This document contains a general wage determination and a notice of a federal contract opportunity. The general wage determination provides prevailing wage rates for various construction work classifications in Blair County, Pennsylvania, to be used on building construction projects covered by the Davis-Bacon Act.
The related federal contract opportunity is a notice for project number 503-19-107 to replace underground storage tanks at the Altoona Veteran's Administration Medical Center in Altoona, Pennsylvania. Work includes demolishing existing fuel oil storage tanks and associated infrastructure, installing new fuel oil storage tanks and related systems. The project is a 100% service-disabled veteran-owned small business set aside with a magnitude between $500,000 to $1 million. The solicitation will be issued on March 25, 2020 as an invitation for bid governed by FAR Subpart 14. The period of performance is 180 calendar days from notice to proceed.
36C24420B0004 WD # PA20200077.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24420B0004-0003000.docx | DOCX document | |
| 36C24420B0004-0002001.pdf | ||
| 36C24420B0004-0002000.docx | DOCX document | |
| 36C24420B0004-0001000.docx | DOCX document | |
| 36C24420B0004-011.xlsx | XLSX spreadsheet | |
| 36C24420B0004-007.docx | DOCX document | |
| 36C24420B0004-008.pdf | ||
| 36C24420B0004-010.pdf | ||
| 36C24420B0004-009.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"General Decision Number: PA20200077 01/10/2020
Superseded General Decision Number: PA20190077
State: Pennsylvania
Construction Type: Building
County: Blair County in Pennsylvania.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Modification Number Publication Date 0 01/03/2020 1 01/10/2020
ASBE0023-008 07/01/2019
Rates Fringes
ASBESTOS WORKER/HEAT & FROST
INSULATOR - MECHANICAL (Duct, Pipe & Mechanical System Insulation)......................$ 33.80 27.21
BOIL0154-003 01/01/2017
Rates Fringes
BOILERMAKER......................$ 40.90 27.27
BRPA0009-011 12/01/2019
Rates Fringes
TILE FINISHER....................$ 26.00 15.86
3/11/2020https://beta.sam.gov/wage-determination/PA20200077/1?index=wd&keywords=&is_activ...
TILE SETTER......................$ 31.91 20.24
BRPA0009-044 12/01/2018
Rates Fringes
BRICKLAYER (Including Pointing, Caulking, Cleaning)....$ 29.46 19.58
MASON - STONE....................$ 29.46 19.58
CARP0142-015 06/01/2018
Rates Fringes
CARPENTER (Scaffold Building and Floor Laying-Hardwood Only)............................$ 33.75 17.03
CARP0900-020 06/01/2018
Rates Fringes
CARPENTER (Includes Acoustical Ceiling Installation,Batt Insulation,Drywall Hanging,Metal Stud Installation,Floor Laying-Carpet and Vinyl,Form Work and Gutter Installation;Excludes Scaffold Building and Floor Laying-Hardwood Floors.).........$ 28.51 15.23
CARP2235-009 06/01/2018
Rates Fringes
MILLWRIGHT.......................$ 40.34 19.16
ELEC0005-016 12/22/2019
Rates Fringes
ELECTRICIAN (Includes Alarm Installation, Installation of Sound and Communication System, Low Voltage Wiring and HVAC Temperature Control Installation)....................$ 42.61 27.19
* ENGI0066-041 07/01/2014
Rates Fringes
POWER EQUIPMENT OPERATOR
Backhoe/Excavator/Trackhoe, Bulldozer, Crane* Loader, Mechanic....................$ 28.37 15.66 Bobcat/Skid Steer/Skid Loader, Drill, Gradall, Grader/Blade, Paver (Asphalt, Aggregate, and Concrete)...................$ 32.59 18.10
Hoist, Pump.................$ 28.36 18.10 Oiler.......................$ 23.35 15.66 Roller......................$ 25.20 15.66
*Add to Crane rate:
Booms 101-150 jibs- Add $.50 Booms 151-200 jibs- Add $1.00 Booms 201-251 jibs- Add $1.50
IRON0003-013 06/01/2019
Rates Fringes
IRONWORKER (Ornamental, Reinforcing, Rigger, and Structural)......................$ 29.58 29.92
LABO0125-005 06/01/2014
Rates Fringes
LABORER
Mason Tender - Cement/Concrete.............$ 24.34 9.75
* LABO0824-002 01/01/2020
Rates Fringes
LABORER (Mason Tender-Brick).....$ 21.56 17.05
PAIN0057-035 06/01/2017
Rates Fringes
PAINTER (Brush, Roller, and Spray Only)......................$ 26.98 15.65 PAINTER (Drywall Finishing/Taping Only)...........$ 27.80 18.75
PAIN0751-002 09/01/2019
Rates Fringes
GLAZIER..........................$ 23.55 20.57
PLAS0526-014 07/01/2019
Rates Fringes
CEMENT MASON/CONCRETE FINISHER...$ 28.49 17.35
PLAS0526-025 06/01/2019
Rates Fringes
PLASTERER........................$ 28.29 10.97
PLUM0354-009 06/01/2017
Rates Fringes
PLUMBER (Industrial).............$ 37.88 22.90
PLUM0354-012 06/01/2019
Rates Fringes
PLUMBER (Excludes Work on Industrial Sites)................$ 34.77 24.25
PLUM0520-013 05/01/2019
Rates Fringes
PIPEFITTER (Includes HVAC Pipe Installation)...............$ 37.52 26.24
SFPA0669-004 04/01/2019
Rates Fringes
SPRINKLER FITTER (Fire Sprinklers)......................$ 38.80 24.38
SHEE0019-017 06/01/2019
Rates Fringes
SHEET METAL WORKER (HVAC Duct Installation Only)...............$ 36.08 37.03
FOOTNOTE: Paid Holiday: Election Day
SUPA2011-035 08/20/2014
Rates Fringes
LABORER: Common or General......$ 18.15 9.76
OPERATOR: Forklift, All Types....$ 23.69 13.13
ROOFER, Excludes Waterproofing...$ 33.50 20.66
ROOFER: Waterproofing Only.......$ 29.50 21.10
SHEET METAL WORKER, Excludes HVAC Duct Installation...........$ 32.03 22.87
TRUCK DRIVER: Dump Truck........$ 23.36 7.60
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).
The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).
Union Rate Identifiers
A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.
Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.
Survey Rate Identifiers
Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.
Survey wage rates are not updated and remain in effect until a new survey is conducted.
Union Average Rate Identifiers
Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.
A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.
WAGE DETERMINATION APPEALS PROCESS
1.) Has there been an initial decision in the matter? This can be:
* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on a wage determination matter
* a conformance (additional classification and rate) ruling
On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.
With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:
Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:
Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.
Washington, DC 20210
4.) All decisions by the Administrative Review Board are final.
END OF GENERAL DECISION"
File details come from the government source that posted it. Updated .