36C24819Q0620-0003000.docx

DOCX document 27 KB Posted

Attached to
Services: Ground Maintenance Services - TIERED EVALUATION Federal contract opportunity
Solicitation number
36C24819Q0620
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 8

About this file

36C24819Q0620 0003 36C24819Q0620 0003.docx

View the file

Other files for this federal contract opportunity

Other files attached to Services: Ground Maintenance Services - TIERED EVALUATION, newest first.
File Type Posted
-18055.docx DOCX document
36C24819Q0620-0003001.docx DOCX document
36C24819Q0620-0002000.docx DOCX document
36C24819Q0620-0001001.docx DOCX document
36C24819Q0620-0001000.docx DOCX document
36C24819Q0620-000.docx DOCX document
36C24819Q0620-001.docx DOCX document
36C24819Q0620-001.docx DOCX document
36C24819Q0620-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Ground Maintenance Industry Questions and Government Responses

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-08-2019 none 36C248 Department of Veterans Affairs Network Contracting Office (NCO) 8 Miami VA Healthcare System 1201 NW 16th Street Miami

FL

33125 36C546 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) Miami VA Healthcare System 1201 NW 16th Street Miami

FL

33125 To all Offerors/Bidders

36C24819Q0620 08-08-2019

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

Wednesday, August 14, 2019@ 11:00am EST See CONTINUATION Page The purpose of this modification is to extend the offer due date, respond to industry questions and update Solicitation to reflect changes to the PWS, Price Cost/Schedule, and evaluation section.

1. Offer due date/time, Section 11 of this SF30. Wednesday, August 14, 2019 at 11:00A.M. EST.

2. Government Responses to Industry Questions, pages 2 - 7.

3. Attached Solicitation includes updates to sections of the PWS, Price/Cost Schedule, and the Evaluation.

CONTINUATION PAGE

See attached document: RFQ 36C24819Q0620 - updated per questions responses.

Industry Questions
Government Responses

Page 7 of 33, 4.3, states that we are to provide watering hoses and portable watering devices, but you mentioned during the walk through that we would not be required to do that. Can you please change that in the specs?

The Contractor must provide their own water hoses for watering and other pertinent equipment.

Page 7 of 33, 4.4, states that we are required to provide 4 cuts per month from April through the end of October, but it was thought by someone in the walk through that it meant the same as once per week. If the math is done for those 7 months, there are 214 days, divided by 7 days per week (for a weekly service), that would mean the VA would be expecting between 30 and 31 cuts. The 5 remaining months have specs that call for service to be performed every other week (every 14 days), or approximately 10 cuts. Therefore, if it's expected to be serviced weekly instead of 4 times per month, the total would be anywhere from 40 to 41 cuts, not 38.

Please clarify what the VA is expecting. Is it what it says in the solicitation, or is it what was claimed by one of the attendees?

Please submit your pricing and technical based on the present conditions, 38 cuts is the requirement.

Page 8 of 33, top paragraph, line 3 says that if a plant should die or become unhealthy due to damage, the contractor is responsible for replacing the plant. Please clarify that is only if the damage is caused by the contractor.
This is correct. If damaged it must be replaced.

Note: This section does not state if caused by the contractor.

Page 8 of 33, 4.6.2, Palm Trees. It is stated that we must meet ANSI Standards for palm trimming, then in parenthesis, it says 10/2, which in the industry means that we trim the fronds up to a point that looks like the hands on a clock, which is 30 degrees above the horizon. That hasn't been the ANSI code since before 2008. The ANSI code since then has been to not trim higher than a horizontal trimming (9/3).

Please revise to a horizontal trim height maximum (9/3).

9/3 is required

Page 8 of 33, 4.7, Maintaining Bedding and Planting Areas, states that we are responsible for all fill material to allow for a constant and even slope. During the walk through I noticed many areas that were not constant with an even slope. The VA will need to pay for this service as it needs it. Please verify.

Please submit your pricing and technical based on the present condition.

Page 9 of 33, 4.7.4, Tree stumps, how is it possible to make the contractor responsible for removing stumps when there's no way to know how many stumps there are going to be needed for removal? And how can we price that twice per year as the Price/Cost Schedule calls for? This should be an as needed service and priced according the size and difficulty of the stump work.
Tree stump removal on the price/cost sheet is each (EA) x 2 different removals. PWS updated to reflect estimated minimum size of 24” (inches) in diameter for an oak tree or similar.
Page 9 of 33, 4.8.1, Broadleaf Control, states that we have to spray a liquid broadleaf weed control to turf areas, but with the amount of turf areas that we saw that were heavily full of weeds, would cause large areas that are currently green, to die off. This should only be used in turf areas that are primarily healthy turf, with some smaller number of broadleaf weeds. Please clarify or remove that spec.
Please submit your pricing and technical based on the present conditions.
Page 9 of 33, 4.11, Annuals. During the walk-through mentioned was that this was supposed to be a quarterly walk-through to determine plants that needed to be changed or added to the landscaping, and that the vendor would provide a list of plants, locations and costs for the plants. Mentioned also was that vendor will work with the COR to determine what annuals the COR wishes to have proposed.
50 annuals per quarter.

Initial Clean Up. We spoke about the VA adding a line item for a one time (initial) clean up. The amount and size of the weeds throughout the grounds, the overgrown hedges that are both tall and encroaching on walkways, numerous exotics (weeds and unwanted trees, palms and plants) growing within the hedges, and the low tree canopies that create a liability due to the possibility of injuring a pedestrian (eyes, ears, and other dangers).

I believe that a onetime charge to bring the site back to the standards that you choose, such as all or most of the above, would be the ideal way to allow the contractor to reach a maintenance level sooner, while also providing the VA with a much-needed improved appearance.

Please advise.

No.

Sec 4-6.1 & 2 Tree trimming needs to say Palms tree's trimmed 2 times a year and the Hardwood trees one time...if you add at the direction of the COR it could be 3 or 4 times.
Tree trimming twice a year.
Also, dead palm fronds and seed pods to be removed every visit any tree over 18 ft requires a lift to do that if you specify 18 ft and below it can be done every visit. Do you want a lift brought every visit?
Equipment requirement is up to the discretion of the Contractor. Submit pricing and technical based on the present condition.
Section 4.7.4 Also it has stump grinding at the direction of the COR. There is no number of times, plus what happened to the tree? Do you want 2 trees and stumps removed as part of the contract?
See updated PWS.

If a tree dies or becomes damaged is that an additional cost?

Now there are 6 dead or dying Palm Trees and 1 hardwood tree that is dead. Who will take them down and at what cost?

No.

Please submit your pricing and technical based on the present condition.

Section 4.13.1 and 4.6.2 If a storm comes thru and takes tree's down you ask for 24-hour response is that with a 5-man crew just to make the property safe and people have access, or do you want the limbs and trees taken away at that time. Cost should be separate, or you would have to take worst case scenario and say 100 trees and bid it that way. Disaster response needs to be quantified so we all can bid it the same. This way it keeps the cost of the contract reasonable and only used in the event of a disaster correct?
PWS revised to address the clearing of debris caused by the natural disaster. Areas that require clearing/cleaning are:

· Main entrances/exits of the hospital.

· Emergency entrances (walk in and ambulance)

· Loading Dock See updated PWS section.

You ask for weed control and saw just how bad it is thru out the property you cannot pull them because you have to kill the roots, or they will be back next week. It will take many days to spray the entire property and then pull or weedeat the dead weeds.
Please submit your pricing and technical based on the present condition.

Trimming will take about 3 months to get the entire place back under control because you trim the property once a month. If you want to keep the cost down and get the property up to speed fast. Ask for 36 cuts vice 38 and 2 extra visits within the first 2 months to get the trimming under control.

With the tree trimming being done also will make the property look nice.

Please submit your pricing and technical based on the present condition.

The ANSI standard you referenced is from prior to 2008. Now the palm standard is 3/9 correct?
3/9 is the requirement

Please submit your pricing and technical based on the present condition.

There were tree's planted and growing within 4 ft of the building in the CLC on the south side are they exempt from that in 4.6.3 plus is says in this section after initial trimming will be done as needed that isn't a quantity you can bid correct?
Trees will be pruned twice a year.

Please submit your pricing and technical based on the present condition.

You stated you would remove the irrigation requirement for Section 4.3 of hoses and alternate means for areas without irrigation correct?
Hoses are required for any plants where irrigation is not available. Please submit your pricing and technical based on the present condition.
4.3.1. says there are 8 controllers there are only 3 working clocks and 2 hose timers correct?
There are eight zones. Please submit your pricing and technical based on the present condition.
I never saw any working Irrigation in the main CLC area with the green house is there a working system?
Please submit your pricing and technical based on the present condition.

Also, in the CLC and Spinal Injury pavilion looks like a broken pipe from the lift for the windows and does the irrigation work in the new planters that were added in the area?

Please submit your pricing and technical based on the present condition.

Section 4.2 In the initial inspection of the property within 5 days of award of the contract if we find irrigation issues do we bill to bring everything up to working order and then maintain it?
No. Please submit your pricing and technical based on the present condition.

Section 4.7.1 does not give any measurement for the Mulched areas, but it asks for 2 inches twice a year and to be inspected every visit. We saw the area in front of the Fisher house by the street. The Main Entrance bed in front of the Portico and the 2 sides of the Emergency Entrance looks to be about 2.5 yards of Mulch would you agree?

Please submit your pricing and technical based on the present condition.

Section 4.26 asks for maintenance reports on each item of equipment? Why and to what degree?

Not required.

Dead plants and dead grass in areas that are irrigated that is not damaged by the contractor who pays for it to be replaced?
If grass or plant are damage by other means the Contractor is not responsible.

The area's on the perimeter of the property that has no irrigation weed control should just be minimal because green neatly trimmed weeds look better than dry patches of dirt, so we need to work closely with the COR with this matter don't you agree?

Please submit your pricing and technical based on the present condition.

Section 9.2 Will the contractor be able to sign the keys out for the locks on the gates we need to enter and secure when we are done? we lose many man hours keeping people on station to prevent access or exit of patients when the COR is busy.

No. This is a secure facility. Access will be provided in a timely manner.

Section 6.3 Not doing the lawn service on the weekend makes safety concerns a big problem a lot of edging and weed eating along the perimeter and parking lots make it very difficult to work around all the cars and people moving about the work area. Especially the tree trimming you would never get all the trees done safely and efficiently. Can the tree trimming, and Lawn service be done on the weekend?

Yes.

Is mulch to be applied to all bare soil areas or only to areas currently being mulched?
Please submit your pricing and technical based on the present condition.

· Will there be an additional line item for Initial Clean-up? – If item not provided what is expected to bring the current conditions to acceptable standards.

No. Please submit your pricing and technical based on the present condition.

Is the awarded contractor responsible for the removal of vines on fence by “CLC” adjacent to trash truck parking lot?

Yes.

In cost schedule Item #5 Emergency Disaster Services per hour rate – please identify what is to be included in this hourly rate. For example, crew(size?), equipment(dump truck, small equipment, heavy equipment, dump fees. Etc
The new PWS reflects updates.

Irrigation – Item #2 – monthly service is to include wet checks and any required repairs or only wet checks and any repairs to be invoiced as required?

Wet check and repair as part of the contract.

Finger island beds, can we replace mulch with rocks or re-mulch?

Please submit your pricing and technical based on the present condition.

In areas with low irrigation can mulch be replaced with rocks?

Please submit your pricing and technical based on the present condition.

What month/date would services start?
09/01/2019
What series/ model numbers are the irrigation controllers?
Unknown.
Current/ previous vendor name? Is landscaping maint. being done by VA employees?
Maintain by VAMC staff.
What is the square footage for the entire facility including fisher house?
Approximately 26 acres.

Confirm which Landscaping certifications are required for this contract? For example:

· Florida Certified Landscape Contractor

· Florida Licensed Irrigation Contractor

· ISA Certified Arborist Certified Pest Control Operator If you are applying Chemicals, you must be certified.

Any sod, and if yes How much sod will need to be laid ?
Please submit your pricing and technical based on the present condition.
Will there be any storage area available for landscaping products/ equipment?
No. Storage is the responsibility of the Contractor.