36C24818R0156-001.docx
DOCX document 166 KB Posted
- Attached to
- Address Physical Security Requirements Design Build - 675-16-102 Federal contract opportunity
- Solicitation number
- 36C24818R0156
About this file
36C24818R0156 36C24818R0156.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24818R0156-00002000.docx | DOCX document | |
| 36C24818R0156-00001000.docx | DOCX document | |
| 36C24818R0156-002.zip | ZIP file | |
| 36C24818R0156-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24818R0156
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24818R0156 X 04-19-2018 675-18-1-3414-0001 675-16-102 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) For Orlando VA Medical Center 8875 Hidden River Pkwy Suite 525 Tampa
FL
33637 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) 8875 Hidden River Pkwy Suite 525 Tampa
FL
33637 Tiffany Garfield 813-631-2818 Project Title: Design Build, Address Physical Security Requirements
Project No: 675-16-102
Project Location: Orlando VA Medical Center, Orlando, FL
Contracting Officer (CO): Tiffany Garfield; email - tiffany.garfield@va.gov
Contracting Officer Representative (COR): Daniel Riquer; email - daniel.riquer@va.gov
Description: This is a 2 Phase Design/Build (DB) project which shall address physical security requirements throughout the Orlando VA Campuses.
Service Disabled Veteran Owned Small Business Program:
The acquisition is Set-Aside under the SDVOSB program. The prospective contractor is cautioned that any proposal submitted to this solicitation must meet the criteria identified by 38 CFR Part 74. Any person, persons or business entity suspected of misrepresenting itself for the purpose of securing a government contract may be criminally investigated and prosecuted for fraud against the United States of America. Parties found misrepresenting their status also risk debarment from government procurements.
Please reference the attached documents for further proposal submission information.
X X 52.211-10 X email 1 copy
12:00 PM
05-18-2018 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Phase 1 - Technical Only - No Pricing Submitted Phase II - Technical and Pricing - $ 36C248 Department of Veterans Affairs Network Contracting Office 8 (NCO 8) For Orlando VA 8875 Hidden River Pkwy Tampa
FL
33637 Department of Veterans Affairs Financial Services Center P.O. Box 149971 Austin
TX
78714-9971
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.1 GENERAL PROPOSAL INFORMATION | 5 |
| A.2 PROPOSAL PREPARATION AND EVALUATION INFORMATION | 6 |
| A.3 PRICE OFFER SCHEDULE (PHASE II ONLY) | 13 |
| A.4 WAGE DETERMINATION (PHASE II ONLY) | 14 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 39 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 39 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 39 |
| 2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 39 |
| 2.4 52.222-41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014) | 40 |
| 2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) | 47 |
| 2.6 52.228-1 BID GUARANTEE (SEP 1996) | 48 |
| 2.7 52.233-2 SERVICE OF PROTEST (SEP 2006) | 48 |
| 2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 49 |
| 2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 49 |
| 2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 50 |
| 2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (JAN 2008) | 50 |
| 2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (JAN 1998) | 50 |
| 2.13 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 51 |
| 2.14 PARTNERING | 51 |
| REPRESENTATIONS AND CERTIFICATIONS | 52 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (JAN 2018) | 52 |
| 3.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 55 |
| GENERAL CONDITIONS | 57 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 57 |
| 4.2 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JUL 2013) | 57 |
| 4.3 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 58 |
| 4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013) | 58 |
| 4.5 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 60 |
| 4.6 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014) | 61 |
| 4.7 SUPPLEMENTAL INSURANCE REQUIREMENTS | 64 |
| 4.8 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 64 |
| 4.9 52.203-98 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE | 65 |
| 4.10 52.203-99 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE | 65 |
| 4.11 VAAR 852.203-70 COMMERCIAL ADVERTISING (JAN 2008) | 68 |
| 4.12 VAAR 852.211-75 PRODUCT SPECIFICATIONS (JAN 2008) | 68 |
| 4.13 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2016)(DEVIATION) | 68 |
| 4.14 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 69 |
| 4.15 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2012) | 70 |
| 4.16 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (JUL 2002) | 71 |
| 4.17 VAAR 852.236-74 INSPECTION OF CONSTRUCTION (JUL 2002) | 71 |
| 4.18 VAAR 852.236-76 CORRESPONDENCE (APR 1984) | 71 |
| 4.19 VAAR 852.236-77 REFERENCE TO "STANDARDS" (JUL 2002) | 71 |
| 4.20 VAAR 852.236-78 GOVERNMENT SUPERVISION (APR 1984) | 72 |
| 4.21 VAAR 852.236-79 DAILY REPORT OF WORKERS AND MATERIAL (APR 1984) | 72 |
| 4.22 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 1984) | 72 |
| 4.23 VAAR 852.236-82 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS) (APR 1984) | 73 |
| 4.24 VAAR 852.236-84 SCHEDULE OF WORK PROGRESS (NOV 1984) | 75 |
| ADDITIONAL REQUIREMENTS FOR BAR CHART SCHEDULE | 76 |
| 4.25 VAAR 852.236-85 SUPPLEMENTARY LABOR STANDARDS PROVISIONS (APR 1984) | 77 |
| 4.26 VAAR 852.236-86 WORKER'S COMPENSATION (JAN 2008) | 77 |
| 4.27 VAAR 852.236-87 ACCIDENT PREVENTION (SEP 1993) | 77 |
| 4.28 VAAR 852.236-88 CONTRACT CHANGES--SUPPLEMENT (JUL 2002) | 77 |
| 4.29 VAAR 852.236-89 BUY AMERICAN ACT (JAN 2008) | 79 |
| 4.30 VAAR 852.236-91 SPECIAL NOTES (JUL 2002) | 80 |
| 4.31 VAAR 852.246-74 SPECIAL WARRANTIES (JAN 2008) | 81 |
| 4.32 LIMITATIONS ON SUBCONTRACTING-- MONITORING AND COMPLIANCE (JUN 2011) | 81 |
| 4.33 DESIGN BUILD STATEMENT OF WORK | 81 |
| DESIGN BUILD SPECIFICATIONS | 102 |
| 4.34 SCHEDULE OF PAYMENTS FOR DESIGN SERVICES | 102 |
| 4.35 OWNERSHIP OF ORIGINAL DOCUMENTS | 102 |
| 4.36 RETENTION OF REVIEW DOCUMENTS | 102 |
| 4.37 CONTRACT DRAWINGS AND SPECIFICATIONS GOVERNMENT FURNISHED PLANNING INFORMATION | 102 |
| 4.38 COORDINATION WITH MEDICAL CENTER | 103 |
| 4.39 RESPONSIBILITY OF THE DESIGN-BUILD CONTRACTOR | 103 |
| RELEASE OF CLAIMS | 103 |
| 4.40 List of Attachments – | 104 |
A.1 GENERAL PROPOSAL INFORMATION
GENERAL PROPOSAL INFORMATION – DESIGN BUILD
NOTE: Contractors shall not submit Phase II proposals until directed to do so by the Contracting Officer
1. Service Disabled Veteran-owned Small Business Verification: This requirement is 100% set aside for verified Service Disabled Veteran Owned Small Business (SDVOSB). The award of this requirement shall not be delayed due to loss of SDVOSB verification. Proposals submitted by non-verified SDVOSB’s will be excluded from evaluation and award consideration.
2. Offer Acceptance Period: Offers providing less than 120 calendar days for Government acceptance after the date offers are due may not be considered and may be rejected.
3. Work Effort: This project is a Design Build Effort: The contractor shall develop project design documentation including drawings, specifications, design analysis, etc. Upon completion of design, and upon acceptance by the Government, construction execution shall commence and be completed in accordance with contract requirements.
4. RFP Issue Date: April 19, 2018
5. Site Visit:
Phase I site visit is scheduled for April 19, 2018 at 10:00 a.m. EST. All contractors are to meet
The Phase II site visit to be determined (TBD) later in Phase II.
Contact Daniel Riquer and Tiffany Garfield by email: Daniel.riquer@va.gov and tiffany.garfield@va.gov to confirm your attendance.
6. Requests for Information (RFIs): Due Date: NLT May 1, 2018, 12:00 pm EST. RFI’s should be submitted to the contracting officer’s e-mail address as follows: tiffany.garfield@va.gov. Responses will be provided in a question and answer format. Subject Line of the RFI e-mail should include “RFI #1, 36C24818R0156 and Company Name”.
Note: RFI’s will not be accepted after due date.
7. Proposal Due Date: The size of your file shall not exceed 5 Meg. If you have multiple documents, please submit as separate emails. Subject Line of the Proposal e-mail should include the following subject line: “Phase I (etc.,) – Technical Proposal (etc.,) - 36C24818R0156 – Your Company Name - TAB “X”, Email “X” of “X (if multiple emails are required to meet the file limitation identified). All material shall be in typeface Time New Roman (12 font size), 1.5-line spacing on 8½” x 11” white paper with one (1) inch margins all around. Tables and illustration may use a reduced font style, but not less than 8 point, and may be single-spaced. Each page must identify the submitting offeror in the header or footer and page number. Proposals received after that time will not be considered. Proposals are due as follows:
a. PHASE I Proposal: Due Date: Request for Proposals (RFP) offers for furnishing services identified within the schedule shall be submitted electronically to the Contracting officer (CO) at tiffany.garfield@va.gov not later than May 18, 2018, 12:00 PM EST
b. PHASE II Proposal: Due date will be announced by email to those Offerors invited to participate.
8. Offer Guarantee (Bid Bond): (An offer guarantee is required for offers requested to participate in Phase II only). Per FAR Clause 52.228-1-Bid Guarantee, the amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000, whichever is less. NOTE: A scanned copy of the original is acceptable with the original sent by mail.
9. Magnitude of Construction: Pursuant to FAR 36.204(d) the following is provided: The magnitude of construction is between $1,000,000 and $2,000,000. This is the estimated range for Design and Construction as defined by Design Build.
10. Proposal Requirements: For Phase 1, only Technical Proposals are required. Offerors shall not submit Phase II proposals unless requested by the Contracting Officer. For Phase II, Technical and Price Proposal are required from offerors who have been asked to submit Phase II proposal.
11. North American Industry Classification (NAICS) code: The applicable NAICS code for this procurement is 238990 (All Other Specialty Trade Contractors). The Small Business size standard is $15 Million.
Wage Determination (WD): For use during Phase II only
A.2 PROPOSAL PREPARATION AND EVALUATION INFORMATION
1. Proposal Preparation and Submission Instructions:
a. Technical Proposal Format: Technical Proposal shall address all information requested and will then be evaluated against the stated factors. The following format shall be used:
(1) TAB A. General Information
(2) TAB B: Technical Approach
(3) TAB C: Technical Qualifications
(4) TAB D: Relevant and Recent Past Performance
(5) TAB E: Project Planning/Safety
(6) TAB F: Phase II – Design and Construction Methods of Security System
(7) TAB G: Phase II – Schedule and Impact to Facility
(8) TAB H: Phase II – Management Approach, Key Personnel, Quality Control, and Warrant Support
(9) TAB I: Phase II – Price Proposal
b. Phase I Evaluation Factors and Proposal Requirements. Phase I Proposal shall include:
(1) TAB A: GENERAL INFORMATION:
(a) Cover Page with Solicitation Number, Project Title
(b) Table of Contents
(c) Signed offer/Acknowledgement of Amendments (SF1442)
(d) Copy of current vetBiz.gov SDVOSB certification
(e) DUNS Number
(f) Cage Code
(g) Tax ID number
(h) Principle points of contact, address, phone numbers, etc.
(2) TAB B: Factor 1 - TECHNICAL APPROACH:
(a) In a narrative format, diagrams and/or drawing, describe in detail how the offeror intends to meet or exceed all performance areas stated in the solicitation/statement of work/attachments that are related to Project 675-16-102, ”. Provide technical methods and procedures that reflect a design and construction approach unique to the site and facility. NOTE: Vague, general narratives to include the restatement of the Statement of Work will be rated less favorably.
(b) Schedule and minimizing downtime is crucial. Describe a plan to complete the project in a timely manner without causing disruptions to facility during normal business hours. Also describe actions to be taken by the offeror if completion of work is anticipated to fall behind schedule. It is critical to the VA mission that services remain intact with minimal disruption.
(c) Describe any technical difficulties that may be encountered in a project of this type. Provide a narrative of preventative measures or solutions to overcome these issues.
(d) Narrative - 10 page maximum
(3) TAB C: Factor 2 - TECHNICAL QUALIFICATIONS:
1. Sub Factor 2a: SPECIALIZED EXPERIENCE AND TECHNICAL COMPETENCE:
i. Contractor shall provide a copy of certification or documentation for Pelco certified installer with Endura experience, and copy of current certification AMAG engineer.
ii. Describe specialized experience, technical competence, and design expertise in security systems work performed by the Prime and Subcontractor. Proposals that demonstrate technical qualifications in performing projects very similar to or exceeding the scope of this of project 675-16-102 will be rated more favorable.
iii. Describe ability to obtain the necessary resources to perform this project
iv. Provide Offeror’s total bonding capacity, current available bonding capacity and expected available capacity in 2017, 2018 and 2019.
v. Disclose any and all negative licensing information and any pending litigation involving any of the proposed firms that will be either Prime or Sub contractors on this project.
vi. Narrative – 5 page maximum
1. Sub Factor 2b: KEY PERSONNEL AND MANAGEMENT APPROACH
i. Submit an organizational chart. Include a narrative which describes the relevant experience, to include similar projects worked on and Education and/or Certification(s), of:
1. Firm’s key personnel and experience, Narrative – 10 page maximum, excluding the organizational chart, to include at least:
1. Project Manager
2. Field Superintendent
2. Other Relevant Firm Employees
1. Overall Team, Narrative-10 page maximum, excluding A-E SF 330s, discuss the planned use of:
1. Subcontractors:
Key trades to be subcontracted Proposed subcontractors, if firms already determined Similar projects worked on
4. Architect-Engineering (A-E) Firm:
SF 330s of key A-E personnel, if A-E firm is already determined Similar projects worked on
4. Other Consultants:
Similar projects worked on
2. Identify key personnel to be assigned to the project, to include principal managers, designers and technical personnel, construction project manager, onsite supervisor with overall site responsibility, superintendent of the contractor's own forces, manager of subcontracts, quality control manager, safety officer, and the project scheduler who will be directly responsible for the day‐to‐day design and construction activities.
2. Provide biographical data for key personnel for both the design and build portions of the work. Biographical data shall include name of individual, years with the company, name of the company, work and educational background, position and role the individual will hold under this contract. Indicate what percentage of each individual’s time would be committed to the project during both, the design and construction phases. Indicate which individuals are used for the design phase and which are used during the construction phase and indicate which individuals are from Prime Contractor and/or Subcontractor.
2. Provide a completed and signed unequivocal letters of commitment from all proposed key personnel not currently employed by the Prime Contractor. Use the form letter attached to solicitation titled “Letter of Commitment Key Personnel”.
(4) TAB D: Factor 3 - RELEVANT AND RECENT PAST PERFORANCE:
(a) A minimum of three (3) and a maximum of five (5) past performance projects completed by the Prime Contractor shall be submitted to the Government. Each past performance shall contain ALL of the following:
i. Brief project description.
ii. List of subcontractors.
iii. Relevance to project stated in RFP.
iv. Initial/Final award amount.
v. State any change orders if occurred during the project performance.
vi. Pictures of completed work.
vii. Project Contracting Officer Representative or Client.
(b) The projects shall be recent (completion date to be within 3 years of the solicitation release date), relevant, and meet or exceed the proposed magnitude and scope of the proposed project 675-16-102.
(c) Two (2) of the submitted past performances may be submitted from the Government Wide Performance Information Retrieval System (PPIRS) at www.ppirs.gov or submit “Contractor Past Performance Evaluation” from two (2) previous performances of equal size and scope.
(d) Note: The Evaluation Team may also use information obtained from Past Performance Information Retrieval System PPIRS http://www.ppirs.gov/ as a basis for evaluating this factor.
(e) Preferable to discuss similar type projects in excess of $1,000,000.00
(f) The examples of projects that most closely resemble the project identified in this solicitation will receive higher consideration.
(g) Narrative-10 page maximum
(5) TAB E: Factor 4 - PROJECT PLANNING/SAFETY/IC/QC:
4. Describe your plan for phasing this project.
4. Describe approach to Construction Safety and Infection Control (IC).
4. Submit Quality Control (QC) monitoring procedures that will ensure a high level of construction quality that is applicable to the Specific and General requirements of the Statement of Work.
4. Develop and include procedures involving key subcontractors in the quality of the construction processes.
4. Provide the precautions the contractor will take to avoid damages to facility buildings (include pre-existing conditions) and surrounding properties and the remediation that will take place if damage is done.
4. Narrative-5 page maximum, excluding the EMR documentation
(6) Phase 1 Evaluation and Selection Criteria:
(a) Phase 1 proposals will be evaluated as follows: Factors 1 thru 4, as described above, will be rated using an adjectival rating system. Each factor response will be reviewed and assigned an adjectival rating.
(b) For evaluation purposes, each technical factor is equal in importance.
(7) Phase I Proposal Submission: The Phase I proposal shall be submitted to the address identified at Section A1, para 7a of this solicitation.
OFFERORS ARE NOT TO SUBMIT A PHASE 2 PROPOSAL UNLESS INVITED.
11. The maximum number of offeror’s that will be selected to submit phase-two proposals shall not exceed five, unless the Contracting Office determines that a number greater than five is in the Government’s interest and is consistent with VISN 8 purposes and objectives.
11. PHASE II Evaluation Factors and Proposal Requirements. Phase II Proposal shall include
0. TAB F: Factor 1 – DESIGN AND CONSTRUCTION METHODS OF SECURITY SYSTEM
0. Describe the techniques and methods that will be incorporated in the design and construction specific to this project. Methods and techniques shall include but not be limited to: Installation procedures for equipment that meet VA guidelines and electrical code standards, and techniques for ensuring that all equipment is installed properly.
0. Describe approach on developing a design that meet requirements of the VA Physical Security Design Manual
0. Describe any changes to the manufacturer of equipment that will be used for the security system that were made since the Phase 1 submission phase.
0. Narrative - 5 page maximum
(2) TAG G: Factor 2 –SCHEDULE AND IMPACT TO FACILITY
(a) Describe a plan to turn-over security systems to the VA once installation is completed.
(b) Submit a preliminary (CPM) Critical Path Method schedule for the design and construction satisfying the requirements of this project. A practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the Contractor contemplates starting and completing the several salient features of the work (including design, acquiring materials, plant, and equipment, mobilization, demolition, installation, finalization, etc.). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work scheduled for completion by any given point during the period. Most importantly, the schedule should show length of downtime required. The schedule shall show key milestone dates and outages for switchover and start-up of equipment. The schedule is not included in the page limit.
(c) Narrative - 2 page maximum
(3) TAB H: Factor 3 – MANAGEMENT APPROACH, KEY PERSONNEL, QUALITY CONTROL, AND WARRANTY SUPPORT
0. Describe any changes to management approach, key personnel, and quality assurance/control procedures that have occurred or will occur since Phase 1 proposals for this requirement were submitted.
0. Describe the organization, process and procedures to be established, implemented and carried out for warranty support.
0. Narrative - 1 page maximum
(4) TAB H: Factor 4 – PRICE PROPOSAL:
(a) The following cost elements shall be addressed:
(1) Labor (Direct & Indirect),
(2) Materials, Material Markups, Materials overhead,
(3) Equipment
(4) Subcontractor Cost
(5) Other Direct Costs
(6) Overhead expenses
(7) Indirect Cost
(8) General & Administrative (G&A) expenses,
(9) Profit
(b) ***Estimate to include a detailed line item breakdown of all G&A expenses inclusive of all Project Staff and General Requirements OF THE PRIME CONTRACTOR and shall be indicative of the 15% of contract performance that will be incurred for SDVOSB personnel in accordance with FAR 52.219-27 – Limitations on Subcontracting. ***
1. Proposal Submission: Each proposal, Phase I, and Phase II if invited, shall be submitted to the address identified at para 7a and must be submitted utilizing the format and means identified in this solicitation.
a. This acquisition will utilize a best value approach in accordance with FAR 15.101. The best value is the most advantageous proposal, price and other factors considered, and consistent with the Government’s stated importance of evaluation criteria. This may result in award being made to a higher-rated, higher priced offeror where the Contracting Officer determines that the technical capability and past performance of the higher-priced offer outweighs the cost difference. A contract award will be made to the responsible offeror whose proposal conforms to the RFP requirements and will provide the best value to the Government.
b. Offerors are cautioned to follow instructions fully and carefully, as the Government reserves the right to make an award based on initial proposals received, without discussions. Therefore, each initial proposal should contain the offeror’s best terms from a price and technical standpoint.
c. Understanding the factors/sub-factors and the associated criteria indicated, the excellence of the work offered, and the ability of the contractor to accomplish what is offered in the proposal is the objective. Contractor shall submit in detail adequate information for evaluation purposes on the evaluation criteria.
d. To provide a basis for sound evaluation by the government, offerors shall submit a complete proposal. The information provided shall be concise, factual, and complete. Proposals will be considered only from offerors that are regularly established in the business and in the judgment of the government, are deemed financially responsible, able to show evidence of experience and have submitted the complete documentation requested.
e. Offerors are hereby advised that any imposed terms and conditions which deviate from the Government’s material terms and conditions established in the solicitation may render their proposal unacceptable and ineligible for award.
f. Phase 2 proposals will be evaluated as follows:
(1) The technical factors consist of the Factors one (1) through three (3), described above, are of equal importance, and when combined are significantly more important than Price.
(2) Price Proposal - Basis of Evaluation: The Government will evaluate price based on the total price.
(a) Analysis will be performed by one or more of the following techniques to ensure a fair and reasonable price:
(i) Comparison of proposed prices received in response to the RFP.
(ii) Comparison of proposed prices with the IGCE.
(iii) Comparison of proposed prices with available historical information.
(iv) Comparison of market survey results.
1. Phase II Evaluation and Award Determination:
a. This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under FAR Part 15 101-1, Tradeoff Process.
b. In accordance with FAR 15.101-1, all evaluation factors, other than cost or price, when combined, are significantly more important than cost or price.
c. Thus, award will be made to the firm whose Phase I proposal was initially ranked in the competitive range and who now offers a Phase II proposal, which based on both its technical and pricing proposals, offers the overall best value to the Government.
d. Evaluation Overview: The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The proposals must conform to the RFP's requirements and judged to represent the Best Value to the Government. The Best Value is the most advantageous offer, price and other factors considered, and consistent with the Government's stated importance of evaluation criteria. This may result in award being made to a higher-rated, higher-priced offeror where the Contracting Officer determines that the Technical capability of the higher-priced offeror outweighs the price.
Each pricing element indicated in TAB B will be evaluated to determine its reasonableness. The Government may use various price analysis techniques and procedures to make a price reasonableness determination. Offerors should assure that their ability to meet or exceed the minimum needs of the Government is adequately described in the offer. The Government reserves the right to evaluate proposals and award a contract without discussions (except clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government considers it to be in its best interest to allow consideration of award to other than the lowest priced offeror or other than the highest technically rated offeror.
A.3 PRICE OFFER SCHEDULE (PHASE II ONLY)
Price Offer Schedule – To be submitted with PHASE 2 Proposal ONLY
| Line Item |
| Description |
| U/I |
| QTY |
| TOTAL PRICE |
| 0001 |
| Provide all labor, materials, tools and equipment, and design-build services necessary for design and construction to address physical security requirements at Orlando VA Medical Center. |
This project will install new security features and correct security deficiencies at the Orlando Campuses. In the required areas, door locksets will be installed, ceiling up and over access will be removed, motion intrusion and physical access card systems will be installed, panic alarms will be installed, cameras will be installed, and other miscellaneous security work will be done.
Completion Time: 343 days from Notice to Proceed
JB
| 0002 |
| DEDUCT - Remove all work associated with panic alarm/duress at Lake Nona |
| JB |
| 1 |
| $ |
| 0003 |
| DEDUCT - Remove all work associated with Lake Baldwin OPC |
| JB |
| 1 |
| $ |
| 0004 |
| DEDUCT - Remove all work associated with Viera |
| JB |
| 1 |
| $ |
A.4 WAGE DETERMINATION (PHASE II ONLY)
General Decision Number: FL180263 03/16/2018 FL263
Superseded General Decision Number: FL20170263
State: Florida
Construction Type: Building
County: Orange County in Florida.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/05/2018 1 01/12/2018 2 03/16/2018
* ASBE0067-003 01/01/2018
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR........................$ 27.89 15.19
CARP1905-003 06/01/2017
Rates Fringes
CARPENTER (Includes Form Work)...$ 22.65 9.85
ELEV0139-002 01/01/2018
Rates Fringes
ELEVATOR MECHANIC................$ 41.40 32.645
FOOTNOTE:
A. Employer contributions 8% of regular hourly rate to vacation pay credit for employee who has worked in business more than 5 years; Employer contributions 6% of regular hourly rate to vacation pay credit for employee who has worked in business less than 5 years.
Paid Holidays: New Year's Day; Memorial Day; Independence Day; Labor Day; Thanksgiving Day; The Friday after Thanksgiving Day; and Christmas Day.
ENGI0487-022 07/01/2016
Rates Fringes
OPERATOR: Forklift..............$ 23.25 9.20 OPERATOR: Mechanic..............$ 32.05 9.20 OPERATOR: Oiler.................$ 23.50 9.20
ENGI0673-016 05/01/2016
Rates Fringes
OPERATOR: Crane Gantry Crane; Bridge Crane..$ 26.09 13.00 Tower Crane; Crawler Crane; Truck Crane; Hydro Crane.......................$ 28.25 13.00
IRON0402-001 02/01/2017
Rates Fringes
IRONWORKER, ORNAMENTAL...........$ 23.00 10.99
SFFL0821-004 01/01/2018
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 27.68 18.89
SHEE0015-006 07/01/2014
Rates Fringes
SHEET METAL WORKER (Includes HVAC Duct Installation)..........$ 18.00 11.76
SUFL2014-027 08/16/2016
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 19.39 0.00
ELECTRICIAN, Includes Low Voltage Wiring...................$ 19.58 6.39
IRONWORKER, REINFORCING..........$ 22.81 11.58
IRONWORKER, STRUCTURAL...........$ 17.92 0.00
LABORER: Common or General, Including Cement Mason Tending and Pipelaying...........$ 13.59 4.28
OPERATOR:
Backhoe/Excavator/Trackhoe.......$ 18.69 3.27
OPERATOR: Bulldozer.............$ 15.40 1.90
OPERATOR: Grader/Blade..........$ 18.97 0.00
OPERATOR: Loader................$ 17.83 0.00
OPERATOR: Roller................$ 14.43 4.78
PAINTER: Brush, Roller and Spray............................$ 13.22 0.00
PIPEFITTER, Includes HVAC Pipe and Unit Installation.......$ 22.29 7.72
PLUMBER..........................$ 19.42 0.00
ROOFER...........................$ 17.60 1.39
TILE SETTER......................$ 17.25 1.74
TRUCK DRIVER: Dump Truck........$ 12.95 2.28
TRUCK DRIVER: Lowboy Truck......$ 14.24 0.00
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION
WD 15-4553 (Rev.-6) was first posted on www.wdol.gov on 01/16/2018
REGISTER OF WAGE DETERMINATIONS UNDER | U.S. DEPARTMENT OF LABOR
THE SERVICE CONTRACT ACT | EMPLOYMENT STANDARDS ADMINISTRATION
By direction of the Secretary of Labor | WAGE AND HOUR DIVISION
| WASHINGTON D.C. 20210
| Wage Determination No.: 2015-4553 Daniel W. Simms Division of | Revision No.: 6 Director Wage Determinations| Date Of Revision: 01/10/2018 Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.35 for calendar year 2018 applies to all contracts subject to the Service Contract Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.35 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2018. The EO minimum wage rate will be adjusted annually.
Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts State: Florida
Area: Florida Counties of Orange, Osceola, Seminole **Fringe Benefits Required Follow the Occupational Listing**
OCCUPATION CODE - TITLE FOOTNOTE RATE
01000 - Administrative Support And Clerical Occupations 01011 - Accounting Clerk I 13.48 01012 - Accounting Clerk II 15.13 01013 - Accounting Clerk III 16.93 01020 - Administrative Assistant 22.60 01035 - Court Reporter 20.91 01041 - Customer Service Representative I 11.59 01042 - Customer Service Representative II 13.03 01043 - Customer Service Representative III 14.22 01051 - Data Entry Operator I 12.58 01052 - Data Entry Operator II 13.73 01060 - Dispatcher, Motor Vehicle 17.17 01070 - Document Preparation Clerk 13.32 01090 - Duplicating Machine Operator 13.32 01111 - General Clerk I 12.05 01112 - General Clerk II 13.15 01113 - General Clerk III 14.77 01120 - Housing Referral Assistant 18.54 01141 - Messenger Courier 13.37 01191 - Order Clerk I 14.03 01192 - Order Clerk II 15.30 01261 - Personnel Assistant (Employment) I 14.51 01262 - Personnel Assistant (Employment) II 16.23 01263 - Personnel Assistant (Employment) III 18.08 01270 - Production Control Clerk 20.30 01290 - Rental Clerk 13.74 01300 - Scheduler, Maintenance 14.87 01311 - Secretary I 14.87 01312 - Secretary II 16.64 01313 - Secretary III 18.54 01320 - Service Order Dispatcher 14.87 01410 - Supply Technician 22.60 01420 - Survey Worker 15.33 01460 - Switchboard Operator/Receptionist 12.87 01531 - Travel Clerk I 12.32 01532 - Travel Clerk II 12.86 01533 - Travel Clerk III 13.44 01611 - Word Processor I 14.54 01612 - Word Processor II 16.32 01613 - Word Processor III 18.25 05000 - Automotive Service Occupations 05005 - Automobile Body Repairer, Fiberglass 19.71 05010 - Automotive Electrician 17.28 05040 - Automotive Glass Installer 16.36 05070 - Automotive Worker 16.36 05110 - Mobile Equipment Servicer 13.56 05130 - Motor Equipment Metal Mechanic 18.18 05160 - Motor Equipment Metal Worker 16.36 05190 - Motor Vehicle Mechanic 18.18 05220 - Motor Vehicle Mechanic Helper 13.10 05250 - Motor Vehicle Upholstery Worker 15.80 05280 - Motor Vehicle Wrecker 16.37 05310 - Painter, Automotive 17.92 05340 - Radiator Repair Specialist 16.36 05370 - Tire Repairer 10.83 05400 - Transmission Repair Specialist 18.18 07000 - Food Preparation And Service Occupations 07010 - Baker 11.80 07041 - Cook I 12.51 07042 - Cook II 14.52 07070 - Dishwasher 9.94 07130 - Food Service Worker 10.48 07210 - Meat Cutter 14.40 07260 - Waiter/Waitress 10.33 09000 - Furniture Maintenance And Repair Occupations 09010 - Electrostatic Spray Painter 14.65 09040 - Furniture Handler 9.64 09080 - Furniture Refinisher 15.19 09090 - Furniture Refinisher Helper 11.72 09110 - Furniture Repairer, Minor 13.78 09130 - Upholsterer 15.61 11000 - General Services And Support Occupations 11030 - Cleaner, Vehicles 10.59 11060 - Elevator Operator 10.41 11090 - Gardener 14.98 11122 - Housekeeping Aide 10.71 11150 - Janitor 10.71 11210 - Laborer, Grounds Maintenance 11.33 11240 - Maid or Houseman 10.48 11260 - Pruner 10.06 11270 - Tractor Operator 13.78 11330 - Trail Maintenance Worker 11.33 11360 - Window Cleaner 13.14 12000 - Health Occupations 12010 - Ambulance Driver 17.78 12011 - Breath Alcohol Technician 17.65 12012 - Certified Occupational Therapist Assistant 28.15 12015 - Certified Physical Therapist Assistant 28.63 12020 - Dental Assistant 17.26 12025 - Dental Hygienist 33.03 12030 - EKG Technician 24.33 12035 - Electroneurodiagnostic Technologist 24.33 12040 - Emergency Medical Technician 17.78 12071 - Licensed Practical Nurse I 15.78 12072 - Licensed Practical Nurse II 17.65 12073 - Licensed Practical Nurse III 19.67 12100 - Medical Assistant 14.35 12130 - Medical Laboratory Technician 17.14 12160 - Medical Record Clerk 17.99 12190 - Medical Record Technician 18.02 12195 - Medical Transcriptionist 15.03 12210 - Nuclear Medicine Technologist 34.45 12221 - Nursing Assistant I 10.33 12222 - Nursing Assistant II 11.62 12223 - Nursing Assistant III 12.68 12224 - Nursing Assistant IV 14.24 12235 - Optical Dispenser 19.70 12236 - Optical Technician 16.81 12250 - Pharmacy Technician 15.85 12280 - Phlebotomist 15.00 12305 - Radiologic Technologist 24.21 12311 - Registered Nurse I 22.12 12312 - Registered Nurse II 27.06 12313 - Registered Nurse II, Specialist 27.06 12314 - Registered Nurse III 32.74 12315 - Registered Nurse III, Anesthetist 32.74 12316 - Registered Nurse IV 39.23 12317 - Scheduler (Drug and Alcohol Testing) 22.12 12320 - Substance Abuse Treatment Counselor 18.76 13000 - Information And Arts Occupations 13011 - Exhibits Specialist I 18.37 13012 - Exhibits Specialist II 22.76 13013 - Exhibits Specialist III 27.81 13041 - Illustrator I 21.64 13042 - Illustrator II 25.12 13043 - Illustrator III 31.42 13047 - Librarian 27.87 13050 - Library Aide/Clerk 12.77 13054 - Library Information Technology Systems 25.12 Administrator 13058 - Library Technician 14.97 13061 - Media Specialist I 16.50 13062 - Media Specialist II 18.47 13063 - Media Specialist III 20.58 13071 - Photographer I 13.91 13072 - Photographer II 15.91 13073 - Photographer III 19.29 13074 - Photographer IV 23.54 13075 - Photographer V 28.55 13090 - Technical Order Library Clerk 15.49 13110 - Video Teleconference Technician 19.64 14000 - Information Technology Occupations 14041 - Computer Operator I 17.38 14042 - Computer Operator II 19.58 14043 - Computer Operator III 22.42 14044 - Computer Operator IV 24.72 14045 - Computer Operator V 27.37 14071 - Computer Programmer I (see 1) 22.24 14072 - Computer Programmer II (see 1) 27.56 14073 - Computer Programmer III (see 1) 14074 - Computer Programmer IV (see 1) 14101 - Computer Systems Analyst I (see 1) 14102 - Computer Systems Analyst II (see 1) 14103 - Computer Systems Analyst III (see 1) 14150 - Peripheral Equipment Operator 17.38 14160 - Personal Computer Support Technician 24.72 14170 - System Support Specialist 26.77 15000 - Instructional Occupations 15010 - Aircrew Training Devices Instructor (Non-Rated) 28.67 15020 - Aircrew Training Devices Instructor (Rated) 39.50 15030 - Air Crew Training Devices Instructor (Pilot) 41.13 15050 - Computer Based Training Specialist / Instructor 30.03 15060 - Educational Technologist 29.00 15070 - Flight Instructor (Pilot) 41.13 15080 - Graphic Artist 22.58 15085 - Maintenance Test Pilot, Fixed, Jet/Prop 38.68 15086 - Maintenance Test Pilot, Rotary Wing 38.68 15088 - Non-Maintenance Test/Co-Pilot 38.68 15090 - Technical Instructor 20.56 15095 - Technical Instructor/Course Developer 25.15 15110 - Test Proctor 16.59 15120 - Tutor 16.59 16000 - Laundry, Dry-Cleaning, Pressing And Related Occupations 16010 - Assembler 10.10 16030 - Counter Attendant 10.10 16040 - Dry Cleaner 12.14 16070 - Finisher, Flatwork, Machine 10.10 16090 - Presser, Hand 10.10 16110 - Presser, Machine, Drycleaning 10.10 16130 - Presser, Machine, Shirts 10.10 16160 - Presser, Machine, Wearing Apparel, Laundry 10.10 16190 - Sewing Machine Operator 12.93 16220 - Tailor…