36C24619Q0750-002.pdf

PDF 20 MB Posted

Attached to
659-19-104 Replace WindowsB3-B6-B12-B14W-B19 Federal contract opportunity
Solicitation number
36C24619Q0750
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6

About this file

36C24619Q0750 P09. Drawings Project # 659-19-112.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 659-19-104 Replace WindowsB3-B6-B12-B14W-B19, newest first.
File Type Posted
36C24619Q0750-0002000.docx DOCX document
36C24619Q0750-0001000.pdf PDF
36C24619Q0750-008.pdf PDF
36C24619Q0750-006.pdf PDF
36C24619Q0750-003.pdf PDF
36C24619Q0750-004.pdf PDF
36C24619Q0750-005.pdf PDF
36C24619Q0750-007.pdf PDF
36C24619Q0750-009.pdf PDF
36C24619Q0750-001.pdf PDF
36C24619Q0750-000.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SmokingShelter

LAB

NATIONAL CEMETERY

NATIONAL

CEMETERY

OFFICES

GENERAL NOTES DRAWING INDEX

1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH CONTRACT DOCUMENTS &

REQUIREMENTS

2. THE CONTRACTOR SHALL CHECK & VERIFY ALL CONTRACT DOCUMENTS, FIELD

CONDITIONS, AND DIMENSIONS FOR ACCURACY AS SHOWN BEFORE PLACING

WINDOW ORDERS OR PROCEEDING WITH THE CONSTRUCTION. IF THERE ARE ANY

QUESTIONS, THE CONTRACTOR SHALL OBTAIN A CLARIFICATION FROM THE

GOVERNMENT BEFORE PROCEEDING WITH THE WORK IN QUESTION OR RELATED

WORK.

3. DRAWINGS SHALL NOT BE SCALED. WRITTEN DIMENSIONS SHALL ALWAYS

GOVERN. CONTRACTOR REQUIRING DIMENSIONS NOT NOTED, SHALL CONTACT

THE GOVERNMENT FOR SUCH INFORMATION PRIOR TO PROCEEDING WITH

WORK RELATED TO THOSE DIMENSIONS.

4. CONTRACTOR SHALL NOTIFY GOVERNMENT OF CONFLICTS BETWEEN DRAWINGS

DETAILS AND SPECIFICATION IN WRITING, PRIOR TO PROCEEDING WITH THE

WORK IN QUESTION.

5. "TYPICAL" OR "TYP." MEANS THAT THE CONDITION IS REPRESENTATIVE FOR

ALL SIMILAR CONDITIONS, UNLESS OTHERWISE NOTED. "SIMILAR" OR "SIM"

MEANS COMPARABLE CHARACTERISTICS FOR THE CONDITIONS NOTED.

VERIFY DIMENSIONS AND ORIENTATION ON PLANS AND ELEVATIONS. "ALIGN"

AS USED IN THESE DOCUMENTS MEANS TO ACCURATELY LOCATE FINISHES

IN THE SAME PLACE.

6. "AS REQUIRED" MEANS AS REQUIRED BY REGULATORY REQUIREMENTS, BY

REFERENCED STANDARDS, BY EXISTING CONDITIONS, BY GENERALLY ACCEPTED

CONSTRUCTION PRACTICE OR BY THE CONTRACT DOCUMENTS.

7. CONTRACTOR SHALL PROVIDE ALL NECESSARY BLOCKING, BACKING, FRAMING

HANGERS OR OTHER SUPPORTS OF ALL FIXTURES, EQUIPMENT, FURNISHINGS AS

REQUIRED BY MANUFACTURE AND THE VA.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND

PATCHING FOR PROPER INSTALLATION OF MATERIAL AND EQUIPMENT.

9. ALL PENETRATIONS THROUGH MASONRY AND CONCRETE STRUCTURES SHALL BE

SEALED TO PROTECT AGAINST FIRE WITH ENVIRONMENTAL CONDITIONS THAT EXIST.

10 CONTRACTOR TO SUBMIT MOBILIZATION PLAN TO GOVERNMENT FOR APPROVAL

BEFORE MOBILIZATION OF THE JOB CAN TAKE PLACE.

11 CONTRACTOR NOT TO PARK IN PATIENT PARKING OR EMPLOYEE LOTS. PARK ONLY

ON DESIGNATED BY COR. CONTRACTOR TO COORDINATE WITH COR FOR PARKING

AREAS AND PROPER ACCESS TO CONSTRUCTION AREA.

12 BEFORE STARTING WORK IN A NEW AREA OR MOVING EQUIPMENT FROM ONE AREA

TO ANOTHER, COORDINATION WITH THE FACILITY AND GOVERNMENT IS REQUIRED TO

ENSURE PATIENT SAFETY.

13 IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAKE THE PROPER COORDINATION IN

ADVANCE FOR MAJOR INTERRUPTIONS (15 CALENDAR DAYS) AND ANY DELAY OF

WORK CAUSED BY IMPROPER NOTICE WILL BE RESPONSIBILITY OF THE CONTRACTOR

NOT THE GOVERNMENT.

14 AT ANY TIME IMPROPER PROCEDURES ARE OBSERVED THAT PUT PATIENT SAFETY ,

STAFF, OR CONTRACTOR WORKERS SAFETY AT RISK, THE WORK WILL BE STOPPED

UNTIL CORRECTIONS ARE MADE AND AND APPROVED BY THE GOVERNMENT. THE

CONTRACTOR WILL BE HELD RESPONSIBLE FOR ANY DELAY DUE TO IMPROPER

ADHERENCE TO THE CONTRACT/DOCUMENTS AND/OR SAFETY REGULATIONS.

15 BEFORE ANY NEW ELECTRICAL, MECHANICAL, AND/OR SITE MODIFICATIONS THE

CONTRACTOR MUST NOTIFY THE GOVERNMENT 72 HOURS IN ADVANCE FOR PROPER

COORDINATION TO ENSURE PATIENT, STAFF, AND CONTRACTOR WORKERS SAFETY.

16 CONTRACTOR TO REMOVE ALL DEBRIS FROM CONSTRUCTION AREA THAT MIGHT

EFFECT GOVERNMENT OPERATIONS AND EACH DAY PERFORM HOUSE KEEPING

OPERATIONS TO ENSURE CLEAN WORK AREA.

DRAWINGS;

G001 COVER SHEET

A001 B 3 GROUND AND 1st FLOOR

A002 B 3 2nd AND 3rd FLOOR

A003 B 3 4th AND PENTHOUSE PLANS

A004 B 6 WINDOW LOCATIONS

A005 B 12 & 14W 1st AND 2nd FLOORS PLANS

A006 B19 WINDOW LOCATIONS

RA001 DETAILS AND NOTES FOR "A" WINDOW

REPLACEMENT

RA002 EXISTING DOUBLE HUNG SECTION DETAILS

RA003 EXISTING DOUBLE HUNG WINDOW SECTION

DETAILS

RA004 COMMERCIAL SECTIONS AND ELEVATIONS

DETAILS

RA005 ELEVATIONS B12 & 14W

RA006 EXISTING STAINED GLASS DETAILS IN B19

SALISBURY, NC

Dept. of Veterans Affairs Medical Center

REPLACE WINDOWS BLDGS. 3, 6, 12, 14w, & 19

SPECIAL CONCERNS

PROJECT DESCRIPTION

LOCATION MAP

KEY PLAN

1. BECAUSE WORK IS BEING DONE IN AN ACTIVE HOSPITAL SPECIAL PRECAUTIONS

AND COORDINATION MUST BE TAKEN BEFORE ANY WORK CAN BE STARTED .

2. MOBILIZATION PLAN MUST BE SUBMITTED TO THE GOVERNMENT AND APPROVED.

MOBILIZATION PLAN MUST ADDRESS DUST CONTROL MEASURE, MOVEMENT OF

MATERIALS, CONTROL METHODS DURING CONSTRUCTION, TRAFFIC CONTROL, AND

DEMOBILIZATION OUTLINE.

3. ALL WORK SHALL BE DONE IN A PROFESSIONAL MANNER AT ALL TIMES WORKERS

WILL CONDUCT THEMSELVES IN A WAY AS NOT TO DISTURB NORMAL HOSPITAL

OPERATIONS.

4. THE GOVERNMENT RESERVES THE RIGHT TO REMOVE ANY PERSONNEL FROM THE

JOB SITE FOR ANY FAILURE TO ADHERE TO THE CONTRACT/DOCUMENTS AND/OR

SAFETY REGULATIONS. THE CONTRACTOR IS RESPONSIBLE FOR THE COST IMPACT

BECAUSE OF FAILURE TO ADHERE TO CONTRACT/DOCUMENTS AND/OR SAFETY

REGULATIONS.

5. AT ALL TIMES, CONTRACTORS SHALL WEAR ID BADGES AND PROPER PPE.

6. CONTRACTOR WORKERS MUST COMPLETE TWO DVD INFECTION CONTROL TRAINING

SESSIONS BEFORE ANY WORK CAN BEGIN.

STATEMENT OF WORK:

PROVIDE ALL LABOR, MATERIALS, TOOLS, EQUIPMENT, QUALIFIED SUPERVISION, AND ALL ASPECTS OF CONSTRUCTION DESCRIBED HEREIN AS DEFINED. WORK INCLUDES, BUT NOT LIMITED TO THE COMPLETE REMOVAL AND INSTALLATION OF WINDOWS IN BUILDINGS 3, 6, 12, 14W & 19. THE WINDOWS WILL BE OF VARIOUS SIZES AND SHAPES. THE PROJECT INVOLVES VARIOUS BUILDINGS OF SIZE AND HEIGHTS SO SAFETY IS A LARGE PART OF THIS CONTRACT. THE CONTRACTOR SHALL VISIT THE SITE TO SEE SITE CONDITIONS REGARDING INDIVIDUAL WINDOWS BEING REPLACED. THE REMOVED WINDOWS ARE TO BE RECYCLED AS PER SPECIFICATION REQUIREMENTS. SOME OF THE WINDOWS HAVE SECURITY SCREENS THAT NEED TO BE REMOVED AND RECYCLED AND OTHER WINDOWS HAVE OUTDATED SECURITY SCREENS AND WILL NEED TO BE REPLACED WITH NEW SCREENS PER SPECIFICATIONS PATCH AND REPAIR ALL DAMAGE CAUSED BY DEMOLITION AND INSTALLATION BACK TO ORIGINAL OR BETTER CONDITIONS. THE CONTRACTOR IS TO REMOVE AND REINSTALL ALL SHADES AND WINDOW TREATMENTS.

COVER SHEET

12 JUNE 2019

659- 19-112

G001 1 13

ALN

1. ALL EMPLOYEES ARE TO HAVE THEIR BADGES ON AT ALL TIMES.

2. THE CONTRACTOR IS TO KEEP THE AREAS THAT THEY ARE WORKING IN CLEAN AND DEBRIS FREE. MOP FLOORS AFTER

INSTALLATION AND BEFORE LEAVING AREA. REMOVE ALL DEBRIS DAILY FROM AREA.

3. DUST BARRIERS ARE TO BE INSTALLED IN AREA AROUND THE REMOVAL OF WINDOWS TO CONTAIN ANY AND ALL DUST

CREATED.

4. ALL WINDOWS ARE TO BE SEALED PRIOR TO LEAVING AREA. THIS INCLUDES THE INSTALLATION OF INSULATION AND TRIM

SO THAT NO AIR CAN FLOW THROUGH WINDOW OPENING.

5. DUE TO THE LARGE NUMBER OF WINDOWS THIS PROJECT MAY REQUIRE THE CONTRACTORS WORK SCHEDULE TO INCLUDE

SATURDAY, SUNDAYS AND NIGHTS.

6. ALL WINDOWS ARE TO BE COMPLETED PRIOR TO MOVING ON TO ANOTHER WINDOW.

7. THE CONTRACTOR IS TO REMOVE ALL EXISTING FINISH SURFACES DOWN TO A COMMON (CMU OR CONCRETE SURFACE)

PRIOR TO INSTALLING NEW WINDOWS.

8. MOST WINDOW TREATMENTS AND WINDOW SHADES ARE TO BE REMOVED, SAFEGUARDED, AND REINSTALLED. HOWEVER, ALL MINI BLINDS ARE TO BE REMOVED AND TURNED OVER TO THE VA.

9. THE INSULATION REQUIREMENTS APPLY TO ALL NEW WINDOWS.

10. SEE TYP. WINDOW SECTION ON SHEET RA001- RA005 FOR WINDOW INFORMATION ON WINDOW TYPES, SIZES, & SECTIONS.

PHASING PLAN

PHASE 1

· WILL INCLUDE ALL

REQUIRED APPROVAL

DOCUMENTATION, OSHA

INFORMATION,

SUBMITTALS, SAMPLES,

COST BREAKDOWNS FOR

EACH PHASE.

PHASE II

· WILL INCLUDE ALL WORK IN

BUILDINGS 3

PHASE III

· WILL INCLUDE BUILDING

14W AND BUILDING 12

PHASE IV

· WILL INCLUDE ALL WORK IN

BUILDING 6

PHASE V

· WILL INCLUDE ALL WORK IN

BUILDINGS 19.

3, 6, 12, 14W, & 19

PROJECT DEDUCTS

DEDUCTS:

1. ALL WORK IN THE PROJECT MINUS THE WORK IN BUILDING 19.

2. ALL WORK IN THE PROJECT MINUS THE WORK IN BUILDING 12

PROJECT NOTES

PDL

REPLACE WINDOWS

BLDG. 3, 6, 12, 14W, & 19

AutoCAD SHX Text

STREET

AutoCAD SHX Text

HEDRICK

AutoCAD SHX Text

AVENUE

AutoCAD SHX Text

BRENNER

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text %%uW.G.(Bill) HEFNER MEDICAL CENTER

AutoCAD SHX Text

SALISBURY, NORTH CAROLINA

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 11A

AutoCAD SHX Text 11C

AutoCAD SHX Text 11B

AutoCAD SHX Text

AutoCAD SHX Text 14E

AutoCAD SHX Text 14W

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 21B

AutoCAD SHX Text 21A

AutoCAD SHX Text

BUILDINGS

AutoCAD SHX Text

1. ADMINSTATION BUILDING

AutoCAD SHX Text

2. G. M. & S BUILDING

AutoCAD SHX Text

3. OUTPATIENT CLINICS

AutoCAD SHX Text

4. PATIENT TREATMENT(MENTAL HEALTH)

AutoCAD SHX Text

5. MAIN KITCHEN

AutoCAD SHX Text

6. RECREATION BUILDING

AutoCAD SHX Text

7. R.M.S & CORE CLINIC BUILDING

AutoCAD SHX Text

10. N.C. VETERANS HOME

AutoCAD SHX Text

12. POLICE HEADQUARTERS

AutoCAD SHX Text

13. STUDENT LODGING

AutoCAD SHX Text

14. E&W CWT HOMELESS AND POLICE

AutoCAD SHX Text

15. ADMIN

AutoCAD SHX Text

16. LAUNDRY

AutoCAD SHX Text

17A. WAREHOUSE

AutoCAD SHX Text

18. BOILER PLANT

AutoCAD SHX Text

19. CHAPEL

AutoCAD SHX Text

21. LOGISTICS, IRM, ENDOSCOPE, PODIATRY, ONCOLOGY, SLEEP CLINIC,

AutoCAD SHX Text

22. FLAG POLE

AutoCAD SHX Text

23. GARAGES

AutoCAD SHX Text

24. R.M.&S STORAGE

AutoCAD SHX Text

25. R.M.&S. STORAGE

AutoCAD SHX Text

28. ENGINEERNG PAINT SHOP

AutoCAD SHX Text

29. R.M.&S. STORAGE

AutoCAD SHX Text

30. GREENHOUSE

AutoCAD SHX Text

31. CHILLER PLANT

AutoCAD SHX Text

32. GENERATOR BUILDING

AutoCAD SHX Text

33. SWITCHGEAR BUILDING

AutoCAD SHX Text

34. GENERATOR BUILDING

AutoCAD SHX Text

35. GENERATOR BUILDING

AutoCAD SHX Text

36. GENERATOR BUILDING

AutoCAD SHX Text

37. GENERATOR BUILDING

AutoCAD SHX Text

38. GENERATOR BUILDING

AutoCAD SHX Text

39. PICINIC SHELTER

AutoCAD SHX Text

40. GROUNDS STORAGE SHELTER

AutoCAD SHX Text

41. NCA SHELTER

AutoCAD SHX Text

42. GEROPSYCHIATRIC BUILDING

AutoCAD SHX Text

11. MENTAL HEALTH OFFICES

AutoCAD SHX Text

AutoCAD SHX Text

43. HOSPICE BUILDING

AutoCAD SHX Text

8. PATIENT TREATMENT(MENTAL HEALTH)

AutoCAD SHX Text

AutoCAD SHX Text

21A. FEE BASIS

AutoCAD SHX Text

21B. ENGINEERING

AutoCAD SHX Text

11A. MENTAL HEALTH OFFICES

AutoCAD SHX Text

11B. MENTAL HEALTH OFFICES

AutoCAD SHX Text

11C. CALL CENTER

AutoCAD SHX Text 17A

AutoCAD SHX Text

AutoCAD SHX Text

17. WAREHOUSE

AutoCAD SHX Text

%%U PARKING GARAGE

AutoCAD SHX Text

AutoCAD SHX Text

STREET

AutoCAD SHX Text

HEDRICK

AutoCAD SHX Text

HOSPITAL ACCESS ROAD

AutoCAD SHX Text

CEMETERY ACCESS ROAD

AutoCAD SHX Text

CEMETERY ACCESS ROAD

AutoCAD SHX Text

AutoCAD SHX Text D R I V E "J"

AutoCAD SHX Text D R I V E "A"

AutoCAD SHX Text M A I N

AutoCAD SHX Text M A I N

AutoCAD SHX Text M A I N

AutoCAD SHX Text M A I N

AutoCAD SHX Text D R I V E "B"

AutoCAD SHX Text D R I V E "G"

AutoCAD SHX Text E X I T D R.

AutoCAD SHX Text E N T R A N C E D R.

AutoCAD SHX Text D R

AutoCAD SHX Text "H"

AutoCAD SHX Text I V

AutoCAD SHX Text E

AutoCAD SHX Text D R I V E "L"

AutoCAD SHX Text D R.

AutoCAD SHX Text "M"

AutoCAD SHX Text D R I V E "K"

AutoCAD SHX Text D R I V E "C"

AutoCAD SHX Text D R. "D D"

AutoCAD SHX Text D R I V E "D"

AutoCAD SHX Text D R I V E "E"

AutoCAD SHX Text M A I N

AutoCAD SHX Text

DRIVE "F"

AutoCAD SHX Text

DRIVE "R"

AutoCAD SHX Text

DR. "Z"

AutoCAD SHX Text M A I N

AutoCAD SHX Text M A I N

AutoCAD SHX Text

LOT 21

AutoCAD SHX Text

LOT 11

AutoCAD SHX Text

LOT 12

AutoCAD SHX Text

LOT 19

AutoCAD SHX Text

LOT 1

AutoCAD SHX Text

LOT 2

AutoCAD SHX Text

LOT 13

AutoCAD SHX Text

LOT 21

AutoCAD SHX Text

LOT 13

AutoCAD SHX Text

LOT 1

AutoCAD SHX Text

LOT 42

AutoCAD SHX Text

LOT 7

AutoCAD SHX Text

LOT 7

AutoCAD SHX Text

LOT 6

AutoCAD SHX Text

LOT 43

AutoCAD SHX Text

LOT 21

AutoCAD SHX Text

9. PARKING DECK

AutoCAD SHX Text Salisbury NC 28144

AutoCAD SHX Text W.G.(Bill) Hefner Medical Center

AutoCAD SHX Text 1601 Brenner Ave.

AutoCAD SHX Text

MEDICAL CENTER DIRECTOR

AutoCAD SHX Text

RECOMMEND APPROVAL

AutoCAD SHX Text

ASSOC. DIR. PATIENT CARE SVC.

AutoCAD SHX Text

APPROVAL BY:

AutoCAD SHX Text

CHIEF OF SERVICE

AutoCAD SHX Text ASSOC. DIR. for OPERATIONS

AutoCAD SHX Text

CHIEF OF STAFF

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Approved:Chief of Facilities Management Svr.

AutoCAD SHX Text Approved: Safety Manager/M&O Supervisor

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text Department of

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text

REQUESTER

AutoCAD SHX Text Date

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text S

BUILDING 3 GROUND FLOOR

1/16" = 1'-0"

BUILDING 3 1st FLOOR 1/16" = 1'-0"

12 JUNE 2019

659- 19-112

A001 2 13

ALN

BUILDING 3 GROUND AND

1st FLOOR PLANS

A.C.

E.F.

A.C.

EXISTING TRIPLE WINDOW

N.T.S.

EXISTING DOUBLE WINDOW

N.T.S.

EXISTING QUAD WINDOW

N.T.S.

EXISTING A-C AND EXHAUST FAN

N.T.S.

C1

A1

A1

A1

A2

C1

C1 C1

C1

C1

C1

C1

C1

C1

C1

C2

C5

C5

C5

C5

C5

C1 C1 C1 C1 C1 C1

C1

C1

C2

C2

C2

C2

C1C1C1

C6C1

C1

C1C1

PDL

REPLACE WINDOWS

BLDG. 3, 6, 12, 14W, & 19

A001

105610361035103110301028

102910081008A1003

10061006A1002

C3

C2

C1C1C1C1

C1

C1

R2

C1

C1

A2

R1

R1

R1

C1

C1

C1

C1

C1

C1

C1 C1 C1 C1 C1 R2

R1

C1

C1

C1

C1

C3C3

C2

C1

1046 1081

1083B 1085 1087 1089

1102 1103 1104B

1099B

1106 1105 1104A1109

1090A

10881086108410821080

1116 1117

1119 1121

R3

C1

C1

C1

R2 R1 C1 C1 C1 C1

R1

C1

C1

C1

C1

C1

C1

C1

C1

R1

A1

R2

C2

C2

C2

C2

C1C1C1C1C1C1

C2

E.F.

1099A

1083B

R3 R3

R3R3

C1

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text Salisbury NC 28144

AutoCAD SHX Text W.G.(Bill) Hefner Medical Center

AutoCAD SHX Text 1601 Brenner Ave.

AutoCAD SHX Text

MEDICAL CENTER DIRECTOR

AutoCAD SHX Text

RECOMMEND APPROVAL

AutoCAD SHX Text

ASSOC. DIR. PATIENT CARE SVC.

AutoCAD SHX Text

APPROVAL BY:

AutoCAD SHX Text

CHIEF OF SERVICE

AutoCAD SHX Text ASSOC. DIR. for OPERATIONS

AutoCAD SHX Text

CHIEF OF STAFF

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Approved:Chief of Facilities Management Svr.

AutoCAD SHX Text Approved: Safety Manager/M&O Supervisor

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text Department of

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text

REQUESTER

AutoCAD SHX Text Date

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text G E N E R A L N O T E S

AutoCAD SHX Text WINDOW SYMBOLS ON THE FLOOR PLAN ARE KEYED TO THE TYPICAL SECTIONS. CONTRACTOR SHALL VERIFY ALL WINDOW

AutoCAD SHX Text DIMENSIONS AND QUANTITIES. DS DESIGNATION IS FOR WINDOWS EQUIPPED WITH DETENTION SCREENS.

AutoCAD SHX Text THE DESIGN INFORMATION IS BASED ON EFCO SERIES 450 TRIPLE GLAZED INSWING CASEMENT WINDOWS.

AutoCAD SHX Text ROOM FINISHES VARY. WINDOW CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL ROOM FINISHES AND REPAIR

AutoCAD SHX Text OF ALL SURFACES RESULTING FROM THE REPLACEMENT OPERATIONS. A SITE SURVEY WILL BE CONDUCTED AT THE BEGINNING OF

AutoCAD SHX Text THIS CONTRACT TO DOCUMENT EXISTING CONDITIONS. COTR SHALL BE NOTIFIED OF ANY CONDITION CHANGES AFTER THE SITE SURVEY.

AutoCAD SHX Text ANY DEBRIS INSIDE ROOMS, ON THE GROUNDS, SIDEWALKS, ETC., SHALL BE REMOVED AT THE END OF EACH DAY. COORDINATE WITH

AutoCAD SHX Text COTR FOR POSSIBLE DUMPSTER LOCATION. ALL WORK SHALL BE ACCOMPLISHED DURING NORMAL DUTY HOURS 8 AM TO 4:30 PM

AutoCAD SHX Text

OR AS APPROVED BY COTR AND CONTRACTING OFFICER.

AutoCAD SHX Text

ALL SAFETY REGULATIONS OF THIS STATION SHALL BE OBSERVED.

AutoCAD SHX Text SALISBURY VAMC WILL NOT PROVIDE STORAGE FOR WINDOWS OR EQUIPMENT. THE WINDOW CONTRACTOR SHALL PROVIDE TRAILER OR OTHER

AutoCAD SHX Text SUITABLE STORAGE FACILITY FOR WINDOWS. STORAGE TRAILER MAY BE PARKED IN SPACE AVAILABLE BEHIND THE WAREHOUSE OR AS

AutoCAD SHX Text

APPROVED BY COTR OR CONTRACTING OFFICER.

AutoCAD SHX Text BUILDING 3 IS OUTPATIENT CARE BUILDING WHICH WILL REQUIRE SCHEDULING THE ACCESS TO MANY SPACES. AFTER THE NOTICE

AutoCAD SHX Text TO PROCEED ON THIS CONTRACT THE CONTRACTOR AND COR SHALL SET A PRELIMINARY SCHEDULE BASED ON THE NUMBER OF

AutoCAD SHX Text WINDOWS THAT CAN SUCCESSFULLY BE REMOVED AND REPLACED IN A NORMAL WORK DAY. NO MORE WINDOWS CAN BE REMOVED

AutoCAD SHX Text THAN CAN BE REPLACED IN A NORMAL WORK DAY. ALL AREAS OF BUILDING 3 ARE OCCUPIED ALL DAY AND THE CONTRACTOR MUST

AutoCAD SHX Text

MUST PROVIDE A CLEAN HAZARD FREE WORK AREA AT EACH WINDOW.

NOTE: SEE SHEET RA001 & RA002 FOR WINDOW INFORMATION ON WINDOW TYPES, SIZES, & SECTIONS.

BUILDING 3 2nd FLOOR 1/16" = !'-0"

BUILDING 3 3rd FLOOR 1/16" = !'-0"

12 JUNE 2019

659- 19-112

A002 3 13

ALN

BUILDING 3 2nd AND 3rd

FLOOR PLAN

A2

A3 A3

A3A3

A3 A3

A3

PDL

REPLACE WINDOWS

BLDG. 3, 6, 12, 14W, & 19

RR4

30073007 3009

3011 3012 3013 3014 3015 3016 3024 3025 3026 3027

3031 3030 3029 30283032305630593060306130623063308330843085308630873088

313331323131312931273116311531143113

3109311031113112

3077 3075

3050 3038

3048 3039

R3 C3

C2

C1C1C1C1C1 C1

RR2

C2

C2

C2

C2

C2

C3

C2

C1

C1

C1

C1

C1

C1

C1

C1

C1 C1 C1 C1 C1 C2

R1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

R2 R1 C1 C1 C1 C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

A1

C2

C2

C2

C2

C2

C2

C1C1C1C1C1C1

C2

20312028202620252023

203820362033202720242001A2001B

2001D2001C

2005D

2005C

2005A

2005B

2012A

C3

C2

C1C1C1C1C1 C1

C2

C2

C2

C2

C2

R3

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1 C1 C1 C1 C1 C2

R3R3

C3

2012B

2001E

2046 2047

C1

R1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

C1

2071 2074 2077 2078 2080 2084

20792076207320722060

RR3

C2 C1 C1 C1 C1 C1

C1

C2

C2

C2

C2

C2

C1C1C1C1C1C1

RR2

A3

A3A3

2091H 2091G 2091F 2091E2093

2103 2105

C1

C1

C1

C1

C1

C1

C1

C1

A1

R2

E.F.

E.F.

2091A 2091B 2091C 2091D

C3

RR4

AutoCAD SHX Text

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

AutoCAD SHX Text

FA

AutoCAD SHX Text

TV

AutoCAD SHX Text 2047A

AutoCAD SHX Text

ESTCODE

AutoCAD SHX Text

ESTCODE

ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/4_HORIZONTAL_INSULATION.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg ftp://image.autodesk.com/drawing/24_SINK_SINGLE_PV.dwg AutoCAD SHX Text Salisbury NC 28144

AutoCAD SHX Text W.G.(Bill) Hefner Medical Center

AutoCAD SHX Text 1601 Brenner Ave.

AutoCAD SHX Text

MEDICAL CENTER DIRECTOR

AutoCAD SHX Text

RECOMMEND APPROVAL

AutoCAD SHX Text

ASSOC. DIR. PATIENT CARE SVC.

AutoCAD SHX Text

APPROVAL BY:

AutoCAD SHX Text

CHIEF OF SERVICE

AutoCAD SHX Text ASSOC. DIR. for OPERATIONS

AutoCAD SHX Text

CHIEF OF STAFF

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Approved:Chief of Facilities Management Svr.

AutoCAD SHX Text Approved: Safety Manager/M&O Supervisor

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text Department of

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text

REQUESTER

AutoCAD SHX Text Date

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text G E N E R A L N O T E S

AutoCAD SHX Text WINDOW SYMBOLS ON THE FLOOR PLAN ARE KEYED TO THE TYPICAL SECTIONS. CONTRACTOR SHALL VERIFY ALL WINDOW

AutoCAD SHX Text DIMENSIONS AND QUANTITIES. DS DESIGNATION IS FOR WINDOWS EQUIPPED WITH DETENTION SCREENS.

AutoCAD SHX Text THE DESIGN INFORMATION IS BASED ON EFCO SERIES 450 TRIPLE GLAZED INSWING CASEMENT WINDOWS.

AutoCAD SHX Text ROOM FINISHES VARY. WINDOW CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL ROOM FINISHES AND REPAIR

AutoCAD SHX Text OF ALL SURFACES RESULTING FROM THE REPLACEMENT OPERATIONS. A SITE SURVEY WILL BE CONDUCTED AT THE BEGINNING OF

AutoCAD SHX Text THIS CONTRACT TO DOCUMENT EXISTING CONDITIONS. COTR SHALL BE NOTIFIED OF ANY CONDITION CHANGES AFTER THE SITE SURVEY.

AutoCAD SHX Text ANY DEBRIS INSIDE ROOMS, ON THE GROUNDS, SIDEWALKS, ETC., SHALL BE REMOVED AT THE END OF EACH DAY. COORDINATE WITH

AutoCAD SHX Text COTR FOR POSSIBLE DUMPSTER LOCATION. ALL WORK SHALL BE ACCOMPLISHED DURING NORMAL DUTY HOURS 8 AM TO 4:30 PM

AutoCAD SHX Text

OR AS APPROVED BY COTR AND CONTRACTING OFFICER.

AutoCAD SHX Text

ALL SAFETY REGULATIONS OF THIS STATION SHALL BE OBSERVED.

AutoCAD SHX Text SALISBURY VAMC WILL NOT PROVIDE STORAGE FOR WINDOWS OR EQUIPMENT. THE WINDOW CONTRACTOR SHALL PROVIDE TRAILER OR OTHER

AutoCAD SHX Text SUITABLE STORAGE FACILITY FOR WINDOWS. STORAGE TRAILER MAY BE PARKED IN SPACE AVAILABLE BEHIND THE WAREHOUSE OR AS

AutoCAD SHX Text

APPROVED BY COTR OR CONTRACTING OFFICER.

AutoCAD SHX Text BUILDING 3 IS OUTPATIENT CARE BUILDING WHICH WILL REQUIRE SCHEDULING THE ACCESS TO MANY SPACES. AFTER THE NOTICE

AutoCAD SHX Text TO PROCEED ON THIS CONTRACT THE CONTRACTOR AND COR SHALL SET A PRELIMINARY SCHEDULE BASED ON THE NUMBER OF

AutoCAD SHX Text WINDOWS THAT CAN SUCCESSFULLY BE REMOVED AND REPLACED IN A NORMAL WORK DAY. NO MORE WINDOWS CAN BE REMOVED

AutoCAD SHX Text THAN CAN BE REPLACED IN A NORMAL WORK DAY. ALL AREAS OF BUILDING 3 ARE OCCUPIED ALL DAY AND THE CONTRACTOR MUST

AutoCAD SHX Text

MUST PROVIDE A CLEAN HAZARD FREE WORK AREA AT EACH WINDOW.

NOTE: SEE SHEET RA001 & RA002 FOR WINDOW INFORMATION ON WINDOW TYPES, SIZES, & SECTIONS.

ROOFROOF

BUILDING 3 4th FLOOR 1/16" = 1'-0"

BUILDING 3 PENTHOUSES

1/16" = 1'-0"

12 JUNE 2019

659- 19-112

A003 4 13

ALN

BUILDING 3 4th FLOOR AND

PENTHOUSE FLOOR PLANS

E.F.

A1

A3 A3

A3A3

A3 A3

A3

PDL

REPLACE WINDOWS

BLDG. 3, 6, 12, 14W, & 19

C1

C1

C1

C1

C1

C1

RR4

R3

R2

C2

C1C1C1C1C1C1

RR2

R2C2

C2

C2

R2

C3

C1

C1

R2

R2

R1

40054003

41174116411541134111

41084107

4102410141004099

4098 4097 4096 4095 4094

4075 4074 4073 4071 4070

C1

C1

C1

C1

C1 C1 C1 C1 C1 C2

C1

C1 4068

4060A

4060B

4060C

C1

C1

C1 C1

C1

C1

C1

4053 4052 4051 4050 4047

C2 C1 C1 C1 C1 C1

4038 4037

4028 4027 4026 4025

C1

C1

C1

C1 C1

C1

C1

C1

4021 4022 4023 4024

C2

C2

C2C2

C2

401540134012401140104009

4008 C1C1C1C1C1C1

R3

RR2

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

FOURTH FLOOR ROOF

AutoCAD SHX Text

CONCRETE CANOPY

AutoCAD SHX Text

THIRD FLOOR ROOF

AutoCAD SHX Text

FOURTH FLOOR ROOF

AutoCAD SHX Text P002

AutoCAD SHX Text

ELEVATOR MACHINE ROOM

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text P003

AutoCAD SHX Text

AIR CONDITIONING EQUIPMENT ROOM

AutoCAD SHX Text

STAIRS

AutoCAD SHX Text

AIR CONDITIONING EQUIPMENT ROOM

AutoCAD SHX Text P001

AutoCAD SHX Text Salisbury NC 28144

AutoCAD SHX Text W.G.(Bill) Hefner Medical Center

AutoCAD SHX Text 1601 Brenner Ave.

AutoCAD SHX Text

MEDICAL CENTER DIRECTOR

AutoCAD SHX Text

RECOMMEND APPROVAL

AutoCAD SHX Text

ASSOC. DIR. PATIENT CARE SVC.

AutoCAD SHX Text

APPROVAL BY:

AutoCAD SHX Text

CHIEF OF SERVICE

AutoCAD SHX Text ASSOC. DIR. for OPERATIONS

AutoCAD SHX Text

CHIEF OF STAFF

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Approved:Chief of Facilities Management Svr.

AutoCAD SHX Text Approved: Safety Manager/M&O Supervisor

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text Department of

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text

REQUESTER

AutoCAD SHX Text Date

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text NOTE: SEE SHEET RA001 & RA002 FOR WINDOW INFORMATION ON WINDOW TYPES, SIZES, & SECTIONS.

AutoCAD SHX Text G E N E R A L N O T E S

AutoCAD SHX Text WINDOW SYMBOLS ON THE FLOOR PLAN ARE KEYED TO THE TYPICAL SECTIONS. CONTRACTOR SHALL VERIFY ALL WINDOW

AutoCAD SHX Text DIMENSIONS AND QUANTITIES. DS DESIGNATION IS FOR WINDOWS EQUIPPED WITH DETENTION SCREENS.

AutoCAD SHX Text THE DESIGN INFORMATION IS BASED ON EFCO SERIES 450 TRIPLE GLAZED INSWING CASEMENT WINDOWS.

AutoCAD SHX Text ROOM FINISHES VARY. WINDOW CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL ROOM FINISHES AND REPAIR

AutoCAD SHX Text OF ALL SURFACES RESULTING FROM THE REPLACEMENT OPERATIONS. A SITE SURVEY WILL BE CONDUCTED AT THE BEGINNING OF

AutoCAD SHX Text THIS CONTRACT TO DOCUMENT EXISTING CONDITIONS. COTR SHALL BE NOTIFIED OF ANY CONDITION CHANGES AFTER THE SITE SURVEY.

AutoCAD SHX Text ANY DEBRIS INSIDE ROOMS, ON THE GROUNDS, SIDEWALKS, ETC., SHALL BE REMOVED AT THE END OF EACH DAY. COORDINATE WITH

AutoCAD SHX Text COTR FOR POSSIBLE DUMPSTER LOCATION. ALL WORK SHALL BE ACCOMPLISHED DURING NORMAL DUTY HOURS 8 AM TO 4:30 PM

AutoCAD SHX Text

OR AS APPROVED BY COTR AND CONTRACTING OFFICER.

AutoCAD SHX Text

ALL SAFETY REGULATIONS OF THIS STATION SHALL BE OBSERVED.

AutoCAD SHX Text SALISBURY VAMC WILL NOT PROVIDE STORAGE FOR WINDOWS OR EQUIPMENT. THE WINDOW CONTRACTOR SHALL PROVIDE TRAILER OR OTHER

AutoCAD SHX Text SUITABLE STORAGE FACILITY FOR WINDOWS. STORAGE TRAILER MAY BE PARKED IN SPACE AVAILABLE BEHIND THE WAREHOUSE OR AS

AutoCAD SHX Text

APPROVED BY COTR OR CONTRACTING OFFICER.

AutoCAD SHX Text BUILDING 3 IS OUTPATIENT CARE BUILDING WHICH WILL REQUIRE SCHEDULING THE ACCESS TO MANY SPACES. AFTER THE NOTICE

AutoCAD SHX Text TO PROCEED ON THIS CONTRACT THE CONTRACTOR AND COR SHALL SET A PRELIMINARY SCHEDULE BASED ON THE NUMBER OF

AutoCAD SHX Text WINDOWS THAT CAN SUCCESSFULLY BE REMOVED AND REPLACED IN A NORMAL WORK DAY. NO MORE WINDOWS CAN BE REMOVED

AutoCAD SHX Text THAN CAN BE REPLACED IN A NORMAL WORK DAY. ALL AREAS OF BUILDING 3 ARE OCCUPIED ALL DAY AND THE CONTRACTOR MUST

MUST PROVIDE A CLEAN HAZARD FREE WORK AREA AT EACH WINDOW.

15 JANUARY 2019

659- 19-112

A004 5 13

ALN6

BUILDING 6 FLOOR PLANS

F7 F7F7G10 G10 G10 G10G10

F7

BUILDING 6 GROUND FLOOR WEST SIDE

1/8"=1'-0"

BUILDING 6 1st FLOOR EAST SIDE 1/16"=1'-0"

BUILDING 6 1st FLOOR NORTHEEAST SIDE 1/16"=1'-0"

F8

F7 F7 F7 F7 F7 F7 F7 F7

DS DS

G4

G4

G4

DS

DS

DS

F2 F2 F2 F2 F2

F7

F7 DS

F7 DS

F7 DS

F7 F7 F7 F7 F7 F7

F7 F7 F7 F7 F7

F7F7F7F7F7

F7

F7

F7

F7

F7

F7

F6

DSDSDSDS

DS

DS

DS

DS AC

DS DS DS DS DS

DS DS DS DS DS

DS DS DS DS DS

DSDSDSDSDSDS

EXISTING FROSTED

GLASS WINDOWS

NDSNDS NDS

INSULATION VALUES PER ASHRAE STANDARD 90.1 2013

STATION CLIMATE ZONE ROOF

INSULATION

WALL

INSULATION

FLOOR

INSULATION

DOOR MAX

(OVERALL "U") WINDOWS

SALISBURY

(659) 3A

R20 ci; METAL R13+ R13, ATTIC R38

R13, 7.5 ci;

METAL R19;

MASS 9.5 ci.

R30 SLAB R15

FOR 24" 0.07 0.06 0.25

MAX "U" MAX "SHGC"

F7

NDS

NDS

NDS

PDL

REPLACE WINDOWS

BLDG. 3, 6, 12, 14W, & 19

EXISTING WINDOW WITH DS

N.T.S.

EXISTING WINDOW

N.T.S.

EXISTING WINDOWS G-TYPE

N.T.S.

EXISTING WINDOWS F-TYPE

N.T.S. 7

G4 G8 G4 G8

A004

A004

A004

A004

"F" "F"

"F"

AutoCAD SHX Text Salisbury NC 28144

AutoCAD SHX Text W.G.(Bill) Hefner Medical Center

AutoCAD SHX Text 1601 Brenner Ave.

AutoCAD SHX Text

MEDICAL CENTER DIRECTOR

AutoCAD SHX Text

RECOMMEND APPROVAL

AutoCAD SHX Text

ASSOC. DIR. PATIENT CARE SVC.

AutoCAD SHX Text

APPROVAL BY:

AutoCAD SHX Text

CHIEF OF SERVICE

AutoCAD SHX Text ASSOC. DIR. for OPERATIONS

AutoCAD SHX Text

CHIEF OF STAFF

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Approved:Chief of Facilities Management Svr.

AutoCAD SHX Text Approved: Safety Manager/M&O Supervisor

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text Department of

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text

REQUESTER

AutoCAD SHX Text Date

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text G E N E R A L N O T E S

AutoCAD SHX Text WINDOW SYMBOLS ON THE FLOOR PLAN ARE KEYED TO THE TYPICAL SECTIONS. CONTRACTOR SHALL VERIFY ALL WINDOW

AutoCAD SHX Text DIMENSIONS AND QUANTITIES. DS DESIGNATION IS FOR WINDOWS EQUIPPED WITH DETENTION SCREENS.

AutoCAD SHX Text THE DESIGN INFORMATION BASED ON EFCO SERIES 450 TRIPLE GLAZED INSWING CASEMENT WINDOWS.

AutoCAD SHX Text ROOM FINISHES VARY. WINDOW CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL ROOM FINISHES AND REPAIR

AutoCAD SHX Text OF ALL SURFACES RESULTING FROM THE REPLACEMENT OPERATIONS. A SITE SURVEY WILL BE CONDUCTED AT THE BEGINNING OF

AutoCAD SHX Text THIS CONTRACT TO DOCUMENT EXISTING CONDITIONS. COTR SHALL BE NOTIFIED OF ANY CONDITION CHANGES AFTER THE SITE SURVEY.

AutoCAD SHX Text ANY DEBRIS INSIDE ROOMS, ON THE GROUNDS, SIDEWALKS, ETC., SHALL BE REMOVED AT THE END OF EACH DAY. COORDINATE WITH

AutoCAD SHX Text COTR FOR POSSIBLE DUMPSTER LOCATION. ALL WORK SHALL BE ACCOMPLISHED DURING NORMAL DUTY HOURS 8 AM TO 4:30 PM

AutoCAD SHX Text

OR AS APPROVED BY COTR AND CONTRACTING OFFICER.

AutoCAD SHX Text

ALL SAFETY REGULATIONS OF THIS STATION SHALL BE OBSERVED.

AutoCAD SHX Text SALISBURY VAMC WILL NOT PROVIDE STORAGE FOR WINDOWS OR EQUIPMENT. THE WINDOW CONTRACTOR SHALL PROVIDE TRAILER OR OTHER

AutoCAD SHX Text SUITABLE STORAGE FACILITY FOR WINDOWS. STORAGE TRAILER MAY BE PARKED IN SPACE AVAILABLE BEHIND THE WAREHOUSE OR AS

AutoCAD SHX Text

APPROVED BY COTR OR CONTRACTING OFFICER.

AutoCAD SHX Text BUILDING 6 IS A LIBRARY, REC THERAPY, SOCIAL BUILDING, POLICE AND MEDICAL RECORDS WHICH WILL REQUIRE SCHEDULING THE ACCESS TO MANY SPACES.

AutoCAD SHX Text AFTER THE NOTICE TO PROCEED ON THIS CONTRACT THE CONTRACTOR AND COR SHALL SET A PRELIMINARY SCHEDULE BASED ON THE NUMBER OF

AutoCAD SHX Text WINDOWS THAT CAN SUCCESSFULLY BE REMOVED AND REPLACED IN A NORMAL WORK DAY. NO MORE WINDOWS CAN BE REMOVED

AutoCAD SHX Text THAN CAN BE REPLACED IN A NORMAL WORK DAY. ALL AREAS OF BUILDING 6 ARE OCCUPIED ALL DAY AND THE CONTRACTOR MUST

AutoCAD SHX Text

MUST PROVIDE A CLEAN HAZARD FREE WORK AREA AT EACH WINDOW.

NOTE: SEE SHEET RA003 & RA004 FOR WINDOW INFORMATION ON WINDOW TYPES, SIZES, & SECTIONS.

A005 6 13

ALN12 & 14W

BUILDING 12 & 14W 1st AND 2nd FLOOR PLANS

R6

R2

R4

R4

R2

R2

R6

R2

R2

R2

R2

R9R9

R2 R2

BUILDING 12 1st FLOOR WINDOW LOCATIONS N.T.S.

R7R7

R1

R1R1

R1

R2R4 R4

BUILDING 14 WEST 1st FLOOR WINDOW LOCATIONS N.T.S.

BUILDING 14 WEST 2nd FLOOR WINDOW LOCATIONS N.T.S.

R3 R3

R5 R5

PDL

REPLACE WINDOWS

BLDG. 3, 6, 12, 14W, & 19

3 4

R2

R2

R2

R2

R2

R2

R2

R2

R2

R2

BUILDING 12 2nd FLOOR WINDOW LOCATIONS N.T.S. 2

AutoCAD SHX Text Salisbury NC 28144

AutoCAD SHX Text W.G.(Bill) Hefner Medical Center

AutoCAD SHX Text 1601 Brenner Ave.

AutoCAD SHX Text

MEDICAL CENTER DIRECTOR

AutoCAD SHX Text

RECOMMEND APPROVAL

AutoCAD SHX Text

ASSOC. DIR. PATIENT CARE SVC.

AutoCAD SHX Text

APPROVAL BY:

AutoCAD SHX Text

CHIEF OF SERVICE

AutoCAD SHX Text ASSOC. DIR. for OPERATIONS

AutoCAD SHX Text

CHIEF OF STAFF

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text Approved:Chief of Facilities Management Svr.

AutoCAD SHX Text Approved: Safety Manager/M&O Supervisor

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Building Number

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text

DWG. OF

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Project No.

AutoCAD SHX Text Drawn

AutoCAD SHX Text Checked

AutoCAD SHX Text Date

AutoCAD SHX Text Department of

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text Revision

AutoCAD SHX Text Date

AutoCAD SHX Text Date

AutoCAD SHX Text

REQUESTER

AutoCAD SHX Text Date

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text D

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text D

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text N

AutoCAD SHX Text U

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text T

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text M

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text V

AutoCAD SHX Text E

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text A

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text F

AutoCAD SHX Text S

AutoCAD SHX Text G E N E R A L N O T E S

AutoCAD SHX Text WINDOW SYMBOLS ON THE FLOOR PLAN ARE KEYED TO THE TYPICAL SECTIONS. CONTRACTOR SHALL VERIFY ALL WINDOW

AutoCAD SHX Text

DIMENSIONS AND QUANTITIES.

AutoCAD SHX Text ROOM FINISHES VARY. WINDOW CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFICATION OF ALL ROOM FINISHES AND REPAIR

AutoCAD SHX Text OF ALL SURFACES RESULTING FROM THE REPLACEMENT OPERATIONS.