36C24818Q9235-A0001004.docx
DOCX document 37 KB Posted
- Attached to
- Furniture Federal contract opportunity
- Solicitation number
- 36C24818Q9235
About this file
36C24818Q9235 A0001 Attachment D Slient Characteristics 36C24818Q9235.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24818Q9235-A0003000.docx | DOCX document | |
| 36C24818Q9235-A0002000.docx | DOCX document | |
| 36C24818Q9235-A0001002.docx | DOCX document | |
| 36C24818Q9235-A0001001.docx | DOCX document | |
| 36C24818Q9235-A0001000.docx | DOCX document | |
| 36C24818Q9235-A0001003.docx | DOCX document | |
| Attachment_D__Slient_Characteristics__36C24818Q9235.docx | DOCX document | |
| Attachment_B_Clauses__36C24818Q9235.docx | DOCX document | |
| Attachment_A_Solicitation____36C24818Q9235.docx | DOCX document | |
| Attachment_C__Schedule__3624818Q9235.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment D RFQ 36C24818Q9235
Salient Characteristics
1. Overview
Bay Pines Veteran Affairs Healthcare System, (BPVAHS) Interior Design program emphasizes principles and strategies for state-of-the art technology, mobility and ergonomic features for both patients and staff in health care settings. The architecture and interior design embody the highest level of environmental stewardship, use of natural spaces as well as providing a streamline, open, modern aesthetic.
2. General Description
The Contractor shall provide all labor, tools, materials, and furniture to support the additional items necessary to complete the installation after hours in phases if needed.
· The Contactor shall be responsible for taking and applying accurate field measurements after award at the site. The contractor shall provide the Interior Designer with the drafted drawings to scale 18x24 pdf documents showing layout, of furniture, including a separate electrical plan showing details of connections to the building of awarded product. The Interior Designer must approve layout before commencing work.
· Manufacturing of goods shall not commence until notification by the Project Interior Designer is given to the awarded contractor. All forms needed to keep the current pricing from the manufacturer of the product shall be the submitted, managed and handled by the contractor.
3. Salient Characteristics Lateral File Cabinets
· Cases shall be constructed of one piece of 20gauge steel with no seams or overlaps
· Drawer fronts shall be double wall construction
· Drawer bottom shall be constructed of 20- gauge steel
· Tops shall be constructed on 18-guage steel
· Inner and outer drawer front and bottom to be 22-gauge steel
· Lifetime warranty
Worksurfaces:
· Worksurfaces shall be available in widths from 24”-120” in 3” increments
· Worksurfaces shall be available in depts. 18”, 24” and 30”
· Worksurfaces shall be a minimum 1 3/6” in thickness.
· Worksurfaces shall be edged in ABS edge band or vinyl T-mold
· Worksurfaces shall be predrilled to accept pedestals and/or cantilevers
· High pressure laminate
· 0.030”, 0.76mm thickness,
· 0.118”, 3mm radius t-mold edge band
· 0.118”, 3 mm radius edge band on user edge, 0.039”, 1mm edge band on remaining edges Upper Storage
· All door types shall be available with optional slow close mechanism.
· The shelf shall have a powder paint finish
· 18-gauge (0.048”, 1.2mm) steel
Cubicle Panels
· All panels shall have an overall thickness of 3”
· Panel surfaces must be capable of being replaced or reupholstered in the field
· Frames shall consist of four roll-formed cold rolled 17- gauge (.060”, 1.5mm) steel tubes welded together at corners into a rectangular frame.
· Panels shall be reinforced to accommodate cantilevered work surfaces, shelves, and storage units.
· Panels shall have integrated slots in the vertical frame that will allow components to be mounted in 1” increments.
· Panel shall have leveling glides with a minimum 2.5” height adjustment and carpet grippers.
Task Chair
· PVC Free
· Provide seat pan width to accommodate 95% of the population
· Waterfall edge for seat
Requirement:
| Item |
| QTY |
| Description |
| Preferred Manufactures |
| 1. |
| 33 |
| Task Chair, fabric seat, mesh back, fully adjustable, synthetic leather, foam seat, aluminum base, carpet caster. Must match existing fabric and finish and to be compliant with union regulations. |
| Haworth |
| 2. |
| 82 |
| Lock and Keys 2 per set, chrome, exact color match existing for security. |
| Haworth |
| 3. |
| 66 |
| Paper sorter, Frost, Metallic Silver, exact color match to existing. |
| Haworth |
| 4. |
| 33 |
| Tool cup, Frost, exact color match to existing. |
| Haworth |
| 5. |
| 10 |
| Top cap aligner, must connect into existing and new. |
| Haworth |
| 6. |
| 13 |
| Top cap must connect into existing and new. |
| Haworth |
| 7. |
| 27 |
| Top cap end panel must connect into existing. |
| Haworth |
| 8. |
| 13 |
| Top Feed must connect to existing and new. |
| Haworth |
| 9. |
| 18 |
| Square Top Cap, must connect to existing monolithic panels |
| Haworth |
| 10. |
| 67 |
| Square toppers must connect to both existing and new |
| Haworth |
| 11. |
| 3 |
| Post to finish run must connect to existing panel ends |
| Haworth |
| 12. |
| 18 |
| Inline connection must connect to existing and new. |
| Haworth |
| 13. |
| 4 |
| Electrical base caps, must be compatible with existing and new. |
| Haworth |
| 14. |
| 10 |
| 64IN Panel Hinge, must connect to existing and new panels |
| Haworth |
| 15. |
| 82 |
| Slat wall 16x36 much connect to existing and new panels |
| Haworth |
| 16. |
| 41 |
| Pedestal with lateral and pencil components to match existing and new. |
| Haworth |
| 17. |
| 31 |
| Duplex receptacles that are compatible with existing and new electrical system. |
| Haworth |
| 18. |
| 28 |
| Raceway kits to convert existing to a power panel that is compatible with existing power. |
| Haworth |
| 19. |
| 82 |
| Up-mounted Storage, locking, hinge outside of unit that is compatible with existing and new panels. |
| Haworth |
| 20. |
| 21 |
| Wire management that is compatible with new and existing panels and worksurfaces. |
| Haworth |
| 21. |
| 81 |
| Worksurface High Pressure Laminate, notched, rectangular 24x48 The finish must match exactly to existing to be used in reconfiguration with existing laminate worksurfaces. |
| Haworth |
| 22. |
| 34 |
| Worksurface High Pressure Laminate, notched, rectangular 24x60 The finish must match exactly to existing to be used in reconfiguration with existing laminate worksurfaces. |
| Haworth |
| 23. |
| 3 |
| Universal Support, non-handed must be compatible with new and existing worksurfaces. |
| Haworth |
| 24. |
| 32 |
| Supports, hanging worksurface, must connect to new and existing work surfaces. |
| Haworth |
| 25. |
| 164 |
| Hardware, flat plate, must connect to new and existing work surfaces. |
| Haworth |
| 26. |
| 33 |
| Swivel mouse, platform keyboard tray, ambidextrous, with gel synthetic leather cover, fully adjustable. No > 21” track must fit on existing and new. |
Humanscale
4. Project Performance Time
The total contractor performance period shall be 130 calendar days which includes that time needed to submit, review and approve all furniture submittals, installations, and final inspection. After work begins on the site, the contractor shall work in potentially phases during none-business hours so that normal work by end users is not disrupted; a representative from the prime contractor shall be present until the completion of the contract.
5. Location and Access United States Department of Veterans Affairs
| BPVAHS VACC |
| 8550 Ulmerton Road |
Largo, FL 33771
COR:
Jodie Sueiro jodie.sueiro@va.gov 727-398-6661 x10506
POC:
Kathleen Matthews kathleen.matthews2@va.gov 727-580-7697 727-398-6661x14173
6. Work Hours The contract shall perform the work at the site form Friday through Monday from 5:00 PM to 5:00 AM, unless otherwise modified in writing and signed off by the Interior Designer. The contractor shall not have access to the site for the performance of any portion of the work beyond these hours.
7. Coordinator
The contractor shall coordinate with the POC. All work shall be coordinated with other trades involved in the project.
8. Receipt of Materials
Address all shipment of furniture, materials, and supplies to the contractor – not the Government. The contractor must be on hand to accept shipments; the Government will not accept shipments.
Furniture and materials shall be carefully handled, properly stored, and adequately protected to prevent damage before and during installation, in accordance with the manufacturer’s recommendations. Damaged or defective items shall be replaced. Location of storage and staging area shall be designated by the POC. The contractor will be responsible for security of all furniture and materials.
The contractor will coordinate with the POC a staging area. The contractor shall be responsible for restoring the area to its original condition at the competition of the work. The contractor shall be responsible for repair of any damage incurred to buildings or pavement as a result of delivery and storage.
9. Specific Environmental Requirements The contractor is responsible for ensuring that all goods are in accordance with one of the following certifications EQ Credit 4.5: Low-Emitting Materials for LEED Commercial Interiors Credit including Greengard certification or BIFMA level 1.
10. Warranties
All warranties and/or guarantees, either implied or expressed, for individual equipment shall be endorsed to the Government. Warranty should cover furniture usage for 24/7.
11. Clean-up and Disposal The Contractor shall be responsible for the removal and disposal of all trash/debris connected with uncrating and assembling furniture and other items installed under this contract. The Contractor will ensure the flooring is swept and clear of all debris due to the re-configuration and installation. The Contractor shall not use VA facilities for trash/debris disposal. Recyclable products shall be disposed of in accordance with applicable statutes, in respective containers.