at the Lee County Healthcare Center, located at 2489 Diplomatic Parkway East, Cape Coral, FL 33909.

Period of Performance

The period of performance shall be November 6, 2025, thru November 5, 2026, with four (4) 12-month option years.

Conduct of Work All work and services under this contract must be performed in such a way that there will be no interruption to, interference with, the normal operation of Government business on the premises of LCHC.

The Contractor shall provide all supplies, materials, equipment, labor, supervision, management, and transportation to perform all lawn, grounds, sidewalk, and parking lot maintenance for the LCHC. The contractor has responsibility for and must demonstrate by an inventory that he/she has all the necessary equipment to perform the work under this contract.

The contractor has the responsibility of providing and installing fertilizer, soil amendments and insecticide materials. The contractor shall develop a schedule for lawn maintenance, fertilization, insect control, plant bed maintenance, sidewalk, and parking lot cleanup for the approval of the contracting officer and/or his/her appointed designee within 10 days of contract award. Schedules should be developed so as not to be a hazard to employees, customers, or visitors to the property. A supervisory official or equivalent must speak English to ensure effective communication.

Protection of VA and privately-owned assets and equipment is essential as the contractor is responsible for any damage as a result of worker negligence. Pesticides or non-regulated waste are prohibited from being stored on-site. Spill containment practices shall be followed when refueling equipment. Spill containment kits must be provided by the contractor; accessible to their workers or sub-contractors every time work is being performed on the property. All costs associated with properly disposing of spill clean-up on this property will be the responsibility of the contractor or his sub-contractors.

Requirements:

Mowing

Mow improved, Semi-Improved Grounds and Native Grassed Areas. Grass cutting of all lawn areas must be completed as per contract schedule. At no time will riding lawn mowers be driven on to or used on parking lot tree islands. Grass clipping discharges shall be blown away from plant beds, mulched or graveled areas at all times. Grass clippings must be removed or mulched when visible after mowing. All improved and semi-improved grounds and native grass areas must look well-manicured at all times. All turf areas shall be mowed in a manner to maintain a uniform height of no less than 2½ “during the peak growing season and no less than 2” during the winter season. Grass shall not be allowed to grow to a height of more than 5” inches before being mowed. All grass areas shall be mowed as needed to keep a well-groomed appearance at all times, which will be monitored by the COR or his/her designated official. No grass clippings shall be left on sidewalks, parking lot surfaces, or the VA and city streets. All clippings blown into the street and sidewalks shall be vacuumed up or blown back into grass area. Clippings can be left on the lawn as long as no readily visible clumps remain on the grass surface 36 hours after mowing. Otherwise, large clumps of clippings will be collected and removed by the contractor. In the case of fungal disease outbreaks clippings will be collected until the disease is controlled.

Fertilizer

Turf areas shall be fertilized no less than two (2) times per year using a fertilizer recommended under the Plant and Turf One (1) Year Guarantee. One application shall be made in the spring and one in the fall. All fertilizer to be used shall be inspected by the COR prior to application for quality and quantity. Both plant and turf fertilizer shall be commercial grade, free flowing, uniform in composition, and conforms to applicable state and federal regulations. Any unapproved fertilizer shall be removed, and the recommended type of fertilizer purchased by the contractor. When fertilization is performed, a report consisting of the areas fertilized, and the quantity and type of fertilizer used shall be given to the COR. Reports should be deliverable and should be stated in the Request for Proposals. Failure to turn in reports shall be deemed work not performed and deductions made to the contract amount equaling cost of fertilizer plus labor. Soil samples must be taken and analyzed on a periodic basis to determine amounts and type of fertilizer or amendments to be used.

Herbicides

All herbicides shall be properly labeled and registered with the U.S Department of Agriculture. Keep all herbicides in the original labeled containers. Herbicide selection will be submitted to the COR for approval prior to application.

Weed Control

Weeds and crabgrass will require ongoing monitoring to ensure the landscaping maintains an aesthetic appeal. The standard of appearance will be determined by the COR, and it is the contractor’s responsibility to adhere to the level of appearance. The contractor is responsible for pulling or killing any and all weeds and grass growing in paved, concrete, mulched, rock and stone areas. The Contractor must keep all lawns (includes semi-improved and native grass areas) shrubs, ground-cover beds, flower beds, graveled areas, parking lot, and all other adjacent areas free of weeds at all times. Any herbicides must be applied by certified or licensed personnel. This should take place as needed under the “Schedule and Requirements” section. When herbicide is performed, a quarterly report consisting of the area’s herbicide, and the quantity and type of herbicide used shall be given to the COR. Reports should be deliverable and should be stated in the Request for Proposal.

Grass and weeds must be trimmed around trees, shrubs, buildings, fences, poles, posts, fire hydrants, parking lot bumper blocks, boulders, sidewalks, road shoulders and other fixed obstacles concurrent with mowing schedule. Damage to trees and shrubs from trimming must be repaired by the contractor. A weed control plan shall be submitted as part of the approval package for review by the contracting officer and his/her designee. The plan shall include but is not limited to methods for removal and standard of appearance.

Insect Control

Insects, to include ants, shall be controlled on an ongoing basis. Damage to turf areas as a result of insect treatment will be the responsibility of the contractor to repair. Only licensed applicators may apply insecticide. Ant mounds shall be identified, reported to the COR, and treated monthly, or when requested. Only licensed applicators may apply insecticide. The contractor shall conduct a semi-annual uniform insecticide treatment of the grounds, plant beds and parking lot tree islands in the spring and fall not to exceed seven months between applications, a completion report with quantity and type of insecticide used shall be given to the COR within 30 days of completion. Failure to turn in reports shall be deemed work not performed and deductions made to the contract amount equaling cost of insecticide treatment plus labor.

Edging and Property Border Overgrowth

Sidewalks, curbs, edges of buildings, asphalt edges located in the improved and semi-improved grounds, bedding/planter areas and tree rings must be edged to maintain a professional appearance. Edging will include removal of vegetation from cracks in sidewalks, driveways, curbs and all other concrete and asphalt joints to maintain a professional neat appearance. The contractor will maintain a three-foot clearance of overgrowth from the Northern property security fencing with a six-foot clearance of overgrowth from the security fencing boarding the West side of the property. Additionally, the contractor will maintain a minimum six-foot clearance of overgrowth from the West side dock yard wall rock bed and will maintain the existing lawn and rock bed beside the West side dock wall.

Blowing/Sweeping

Sidewalks, curbs, patios, and parking lots shall be cleaned of debris and clippings during mowing, weed eating and edging during regularly scheduled days of service.

Retention Pond/Low Runoff Areas

Retention ponds banks/low runoff areas shall be mowed on the same frequency schedule as other turf areas and shall be maintained at the same height requirements as the rest of the turf throughout the property especially during the rainy season (May-August). The use of herbicides in retention ponds is not permitted when water is present. The wet Retention Ponds shall have annual programs for eradication of Aquatic Weeds and cycles of control. The Dry Retention Ponds will be mowed, trimmed, and well maintained. All Biomass debris will be removed and disposed of offsite.

Turf Disease/Fungus

Any turf disease that appears must be properly identified, and a permanent corrective action shall be submitted in writing to the COR for approval. The contractor shall maintain trees, plants, lawns, and ground cover free of insects and disease. The treatment of insects and diseases will be provided by the contractor. All turf areas or plants under the contractor’s responsibility which dies as a result of the contractor’s non-performance or negligence, to include application of herbicide or irrigation issues that the contractor is responsible for, will be replaced by the contractor at the discretion of the CO or his/her designee.

Plant Beds and Rock Beds

Plant beds located on the property will be maintained by the contractor in a neat and professional manner, determined by the COR. An approved method of weed control shall be incorporated to include manual removal during the peak growing season, which will require more frequent maintenance during this time frame (March-November). At no time will plant beds and rock beds be over-run with weeds or grass. The rock beds boarding the building and dock yard wall will be kept free from weeds and grass clippings at all times.

Mulching

Plant and tree beds shall receive 3 inches of mulch cover during the month of November and an additional 1 ½ inches of mulch cover during the month of April. If needed some old existing mulch in the plant beds may be removed to maintain a neat appearance and maintain an even dispersing of mulch in the existing plant beds. The mulch will not exceed over the existing plant bed or planter’s border. Red or brown mulch will be the only approved color mulch used in the plant beds, and this will be approved by the COR in advance.

Pruning

Trees and shrubs will be trimmed as needed. Palm fronds will be removed that are not positioned between 9 and 3, pose a safety hazard, or when determined to be no longer ascetically appealing by the COR. The contractor assumes responsibility for any palm frond related injury that results from neglecting the previously mentioned removal criteria. In the event of a storm or hurricane, the contractor has 3 days to clean up debris. No herbicides will be used for this purpose. The Contractor must maintain a neat and well-maintained appearance of all plants, shrubs, and trees, by proper pruning, clipping, pinching back and shape maintenance. Also, the contractor shall prune trees as necessary and/or at the request of the COR. Shrubs and ground covers should be pruned as necessary to maintain a well-manicured appearance. Shrubs will be pruned as needed to ensure an informal shape, fullness, and bloom. Tree and palm pruning will be done at a minimum of once a year and is limited to branches and/or brown fronds and seed heads below 20 feet in height. No green palm fronds shall be removed. All litter will be removed by the following growth flushes. Branches will be pruned just outside the branch collar. Pruning paint will not be applied. Sucker growth will be removed by hand from the base of trees. No herbicides will be used for this purpose. All dead, diseased or unsightly branches, vines or other growth will be collected and removed by the contractor

Irrigation system

The Contractor will conduct and complete a semi-annual Irrigation System Tune-up and a report given to the COR upon completion. Failure to turn in reports shall be deemed work not performed and deductions may be made to the contract amount equaling cost of professional irrigation system tune-up plus labor. The contractor will inspect and test all components and zones in the irrigation system monthly and shall reset zones according to seasonal changes. Minor adjustments and repairs such as head/emitter cleaning, replacement, filter cleaning, small leaks and minor timer adjustments shall be made by the contractor. If any parts needed it is found that damage was due to contractor non-performance or negligence, and then the contractor would be responsible for the cost of those parts during weekly maintenance. The contractor will note and report to COR any symptoms of inadequate or excessive irrigation, drainage problems, etc., repairs to the system beyond the above scope will be negotiated at the time of occurrence. The government is not obligated to use the contractor for repairs to the system above those stated in the contract. The Contractor is responsible for replacing any and all grass, plants, shrubs, trees, to include palms trees that die from lack of irrigation due to negligence by the contractor.

Thatch Removal

The Contractor must perform general litter patrol on all grounds. Responsibilities will include, but will not be limited to, the removal and disposal of all-natural debris (tree limbs, dry brush, rodent habitats, dead animals, etc.) and manmade debris. All grass clippings must be properly removed and disposed of offsite (not in the office dumpster). Sidewalks and paved areas must be cleaned of all lawn clippings after each mowing. Parking Lots/areas, walks, curb-gutter, sidewalks, and concrete flatwork must be kept debris free (includes bark debris, dust and dirt), with the debris properly removed and disposed of offsite. Removal of debris and policing of grounds will be concurrent with mowing schedule. Removal of thatch (a spongy build-up of dead and living grass shoot, stems and roots) should be considered when thatch thickness exceeds one inch. The best time for thatch removal is March through August when the turf-grass is rapidly growing.

Storm Drains

Storm drains will remain clear of mulch and debris to allow for adequate flow of water.

Pond Maintenance

The contractor is responsible for cutting back all vegetation along the perimeter of the five retention ponds on the property, except for the cattails. This will be completed as needed.

Sidewalks and Entrance Ways

All Sidewalks, entrance ways, and parking lots shall be kept clear of debris by the contractor. Sidewalks, curbs, signage, rock walls, exterior furniture, facility marquis signs, bus stops/shelters (5), tree planters, concrete safety bollards will be pressure washed and treated twice yearly or as needed and be stain free. A detailed report on all pressure washing will be sent to the COR upon completion within 10 working days. All exterior trash cans will be emptied as needed or weekly as minimum. Any dead animals in parking lots, on sidewalks, and on the grounds will be removed within 8 hours of notification by the COR. All work is to be accomplished where it does not interfere with day-to-day operations of the facility. All outside tables, bus stops/shelters (5), trash receptacles and furniture shall be cleaned as needed. Tasks shall be conducted on Monday-Saturday, between 8am and 6pm as not to disrupt the day-to-day activity of the facility.

Schedule and Requirements

The hours approved for these services are 8am to 6pm and Monday-Saturday.

Mowing will take place per the following schedule or on an as needed basis as directed by the COR.

Once a week during – March, April, May, June, July, August, September, October, November Every two weeks during – January, February, December

Fertilizer once per month during the following months: March and November.

Chemical Weed Control as needed at least once per month.

Specifics of Services

The Contractor will be responsible for satisfactorily managing and performing exterior landscape maintenance services at the LCHC, Cape Coral, Florida. Exterior grounds consist of lawns, native grass areas, gravel, plant beds, parking lot, walks, driveways, and curb. The Contractor must provide all labor, tools, equipment, supervision, herbicides, fertilizer, transportation and any other material or services necessary to maintain the landscaping and grounds in such a manner to present a neat and well-maintained appearance. All products are to be used in accordance with local, state, and federal laws. and Material Safety Data Sheets (MSDS) and a list of these products will be supplied to the COR. The MSDS must be provided by the contractor to the COR where the information will be kept on file in accordance with the applicable guidelines of the OSHA Hazard Communications Standard. Requirements pertaining to recordkeeping will be strictly followed, with copy(s) provided to COR as necessary and upon request.

Inspections

The contractor is responsible for oversight of all work and must perform and document monthly quality control inspections and provide to the COR to ensure compliance with all provisions within the contract. The criteria and frequency of reporting will be determined upon contract award.

Circumstances to Be Reported:

The Contractor or Contractor’s employees shall report any circumstances of needed repair of the facility or unusual soiling of an area which may affect the performance of the work, present unhealthy or hazardous conditions. In addition, report those which may create any delays or interference with the work caused by the employees of the Government. Such report shall be made immediately upon discovery by the Contractor to the COR.

Emergency and Special Event Services:

Upon notification by the contracting officer, the contractor shall perform emergency or special event grounds maintenance required in areas covered under this contract. Upon notification of an emergency, the contract manager shall respond within one (1) hour to meet with the COR and initiate emergency services. Upon receiving directions by the COR. contractor personnel shall begin emergency work within two hours. The contracting officer will notify the contractor as soon as a special event requirement is known, but no less than 24 hours prior to the event.

Quality Control

The contractor shall develop, submit for contracting officer approval, and maintain a quality program to ensure grounds maintenance services are performed in accordance with established standards of Professional Grounds Management Society (PGMS), National Arborist Association, American Society of Landscape Architects, and the local county extension office. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. As a minimum the contractor shall develop quality control procedures addressing the areas identified in paragraph 2, Service Delivery Summary.

Quality Assurance

The government will periodically evaluate the contractor’s performance in accordance with the Quality Assurance Surveillance Plan.

Confidentiality and Nondisclosure

It is agreed that:

1. The preliminary and final deliverables and all associated working papers, application source code, and other material deemed relevant by the VA which have been generated by the contractor in the performance of this task order are the exclusive property of the U.S. Government and shall be submitted to the COR at the conclusion of the task order.

1. The CO or COR will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this task order. No information shall be released by the contractor. Any request for information relating to this task order presented to the contractor shall be submitted to the CO for response.

1. Press releases, marketing material or any other printed or electronic documentation related to this project, shall not be publicized without the written approval of the CO or COR.

Safety and Security

It is agreed that the Vendor shall meet all local, state and federal safety requirements during the entire contract period. All materials must be securely transported with straps or chains in accordance with all local, state, and Federal Department of Health Regulations. Any work stoppages directed by the CO, COR, Facility Safety Officer, or VA Police due to safety or security violations by the contractor or his designated sub-contractor, will be promptly corrected. The corrective action shall be reported to the CO or COR prior to permission being granted to recommence work.

Damage to Government Property:

a. Contractors shall be responsible for the replacement of any structure, to include building glass, turf, curb, road pavement, headstone or marker, valve boxes, control markers, sprinkler heads, which is chipped, marred, damaged and/or ruined at the fault of the contractor. The contractor shall bear all costs associated with replacement and reinstallation. Any such damage shall be brought to the immediate attention of the appointed COR prior to repair/replacement/installation.

b. At the Government's discretion, the contractor shall either repair or replace the property or reimburse the Government the full amount for all property damage(s). The contractor shall be aware that Government property - beyond standard structures and equipment - also includes monuments, trees, beds, and turf (i.e., wounded trees or damaged turf).

Government holidays:

The contractor is not required to provide service on the following National holidays, nor shall the contractor be paid for these holidays.

New Year’s DayMartin Luther King Day
President’s DayMemorial Day
JuneteenthIndependence Day
Labor DayColumbus Day
Veterans DayThanksgiving Day
Christmas Day
Performance Objective
Performance Standard
AQL

Maintain Improved and Semi-improved Grounds

Grass is maintained within proper height for its area. Sod does not need to be replaced. Sod is healthy and looks well maintained
Customer complaints shall not exceed 2 per month

Maintain Trees, Shrubs, Broadleaf Evergreens, Hedges, and Perennial Flowers

Trees, plants, hedges, flowers, flourish and do not need to be replaced. They have adequate drainage and mulch. They do not show any sign of disease or pests and appear healthy. They are pruned properly and in a timely manner. They are trimmed properly. Bedding is mulched and free of weeds, grass, and debris. Fertilizer and soil amendments are applied. Soil is aerated;
Customer complaints shall not exceed 2 per month.

Maintain Irrigation System and Replace Parts

The irrigation system functions properly.
System Functions 95% of time.

Police Grounds of Trash and Litter

Grounds are free of trash and litter.
Customer complaints shall not exceed 2 per month.

Pest Control

Pest control plans are reviewed, and pests are controlled. Pesticide usage is reported to COR
Customer complaints shall not exceed 2 per month.

The Contractor will be required to comply with physical security guidelines by either checking in with the VA Police each time they come on-site to perform contracted services or by obtaining a VA Contractor ID badge from the VA Police.

The contractor may not have access to any VA sensitive information under this contract.

B.2 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM NUMBER
DESCRIPTION OF SUPPLIES/SERVICES
QUANTITY
UNIT
UNIT PRICE
AMOUNT
12.00
MO
__________________
__________________

BASE YEAR GROUNDS MAINT. CONTRACT **The Price referenced was calculated independently and shall be considered as the IGCE.** **SITE VISIT REQUIRED** The Contractor shall provide all supplies, materials, equipment, labor, supervision, management and transportation to perform all lawn, grounds, sidewalk and parking lot cleanup for the Lee County Health Care Center (LCHCC). The contractor has responsibility for and must demonstrate by an inventory that he/she has all necessary equipment to perform work under this contract. The contractor has the responsibility for providing and applying fertilizer, soil amendments and insecticide materials. The contractor shall develop a schedule for lawn maintenance, fertilization, sidewalk, and parking lot cleanup for the approval of the contracting officer and/or his/her appointed designee prior to contract award. Schedules should be developed so as not to be a hazard to employees, customers or visitors to the property. A supervisory official or equivelant must speak English to ensure effective communication. The contractor is required to provide a certified arborist to conduct quarterly inspections on all living plants and trees throughout the property. The contractor is required to provide a certified horticultural professional with extensive knowledge of pests, disease, and fungus of plants. Pond maintenance is required by someone who has an aquatic license in the state of Florida.

Contract Period: Base POP Begin: 11-06-2025 POP End: 11-05-2026 PRINCIPAL NAICS CODE: 561730 - Landscaping Services PRODUCT/SERVICE CODE: S208 - Housekeeping - Landscaping/Groundskeeping

12.00
MO
__________________
__________________

OPT YEAR 1 GROUNDS MAINT. CONTRACT **The Price referenced was calculated independently and shall be considered as the IGCE.** **SITE VISIT REQUIRED** The Contractor shall provide all supplies, materials, equipment, labor, supervision, management and transportation to perform all lawn, grounds, sidewalk and parking lot cleanup for the Lee County Health Care Center (LCHCC). The contractor has responsibility for and must demonstrate by an inventory that he/she has all necessary equipment to perform work under this contract. The contractor has the responsibility for providing and applying fertilizer, soil amendments and insecticide materials. The contractor shall develop a schedule for lawn maintenance, fertilization, sidewalk, and parking lot cleanup for the approval of the contracting officer and/or his/her appointed designee prior to contract award. Schedules should be developed so as not to be a hazard to employees, customers or visitors to the property. A supervisory official or equivelant must speak English to ensure effective communication. The contractor is required to provide a certified arborist to conduct quarterly inspections on all living plants and trees throughout the property. The contractor is required to provide a certified horticultural professional with extensive knowledge of pests, disease, and fungus of plants. Pond maintenance is required by someone who has an aquatic license in the state of Florida.

Contract Period: Option 1 POP Begin: 11-06-2026 POP End: 11-05-2027

12.00
MO
__________________
__________________

OPT YEAR 2 GROUNDS MAINT. CONTRACT **The Price referenced was calculated independently and shall be considered as the IGCE.** **SITE VISIT REQUIRED** The Contractor shall provide all supplies, materials, equipment, labor, supervision, management and transportation to perform all lawn, grounds, sidewalk and parking lot cleanup for the Lee County Health Care Center (LCHCC). The contractor has responsibility for and must demonstrate by an inventory that he/she has all necessary equipment to perform work under this contract. The contractor has the responsibility for providing and applying fertilizer, soil amendments and insecticide materials. The contractor shall develop a schedule for lawn maintenance, fertilization, sidewalk, and parking lot cleanup for the approval of the contracting officer and/or his/her appointed designee prior to contract award. Schedules should be developed so as not to be a hazard to employees, customers or visitors to the property. A supervisory official or equivelant must speak English to ensure effective communication. The contractor is required to provide a certified arborist to conduct quarterly inspections on all living plants and trees throughout the property. The contractor is required to provide a certified horticultural professional with extensive knowledge of pests, disease, and fungus of plants. Pond maintenance is required by someone who has an aquatic license in the state of Florida.

Contract Period: Option 2 POP Begin: 11-06-2027 POP End: 11-05-2028

12.00
MO
__________________
__________________

OPT YEAR 3 GROUNDS MAINT. CONTRACT **The Price referenced was calculated independently and shall be considered as the IGCE.** **SITE VISIT REQUIRED** The Contractor shall provide all supplies, materials, equipment, labor, supervision, management and transportation to perform all lawn, grounds, sidewalk and parking lot cleanup for the Lee County Health Care Center (LCHCC). The contractor has responsibility for and must demonstrate by an inventory that he/she has all necessary equipment to perform work under this contract. The contractor has the responsibility for providing and applying fertilizer, soil amendments and insecticide materials. The contractor shall develop a schedule for lawn maintenance, fertilization, sidewalk, and parking lot cleanup for the approval of the contracting officer and/or his/her appointed designee prior to contract award. Schedules should be developed so as not to be a hazard to employees, customers or visitors to the property. A supervisory official or equivelant must speak English to ensure effective communication. The contractor is required to provide a certified arborist to conduct quarterly inspections on all living plants and trees throughout the property. The contractor is required to provide a certified horticultural professional with extensive knowledge of pests, disease, and fungus of plants. Pond maintenance is required by someone who has an aquatic license in the state of Florida.

Contract Period: Option 3 POP Begin: 11-06-2028 POP End: 11-05-2029

12.00
MO
__________________
__________________

OPT YEAR 4 GROUNDS MAINT. CONTRACT **The Price referenced was calculated independently and shall be considered as the IGCE.** **SITE VISIT REQUIRED** The Contractor shall provide all supplies, materials, equipment, labor, supervision, management and transportation to perform all lawn, grounds, sidewalk and parking lot cleanup for the Lee County Health Care Center (LCHCC). The contractor has responsibility for and must demonstrate by an inventory that he/she has all necessary equipment to perform work under this contract. The contractor has the responsibility for providing and applying fertilizer, soil amendments and insecticide materials. The contractor shall develop a schedule for lawn maintenance, fertilization, sidewalk, and parking lot cleanup for the approval of the contracting officer and/or his/her appointed designee prior to contract award. Schedules should be developed so as not to be a hazard to employees, customers or visitors to the property. A supervisory official or equivelant must speak English to ensure effective communication. The contractor is required to provide a certified arborist to conduct quarterly inspections on all living plants and trees throughout the property. The contractor is required to provide a certified horticultural professional with extensive knowledge of pests, disease, and fungus of plants. Pond maintenance is required by someone who has an aquatic license in the state of Florida.

Contract Period: Option 4 POP Begin: 11-06-2029 POP End: 11-05-2030

GRAND TOTAL
__________________

B.3 DELIVERY SCHEDULE

ITEM NUMBER
SHIPPING INFORMATION
QUANTITY
DELIVERY DATE
0001
SHIP TO:
Lee County Health Care Clinic (LCHCC)

2489 Diplomatic Parkway East Cape Coral, FL 33909

USA

12.00
11/06/2025 - 11/05/2026
MARK FOR:
Collins, Jene L.

(727) 398-6661 17755 Jene.Collins@va.gov

FOB:
DESTINATION
1001
SHIP TO:
Lee County Health Care Clinic (LCHCC)

2489 Diplomatic Parkway East Cape Coral, FL 33909

USA

12.00
11/06/2026 - 11/05/2027
MARK FOR:
Collins, Jene L.
FOB:
DESTINATION
2001
SHIP TO:
Lee County Health Care Clinic (LCHCC)

2489 Diplomatic Parkway East Cape Coral, FL 33909

USA

12.00
11/06/2027 - 11/05/2028
MARK FOR:
Collins, Jene L.
FOB:
DESTINATION
3001
SHIP TO:
Lee County Health Care Clinic (LCHCC)

2489 Diplomatic Parkway East Cape Coral, FL 33909

USA

12.00
11/06/2028 - 11/05/2029
MARK FOR:
Collins, Jene L.
FOB:
DESTINATION
4001
SHIP TO:
Lee County Health Care Clinic (LCHCC)

2489 Diplomatic Parkway East Cape Coral, FL 33909

USA

12.00
11/06/2029 - 11/05/2030
MARK FOR:
Collins, Jene L.
FOB:
DESTINATION

Page 1 of

SECTION C - CONTRACT CLAUSES

C.1 52.212-4 CONTRACT TERMS AND CONDITIONS—COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2023)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights—

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign its rights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727). However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at Federal Acquisition Regulation (FAR) 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include—

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price and extended price of the items delivered;

(v) Shipping number and date of shipment, including the bill of lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer—Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.—

(1) Items accepted. Payment shall be made for items accepted by the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR part 1315.

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if—

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .