36C24818R0039-00001000.docx
DOCX document 276 KB Posted
- Attached to
- Renovate Chiller Plant Federal contract opportunity
- Solicitation number
- 36C24818R0039
About this file
36C24818R0039 00001 36C24818R0039 00001 (RFIs responses - Chiller Plant).docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24818R0039-00002000.docx | DOCX document | |
| 36C24818R0039-00001002.pdf | ||
| 36C24818R0039-00001001.pdf | ||
| 36C24818R0039-00001003.pdf | ||
| 36C24818R0039-006.pdf | ||
| 36C24818R0039-003.doc | DOC document | |
| 36C24818R0039-008.docx | DOCX document | |
| 36C24818R0039-009.docx | DOCX document | |
| 36C24818R0039-001.docx | DOCX document | |
| 36C24818R0039-007.pdf | ||
| 36C24818R0039-002.docx | DOCX document | |
| 36C24818R0039-005.docx | DOCX document | |
| 36C24818R0039-004.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Continuation of Amendment A00001 Solicitation Number: 36C24818R0039 | Renovate Chiller Plant
Continuation of Amendment A00001 Solicitation Number: 36C24818R0039 | Renovate Chiller Plant
X Renovate Chiller Plant
The purpose of this amendment A00001 to solicitation number 36C24818R0039 is to respond to the RFI questions and provide copy of the site visit attendance sheet. The date for Request for Information (RFI) has closed.
All Offerors are required to acknowledge receipt of this amendment A00001 This amendment does NOT change the closing date for the receipt of proposals of February 13, 2018 @ 3:00pm (AST) N/A A0000
NCO815L3-0313
Contracting Officer Ana G. Alvarado X X
01-03-2018 36C24818R0039
To all Offerors/Bidders San Juan PR 00921-3201 #10 Calle Casia Suite #4M440 Administrative Building VA Caribbean Healthcare System Department of Veterans Affairs 00672 VACHS, San Juan, PR NCO 8 - Construction Team San Juan PR 00921-3201 #10 Calle Casia Suite #4M440 Administrative Building VA Caribbean Healthcare System Department of Veterans Affairs 00672 672-14-200 01-31-2018 (Signature of Contracting Officer) (Signature of person authorized to sign)
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
ONE
CHECK
(X)
(SEE ITEM 13)
(SEE ITEM 11)
(If required) (such as changes in paying office, appropriation date, etc.)
(Specify type of modification and authority) (If other than Item 6) (Number, street, county, State and ZIP Code) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Type or print) (Type or print) Prescribed by GSA - FAR (48 CFR) 53.243
PREVIOUS EDITION NOT USABLE
STANDARD FORM 30
15B. CONTRACTOR/OFFEROR
16A. NAME AND TITLE OF CONTRACTING OFFICER
15A. NAME AND TITLE OF SIGNER
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
16B. UNITED STATES OF AMERICA
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16C. DATE SIGNED
Contractor
BY
D. OTHER
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
prior to the opening hour and date specified.
by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
15C. DATE SIGNED
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
is not, is required to sign this document and return ___________ copies to the issuing office.
(REV. 11/2016)
12. ACCOUNTING AND APPROPRIATION DATA
is not extended.
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the is extended, E. IMPORTANT:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
CODE
FACILITY CODE
1. CONTRACT ID CODE
BPA NO.
10B. DATED
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
OF PAGES
PAGE
9B. DATED
9A. AMENDMENT OF SOLICITATION NUMBER
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NUMBER
8. NAME AND ADDRESS OF CONTRACTOR
6. ISSUED BY
CODE
2. AMENDMENT/MODIFICATION NUMBER
7. ADMINISTERED BY
CODE
5. PROJECT NUMBER (if applicable)
CONTINUATION PAGE
Continuation of Amendment A00001 Solicitation Number: 36C24818R0039 | Renovate Chiller Plant
RFIs Question(s) and Answer(s):
| # |
| Questions |
| Answers |
| 1. |
| The government specified that piping could be a deductive item if it is determined that portions of the piping will be reused. Is the government going to consider maintaining other equipment (covered by this contract) in place if found to be in good condition? |
| All equipment stated on the SOW to be replaced shall be so. |
| 2. |
| It is not clear if an architectural firm is being requested for design purposes or if only a mechanical consultant firm is being requested. It seems that we can use either one or both however we would like to know if VA will place a higher value on either one. |
| All design shall be stamped by professionals licensed in Puerto Rico by their competence. |
| 3. |
| Is VA going to provide parking for the contractor personnel? How many parking are going to be provided? |
| No parking will be allowed on VA premises. |
| 4. |
| Is VA going to provide space for a local temporary office within the VA premises? |
| Due to the project magnitude, one staging area shall be coordinated with VA personnel. |
| 5. |
| Is VA going to consider extending the proposal due date? |
| The closing date for the receipt of Phase One proposals remain unchanged. Phase One only required Technical Proposal. |
| 6. |
| As Built drawings or design set for all existing facilities, chilled water piping layout, condenser water piping layout, hydronic ISO view, elevations and cross-sections. |
| Available as-built drawings shall be provided for reference (see attached), however, VA does not guarantee its accuracy. The contractor shall be responsible to perform a thorough field assessment and verify equipment capacities, electrical loads, cooling loads if necessary. |
| 7. |
| Datasheet and equipment description of equipment in the mechanical room: |
· Pumps
· Cooling tower Available equipment data shall be provided (see attached), however the data shall be gathered on the field if necessary.
| 8. |
| Do the chillers work all at the same time and what are the capacities? |
| See attached as-drawing for layout and equipment schedule. VA does not guarantee its accuracy as the offeror is responsible of field verification. Existing sequence of operation not available. New controls architecture is required on the SOW. |
| 9. |
| The existing chillers are manufactured by Trane, are we required to use their control systems? |
| The existing BAS uses Tracer Summit. The contractor shall use the existing platform. |
| 10. |
| Would it be possible to get the company that provides the AHU balancing? |
| Multi Air Service Engineers (MASE) |
| 11. |
| Which company provides the ph balance (chemical) for the units. |
| State Chemical Solutions |
| 12. |
| Will the remaining chillers/ cooling towers require a full service by the contractor before placing them into service? Or will it be performed by the VA maintenance crew |
| Full maintenance and cleaning services shall be performed to both chillers and cooling towers prior operation. |
| 13. |
| Will the MCC be replaced before or after the upgrade? |
| The replacement of the existing MCC is not part of the SOW. A project currently under construction shall replace the existing unit. |
| 14. |
| Can we have an idea of possible locations for staging and equipment placement. |
| The government will coordinate staging location with the selected offeror. |
| 15. |
| Is this project sales tax exempt? If the project is sales tax exempt can the government provide a sales tax exemption certificate? |
| No tax exemption. Refer to Phase Two, Factor 4 Price. |
| 16. |
| Will the Government provide comprehensive written badging requirements for the project if badging is required? |
| The selected offeror will be addressed on the badging requirements. |
| 17. |
| Will there be a site visit and a RFI due date scheduled once GCs get approved for phase 2? |
| There is no additional site visit scheduled for Phase Two. |
| 18. |
| Is the VA open to extend the amount of days for the contract to allow enough time to survey the site, systems, come up with the scope, order parts and equipment and making all the changes on the plant? |
| From the 365-contract performance period, the project will have a total of 120 calendar day to the design phase. |
| 19. |
| What are the mechanical control systems that the VA currently has on site and would like to tie in to the new equipment? |
| The BAS uses Tracer Summit. |
| 20. |
| Warranty on parts and equipment are for replaced items only, correct. |
| Yes. |
| 21. |
| Where will the designated parking area be for workers accessing the construction site? |
| No parking inside VA premises is allowed. |
| 22. |
| Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations. |
| The Use of Procore is acceptable. |
| 23. |
| Will the government accept the use of the industry leading Procore Project Management software as the primary submittal and data tracking tool for this project? The software is compatible with the VA’s networks and is currently in use at many VA locations. |
| The information shall be provided to the selected offeror on a future date. |
See attached documents:
MH5-101 Building 1 Equipment Schedules.
MH2-131 Bldg. 1 Enlarged Mechanical Room Piping Plan.
Site Visit Attendance 1-11-2018 Chiller Plant.