About this file

This document includes an amendment to a solicitation and questions and responses related to a federal contract opportunity to replace underground storage tanks at a Department of Veterans Affairs medical center.

The solicitation is to award a single fixed-price contract for construction services including demolition of existing fuel storage tanks, installation of new fuel tanks, piping, pumps, monitors and sensors. The period of performance is 180 days from notice to proceed. The opportunity is set aside for verified service-disabled veteran-owned small businesses. The estimated value is between $500,000 to $1 million. Questions were received and answered clarifying fuel quantities on site, temporary storage tank requirements, responsibility for permits, and acceptance of alternate well designs. The pre-bid date, bid due date, and other terms remain unchanged.

36C24420B0004 0002 36C24420B0004 0002.docx

View the file

Other files for this federal contract opportunity

Other files attached to Y1NA--Replace Underground Storage Tasks Project # 503-19-107, newest first.
File Type Posted
36C24420B0004-0003000.docx DOCX document
36C24420B0004-0002001.pdf PDF
36C24420B0004-0001000.docx DOCX document
36C24420B0004-011.xlsx XLSX spreadsheet
36C24420B0004-007.docx DOCX document
36C24420B0004-008.pdf PDF
36C24420B0004-012.pdf PDF
36C24420B0004-010.pdf PDF
36C24420B0004-009.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 04-13-2020 503-19-107 00244 Department of Veterans Affairs Network Contracting Office 4

00244 Department of Veterans Affairs Network Contracting Office 4

To all Offerors/Bidders

36C24420B0004 03-25-2020

X X X

Amendment A0002 is issued to answer questions received regarding the Replace Underground Storage Tanks Project.

All questions and responses are listed on following pages.

Bid due date of APRIL 29, 2020 remains as stated in Solicitation and all other terms remain unchanged.

Melvin Moore Contracting Officer

CONTINUATION PAGE

Questions and Responses

Solicitation #36C24420B0004 Amendment # A0002 Replace Underground Storage Tanks

1. Question: How much Fuel is in Existing USTs?

Response 1: As of 4/13/2020, we have approximately 32,800 gallons on hand. The total varies by usage and when deliveries of fuel are ordered and delivered.

2. Question: What’s the minimum size for Temporary AST?

Response 2: Provide 20,000-gallon temporary AST per contract documents.

3. Question: Due to current events lead time will be affected for material. Will the performance period be extended due to COVID-19? Currently 180days after NTP.

Response 3: At this time, no. However, delays due to material lead times and deliveries attributed to COVID-19 will be considered on a case-by-case basis.

4. Question: Are we replacing Chain-link Fence?

Response 4: Replace fencing per contract documents.

5. Question: Who is currently the fuel supplier for the USTs? Please provide name and number.

Response 5: Fuel is supplied under a national DLA contract. Our contact is below.

Pleasant Lane Customer Account Specialist – COG2 Mobility Fuels Customer Facing DLA Energy, Fort Belvoir VA Com: (571) 767-2329

DSN: (392) 767-2329

Cell: (571) 789-6566 (Tues and Fridays Only)

6. Question: Do you currently have preferred electrician contracted if so, can name and contract information be provided?

Response 6: No. Electricians must meet qualifications per contract documents.

7. Question: Can we change layout of temporary fencing for stockpiling?

Response 7: Alternate value engineered layout/laydown plans can be evaluated after bid award. Be aware certain traffic flows and egress/ingress pathways cannot be obstructed or impeded to the northwest of the site.

8. Question: When is the projected start date?

Response 8: As of 4/13/2020, the bid opening is 4/29/2020. Offers are to be valid for 120 calendar days for acceptance. Notice To Proceed (NTP) will be provided during the Pre-Construction Conference shortly after award.

9. Question: Who is responsible for the SSIP? Site Specific Installation Permit?

Response 9: The VA is obtaining the appropriate permits. The selected contractor is required to provide all information and signatures in support of these permits in a timely manner.

10. Question: Who is responsible for Labor & Industry Permit?

Response 10: See Response 9.

11. Question: Can you confirm if we encounter contamination it would be considered a modification to the contract?

Response 11: See contract documents.

12. Question: Shall we include a Tank bottom Sump in the USTs?

Response 12: No. This would void tank manufacturer’s warranty.

13. Question: In reviewing Drawing. MP-03, Detail 005 UST Monitoring Well, would the VA accept a 4” PVC 0.20 slotted well dropped into the specified backfill material that will be placed around the tank, in replacement to detail 005? Our proposed design would still extend 2’-0” below the bottom of the tank elevation. Detail 005 shows a monitoring well, constructed by a licensed driller. Typical installation of a Monitoring Well at new UST sites is a 4” slotted well screen in the 1B stone backfill.

Response 13: This would be acceptable. A 4” monitoring system can be installed during tank installation; however, most crews do not prefer installing these at the same time. Great care needs to be provided in order to not damage the well during construction.

See attached document: Sign in Sheet.

End of Document