8340--Decontamination Tents & A/C Units Federal contract opportunity
Solicitation number
36C24820Q0628
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

36C24820Q0628 0001 SF 30 Amendment Page 2 Questions and Answers.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 8340--Decontamination Tents & A/C Units, newest first.
File Type Posted
36C24820Q0628-0001012.docx DOCX document
36C24820Q0628-0001013.pdf PDF
36C24820Q0628-040.docx DOCX document
36C24820Q0628-042.pdf PDF
36C24820Q0628-041.pdf PDF
36C24820Q0628-043.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 36C24820Q0628

1. What is the inflation pressure for the air beams for the specified tents?

a. For the 16 ft it shall be approx. 120 cub ft of Air Vol

b. For the 21 ft it shall be approx. 157

2. Is a liner required for the tents? - The liner would be the radiant barrier

3. With regard to the removable ground floor – please clarify:

a. Are they thinking that the floor is a “ground cloth” which would be put down prior to setting up the tent?

or

b. Are they thinking the floor is an integral part of the tent which must “zip off” and be removable? It is part of the tent that if need be can be removed for certain operational needs.

4. Is there information regarding with the 6 and 8 ducts will be used for and the sizes they will need to be, i.e. – Will be used for all of the items listed, the size for the HVAC is needed.

1. HVAC

2. Power Cords

3. Light Cords

4. Center zipper door on the front and the back – is this a mandoor or the whole tent end? Whole tent end

5. The Center divider curtains with pass-through areas (quantity of 2) – are these hermetically sealed, i.e. sealed to an inner liner)? Sealed to the inner liner, but removable when operations are over

6. Shall require a minimum of one staff to set up tent –Is there a maximum number of staff to set up the tent? - Maximum is 2-3

7. Internal radiant barrier for heat deflection in the Florida heat. What is the operational temperature range you are trying to achieve and maintain? Maintain A/C temperatures while deflecting the Florida heat.

VHANFLBRICKS

Typewritten Text End of Document