36C24419Q0841-0002000.docx
DOCX document 28 KB Posted
- Attached to
- TVs, Installation, RG6 Cable Federal contract opportunity
- Solicitation number
- 36C24419Q0841
About this file
36C24419Q0841 0002 36C24419Q0841 0002_1.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| -17255.docx | DOCX document | |
| 36C24419Q0841-0002001.pdf | ||
| 36C24419Q0841-0001000.docx | DOCX document | |
| 36C24419Q0841-0001001.pdf | ||
| 36C24419Q0841-001.pdf | ||
| 36C24419Q0841-000.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
See attached document: 36C24419Q0841 0002.
FedBizOpps Amendment to a Previous Combined Solicitation
CLASSIFICATION CODE
SUBJECT
CONTRACTING OFFICE'S
ZIP-CODE
SOLICITATION NUMBER
BASE NOTICE TYPE
RESPONSE DATE (MM-DD-YYYY)
ARCHIVE
DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
SET-ASIDE
NAICS CODE
CONTRACTING OFFICE
ADDRESS
POINT OF CONTACT
(POC Information Automatically Filled from User Profile Unless Entered)
DESCRIPTION
See Attachment
AGENCY'S URL
URL DESCRIPTION
AGENCY CONTACT'S EMAIL
ADDRESS
EMAIL DESCRIPTION
ADDRESS
POSTAL CODE
COUNTRY
ADDITIONAL INFORMATION
GENERAL INFORMATION
PLACE OF PERFORMANCE
* = Required Field FedBizOpps Amendment to a Previous Combined Solicitation Rev. March 2010 TVs, Installation, RG6 Cable - amd 2 16602 36C24419Q0841
COMBINE
07-05-2019 N 334310 Department of Veterans Affairs Network Contracting Office 4
JENNIFER A CUTSHALL
Contract Specialist 814-943-8164 Jennifer.Cutshall2@va.gov Jennifer.Cutshall2@va.gov
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION
OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADM
INISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and d ate specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 3
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO
MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-01-2019 542-19-3-483-0057
NONE
36c244 Department of Veterans Affairs Network Contracting Office 4 James E. Van Zandt VA Medical Center 2907 Pleasant Valley Blvd.
Altoona PA 16602 36C244 Department of Veterans Affairs Network Contracting Office 4 James E. Van Zandt VA Medical Center 2907 Pleasant Valley Blvd.
Altoona PA 16602 To all Offerors/Bidders
36C24419Q0841 07-01-2019
X X X
See CONTINUATION Page X The purpose of this amendment is to provide all offerors with a list of questions received and the corresponding answers. See attached.
All other terms and cond itions as outlined remain unchanged.
CONTINUATION PAGE
A.1 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 174.00 |
| EA |
| __________________ |
| __________________ |
Brand Name Only - PDI-P19TV-CA-C, 18.5" LCD, TV ONLY, CREAM, COAX CABLE
LOCAL STOCK NUMBER: PDI-P19TV-CA-C
| 1.00 |
| JB |
| __________________ |
| __________________ |
Removal of Existing TV's, Installation of New
| 1.00 |
| EA |
| __________________ |
| __________________ |
RG 6 Cable and Installation
| GRAND TOTAL |
| __________________ |
A.2 DELIVERY SCHEDULE
| ITEM NUMBER |
| QUANTITY |
| DELIVERY DATE |
| 0001 |
| SHIP TO: |
| Department of Veterans Affairs |
Coatesville VA Medical Center 1400 Blackhorse Hill Road Coatesville, PA 19320
USA
| 174.00 |
| September 30, 2019 |
| MARK FOR: |
| Tara Callahan |
610-384-7711 x 4304 tara.callahan2@va.gov
| 0002 |
| SHIP TO: |
| SAME AS CLIN 0001 |
| 1.00 |
| September 30, 2019 |
| MARK FOR: |
| SAME AS CLIN 0001 |
| 0003 |
| SHIP TO: |
| SAME AS CLIN 0001 |
| 1.00 |
| SAME AS CLIN 0001 |
| MARK FOR: |
| SAME AS CLIN 0001 |
End of Document
1. Can the equipment be dropped shipped directly to the Hospital and securely stored there?
ANSWER: YES EQUIPMENT CAN BE SHIPPED TO THE VA AND STORED.
1. Can the selected vendor store equipment at the Hospital?
ANSWER: YES, VA CAN PROVIDE A SPACE TO STORE EQUIPMENT.
1. Will the rooms be occupied during the work?
ANSWER: YES, PATIENT ROOMS WILL BE OCCUPIED. VA WILL WORK WITH UNIT MANAGERS TO ENSURE ROOMS ARE UNOCCUPIED AS THE VENDOR NEEDS TO GO INTO THE ROOM. A ROOM LIST WILL BE GIVEN TO MANAGERS EACH DAY SO THAT PATIENTS CAN BE RELOCATED THE FOLLOWING DAY.
1. How high are the ceilings? Any lifts required?
ANSWER: CEILINGS ARE GENERALLY 8-10 FEET TALL. NO LIFT SHOULD BE NEEDED.
1. Under the heading of item 4 “Specific Tasks” it is stated that “The contractor shall provide, install, and verify proper operation of the RG6 cable backbone for 225 patient televisions”. However, since the headend system is pre-existing, who is responsible for making the final connections at the demarc locations - the AV contractor or the CATV provider?
ANSWER: It really depends on who finishes the install first. The CATV provider will be installing about the same time. The AV contractor will be responsible for making the final connections at the demark locations if the CATV is already installed. If not, it will be the responsibility of the CATV provider or myself. More information will be provided and known once the CATV contract is awarded.
1. Will the incumbent CATV provider be able to provide drawings of the existing cable infrastructure that also includes dB power figures from the head end splitters in each demark location?
ANSWER: We do not have drawings at this time as the cable infrastructure is not installed. At the time of award of this contract, I hope to have more information about the infrastructure that can be provided to the contractor.
1. How many locations will require a new wall plate?
ANSWER: All 225
1. Can the VA provide a floor plan of the facility that identifies the demarks and the locations of the new displays?
ANSWER: Not at this time as the backend equipment hasn’t been installed. This information will be provided once the contract is awarded. The cable runs will be no more than 150 ft in length. This information was provided by the CATV providers as a requirement. There will be 2-4 televisions per room for a majority of the rooms. Some rooms have only one television. The facility is over 100 acres with 25 buildings that have televisions in them.
1. What is the procedure for obtaining a “penetration permit” from the Coatesville VA Fire Department?
ANSWER: The contractor will meet with the Fire Department to fill out paperwork explaining where you will be working. Once the work is complete you will return the permit and the Fire Department will inspect the area to ensure it is sealed properly. Fire department is located on campus and is staffed 24/7.
1. Is the space above the ceiling where the RG6 will be installed plenum rated or not?
ANSWER: Not plenum rated
1. Are we to utilize the same wall plate that currently exists for the new coaxial cable connection?
ANSWER: No, 225 new wall plates are needed. They will be located next to the current wall plates.
1. Are we responsible for connecting the new cable once the new signal is switched over if we complete the entire project before September 30th?
ANSWER: No, if completed before September 30th, Coatesville will switch over the cables when the new signal is switched. This is why we are not reutilizing the current wall plates as we can’t have televisions unable to receive signal if the new cable is installed before the switch over. The new RG6 infrastructure will not work with our current cable provider so we need both systems running side by side during installation.
End of Document
File details come from the government source that posted it.