36C24819Q0977-0002001.pdf
PDF 101 KB Posted
- Attached to
- Equipment: Remove & Replace Generator Batteries Federal contract opportunity
- Solicitation number
- 36C24819Q0977
About this file
36C24819Q0977 0002 Attachment A - Questions and Answers from Site Visit.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -17326.docx | DOCX document | |
| 36C24819Q0977-0002000.pdf | ||
| 36C24819Q0977-0001000.docx | DOCX document | |
| 36C24819Q0977-0001001.pdf | ||
| 36C24819Q0977-003.pdf | ||
| 36C24819Q0977-000.docx | DOCX document | |
| 36C24819Q0977-002.pdf | ||
| 36C24819Q0977-001.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment A 36C24819Q0977 0002
Questions and Answers for RFQ 36C24819Q0977 Site Visit
Location: Gainesville Room C087-1 Main Building Electrical Vault
1. Will temporary batteries and charger be needed while batteries are being switched out?
Answer: No.
2. What is the shelf life of the existing shelves?
Answer: 30 years. They were installed in 2010, so they are 9 years old.
3. Are the batteries monitored?
Answer: No.
4. What are these batteries powering?
Answer: These batteries power all the switch gear in the room.
5. Will any of the systems that the batteries support be changing?
Answer: No, we will not be changing systems.
6. Is there a data plate on the shelves?
Answer: No
7. Are there any countries we cannot do business with?
Answer: VA supports buy American
8. Will we have to work after hours to switch this set of batteries out?
Answer: Yes.
Location: Gainesville Room C094-1 ACA/E-Wing Generators
1. Must batteries be made in the USA?
Answer: Yes
2. Are all batteries NiCad?
Answer: Yes
3. Will we have to work after hours to switch this set of batteries out?
Answer: Yes. Coordination will need to occur between the OR and the COR to ensure batteries are replaced during a period when surgeries are not taking place.
Location: Gainesville Building #25 Main Switch Gear Building
1. Are all shelving units set on rubber?
Answer: No.
2. Do you need the connecting links on the batteries to be insulated?
Answer: No.
Attachment A 36C24819Q0977 0002
3. What are these batteries powering?
Answer: These batteries are powering the switch gears in the room.
4. Will we have to work after hours to switch this set of batteries out?
Location: Gainesville Building #29 Full Power Back Up Generators
1. Is there a requirement for ED testing?
Answer: No
2. Do these batteries need to be sealed or not?
Answer: No.
3. Will we have to work after hours to switch this set of batteries out?
Location: Lake City Room 1A-05 LC Gen
1. What is the voltage?
Answer: 24 volts
2. Does this (the generators) power the hospital?
Answer: Yes. But only during a utility outage. These generators are part of an alternate power system.
3. Will we have to work after hours to switch this set of batteries out?
Answer: No, you do not need to do the battery replacement in this room after hours.
File details come from the government source that posted it.