About this file

36C24718B0473 Final Drawings- Plumbing Upgrades.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Project 619A4-17-101: Improve Facility Condition -Plumbing Upgrade, newest first.
File Type Posted
36C24718C0202-000.docx DOCX document
36C24718B0473-0001000.docx DOCX document
36C24718B0473-0001001.pdf PDF
36C24718B0473-002.pdf PDF
36C24718B0473-001.docx DOCX document
36C24718B0473-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D ep ar tm en t of V et er an s

A ff ai rs

NOTE:

COORDINATE WITH VA FACILITIES ADMINISTRATION

FOR SPECIFIC REQUIREMENTS FOR AREAS OF

MATERIALS STAGING INDICATED AS

FOR CONSTRUCTION WORKER PARKING AND

GENERAL PROJECT ACCESS / SECURITY, ETC.

MECHANICAL

B-68

MECHANICAL

B-120

MECHANICAL

B-129

MECHANICAL

ROOM

G-129

MECHANICAL

B-4A

D ep ar tm en t of V et er an s

A ff

NOTE: LEGEND IS UNABRIDGED. SOME SYMBOLOGY &

PIPING LINETYPES INDICATED MAY NOT BE

INCLUDED IN PROJECT.

PLUMBING LEGEND (UNABRIDGED)

FLOOR CLEANOUTFCO

CLEANOUT TO GRADECOTG

WATER METER

(PULSE ACCUMULATOR

OUTPUT TO BAS)

M

CONNECT TO EXISTING

AT INDICATED POINT

HUB DRAINHD

FLOOR SINKFS-1

FLOOR DRAINFD-1

ROOF DRAINRD

OVERFLOW DRAINOD

RD

OD

ROOF DRAIN ASSEMBLY

(SEE ARCH.)

BUTTERFLY VALVE

GATE VALVE

NON-SLAM CHECK VALVE

PLUG VALVE

CIRCUIT SETTING VALVE

GAS COCK

WATER HAMMER ARRESTOR

HOSE BIBB

HB

WALL HYDRANT

WH

ELBOW, TURNED DOWN

ELBOW, TURNED UP

BRANCH BOTTOM CONNECTION

BRANCH TOP CONNECTION

CAP OR PLUG

PUMP

RISE OR DROP

CLEANOUTCO

A

UNION

CEILING ACCESS PANEL

PRESSURE REDUCING VALVE

BALL VALVE

UNIT MARK

SEE ABBREVIATIONS

XXX-#

THERMOMETER

PRESSURE GAUGE

BACKFLOW PREVENTER

ELECTRONIC TRAP PRIMER

ETP-2-#

FLOOR SINK, FLOOR DRAIN,

HUB DRAIN CONNECTION

IDENTIFIER

ETP MARK IDENTIFIER

# DRAIN CONNECTION

IDENTIFIER

NCC NITROGEN CONTROL CABINET

NG NATURAL GAS

NO NITROUS OXIDE

NPT NATIONAL PIPE THREAD

NPW NON-POTABLE WATER

NTS NOT TO SCALE

O OXYGEN

OD OVERFLOW DRAIN

OE ORAL EVACUATION

OEE ORAL EVACUATION EXHAUST

PA PROCESS AIR

PB PRESSURE BOOSTER

PD PRESSURE DROP

PDI PLUMBING DRAINAGE INSTITUTE

PRESS PRESSURE

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIG POUNDS PER SQUARE INCH GAUGE

PT PLASTER TRAP

PV PLUG VALVE

PWB PLUMBING WALL BOX

RD ROOF DRAIN

REF REFERENCE

REG REGULATING

RENO RENOVATE / RENOVATION

REQD REQUIRED

RM ROOM

RO REVERSE OSMOSIS

RP RECIRCULATION PUMP

RPBP REDUCED PRESSURE BACKFLOW PREVENTER

RPM ROTATIONS PER MINUTE

RW RAINWATER

S SINK

SAN SANITARY

SCW SOFT COLD WATER

SD STORM DRAIN

SDU SUPPLY AND DRAIN UNIT

SE SEWAGE EJECTOR

SEP SEPARATOR TANK

SFU SUPPLY FIXTURE UNITS

SH SHOWER

SHT SHEET

SP SUMP PUMP

SPEC SPECIFICATION

SQ SQUARE

SRW SECONDARY RAINWATER

SS SANITARY SEWER; STAINLESS STEEL

ST SEPARATOR TANK

STRUC STRUCTURAL

SYS SYSTEM

TEMP TEMPERATURE

TMV THERMOSTATIC MIXING VALVE

TP TRAP PRIMER

T&P TEMPERATURE AND PRESSURE

TW TEPID WATER

TYP TYPICAL

UR URINAL

V VENT

VP VACUUM PUMP

VTR VENT THRU ROOF

W WASTE

W/ WITH

WAGD WASTE ANESTHETIZING GAS DISPOSAL

WAGE WASTE ANESTHETIZING GAS EXHAUST

WC WATER CLOSET

WCO WALL CLEANOUT

WH WALL HYDRANT, WATER HEATER

WHA WATER HAMMER ARRESTOR

WM WATER METER

WS WASTE STACK

WST WATER SOFTENER TANK

ZVB MEDICAL GAS ZONE VALVE BOX

ELEV ELEVATION

EQMT EQUIPMENT

ESEW EMERGENCY SHOWER / EYEWASH

ES-TMV EMERGENCY SHOWER THERMOSTATIC MIXING VALVE

(PROVIDED WITH FIXTURE)

ET EXPANSION TANK

ETP ELECTRONIC TRAP PRIMER

EW EYEWASH

EWC ELECTRIC WATER COOLER

EX EXISTING

FA FROM ABOVE

FB FROM BELOW

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FFE FINISHED FLOOR ELEVATION

FIN FLR FINISHED FLOOR

FLR FLOOR

FM FORCE MAIN

FRP FUEL OIL

FS FLOOR SINK

FW FILTERED WATER

G GAS

GAL GALLON

GPM GALLONS PER MINUTE

GR GREASE WASTE

GTV GATE VALVE

GV GLOBE VALVE

GWH GAS WATER HEATER

HB HOSE BIBB

HC HANDICAP

HD HUB DRAIN

HP HORSEPOWER

HVAC HEATING / VENTILATING / AIR CONDITIONING

HWCP HOT WATER CIRCULATING PUMP

IAW IN ACCORDANCE WITH

IN INCHES

IN. WC INCHES OF WATER, GAUGE

INV INVERT

IE INVERT ELEVATION

IPC INTERNATIONAL PLUMBING CODE

JS JANITORS SINK

JSN JOINT SCHEDULE NUMBER

L LAVATORY

LA LAB AIR - DENTAL / MEDICAL

LAI LAB AIR INTAKE

LAV LAVATORY

LF LINEAR FEET

LP LIQUIFIED PETROLEUM GAS

LVL LEVEL

MA MEDICAL COMPRESSED AIR

MAI MEDICAL AIR INTAKE

MAP MEDICAL GAS MASTER ALARM PANEL

MAX MAXIMUM

MECH MECHANICAL

MED MEDICAL

MFR MANUFACTURER

MG MEDICAL GAS

MIN MINIMUM

MS MOP SINK

MTD MOUNTED

MV MEDICAL SURGICAL VACUUM

MVE MEDICAL VACUUM EXHAUST

MX MIXING VALVE

N NITROGEN

NC NORMALLY CLOSED

AAP MEDICAL GAS AREA ALARM PANEL

ABBRV ABBREVIATION

AC ABOVE CEILING, AIR COMPRESSOR

AD AREA DRAIN

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

ALT ALTERNATE

APR AIR PRESSURE REDUCING STATION

ARCH ARCHITECTURAL

AUTO AUTOMATIC

BAS BASE AUTOMATION SYSTEM

BCW BOOSTED COLD WATER

BF BELOW FLOOR

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTER

BHW BOOSTED HOT WATER

BLDG BUILDING

BLK BLOCK

BLV BALANCING VALVE

BSMT BASEMENT

BT BRINE TANK

BTUH BRITISH THERMAL UNITS PER HOUR

BV BALL VALVE

BWV BACKWATER VALVE

CA COMPRESSED AIR

CAI COMPRESSED AIR INTAKE

CAP CAPACITY

CD CONDENSATE WASTE

CFM CUBIC FEET PER MINUTE

CFH CUBIC FEET PER HOUR

CMU CONCRETE MASONRY UNIT

CO CLEANOUT, CARBON MONOXIDE

CO2 CARBON DIOXIDE

COMM COMMUNICATIONS

COMP. COMPOSITE

CONC CONCRETE

COND CONDENSATE

CONN CONNECTION

CONT CONTINUATION

COTG CLEANOUT TO GRADE

CU CUBIC; COPPER

CV CHECK VALVE

DA DENTAL COMPRESSED AIR

DAI DENTAL AIR INTAKE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DDC DIRECT DIGITAL CONTROLS

DEMO DEMOLISH / DEMOLITION

DFU DRAIN FIXTURE UNITS

DI DEIONIZED WATER

DIA DIAMETER

DN DOWN

DS DOWNSPOUT

DSV DENTAL SURGICAL VACUUM

DSVE DENTAL SURGICAL VACUUM EXHAUST

DWG DRAWING

EA EACH

ECO EXTERIOR CLEANOUT

EE-TMV EMERGENCY EYEWASH THERMOSTATIC MIXING

VALVE (PROVIDED WITH FIXTURE)

ELEC ELECTRICAL

GENERAL NOTES AND REQUIREMENTS:

1. THE CONTRACTOR SHALL VISIT THE SITE TO OBSERVE THE EXISTING CONDITIONS PRIOR TO PLACING A BID. ALL QUESTIONS SHALL BE SUBMITTED TO THE VA FOR

RESPONSE PRIOR TO BIDDING THE WORK.

2. THIS PROJECT WILL INCLUDE, BUT NOT BE LIMITED TO THE FOLLOWING WORK ITEMS: THE EXISTING WATER HEATING UNITS FOR THE FOUR LOCATIONS SHOWN WILL BE REMOVED AND REPLACED. REMOVAL OF THE NATURAL GAS SYSTEMS WILL INCLUDE THE EXISTING GAS LINES AND REGULATORS TO THE MINIMUM POINT REQUIRED FOR NEW INSTALLATION. NEW GAS REGULATORS WILL BE INSTALLED FOR EACH NEW HEATER. REMOVAL OF HOT PIPING WILL BE AS SHOWN ON THE DOCUMENTS AND WILL BE MODIFIED AS REQUIRED FOR THE NEW INSTALLATION. THE EXISTING WATER HEATERS, STORAGE TANKS, EXPANSION TANKS AND MASTER THERMOSTATIC MIXING VALVES SHALL BE REMOVED AND REPLACED, EXCEPT AS LISTED IN THE BID ALTERNATES.

BUILDING 120 AND 129 WILL REQUIRE MINIMUM DISRUPTION TO THE EXISTING HOT WATER SYSTEM. TEMPORARY WATER HEATING UNITS WILL BE INSTALLED AS DESCRIBED IN NOTE 3 BELOW. OUTAGES FOR BUILDING 120 AND 129 SHALL BE LIMITED TO NO MORE THAN 8 HOURS AND WILL BE COORDINATED AT LEAST 2 WEEKS

IN ADVANCE WITH THE OWNER.

NEW POINT OF USE THERMOSTATIC MIXING VALVES SHALL BE INSTALLED AT THE LAVATORIES IN BUILDING 120 AS SHOWN.

3. A TEMPORARY, PORTABLE WATER HEATING UNIT SHALL BE PROVIDED FOR USE DURING THE MODIFICATIONS OF THE WATER HEATING SYSTEMS IN BUILDINGS 120 AND 129. THE UNIT SHALL BE TRAILER MOUNTED FOR EASY TRANSPORT. ONE UNIT SHALL BE UTILIZED FOR BOTH FACILITIES WITH THE CONTRACTOR'S PHASING OF WORK ARRANGED SUCH THAT THE UNIT CAN BE MOVED FROM ONE BUILDING LOCATION TO THE OTHER. REFER TO THE ELECTRICAL DRAWINGS FOR POWER SOURCE FOR THE HEATERS. THE HEATERS SHALL BE PROVIDED WITH AN ONBOARD PROPANE GAS SOURCE AND ALL REQUIRED PUMPS, CONTROLS, AND CONNECTIONS AS REQUIRED FOR PROPER OPERATION OF THE SYSTEM. THE SYSTEM SHALL BE SIZED IN SINGLE OR MULTIPLE UNITS WITH A TOTAL GAS INPUT

CAPACITY OF 400,000 BTUH MINIMUM.

4. THE BASIS OF DESIGN FOR MAJOR EQUIPMENT PROVIDED IN THIS PROJECT INCLUDE THE FOLLOWING:

a. SEMI-INSTANTANEOUS WATER HEATERS: NORITZ MODEL NCC

b. MASTER THERMOSTATIC MIXING VALVES: LEONARD TYPE TM EXPOSED MIXING VALVE

c. POINT OF USE THERMOSTATIC MIXING VALVES: ZURN AQUA-GARD

d. STORAGE TANKS: PVI VERTICAL AQUAPLEX SERIES

THE BASIS OF DESIGN EQUIPMENT SERVES ONLY AS A REFERENCE FOR THE ITEMS USED DURING THE DESIGN PHASE AND IS NOT INTENDED TO BE THE SOLE SOURCE OF ACCEPTABLE EQUIPMENT. ALL EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH THE MANUFACTURERS' RECOMMENDATIONS. WHERE THOSE RECOMMENDATIONS CONFLICT WITH THIS DESIGN, THE CONTRACTOR SHALL NOTIFY THE OWNERS' REPRESENTATIVE FOR DIRECTION PRIOR TO PROCEEDING WITH

THE WORK.

5. MOUNTING FRAMES FOR THE WATER HEATERS SHALL BE PROVIDED BY THE HEATER MANUFACTURER, DESIGNED SPECIFICALLY FOR THE HEATER MODEL SUPPLIED.

6. REFER TO THE SPECIFICATIONS FOR BID ALTERNATES.

7. ALL WORK SHALL BE THOROUGHLY COORDINATED WITH EXISTING CONDITIONS AND WITH OTHER TRADES. NEW WALL PENETRATIONS FOR TEMPORARY SERVICES WILL BE HELD TO A MINIMUM AND SHALL BE RETURNED TO “NEAR ORIGINAL” CONDITION WHEN TEMPORARY SERVICES ARE REMOVED.

8. THE EXISTING NATURAL GAS MAIN LINES WILL BE REUSED. NEW NATURAL GAS PRESSURE REGULATORS AND SHUTOFF VALVES WILL BE PROVIDED FOR EACH NEW WATER HEATER. WHERE LOCATED INDOORS, THE PRESSURE REGULATORS WILL BE DIRECT VENTED TO THE EXTERIOR.

9. ALL CONTROL WIRING WILL BE INSTALLED IN CONDUIT. THE MANUFACTURERS' RECOMMENDATIONS WILL BE FOLLOWED FOR CONTROL COMMUNICATIONS LINES

BETWEEN THE WATER HEATERS.

10. THE EXISTING HOT WATER RETURN PUMPS WILL BE REUSED. NEW PRIMARY AND BACKUP HOT WATER CIRCULATION PUMPS SHALL BE PROVIDED.

11. THE NATURAL GAS VENTS FROM THE INDOOR WATER HEATERS SHALL BE AS RECOMMENDED BY THE HEATER MANUFACTURER. THE VENTS SHALL BE INSTALLED IN ACCORDANCE WITH ALL CODES AND MANUFACTURERS' RECOMMENDATIONS. THE NEW VENTS SHALL FOLLOW THE ROUTING OF THE EXISTING VENTS THAT ARE REMOVED. NEW SLEEVES IN WALLS AND ROOFS SHALL BE INSTALLED IF NEW WALL OR ROOF OPENINGS ARE REQUIRED. WHERE PENETRATIONS THROUGH THE ROOF OR WALLS ARE NOT REUSED, THE CONTRACTOR SHALL REPAIR THE OPENINGS TO NEAR ORIGINAL CONDITION.

12. A TEMPORARY, SELF CONTAINED WATER HEATING SYSTEM SHALL BE PROVIDED FOR BUILDINGS 120 AND 129 TO PROVIDE DOMESTIC HOT WATER DURING CONSTRUCTION. 120 VOLT POWER WILL BE PROVIDED TO THE TEMPORARY LOCATIONS OF THE UNIT. DOWN TIME FOR THE CONNECTION OF THE TEMPORARY UNIT TO THE SERVICE PIPING SHALL BE COORDINATED WITH THE OWNERS REPRESENTATIVE. THE SAME UNIT SHALL BE USED FOR BOTH BUILDINGS AND DURING THEIR RESPECTIVE CONSTRUCTION PHASES. THE UNIT SHALL BE PROVIDED WITH AN ONBOARD PROPANE TANK ADEQUATELY SIZED FOR THE ANTICIPATED PROPANE USAGE DURING THE TIME OF CONSTRUCTION. THE UNIT IS ANTICIPATED TO BE TRAILER MOUNTED. THE TEMPORARY LOCATION SHALL BE SECURED DURING CONSTRUCTION WITH A LOCKED FENCE OR ENCLOSURE AS A PART OF THIS PROJECT. THE UNIT SHALL BE SIZED BASED ON THE HIGHER DEMAND OF BUILDING 120 AND 127. MAXIMUM DEMAND CAN BE ANTICIPATED FROM THE SIZE OF THE PERMANENT WATER HEATERS BEING INSTALLED BY THIS PROJECT. ALL REQUIRED TEMPORARY PIPING AND FITTINGS SHALL BE PROVIDED AND INSTALLED AS A PART OF THIS TASK.

PLUMBING ABBREVIATIONS (UNABRIDGED)

BALL VALVE

WALL HYDRANTW.H.

A WATER HAMMER ARRESTOR

COLD WATER PIPING

HOT WATER PIPING

HOT WATER RETURN PIPING

VENT PIPING

SS WASTE PIPING

EX. COLD WATER PIPING

EX. HOT WATER PIPING

EX. HOT WATER RETURN PIPING

EX. VENT PIPING

SS EX. WASTE PIPING

EX. TO BE REMOVED

END DEMOLITION AT THIS POINT

CONNECT TO EXISTING AT THIS POINT

DIELECTRIC UNION

DCA DENTAL COMPRESSED AIR

DLV DENTAL LOW VACUUM (ORAL EVACUATION)

CHECK VALVE

TEMPERATURE GAUGE

PRESSURE REDUCING VALVE

CIRCUIT SETTER

D ep ar tm en t of V et er an s

A ff

140° 140° 140°

G G

G G

G G

G G

G G

G G

G G

G

140°

140°140°

140°

0°

0°

HOT

RET

HOT

RET

HOT

RET

HOT

RET

VENT

vent

VENT

VENT

STORAGE TANKS

200 GAL EACH

TO/FROM

BLDG

DEMOLISH TO

THIS POINT

7.5 HP

0°

0°

0°

G G

0°

0°DEMOLISH TO

THIS POINT

DEMOLISH TO

THIS POINT

NEW THERMOSTATIC

MIXING VALVE TMV-3A

NEW EXPANSION

TANK ET-3A

(SEE DIAGRAM 3/PP-4003)

140° 140° 140° 140° 140°

EX. DHW

EX. DHW

EX. DCW

EX. DHWR

CONNECT TO

NEW TMV

140° 140°

G G

G G

G G

G G

G G

G G

0°

0°

0°

TO/FROM

BLDG

WH 3A-1

0°

0°

0°

G G

0°

NEW STRUCTURAL

SUPPORT FRAME

G G G 140°

0°

STORAGE TANK

(400 GAL.)

ALTERNATE No. 1:

NEW CANOPY

FRAME (ABOVE)

WH 3A-3 WH 3A-2

4" Ø

4" Ø

4" Ø

NEW GAS PIPE

TO MATCH

EXISTING GAS

SUPPLY PIPE

D ep ar tm en t of V et er an s

A ff

CENTRAL ALABAMA VETERANS HEALTHCARE SYSTEM

KEY PLAN

MECHANICAL

B-4A

4- H-

4- H-

4- H-

4- H-

0°

0°

0°

0°

140° 140° 140°

0°

G G G

VE

NT

DEMOLISH EX.

STORAGE TANK

DEMOLISH

EXISTING TMV

2 BFP'S (BELOW LANDING)

WITH BY-PASS BETWEEN

TO REMAIN

VE

NT

VE

NT

VE

NT

EXPANSION

TANK TO BE

REMOVED

HIGH

LOW

140°

MECHANICAL

B-4A

G G G G G G

G G

G G

45°

G G

REGULATOR

IN GROUND

DEMOLISH TO

THIS POINT

140°

140° 140°

G G

G G

G G

45°

0°

0°

G G G

140°

0°

NEW

4-ST-2

NEW

4-ST-1

NEW TMV-4A

NEW EXPANSION

TANK ET-4A

(SEE DIAGRAM 1/PP-4003)

140°

0°

0°

0°

0°

WH 4A-1 WH 4A-2

WH 4A-4 WH 4A-3

EXISTING PUMP

AND FITTINGS

TO REMAIN

4" Ø

4" Ø

4" Ø

4" Ø

NEW GAS PIPE

TO MATCH

EXISTING GAS

SUPPLY PIPE

D ep ar tm en t of V et er an s

A ff

B-68

BFP WITH

BY-PASS

M

ELEC WH

(119 GAL)

ELEC WH

(119 GAL)

EXPANSION

TANK

TMV

MECHANICAL

B-68

NO PLUMBING WORK IN THIS AREA.

PLANS FOR INFORMATION ONLY

D ep ar tm en t of V et er an s

A ff

B-120

120-ST-1

(225 GAL)

120-ST-2

(225 GAL) 120-WH-1

(1,600,000

BTUH)

120-WH-2

(1,600,000

BTUH)

VENT

VENT

TMV

BELOW (IN-LINE WITH PUMP)

VALVE V4

140° 140°

EXIST.

MECH

EXP TANK

0°

VALVE

EXPANSION

TANK

VENTS UP

COMBUSTION

AIR INTAKE

MECHANICAL

B-120

5"Ø STAINLESS STEEL CATEGORY III GAS VENT.

STRAP SUPPORTS, CONNECTORS, FITTINGS

AND RAIN CAP AS REQUIRED. INSTALL AS

RECOMMENDED BY THE MANUFACTURER.

PATHWAY TO MATCH EXISTING VENTS THAT

ARE REMOVED.

COMBUSTION

AIR INTAKE

NOTE: TMV'S TO BE ADDED AT EACH LAVATORY ON

THIRD AND FOURTH FLOORS.

120-HW-1-CP

120-HW-2-CP

TEMPORARY MOBILE

WATER HEATING SYSTEM.

SEE GENERAL NOTE 12,

SHEET PP-0001.

NEW EXPANSION

TANK ET-120

(SEE DIAGRAM 2/PP-4003)

140°

ST-120-1

ST-120-2

G G

G

G

G

WH 120-1

WH 120-2

WH 120-3

EXIST.

MECH

EXP TANK

4" Ø

4" Ø

NEW TMV-120

TEMPORARY CONNECTION

TEE FOR TEMPORARY

WATER HEATER (TYP)

NEW GAS PIPE

TO MATCH

EXISTING GAS

SUPPLY PIPE

D ep ar tm en t of V et er an s

A ff

POINT OF USE MIXING

VALVE LOCATIONS AS

NOTED BY

ALTERNATE No. 2:

THERMOSTATIC

MIXING VALVE AT

LAVATORY (TYP.)

D ep ar tm en t of V et er an s

A ff

0 6' 12' 24'

SCALE: 3/32"=1'-0"

ALTERNATE No. 2:

THERMOSTATIC

MIXING VALVE AT

LAVATORY (TYP.)

POINT OF USE MIXING

VALVE LOCATIONS AS

NOTED BY

D ep ar tm en t of V et er an s

A ff

0 6' 12' 24'

SCALE: 3/32"=1'-0"

B-129

MECHANICAL

B-129

0°

TWO WH STACKED

TMV

0°

TWO VENTS FOR

UPPER WH

TWO VENTS FOR

LOWER WH

140°

NATURAL GAS

REGULATOR

FOR LOWER WH (SEE ELEVATION)

FOR UPPER WH (SEE ELEVATION)

G

G

G

FOR LOWER WH

FOR UPPER WH

NATURAL GAS

REGULATORS

THRU WALL

ELEVATION

NOT TO SCALE

EXPANSION

TANK

G G

GG G

G

DEMOLISH TO

THIS POINT

DEMOLISH TO

THIS POINT

STORAGE TANK

MECHANICAL

ROOM

G-129

MECHANICAL

ROOM

G-129

140° WATER SUPPLY

FROM MECHANICAL

ROOM THRU TRENCH

0°

NEW

TMV-129

CONNECT TO EXISTING COLD

WATER SUPPLY IN TUNNEL

CONNECT TO EXISTING

HOT WATER SUPPLY TO

BLDG. IN TUNNEL

NEW STRUCTURAL

SUPPORT FRAME

MECHANICAL

B-129

MECHANICAL

B-129

G G

GG G

NEW EXPANSION

TANK ET-129

(SEE DIAGRAM 4/PP-4003)

NATURAL GAS

REGULATOR

EXTEND CW, HWR AND

140° HW PIPE THRU

TUNNEL TO NEW TMV-129

NEW STRUCTURAL

SUPPORT FRAME

140°140°

SS TYPE 3 GAS VENTS TYP FOR 3,

EXTEND 3' ABOVE ROOF

LOCATION OF TEMPORARY

PORTABLE WATER HEATER. ROUTE

TEMPORARY PIPING TO TEE'S IN HOT

WATER DISTRIBUTION SYSTEM.

SEEN GENERAL NOTE 12, SHEET

PP-0001.

WH 129-1 WH 129-2

WH 129-3

4" Ø

4" Ø

TEMPORARY CONNECTION

TEE FOR TEMPORARY

WATER HEATER (TYP)

CONNECT TO EXISTING

PIPING IN TUNNEL

NEW GAS PIPE

TO MATCH

EXISTING GAS

SUPPLY PIPE

MECHANICAL

ROOM

G-129

DEMO. EXIST.

VACUUM SYSTEM

CAP VACUUM PIPING

AS HIGH AS POSSIBLE.

CAP VACUUM PIPING

AS HIGH AS POSSIBLE.

D ep ar tm en t of V et er an s

A ff

DOMESTIC WATER HEATER & RECIRCULATING PUMP SCHEDULE

MARK

WH 3A-1,2,3 5

GPM DEMAND

@ 75°F

TEMP RISE

DESCRIPTION

199,900

MINIMUM

INPUT CAP.

BTUH

ELECTRICAL

CHARACTERISTICS

120 V / 1 PH / 60 Hz

WATER HEATER CIRCULATING PUMP

MARK PUMP TYPE

CENTRIFUGAL

IN-LINE

FLOW

GPM

HEAD

FEET OF

WATER

RPM

HP

1/3

ELECTRICAL

CHARACTERISTICS

120 V / 1 PH / 60 Hz

COMMENTSINLET/OUTLET CONN.

SIZES

2" x 2"

-GAS FIRED , SEMI-INSTANTANEOUS WATER

HEATER, EXTERIOR(EACH)

SYSTEM

7.5

MINIMUM

FLOW (GPM)

CP 3A-1 & 2

(EACH)

WH 4A-1,2,3,4 5 199,900 120 V / 1 PH / 60 Hz CENTRIFUGAL

IN-LINE

9 40 3700 1/3 120 V / 1 PH / 60 Hz2" x 2"

-GAS FIRED , SEMI-INSTANTANEOUS WATER

HEATER, EXTERIOR(EACH)

10.3 CP 4A-1 & 2

(EACH)

WH 120-1,2,3 5 199,900 120 V / 1 PH / 60 Hz CENTRIFUGAL

IN-LINE

9 40 3700 1/3 120 V / 1 PH / 60 Hz2" x 2"

-GAS FIRED , SEMI-INSTANTANEOUS WATER

HEATER, INTERIOR(EACH)

9.0 CP 120-1 & 2

(EACH)

WH 129-1,2,3 5 199,900 120 V / 1 PH / 60 Hz CENTRIFUGAL

IN-LINE

9 40 3700 1/3 120 V / 1 PH / 60 Hz2" x 2"

-GAS FIRED , SEMI-INSTANTANEOUS WATER

HEATER, INTERIOR(EACH)

7.1 CP 129-1 & 2

(EACH)

THERMOSTATIC MIXING VALVE SCHEDULE

MARK DESCRIPTION DESIGN FLOW

RATE (GPM)

LOW FLOW

RATE (GPM)

MAXIMUM PRESSURE

DROP (PSIG)

COLD WATER INLET

TEMPERATURE (°F)

OUTLET WATER

TEMPERATURE (°F)

TMV-3A HIGH/LOW FLOW TYPE THERMOSTATIC MIXING

VALVE, SURFACE MOUNTED

7.51 5 65 126 MAX

122 MIN

NOTES:

1. FURNISHED WITH HIGH AND LOW FLOW THERMOSTATIC MIXING REGULATORS, SURFACE MOUNTED. PROVIDE BALL VALVES, PRESSURE GAUGES, DIAL

THERMOMETER, AND OTHER ACCESSORIES REQUIRED FOR A COMPLETE OPERATING SYSTEM.

2. PROVIDE TEMPERATURE SENSOR LOCATED IN HWR LINE SET TO START PUMP WHEN HWR CIRCULATING TEMPERATURE DROPS BELOW 122 F. WATER HEATERS TO BE PROVIDED WITH HARDWARE INCLUDING COMMUNICATION BOARD AND TWO DEVICE ADAPTERS COMPATIBLE FOR CONNECTION TO THE BUILDING DDC SYSTEM.

3. COORDINATE OUTLET WATER TEMPERATURE WITH OWNER.

HOT WATER INLET

TEMPERATURE (°F)

TMV-4A HIGH/LOW FLOW TYPE THERMOSTATIC MIXING

VALVE, SURFACE MOUNTED

5 65 126 MAX

122 MIN

REMARKS

HOT WATER STORAGE TANK SCHEDULE

MARK ORIENTATIONVOLUME

(GAL) EACH

PIPE CONNECTIONS

MINIMUM

NUMBER

WATER

TEMPERATURE (°F)

ST 3A-1 VERTICAL400 4 140

REMARKS

SIZE

2"

ST 4A-1 & 2 VERTICAL200 4 1402"

ST 120-1 & 2 VERTICAL225 4 1402"

ST 129-1 & 2 VERTICAL200 4 1402"

EXPANSION TANK SCHEDULE

MARK DESCRIPTION MINIMUM

ACCEPTANCE

VOLUME (GAL)

MINIMUM

TANK SIZE

(GAL)

MINIMUM OPERATING

TEMPERATURE

MAXIMUM DESIGN

TEMPERATURE

MAXIMUM

OPERATING

PRESSURE (PSI)

ET-3A PRESSURIZED BLADDER, VERTICAL STAND 17.526 122 140 150

MINIMUM OPERATING

PRESSURE (PSI)

REMARKS

INTERIOR

ET-4A PRESSURIZED BLADDER, VERTICAL STAND 17.526 122 140 15025

ET-120 PRESSURIZED BLADDER, VERTICAL STAND 17.526 122 140 15025

ET-129 PRESSURIZED BLADDER, VERTICAL STAND 17.526 122 140 15025

10.31

TMV-120 HIGH/LOW FLOW TYPE THERMOSTATIC MIXING

VALVE, SURFACE MOUNTED

5 65 126 MAX

122 MIN

1409.01

TMV-129 HIGH/LOW FLOW TYPE THERMOSTATIC MIXING

VALVE, SURFACE MOUNTED

5 65 126 MAX

122 MIN

1407.11

INTERIOR

INTERIOR

INTERIOR

D ep ar tm en t of V et er an s

A ff

CONC. CAP

(ABOVE)

BRICK

WALL

CONC.

SLAB BASEPLATE

W/ 2 EXPANSION

ANCHOR BOLTS

WALL BRACKET

W/ 2 EXPANSION

ANCHOR BOLTS

(TYP.)±7

'-6

6" 6'-6"

PLATE OR DECKING

FOR WEATHER

COVER

BOTTOM OF

CONC. CAP

DIAGONAL

BRACE

(TYP.)

SECTION VIEW ELEVATION

SCALE: 3 4" = 1'-0" SCALE: 3 4" = 1'-0"

FRAME PIECE

(PERPENDICULAR

TO VIEW)

BUILDING 3A COURTYARD HEATER CANOPY & FRAMING DETAIL (ALTERNATE No. 1)1 SCALE: 3/4" = 1'-0"

BASEPLATE

(TYP.)

DECKING SUPPORT

PIECE

2'-0"

2'-6" MIN.

CONC. CAP

BRICK

WALL

3'- 6"

3'- 0"

DIAGONAL

BRACE

(SKEWED

IN VIEW)

PLAN VIEW

SCALE: 3 4" = 1'-0"

NEW HEATING

UNIT

HEATING UNIT

FRAME

HEATING

UNIT

FRAME

ALTERNATE No. 1:

A FREE STANDING CANOPY WILL BE PROVIDED AS

SHOWN TO PROTECT THE WATER HEATING UNITS

FROM THE WEATHER. CANOPY WILL BE CONSTRUCTED

TO THE DIMENSIONS SHOWN AND WILL BE

CONSTRUCTED OF UNISTRUT, BRACKETS, ANCHOR

BOLTS, AND WEATHER RESISTANT ROOF DECKING.

CANOPY SHALL BE SUPPORTED ON THE EXISTING

CONCRETE PAD AND SECURED WITH ANCHOR BOLTS.

COORDINATE ALL PIPING, CONDUIT & OTHER

APPURTENANCES.

EXTERIOR

FACE

1'- 0"

2'- 81 2"

1'- 0"

4'- 81 2"

5'- 4"

THERMOSTATIC

MIXING VALVE

HOT WATER

SUPPLY

CAP FOR

TEMPERATURE

ADJUSTMENT

COLD WATER

SUPPLY

TEMPERED WATER SUPPLY

TO LAVATORY FIXTURE

COLD WATER

SUPPLY

HOT WATER

SUPPLY

TEMPERED WATER SUPPLY

TO LAVATORY FIXTURE

ISOLATION BALL

VALVE (TYP.)

CONNECTION DIAGRAM (ALTERNATE No. 2)3 NOT TO SCALE

THERMOSTATIC MIXING VALVE

0°

G G G G

140° 140° 140° 140° 140° 140° 140° 140°

REMOTE CONTROLLER (PROVIDED BY

EQUIPMENT MANUFACTURER)

UNIT 1UNIT 2

UNIT 4 (WHERE

REQUIRED)

140° 140°

140°

COLD WATER SUPPLY

NATURAL GAS SUPPLY

NEW HOT WATER

STORAGE TANK(S)

140°

HOT WATER FIXTURES

TYPICAL HEATING UNIT CONNECTION DETAIL (MULTIPLE STORAGE TANKS SIMILAR)2 NOT TO SCALE

UNION

(TYP.)

PRESSURE RELIEF

VALVE (TYP.)

ISOLATION BALL

VALVE (TYP.)

CHECK VALVE

(TYP.)

BACK-UP HOT WATER

CIRCULATING PUMP

PRIMARY HOT WATER

CIRCULATING PUMP

NEW EXISTING

UNIT 3

RELIEF VALVE PIPED TO NEAREST FLOOR

DRAIN FOR INDOOR UNITS

EXISTING HOT WATER RETURN

PUMP AND BYPASS

HWS

NEW THERMOSTATIC

MIXING VALVE

EXPANSION

TANK

D ep ar tm en t of V et er an s

A ff

140°

0°

0°

0°

140°

0°

0°

HOT

WATER

RETURN

PUMP

200 GAL

STORAGE

TANK

200 GAL

STORAGE

TANK

OUTSIDE BLDG 4

TO

FIXTURES

FROM

FIXTURES

EXPANSION

TANK

ET-4A

HIGH-LOW CAPACITY

THERMOSTATIC

MIXING VALVE

NEW WATER HEATERS WH 4A-1,

WH 4A-2, WH 4A-3 & WH 4A-4

SEE DETAIL 2

SHEET PP4002

BLDG'S 2, 3, 4, 4A FLOW DIAGRAM1 NO SCALE

TEMPERATURE

SENSOR (TYP)

140°

0°

0°

0°

140°

0°

0°

HOT

WATER

RETURN

PUMP

225 GAL

STORAGE

TANK

225 GAL

STORAGE

TANK

TO

FIXTURES

FROM

FIXTURES

EXPANSION

TANK

ET-120

NEW WATER HEATERS WH 120-1,

WH 120-2 & WH 120-3

SEE DETAIL 2

SHEET PP4002

BLDG 120 FLOW DIAGRAM2 NO SCALE

HIGH-LOW CAPACITY

THERMOSTATIC

MIXING VALVE

TEMPERATURE

SENSOR (TYP)

140°

0°

0°

0°

HOT

WATER

RETURN

PUMP

400 GAL

STORAGE

TANK

OUTSIDE BLDG 3A

BASEMENT

140° 140°

140°

TO

FIXTURES

FROM

FIXTURES

EXPANSION

TANK

ET-3A

NEW WATER HEATERS WH 3A-1,

WH 3A-2 & WH 3A-3

SEE DETAIL 2

SHEET PP4002

BLDG'S 3A & 83 FLOW DIAGRAM3 NO SCALE

HIGH-LOW CAPACITY

THERMOSTATIC

MIXING VALVE

TEMPERATURE

SENSOR (TYP)

0°

0°

0°

140°140°

HOT

WATER

RETURN

PUMP

200 GAL

STORAGE

TANK

REMOTE

MECH BLDG

BLDG 129

140° 140°

140°

140° 140°140° 140°

EXPANSION

TANK

ET-129

TO

FIXTURES

FROM

FIXTURES

200 GAL

STORAGE

TANK

NEW WATER HEATERS WH 129-1,

WH 129-2 & WH 129-3

SEE DETAIL 2

SHEET PP4002

BLDG 129 FLOW DIAGRAM4 NO SCALE

HIGH-LOW CAPACITY

THERMOSTATIC

MIXING VALVE

TEMPERATURE

SENSOR (TYP)

D ep ar tm en t of V et er an s

A ff

_17019 Tuskegee VA - 11 sheets 30x42.pdf
SSA-PLBG-Abbrv & Legend-PP-0001
SSA-PLBG-Building3A-3A-PP-1001
SSA-PLBG-Building4A-4A-PP-1001
SSA-PLBG-Building68-68-PP-1001
SSA-PLBG-Building120-1st mech rm-120-PP-1001
SSA-PLBG-Building120-3rd fl-120-PP-1002
SSA-PLBG-Building120-4th fl-120-PP-1003
SSA-PLBG-Building129-129-PP-1001
SSA-PLBG-Details-3 sheets-PP-4001
SSA-PLBG-Details-3 sheets-PP-4002
SSA-PLBG-Details-3 sheets-PP-4003
Elec-Full-Size.pdf
E-0001
03A-EP-0001
04A-EP-0001
068-EP-0001
120-EP-0001
129-EP-0001