36C24419B0039-0002001.pdf

PDF 10 MB Posted

Attached to
Replace Keying System for Outbuildings Project Altoona VAMC Federal contract opportunity
Solicitation number
36C24419B0039
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419B0039 0002 _17044_Stamped Drawing Set_2019_08_07.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Replace Keying System for Outbuildings Project Altoona VAMC, newest first.
File Type Posted
36C24419B0039-0002000.docx DOCX document
36C24419B0039-0002002.pdf PDF
36C24419B0039-0002004.pdf PDF
36C24419B0039-0002003.pdf PDF
36C24419B0039-0001000.docx DOCX document
36C24419B0039-0001001.pdf PDF
36C24419B0039-004.pdf PDF
36C24419B0039-003.pdf PDF
36C24419B0039-002.zip ZIP file
36C24419B0039-001.docx DOCX document
36C24419B0039-000.docx DOCX document
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS IS A STANDARD SYMBOL LIST. ALL SYMBOLS MAY NOT APPEAR ON THIS PROJECT.

SYSTEMS SYMBOLS LEGEND

DRAWING KEYNOTE

EQUIPMENT TAG

REVISION TRIANGLE WITH REVISION CLOUD

EXISTING TO REMAIN

DOOR SECURITY SYMBOLS

ANNOTATION SYMBOLS

DOOR NUMBER

WP - WEATHERPROOF AS INDICATED ON PLANS

WIRELESS GATEWAY FOR ACCESS CONTROL

VALIDATION POINT

WG

VP

NEW WORK

EXISTING UNDERGROUND

TELECOM PATHWAY

WP

WIRELESS NODE FOR ACCESS CONTROLWN

UPDATERU

NEW FIRE RATED SLEEVE. ALL PENETRATIONS OF WALLS AND/OR FLOORS SHALL BE FIRE

STOPPED IN ACCORDANCE WITH THE ASTM AND NFPA REQUIREMENTS FOR 2-HOUR FIRE

RATING. REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL INFORMATION.

INSTALLATION OF FIRE-STOPS SHALL BE PERFORMED BY APPLICATOR/INSTALLER

QUALIFIED AND TRAINED BY THE MANUFACTURER. INSTALLATION SHALL BE PERFORMED

IN STRICT ACCORDANCE WITH MANUFACTURER'S DETAILED INSTALLATION PROCEDURES.

EXISTING ABOVE GROUND

TELECOM PATHWAY

ES ELECTRIC STRIKE

LATEST VERSIONS OF:

1. LIFE SAFETY CODE - NFPA 101

2. INTERNATIONAL BUILDING CODE - IBC

3. NATIONAL ELECTRICAL CODE - NFPA 70

4. HEALTHCARE FACILITIES CODE - NFPA 99

5. VA DESIGN REQUIREMENTS

A. ELECTRICAL DESIGN MANUAL FOR NEW HOSPITALS, REPLACEMENT HOSPITALS,

AMBULATORY CARE CLINICAL ADDITIONS, ENERGY CENTERS, OUTPATIENT CLINICS,

ANIMAL RESEARCH FACILITIES, LABORATORY BUILDINGS

B. FIRE PROTECTION DESIGN MANUAL

C. TELECOMMUNICATIONS AND SPECIAL TELECOMMUNICATIONS SYSTEMS DESIGN

MANUAL

APPLICABLE CODES AND STANDARDS

FIRE SEAL WITH APPROVED

CAULK OR PUTTY BY CABLE

INSTALLER

12" MINMUM

EACH SIDE

1. THROUGH PENETRANTS — ONE METALLIC CONDUIT TO BE CENTERED WITHIN THE FIRESTOP SYSTEM. A NOM ANNULAR SPACE

OF 3/4 IN. (19 MM) IS REQUIRED WITHIN THE FIRESTOP SYSTEM. CONDUIT TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF FLOOR OR

WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF CONDUITS MAY BE USED:

A. CONDUIT - NOM. 4 IN. (102 MM) DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR STEEL CONDUIT.

2. PACKING MATERIAL - MIN. 3 IN. (78 MM) THICKNESS OF MIN 4 PCF (64 KG/M3) MINERAL WOOL BATT INSULATION FIRMLY PACKED

INTO OPENING AS A PERMANENT FORM. PACKING MATERIAL TO BE RECESSED FROM TOP SURFACE OF FLOOR AS REQUIRED TO

ACCOMMODATE THE REQUIRED THICKNESS OF FILL MATERIAL. PACKING MATERIAL TO BE CENTERED IN WALLS AND MID DEPTH

AND RECESSED TO ALLOW FOR INSTALLATION OF FILL MATERIAL.

3. FILL, VOID OR CAVITY MATERIAL*- SEALANT - MIN. 1/2 IN. (13 MM) THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS.

FLUSH WITH TOP SURFACE OF FLOOR, IN WALLS, FILL MATERIAL TO BE APPLIED ON EACH SIDE OF PACKING MATERIAL. 3M COMPANY

TYPES FB-1000 NS, FB-10003SL (FLOORS ONLY), FB-2000 OR FB-2000+ (FLOORS ONLY).

*INDICATES SUCH PRODUCTS SHALL BEAR THE UL OR CUL CERTIFICATION MARK FOR JURISDICTION EMPLOYING THE UL OR CUL

CERTIFICATION (SUCH AS CANADA), RESPECTIVELY,

1A3

UL 1479

F RATING - 2 HOUR

T RATING - 0 HOUR

L RATING AT AMBIENT - LESS THAN 1 CFM/SQ FT

L RATING AT 400 F - LESS THAN 1 CFM/SQ FT

1A2B

2A

UL 1479

F RATING - 2 HOUR

T RATING - 0 HOUR

L RATING AT AMBIENT - LESS THAN 1 CFM/SQ FT

L RATING AT 400 F - LESS THAN 1 CFM/SQ FT

FIRE SEAL WITH APPROVED

CAULK OR PUTTY BY CABLE

INSTALLER

12" MINMUM

EACH SIDE

1. THROUGH PENETRANTS — ONE METALLIC PIPE, CONDUIT OR TUBING TO BE CENTERED WITHIN THE FIRESTOP SYSTEM.

CONDUIT TO BE RIGIDLY SUPPORTED ON BOTH SIDES OF WALL ASSEMBLY. THE FOLLOWING TYPES AND SIZES OF CONDUITS

MAY BE USED:

A. CONDUIT - NOM. 4 IN. (102 MM) DIAM (OR SMALLER) STEEL ELECTRICAL METALLIC TUBING OR STEEL CONDUIT. A NOM ANNULAR

SPACE OF 3/4 IN. (19 MM) IS REQUIRED WITH THE FIRESTOP SYSTEM.

2. FIRESTOP SYSTEM - THE FIRESTOP SYSTEM SHALL CONSIST OF THE FOLLOWING:

A. PACKING MATERIAL - MIN. 3 IN. (78 MM) THICKNESS OF MIN 4 PCF (64 KG/M3) MINERAL WOOL BATT INSULATION FIRMLY PACKED

INTO OPENING AS A PERMANENT FORM. PACKING MATERIAL TO BE RECESSED FROM BOTH SURFACES OF WALL AS REQUIRED TO

ACCOMODATE THE REQUIRED THICKNESS OF FILL MATERIAL.

B. FILL, VOID OR CAVITY MATERIAL*- SEALANT - MIN. 1 IN. (25 MM) THICKNESS OF FILL MATERIAL APPLIED WITHIN THE ANNULUS.

ON BOTH SURFACES OF WALL. ADDITIONAL FILL MATERIAL TO BE INSTALLED SUCH THAT MIN 1/4 IN. (6 MM) CROWN IS FORMED

AROUND THE PENETRATING ITEM. 3M COMPANY - TYPES FB-1000 NS, FB-2000 OR FB-2000+

*INDICATES SUCH PRODUCTS SHALL BEAR THE UL OR CUL CERTIFICATION MARK FOR JURISDICTION EMPLOYING THE UL OR CUL

CERTIFICATION (SUCH AS CANADA), RESPECTIVELY,

SECURED CONCEALED VERTICAL RODS UNSECURED CONCEALED VERTICAL RODS

RIGHT HAND REVERSE(RHRB) DOOR

PANIC EXITING DEVICE

WITH CONCEALED

VERTICAL ROD AND

MONITOR SWITCH

SEE PLAN FOR

CONDUIT SIZE

J-BOX(RECESSED)

4"x4"x2 1/8"

MOUNTED ABOVE CEILING

(VERIFY IN FIELD W/ EC)

1/2" FLEX CO 1/2" FLEX CO

DOOR CONTACT

3/4" CO3/4" CO

CONCELAED

ELECTRIC POWER

TRANSFER

3/8" CHANNEL

3/4" CO

UPDATER

SINGLE GANG BB

(VERTICAL)

CONCEALED

ELECTRIC POWER

TRANSFER

3' -6

3' -4

6" 6"

UNSECURED SURFACE STRIKESECURED SURFACE STRIKE

RIGHT HAND REVERSE(RHRB) DOOR

PANIC

EXITING DEVICE

DOOR STRIKE

SURFACE MTD.

DOOR STRIKE

(BEYOND)

1/2" FLEX CO

DOOR CONTACT

3/4" CO

CARD READER

SINGLE GANG BB

(VERTICAL)

1/2" FLEX CO

REQUEST TO EXIT(REX)

SINGLE GANG BB

(HORIZONTAL)

4" TO 8"

6"

3' -6

3' -4

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/ 7/

:4

5:

A M

REPLACE KEYING SYSTEM FOR

OUTBUILDINGS

503-17-106

AEW REC

2907 Pleasant Valley Blvd, Altoona, PA 16602

ET001

SYSTEMS SYMBOLS, NOTES, AND DETAILS

02/08/2019 17044

100% DESIGN DOCUMENTS

SWBD SWITCHBOARD

SWGR SWITCHGEAR

SYM SYMMETRICAL TOP

T TOP

TA THROWAWAY

TAN TANGENT

TC TELECOMMUNICATIONS

CONTRACTOR

TCV TEMPERATURE CONTROL VALVE

TEMP TEMPERATURE

TER TERRAZZO

TH THERMOMETER

THRES THRESHOLD

TR TEMPERATURE RISE

TRANS TRANSITION

TRANSR TRANSFORMER

TSTAT THERMOSTAT

TYP TYPICAL

UC UNDER CABINET OR UNDER CUT

UFD UNDER FLOOR DUCT

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITER'S LABORATORIES

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UPS UNINTERRUPTIBLE POWER SUPPLY

UTIL UTILITY

V VOLT

VENT VENTILATION

VERT VERTICAL

VIF VERIFY IN FIELD

W WATT

W/ WITH

W/O WITHOUT

WC WALL COVERING

WCL WATER CLOSET

WF WIDE FLANGE

WHCH WHEEL CHAIR

WIN WINDOW

WP WEATHERPROOF

X DEMO

XN TO BE RELOCATED / NEW LOCATION

XR EXISTING TO REMAIN

ZVC ZONE VALVE CABINET

HPF HIGH POWER FACTOR

HT HEIGHT

HVAC HEATING, VENTILATING, AIR

CONDITIONING

HZ HERTZ

ID INSIDE DIAMETER

IG ISOLATED GROUND

IME INSULATED METAL ENCLOSURE

IN INCH

INCAND INCANDESCENT

INCL INCLUDED

INSUL INSULATION

INT INTERIOR

INTERL INTERLOCK

INV INVERT

ISO ISOLATION

IVS ISOLATED VALVE STATION

J-BOX JUNCTION BOX

JST JOIST

JT JOINT

KO KNOCK OUT

kVA KILOVOLT AMPERE kVAR KILOVAR (REACTANCE) kW KILOWATT kWH KILOWATT HOUR METER

LB POUND

LED LIGHT EMITTING DIODE

LF LINEAR FEET

LIN LINEAR

LOC LOCATION OR LOCATE

LPT LOW POINT

LT LIGHT

LTG LIGHTING

LV LOW VOLTAGE

LVR LOUVER

LWC LINEAR WOOD CEILING

MAN MANUAL

MATL MATERIAL

MAV MANUAL AIR VENT

MAX MAXIMUM

MC METAL CLAD CABLE

MCB MAIN CIRCUIT BREAKER

MCC MOTOR CONTROL CENTER

MDP MAIN DISTRIBUTION PANEL

MECH MECHANICAL

MEMB MEMBRANE

MET METAL

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MO MASONRY OPENING

MONO MONOLITHIC

MTD MOUNTED

MTG HT MOUNTING HEIGHT

MTL METAL

MTLH METAL HALIDE

MTR MOTOR

MTS MANUAL TRANSFER SWITCH

MV MEDIUM VOLTAGE

N/A NOT APPLICABLE

NEC NATIONAL ELECTRIC CODE

NEMA NATIONAL ELECTRICAL

MANUFACTURER ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER OR NORMALLY OPEN

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OPER OPERATED

OPNG OPENING

OPP OPPOSITE

PB PULL BOX

PNL PANEL

PR PAIR

PRELIM PRELIMINARY

PRT PRESSURE TAP

PRV PRESSURE REDUCING VALVE

PT PAINT OR POTENTIAL

TRANSFORMER

RO ROUGH OPENING

QT QUARRY TILE

R RADIUS

RC REMOVE COMPLETELY

RE RELOCATE EXISTING

REC RECESSED

RECPT RECEPTACLE

REF REFERENCE

REFL REFLECTOR

REG REGISTER

REINF REINFORCING

REM REMOVE

REQD REQUIRED

RET RETURN

REV REVISE

REX REMOVE EXISTING

RF RESILIENT FLOOR

RFI REQUEST FOR INFORMATION

RGS RIGID GALVANIZED STEEL CONDUIT

RH ROOF HATCH

RM ROOM

RN REMOVE AND REPLACE WITH NEW

RR REMOVE AND REPLACE

RS RAPID START

SCHED SCHEDULE

SF SQUARE FOOT

SHT SHEET

SHT MTL SHEET METAL

SHTG SHEATHING

SIM SIMILAR

SM SURFACE MOUNTED

SNC SANITARY NAPKIN CABINET

SND SANITARY NAPKIN DISPOSER

SPC SPECIMEN PASS-THRU CABINET

SPEC SPECIFICATIONS

ST STL STAINLESS STEEL

STD STANDARD

STER STERILIZER

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SW SWITCH

& AND

AAP ALARM ANNUNCIATOR PANEL

AAV AUTOMATIC AIR VENT

ABV ABOVE

ACC DR ACCESS DOOR

ACFL ACCESS

ACT ACOUSTICAL CEILING TILE

ADA AMERICAN DISABILITIES ACT

ADD ADDENDUM

ADDL ADDITIONAL

ADJ ADJUSTABLE

ADMIN ADMINISTRATION

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AL ALIGN

ALT ALTERNATE

ALUM ALUMINUM

AMP AMPERE

APPROX APPROXIMATE

ARCH ARCHITECTURAL

BFC BELOW FINISH CEILING

BFE BOTTOM FOOTING ELEVATION

BFG BELOW FINISHED GRADE

BLDG BUILDING

BLKG BLOCKING

BOT BOTTOM

BRKR BREAKER

BSMT BASEMENT

BTWN BETWEEN

C CONDUIT

CAB CABINET

CAP CAPACITY

CATV CABLE TELEVISION

CCTV CLOSED CIRCUIT TELEVISION

CFH CUBIC FEET / HOUR

CFM CUBIC FEET / MINUTE

CH CHANNEL

CKT CIRCUIT

CKT BRKR CIRCUIT BREAKER

CL CENTERLINE

CLG CEILING

CLG MTD CEILING MOUNTED

COMM COMMUNICATION

CONC CONCRETE

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUE / CONTINUOUS

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CTR CENTER

CU COPPER

D DEPTH OR DEEP

dB DECIBEL

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAILS

DIA DIAMETER

DIAG DIAGONAL OR DIAGRAM

DIM DIMENSION

DISC DISCONNECT

DIST DISTRIBUTION

DIV DIVISION

DN DOWN

DP DISTRIBUTION PANEL

DWG DRAWING

EC ELECTRICAL CONTRACTOR

EL ELEVATION

ELEC ELECTRICAL

ELEC CAB ELECTRICAL CABINET

ELEV ELEVATOR

EMER EMERGENCY

ENCL ENCLOSURE

ENTR ENTRANCE

EO ELECTRICAL OUTLET

EQ EQUAL

EQUIP EQUIPMENT

ETR EXISTING TO REMAIN

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

XP EXPLOSION PROOF

F/S FIRE / SMOKE DAMPER

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FB FIRE BLANKET

FC FLEXIBLE CONNECTION OR

FOOTCANDLE

FDN FOUNDATION

FHP FULL HEIGHT PARTITION

FHV FIRE HOSE VALVE

FIN FINISH

FIXT FIXTURE

FLA FULL LOAD AMPERES

FLEX FLEXIBLE

FLG FLANGE

FLG C FLANGE CONNECTION

FLR FLOOR

FLUOR FLUORESCENT

FP FIRE PROOFING

FRMG FRAMING

FSTOP FIRESTOPPING

FT FOOT / FEET

FT HD FEET OF HEAD

FTC FOOTCANDLES

FTG FOOTING

FUR FURRING

G ELECTRICAL GROUND

GA GAUGE

GALV GALVANIZED

GC GENERAL CONTRACTOR

GEN GENERATOR

GENL GENERAL

GFCI GROUND FAULT CIRCUIT

INTERRUPTOR

GL GLASS

GND GROUND

GR GRADE

GWB GYPSUM BOARD

H HIGH

HDCP HANDICAP

HDR HEADER

HDW HARDWARE

HM HOLLOW METAL

HORIZ HORIZONTAL

HP HORSE POWER

SYSTEMS GENERAL NOTES

1 THE FOLLOWING GENERAL NOTES AS LISTED BELOW SHALL APPLY TO ALL SYSTEM REQUIREMENTS AS

INDICATED ON ALL CONTRACT DRAWINGS.

2 DUE TO SCALE OF THE DRAWINGS, ALL SECURITY SYSTEM EQUIPMENT SYMBOLS ARE SHOWN ON DRAWINGS AS CLOSE AS POSSIBLE TO THEIR INTENDED LOCATION. CONTRACTOR SHALL COORDINATE IN THE FIELD THE PROPER INSTALLATION OF ALL EQUIPMENT, DEVICES, CONTROLS AND CABLING.

REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL REQUIREMENTS.

3 COORDINATE WITH ALL SYSTEM PROVIDERS ALL CONDITIONS RELATED TO THE INSTALLATION OF ALL SYSTEMS. THE CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE TRADE ALL INSTALLATION REQUIREMENTS IMPACTING THE PLACEMENT OF ALL SYSTEM COMPONENTS TO THE SATISFACTION OF

ALL CONCERNED TRADES.

4 COORDINATE EXACT LOCATION(S) OF ALL CEILING MOUNTED CABLE, CONDUITS, EQUIPMENT AND/OR

DEVICES WITH ALL AFFECTED TRADES PRIOR TO INSTALLATION.

5 ALL SYSTEM WIRING, CONDUITS AND EQUIPMENT INSTALLATION SHALL BE IN ACCORDANCE WITH GOOD ENGINEERING PRACTICES AND BY ALL IEEE, EIA, NEC AND MANUFACTURER'S REQUIREMENTS.

ALL WIRING SHALL COMPLY WITH ALL STATE AND LOCAL ELECTRICAL CODES AND SHALL TEST FREE

FROM ALL GROUNDS, SHORTS STRAY VOLTAGES AND EMI.

6 PROVIDE ALL EQUIPMENT CLEARANCES IN ACCORDANCE WITH NEC REQUIREMENTS. ARRANGE

EQUIPMENT TO FACILITATE UNRESTRICTED ACCESS FOR MAINTENANCE AND SERVICE AROUND ALL

EQUIPMENT, COMPONENTS AND/OR CABLE TERMINATIONS.

7 ALL PENETRATIONS OF WALLS AND/OR FLOORS SHALL BE FIRE STOPPED IN ACCORDANCE WITH THE

ASTM AND NFPA REQUIREMENTS FOR A 2-HOUR MINUIMUM FIRE-RATING.. REFER TO RELATED

SPECIFICATION SECTIONS FOR ADDITIONAL INFORMATION. INSTALLATION OF FIRE-STOPS SHALL BE

PERFORMED BY AN APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE MANUFACTURER.

INSTALLATION SHALL BE PERFORMED IN STRICT ACCORDANCE WITH MANUFACTURER'S DETAILED

INSTALLATION\ PROCEDURES.

8 REFER TO ALL RELATED CONTRACT DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND/OR REQUIREMENTS RELATED TO THE INSTALLATION, PROGRAMMING, TESTING, COMMISSIONING

AND CERTIFICATION OF ALL ELECTRONIC SECURITY SYSTEMS.

9 ALL EQUIPMENT ENCLOSURES LOCATED OUTSIDE OR IN ALL AREAS WITH HIGH MOISTURE OR A RELATIVE HUMIDITY OF 75% OR GREATER SHALL BE NEMA 4X ENCLOSURES AND SHALL BE RATED FOR

THAT APPLICATION.

10 ALL INTERIOR AND/OR EXTERIOR COMPONENTS, DEVICES OR SYSTEMS EQUIPMENT EXPOSED TO THE GENERAL POPULATION SHALL BE INSTALLED IN SECURED EQUIPMENT ENCLOSURES WITH TAMPER SWITCHES AND INSTALLED IN SUCH A MANNER THAT RESISTS TAMPERING AND/OR REMOVAL WITHOUT

THE USE OF SPECIALIZED TOOLS.

11 FOR EQUIPMENT INSTALLATIONS REQUIRING COORDINATION WITH OTHER TRADES THE CONTRACTOR SHALL PROVIDE ALL TEMPLATES, BACKBOXES AND EQUIPMENT ANCHOR BOLTS FOR MOUNTING OR FLUSH MOUNTING PREPARATION, (E.G. PEDESTALS OR OTHER DEVICES REQUIRING MOUNTING ON

WALLS, CONCRETE PADS OR OTHER MATERIALS). COORDINATE DELIVERY OF TEMPLATES AND

EQUIPMENT WITH ALL AFFECTED CONTRACTORS.

12 ALL CONTROL EQUIPMENT AND EXTERIOR DEVICES MUST HAVE TRANSIENT PROTECTION TO COMPLY WITH UL AND NFPA 70 REQUIREMENTS. WHERE ANY CIRCUITS LEAVE THE BUILDING, ADDITIONAL

TRANSIENT PROTECTION MUST BE PROVIDED FOR EACH CIRCUIT. ALL TRANSIENT PROTECTION

DEVICES MUST BE UL LISTED UNDER STANDARD #497B (ISOLATED LOOP PROTECTORS).

13 REFER TO ALL RELATED CONTRACT DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION AND/OR REQUIREMENTS RELATED TO THE INSTALLATION, PROGRAMMING, TESTING, COMMISSIONING

AND CERTIFICATION OF ALL ELECTRONIC SECURITY SYSTEMS.

14 PROVIDE A KEY OVERRIDE FOR ALL DOORS. KEYING BY VENDOR.

15 A 7-PIN CORE SHALL BE PROVIDED WITH ALL LOCKSETS. VENDOR TO COORDINATE WITH COR ON PIN

SETTING PRIOR TO ORDERING. KEY WAY IS TYPE "D".

16 A CONTACT SWITCH SHALL BE SPECIFIED FOR EVERY DOOR.

17 THERE ARE NO CLOSERS ON THE DOORS. THE DOORS WILL BE CLOSED MANUALLY.

18 GUEST CARDS COULD BE SUPPLIED TO OUTSIDE USERS AND SPECIFICALLY 'TIMED' SO THEY COULD ONLY USED AS DIRECTED BY THE VA. THE CONTRACTOR AND MANUFACTURER WILL BE RESPONSIBLE

FOR INSTRUCTION VA STAFF IN THE PROGRAMMING OF CARDS AS PART OF THEIR TRAINING.

19 PROVIDE AN ADDITIONAL 10 (TEN) OUTDOOR PADLOCKS BESIDES WHAT IS SHOWN FOR SPECIFIC

DOORS FOR USE BY THE VA.

20 PROVIDE AN ADDITIONAL 25 (TWENTY FIVE) PERCENT SPARE CAPACITY ON WIRELESS GATEWAYS AND

NODES.

NTS

CONDUIT THROUGH EXISTING CONCRETE BLOCK / CONCRETE WALL

- FLOOR ASSEMBLY

NTS

CONDUIT THROUGH EXISTING FIRE RATED DRYWALL PARTITION

NOT TO SCALE

EGRESS DOOR ASSEMBLY - CONCEALED VERTICAL RODS

ELECTRICAL GENERAL NOTES

1 THE FOLLOWING GENERAL NOTES AS LISTED BELOW SHALL APPLY TO ALL DRAWING REQUIREMENTS AS INDICATED ON ALL ET SERIES CONTRACT DRAWINGS.

2 DRAWINGS FOR THIS WORK ARE DIAGRAMMATIC AND INTENDED TO CONVEY THE EXTENT, GENERAL ARRANGEMENT AND LOCATIONS OF THE WORK. BECAUSE OF THE SCALE OF THE DRAWINGS, CERTAIN BASIC ITEMS SUCH AS ACCESS PANELS, CONDUITS, CABINET SIZES, PENETRATION SLEEVES, PULL BOXES, BACKBOXES AND JUNCTION BOXES MAY NOT BE SHOWN. INCLUDE ALL ITEMS WHERE REQUIRED BY CODE, MANUFACTURER AND RELATED SPECIFICATION SECTIONS FOR THE PROPER INSTALLATION OF ALL

WORK.

3 DUE TO SCALE OF THE DRAWINGS, ALL ELECTRICAL DEVICE SYMBOLS ARE SHOWN ON DRAWINGS AS CLOSE AS POSSIBLE TO THEIR INTENDED LOCATION. CONTRACTOR SHALL COORDINATE IN THE FIELD THE PROPER INSTALLATION OF ALL EQUIPMENT, DEVICES, CONTROLS AND CONDUITS. REFER TO RELATED SPECIFICATION SECTIONS FOR

ADDITIONAL REQUIREMENTS.

4 COORDINATE WITH ALL TRADES AND SYSTEM INTEGRATORS ANY CONDITIONS RELATED TO THE INSTALLATION OF ALL SYSTEMS. THE CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE TRADE ALL INSTALLATION REQUIREMENTS IMPACTING THE PLACEMENT OF ALL SYSTEM COMPONENTS TO THE SATISFACTION OF ALL CONCERNED TRADES.

5 ALL CONDUITS SHALL BE SIZED AND INSTALLED IN ACCORDANCE WITH NFPA 70 AND PROJECT SPECIFICATIONS. ALL CONDUITS SHALL BE A MINIMUM OF 3/4" UNLESS

OTHERWISE NOTED.

6 PROVIDE ALL EQUIPMENT CLEARANCES IN ACCORDANCE WITH NEC REQUIREMENTS. ARRANGE EQUIPMENT TO FACILITATE UNRESTRICTED ACCESS FOR MAINTENANCE AND

SERVICE AROUND ALL EQUIPMENT, COMPONENTS AND/OR CABLE TERMINATIONS.

7 WHERE EQUIPMENT AND/OR JUNCTION BOXES ARE INSTALLED ABOVE FINISHED CEILINGS, THE CONTRACTOR SHALL PROVIDE ACCESS HATCHES LISTED FOR THE INTENDED APPLICATION. ACCESS HATCHES SHALL BE LOCATED SO THAT SERVICE ACCESS TO THE EQUIPMENT AND/OR JUNCTION BOXES IS UNIMPEDED.

8 ALL PENETRATIONS OF WALLS AND/OR FLOORS SHALL BE FIRE STOPPED IN ACCORDANCE WITH THE ASTM AND NFPA REQUIREMENTS. REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL INFORMATION. INSTALLATION OF FIRE-STOPS SHALL BE PERFORMED BY APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE MANUFACTURER. INSTALLATION SHALL BE PERFORMED IN STRICT ACCORDANCE WITH MANUFACTURER'S DETAILED INSTALLATION PROCEDURES.

9 ALL EQUIPMENT ENCLOSURES LOCATED OUTSIDE OR IN ALL AREAS WITH HIGH MOISTURE OR A RELATIVE HUMIDITY OF 75% OR GREATER SHALL BE NEMA 4X STAINLESS

STEEL AND RATED FOR THAT APPLICATION.

10 ALL DEVICES, COMPONENTS OR EQUIPMENT INSTALLED ON THE EXTERIOR OF THE FACILITY SHALL BE PROVIDED IN ACCORDANCE WITH ALL MANUFACTURERS' REQUIREMENTS TO ENSURE THE PROPER OPERATION WHEN EXPOSED TO THE ENVIRONMENTAL CONDITIONS AND/OR AVERAGE ANNUAL LOWEST TEMPERATURE THAT CAN

BE ANTICIPATED FOR THE GEOGRAPHIC REGION OF THE FACILITY.

11 ALL INTERIOR AND/OR EXTERIOR COMPONENTS, DEVICES OR SYSTEMS EQUIPMENT EXPOSED TO THE GENERAL POPULATION SHALL BE INSTALLED IN SECURED EQUIPMENT ENCLOSURES WITH TAMPER SWITCHES AND INSTALLED IN SUCH A MANNER THAT RESISTS TAMPERING AND/OR REMOVAL WITHOUT THE USE OF SPECIALIZED TOOLS.

12 FOR EQUIPMENT INSTALLATIONS REQUIRING COORDINATION WITH OTHER TRADES THE CONTRACTOR SHALL PROVIDE ALL TEMPLATES, BACKBOXES AND EQUIPMENT ANCHOR BOLTS FOR MOUNTING OR FLUSH MOUNTING PREPARATION (E.G. PEDESTALS OR OTHER DEVICES REQUIRING MOUNTING ON WALLS, CONCRETE PADS OR OTHER MATERIALS).

COORDINATE DELIVERY OF TEMPLATES AND EQUIPMENT WITH ALL AFFECTED CONTRACTORS.

13 ALL ELECTRICAL WORK SHALL BE DONE IN ACCORDANCE WITH THE NATIONAL ELECTRIC CODE (LATEST VERSION BEING ENFORCED) AND ALL OTHER APPLICABLE CODES AND

STANDARDS BEING ENFORCED BY THE AUTHORITY HAVING JURISDICTION.

14 THESE DRAWINGS DO NOT INCLUDE NECESSARY COMPONENTS OR INSTRUCTIONS FOR CONSTRUCTION SAFETY. THE ENGINEER ASSUMES NO RESPONSIBILITY FOR ANY WORKMAN'S OR TRANSIENT'S SAFETY, OR FOR THE ADEQUACY OF EQUIPMENT, BUILDING COMPONENTS, WORK AIDS, OR ANY NECESSITY TO WORK ON ENERGIZED

ELECTRICAL COMPONENTS. FURTHER, NO SUPERINTENDENCE IS INCLUDED OR IMPLIED.

15 ALL SYSTEMS AND EQUIPMENT SHALL BE INSTALLED AND WIRED ACCORDING TO THE MANUFACTURER'S RECOMMENDATIONS.

16 ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE TESTED AND LISTED BY A NATIONALLY-RECOGNIZED TESTING LABORATORY.

17 THE CONTRACTOR SHALL COORDINATE CONDUIT ROUTING (PLAN AND ELEVATION) WITH THE LIGHTING (NEW AND EXISTING), CEILING ELEVATION, STRUCTURE, DUCTWORK, PIPING, ETC. REQUIRED FOR THE COMPLETION OF THE PROJECT PRIOR TO INSTALLATION.

18 THE CONTRACTOR SHALL SECURE AND PROTECT THE BUILDING AND/OR WORK AREA WITH FIRE RETARDANT TEMPORARY PLYWOOD PARTITIONS (WITH LOCKING DOORS), ETC. CLOSE ALL EXISTING OPENINGS AS REQUIRED. COORDINATE THIS WORK WITH THE OWNER'S REPRESENTATIVE PRIOR TO STARTING. IF TEMPORARY PARTITIONS

IMPEDE THE FLOW OF EGRESS TO REQUIRED EGRESS DOORS AND STAIRS, THE CONTRACTOR SHALL PROVIDE EXIT SIGNS, AND SIGNAGE INDICATING SUCH.

19 THE CONTRACTOR SHALL CAULK ALL JOINTS BETWEEN METAL FRAMES AND EXISTING CONDITIONS. THIS APPLIES TO BOTH INTERIOR AND EXTERIOR INSTALLATIONS.

20 THE DIMENSIONS SHOWN ON THE DRAWINGS ARE FOR THE CONVENIENCE OF THE CONTRACTOR ONLY. VERIFY ALL DIMENSIONS IN THE FIELD PRIOR TO PERFORMING ANY

WORK.

21 THE CONTRACTOR SHALL INSTALL ALL CONDUITS CONCEALED UNLESS NOTED OTHERWISE. EXPOSED CONDUIT SHALL ONLY BE INSTALLED IN CHASES, EXPOSED CEILING

AREAS, JANITOR CLOSETS, AND MECHANICAL/ELECTRICAL ROOMS.

22 ALL ELECTRICAL EQUIPMENT SHALL BE GROUNDED AND/OR BONDED PER THE REQUIREMENTS OF THE NATIONAL ELECTRIC CODE. PROVIDE ALL GROUNDING AND/OR

BONDING COMPONENTS NOT EXPLICITLY SHOWN ON THE DOCUMENTS.

23 THE CONTRACTOR SHALL PROVIDE TYPEWRITTEN PANELBOARD DIRECTORIES, INDICATING THE LOADS SERVED BY THE RESPECTIVE PANELS. AMEND AS REQUIRED FOR AS-BUILT CONDITIONS. PROVIDE ELECTRONIC VERSIONS OF THE PANELBOARD SCHEDULES FOR FUTURE USE BY THE OWNER.

24 THE CONTRACTOR SHALL COORDINATE ALL WORK WITH THE OWNER PRIOR TO STARTING ALL PHASES OF THE PROJECT. THE CONTRACTOR SHALL COORDINATE WITH THE

OWNER WHAT WORK, IF ANY, HAS TO BE COMPLETED DURING SECOND OR THIRD SHIFT.

25 THE CONTRACTOR SHALL PROVIDE ALL TEMPORARY POWER CONNECTIONS TO KEEP AREAS UP AND OPERATIONAL DURING THE CONSTRUCTION. THE CONTRACTOR SHALL

COORDINATE THESE REQUIREMENTS WITH THE OWNER.

26 THE CONTRACTOR SHALL PROVIDE ALL NEW OPENINGS IN EXISTING PARTITIONS, EXTERIOR WALLS, FLOORS, AND ROOFS FOR THE INSTALLATION OF ANY NEW ELECTRICAL WORK. FURNISH AND INSTALL ALL REQUIRED LINTELS AND SLEEVES FOR THIS NEW WORK. ALL CONDUITS SHALL HAVE SLEEVES INSTALLED. ALL SLEEVES INSTALLED

THROUGH EXTERIOR WALLS SHALL HAVE LINK SEALS INSTALLED.

27 THE CONTRACTOR SHALL CONTACT THE NATIONAL "811-CALL BEFORE YOU DIG" SYSTEM PRIOR TO PERFORMING ANY UNDERGROUND INSTALLATION WORK. THE

CONTRACTOR SHALL HAVE ALL UTILITIES VERIFIED IN AND AROUND THE EXCAVATION AREA.

28 PROVIDE ALL JUNCTION BOXES, PULL BOXES AND OTHER PULL POINTS AS REQUIRED TO MEET THE MAXIMUM NUMBER OF BENDS PER NEC REQUIREMENTS. NOT ALL CONDUITS, PULL BOXES AND OTHER RACEWAY ITEMS ARE INDICATED ON THE DOCUMENTS. THE CONTRACTOR SHALL PROVIDE A COMPLETE RACEWAY SYSTEM MEETING THE

REQUIREMENTS OUTLINED IN THE DRAWINGS AND SPECIFICATIONS.

29 THESE DRAWINGS DO NOT INDICATE ALL CONDUITS INTERCONNECTING EQUIPMENT, AND WHERE CONDUITS ARE INDICATED, THE ROUTING IS APPROXIMATE. THE CONTRACTOR IS RESPONSIBLE FOR THE ROUTING AND INSTALLATION OF ALL CONDUIT IN COORDINATION WITH OTHER TRADES AND EXISTING CONDITIONS.

30 MULTIWIRE BRANCH CIRCUITS ARE NOT PERMITTED, ALL SINGLE POLE BRANCH CIRCUITS SHALL HAVE A DEDICATED NEUTRAL.

31 MULTIPLE SMALL 20A/1P BRANCH CIRCUITS MAY SHARE A SINGLE CONDUIT PROVIDED THE CONTRATOR UPSIZES THE CONDUIT AS REQUIRED, AND THE AMPACITY ADJUSTMENTS FROM TABLE 310.15(B)(3)(a) HAVE BEEN APPLIED.

32 COLOR CODING OF WIRES SHALL BE AS PER NEC.

BID ITEM #1: BASE BID:

GENERAL CONSTRUCTION: WORK INCLUDES GENERAL CONSTRUCTION, ALTERATIONS/ NECESSARY REMOVAL OF EXISTING STRUCTURES AND CONSTRUCTION AND CERTAIN OTHER ITEMS. ELECTRICAL WORK: WORK INCLUDES ALL LABOR, MATERIAL, EQUIPMENT AND SUPERVISION TO PERFORM THE REQUIRED ELECTRICAL CONSTRUCTION WORK ON THIS PROJECT INCLUDING BUT NOT LIMITED TO THE WORK ASSOCIATED WITH PROVIDING KEYING SYSTEM VARIOUS BUILDINGS AT THE

JAMES E. VAN ZANDT MEDICAL CENTER.

BID ITEM #2: DEDUCT ALTERNATE NO.1: DELETE ALL WORK IN AND TO BUILDING 22 INCLUDING ALL SALTO LOCK WORK AND INSTALLATION AND ANY NEW FIBER RUNS

TO IT.

BID ITEM #3: DEDUCT ALTERNATE NO.2: 10 EXTRA EXTERIOR PADLOCKS (ATTIC STOCK).

BID ITEM #4: DEDUCT ALTERNATE NO.3: DELETE ALL WORK IN AND TO BUILDING #19 INCLUDING ALL SALTO LOCK WORK AND INSTALLATION AND ANY NEW FIBER

RUNS TO IT.

BID ITEM #5: DEDUCT ALTERNATE NO.4: THE REST OF THE EXTERIOR PADLOCKS THAT WERE INCLUDED IN THE BASE BID WORK.

BID ITEM #6: DEDUCT ALTERNATE NO.5: BUILDING #6 REMOVE SALTO LOCK WORK ONLY, FIBER WORK REMAINS.

BID ITEM #7: DEDUCT ALTERNATE NO.6: THE 299 QTY CORES TO BE INSTALLED IN SALTO LOCKS WHILE ACTIVATING NETWORK CHANGE OVER, THESE ARE NOT EXTRA AND ARE IN THE BASE BID CURRENTLY. CONTRACTOR “FURNISH ONLY” TO BE REMOVED AS OF THIS DEDUCT ALTERNATE.

BID ITEM #8: DEDUCT ALTERNATE NO.7: DELETE ELECTRIC STRIKES & CIRCUIT TO PANELS ON EXTERIOR ENTRY DOORS TO NINE OUTBUILDINGS. KEEP CARD READER

W/CAT 5 TO NETWORK SWITCHES.

BID ITEM #9: DEDUCT ALTERNATE NO.8: BUILDING #4 REMOVE SALTO LOCKS ONLY, FIBER REMAINS.

NOT TO SCALE

EGRESS DOOR ASSEMBLY

08/07/19

W

W

W

W

W

W

W

W

W W

W

W

RAMP

N O F I R E A R M S O R O R W E A P O N S

A L L O W E D O N T H I S P R O P E R T Y

S

O B

S C

U R

E D

A R

E A

FA

N

TRANSFORMER PAD

CONC. PAD

#30

#16

#8

#3

#19

#2

#14

#15

#11

#20

#18

#17

#1

#12

#32

#22

#33

#7

#4

#6

#5#10

EXISTING

TELECOM

HANDHOLE

EXISTING

PEDESTAL

EXISTING

TELECOM

HANDHOLE

EXISTING

TELECOM

HANDHOLE

TYPICAL

EXISTING

TELECOM

HANDHOLE

CONTRACTOR

PARKING AREA

IT/ELECTRICAL

ROOM

ROOM 180

IT ROOM 199

CANTEEN

ROOM 11

EXISTING

TELECOM

HANDHOLE

TYPICAL

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/ 7/

:4

5:

A M

REPLACE KEYING SYSTEM FOR

OUTBUILDINGS

503-17-106

AEW TA

2907 Pleasant Valley Blvd, Altoona, PA 16602

ET100

SYSTEMS SITE PLAN

02/08/2019 17044

100% DESIGN DOCUMENTS

NORTH

TRUE NORTH

PROJECT

1" = 60'-0"

SYSTEMS SITE PLAN

BUILDING KEY

LEGEND

APPROXIMATE LOCATION OF EXISTING

UNDERGROUND TELECOM PATHWAY.

CONTRACTOR TO VERIFY PATHWAYS.

CONTRACTOR TO UTILIZE EXISTING PATHWAYS AS INDICATED TO INSTALL

NEW 50 µ MULTIMODE LASER OPTIC FIBER - 12 STRAND TO ESTABLISH UPDATE

CONNECTIVITY TO BUILDINGS AS SHOWN. CONTRACTOR TO TERMINATE ALL

STRANDS ON NEW FIBER PATCH PANEL AT BOTH ENDS. CONTRACTOR TO UTILIZE

EXISTING RACKS AND CABINETS. REFER TO SPECIFICATIONS FOR TYPE OF FIBER AND

PATCH PANELS. COORDINATE WITH VA OIT AND SALTO REP TO LIGHT FIBER AND

ESTABLISH NEW SALTO NETWORK. TESTING TO BE PERFORMED PER

SPECIFICATIONS.

LABEL ALL FIBER AND PATHWAYS FOR IDENTIFICATION TO VA.

KEYNOTES

SEE BUILDING FLOOR PLAN FOR

CONTINUATION OF WORK. EFFORT IS TO

PROVIDE NEW SALTO NETWORK WITH USE

OF NEW FIBER NETWORK EMANATING FROM

BUILDING 11, WHERE NEW SALTO SERVER TO

BE LOCATED.

BUILDING TO RECEIVE NEW 12 STRAND, 50µ

MULTIMODE LASER OPTIMIZED FIBER

TERMINATED ON NEW FIBER PATCH PANEL.

PROVIDE NEW FIBER PATCH CABLE TO

EXISTNG SWITCH / NEW SWITCH

INSTALLATION TO ESTABLISH CONNECTIVETY

TO NEW NETWORK.

BUILDING 1 TO RECEIVE NEW 84 STRAND,50µ

MULTIMODE LASER OPTIMIZED FIBER FOR

NEW SALTO NETWORK. SEE ET500 FOR

CONTINUATION OF WORK.

PATHS AND LENGTHS OF FIBER TO BE

VERIFIED BY CONTRACTOR.

PATHWAYS INSIDE BUILDINGS SHALL BE RUN

ABOVE GROUND (CONCEALED ABOVE

CEILING).

PROVIDE NEW UNDERGROUND PATHWAY TO

PARKING GARAGE.

BLDG #1 - MEDICAL CENTER

BLDG #2 - FACILITIES

BLDG #3 - BOILER PLANT AND GARAGE

BLDG #4 - UNION

BLDG #5 - SWING SPACE

BLDG #6 - DAYCARE

BLDG #7 - HUMAN RESOURCES

BLDG #11 - COMPUTER BUILDING

BLDG #15 - TELEPHONE BUILDING

BLDG #16 - BUTLER BUILDING

BLDG #19 - VISITOR'S CENTER

BLDG #20 - IRM

BLDG #22 - MEDICAL ADMINISTRATION

BLDG #30 - WASHBAY

BLDG #32 - BEHAVIORAL HEALTH

BLDG #33 - PARKING GARAGE

CONTRACTOR SHALL CLEAN OUT EXISTING PATHWAYS AND PROVIDE INNERDUCTS

FOR ALL FIBER INSTALLATION. WHERE EXISTING PATHWAYS ARE DAMAGED OR

INACCESSIBLE, CONTRACTOR SHALL REPAIR OR PROVIDE A BYPASS OR NEW

PATHWAY. WHERE PATHWAYS DO NOT EXIST, CONTRACTOR SHALL MAKE AN

ALLOWANCE TO INSALL NEW. ALL NEW EXTERIOR PATHWAYS SHALL BE INSTALLED

UNDERGROUND AND ENCASED IN CONCRETE.

IT ROOM

199A

EXISTING FIBER TERMINATION CABINET. TERMINATE NEW FIBER - ALL STRANDS.

PROVIDE NEW 12-STRAND OPTICAL FIBER, 50µ LASER OPTIMIZED PATCH CABLE.

EXISTING EQUIPMENT RACK. TIE NEW FIBER VIA PATCH CABLE TO EXISTING SWITCHES.

COORDINATE WITH VA OIT TO ESTABLISH SALTO NETWORK.

EXISTING PULL BOX FOR INCOMING SERVICES. USE AS PULL POINT FOR NEW 84 STRAND FIBER BUNDLE

FROM BLDG. 11

EXISTING PATHWAY TO PULL NEW 108 STRAND FIBER UP THROUGH BLDG. 1.

EXISTING PATHWAY TO PULL NEW 72 STRAND FIBER UP THROUGH BLDG. 1.

EXISTING PATHWAY TO PULL NEW 60 STRAND FIBER UP THROUGH BLDG. 1.

EXISTING PATHWAY TO PULL NEW 48 STRAND FIBER UP THROUGH BLDG. 1.

EXISTING PATHWAY TO PULL NEW 24 STRAND FIBER UP THROUGH BLDG. 1.

SEE DETAIL 2 / ET500 FOR CONTINUATION TO PROVIDE SALTO TO RADIOLOGY.

J-HOOK FOR ROUTING CABLING. USE EXISTING AND PROVIDE NEW AS SCOPE OF WORK REQUIRES.

NEW 12 STRAND OPTICAL FIBER, 50µ LASER OPTIMIZED TO ESTABLISH NEW SALTO NETWORK.

NEW FIBER CONNECTION, BLDG. 1 TO BLDG. 11

FURNISH AND INSTALL NEW CAT. 6 CABLING FROM EXISTING SWITCH TO SALTO WIRELESS GATEWAY AND NODES TO ESTABLISH SALTO NETWORK. USE EXISTING J-HOOKS OR INSTALL NEW AS NEEDED. WIRELESS

GATEWAYS AND NODES AS SHOWN ON FLOOR PLANS.

EXISTING PATHWAY TO PULL NEW 96 STRAND FIBER UP THROUGH BLDG. 1.

EXISTING PATHWAY TO PULL NEW 36 STRAND FIBER UP THROUGH BLDG. 1.

EXISTING PATHWAY TO PULL NEW 12 STRAND FIBER UP THROUGH BLDG. 1 TO PARKING GARAGE. REFER

TO DETAIL 3 / ET500.

TERMINATE 12 STRAND AND PROVIDE OPEN RACK SIZED TO ACCOMODATE ALL NEW ITEMS INSTALLED IN

PROJECT.

FURNISH AND INSTALL NEW CAT6 CABLING FROM EXISTING SWITCH TO SALTO WIRELESS GATEWAY AND NODES TO ESTABLISH A SALTO NETWORK. PROVIDE 1-1/4" CONDUIT TO INSTALL CABLING. REFER TO

BUILDING FLOOR PLAN FOR DEVICE LOCATIONS.

RISER DIAGRAM KEYED NOTES:

1ST FLOOR

CEILING

2ND FLR

3RD FLR

4TH FLR

5TH FLR

BASEMENT

CEILING

HVAC

ROOM 11

ROOM

042A

ROOM

042B

ROOM

000C

12 12

4 4

1 ROOM

199B12

TYP. DOOR LOCATION

IT ROOM

CEILING

IT ROOM

1 CEILING

IT ROOM

CEILING

6TH FLR

IT ROOM

552A

CEILING

7TH FLR

IT ROOM

CEILING

8TH FLR

IT ROOM

CEILING

9TH FLR

ROOF

CEILING

TO RADIOLOGY

TO 9TH FLOOR

SEE FLOOR PLANS FOR SALTO

LOCATIONS.

TO 8TH FLOOR

SEE FLOOR PLANS FOR SALTO

LOCATIONS.

FROM BUILDING 11

TO PARKING

GARAGE

CEILING

SALTO WIRELESS LOCKSET

CAT6 CABLE

WN

WIRELESS NODE

(TYP)

CAT6 CABLE

WG

WIRELESS GATEWAY (TYP)

FLOOR

RADIOLOGY SUITE

CAT6 BACK TO

ELEC ROOM 198A

HVAC

ROOM 11

42B

42A

PARTIAL BASEMENT FLOOR PLAN - BUILDING 1 PARTIAL FLOOR PLAN - BUILDING 11 PARTIAL FLOOR PLAN - BUILDING 15

INTERCONNECTION DIAGRAM KEY NOTE

SEE RISER DIAGRAM

FOR CONTINUATION OF WORK.

EXISTING

CONDUITS FOR

TELECOM

COMPUTER ROOM

COMPUTER ROOM

EXISTING CABINETS WITH

ACTIVE SWITCHING AND SERVERS

INSTALL NEW SALTO SERVER

IN RACK 3. COORDINATE WITH

VA OIT

EXISTING CABINETS FOR

FIBER TERMINATIONS

TO BLDG'S

4, 5, 6, 7, &

MH

TO BLDG 1

TO BLDG 15

WORK RM.

STOR

TO BLDG 11 VIA MANHOLE

15-101

NEW OFFLINE

SALTO

HARDWARE

MH

TO BLDG 2

TO BLDG 3

SALTO WIRELESS LOCKSET

CAT6 CABLE

WN

WIRELESS NODE

(TYP)

CAT6 CABLE

WG

WIRELESS GATEWAY (TYP)

FLOOR

PARKING GARAGE

PATCH PANEL

LAYER II

DATA SWITCH

(EXISTING) 2

IT/ELEC ROOM

WALL MOUNTED

LOCKING ENCLOSURE

(TYP) OR EXISTING EQUIPMENT

EXISTING

120V/20A

EMER. CKT.

IF NEW PATCH PANEL IS

REQUIRED, EC SHALL RUN

2 #12, 1 #12G IN 3/4"C TO

NEAREST 120V EMERGENCY

SOURCE AND 20A BREAKER.

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/ 7/

:4

5:

A M

REPLACE KEYING SYSTEM FOR

OUTBUILDINGS

503-17-106

AEW TA

2907 Pleasant Valley Blvd, Altoona, PA 16602

ET500

SYSTEMS RISER DIGRAM AND

INTERCONNECTION DIAGRAM

02/08/2019 17044

100% DESIGN DOCUMENTS

NTS

BUILDING 1 - NEW FIBER RISER AND BUILDING INTERCONNECTION

NTS

RISER DIAGRAM FOR ESTABLISHING SALTO IN RADIOLOGY

NTS

SALTO NETWORK INTERCONNECTION DIAGRAM

CONTRACTOR TO UTILIZE EXISTING PATHWAYS AS INDICATED TO INSTALL

NEW 50 µ MULTIMODE LASER OPTIC FIBER - 12 STRAND TO ESTABLISH UPDATE

CONNECTIVITY TO BUILDINGS AS SHOWN. CONTRACTOR TO TERMINATE ALL

STRANDS ON NEW FIBER PATCH PANEL AT BOTH ENDS. CONTRACTOR TO UTILIZE

EXISTING RACKS AND CABINETS. REFER TO SPECIFICATIONS FOR TYPE OF FIBER AND

PATCH PANELS. COORDINATE WITH VA OIT AND SALTO REP TO LIGHT FIBER AND

ESTABLISH NEW SALTO NETWORK. TESTING TO BE PERFORMED PER

SPECIFICATIONS.

LABEL ALL FIBER AND PATHWAYS FOR IDENTIFICATION TO VA.

BACKBONE CABLING:

VERIFY USABILITY WITH VA OIT PRIOR TO WORK.

CONTRACTOR TO FURNISH AND INSTALL NEW FIBER TO

ESTABLISH SALTO NETWORK. COORDINATE WITH SITE

PLAN FOR TOTAL CONNECTIVITY. CONTRACTOR TO USE

EXISTING PATHWAYS, INCLUDING CONDUITS, FOR NEW

FIBER. PROVIDE NEW PULLBOX, OR OTHER MATERIALS

TO COMPLETE THE FIBER INSTALL.

EXISTING

TELECOM

PULLBOX

EXISTING UNDERGROUND

PATHWAYS FROM

BUILDING 11 VIA MANHOLE

SALTO TOPOLOGY

NTS - FOR REFERENCE ONLY

NTS

RISER DIAGRAM FOR ESTABLISHING SALTO IN PARKING GARAGE

131C

131D

131F

131E

131J

131A

131I

131H

128A 128B

WN

WG

LAUNDRY

141D

PATIENT CLOTHING

CORRIDOR

141G

LAUNDRY

141A

STOR

141E

OXYGEN

STORAGE

141N

SMOKING

ROOM

141M

AUTOPSY

140A

MORGUE

LITTER AREA

140B

FREEZER

STAIRS

S100

OFFICE

TLT

134A

TLT

140C

TLT

XRAY

CAT

SCAN

SOILED

UTIL

MALE

DRESSING

ROOM

128A

FEMALE

DRESSING

ROOM

128B

XRAY

CORRIDOR

CORRIDOR

TLT

CLOS

130B

CLOS

130A

STORAGE

131KCOMPUTER

CONTROL

ROOM

131C

VEST

131B

OFFICE

131D

131E

MRI ROOM

131F

131J 131I

131H

131G

ULTRASOUND

129B

RADIOLOGY

129A

INPATIENT

WAITING

129 XRAY

ROOM

TLT

126A

WOMEN

MEN

OFFICE

121 OFFICE

OFFICE

OP. MANAGER

OFFICE

120A

TEL. CL.

199A

ELEC. RM.

198A

U EXISTING

W

NEXISTING

W N

WN

WN

U

EXISTING

EXISTING

EXISTING

3 4 5 6

7 8 9 10

WN

EXISTING

EXISTING

WN

EXISTING

SALTO

SWITCH

WN

FIBER TO

PARKING

GARAGE

CAT6 TO

ELEC ROOM

198A

APPROX. LOCATION OF AREA TO RECEIVE SALTO PADLOCK DEVICES. PROVIDE (4) SALTO

OUTDOOR RATED PADLOCKS.

APPROX. LOCATION OF CONTAINMENT AREAS TO RECEIVE SALTO PADLOCK DEVICES. PROVIDE (4)

SALTO OUTDOOR RATED PADLOCKS.

FURNISH AND INSTALL NEW CAT. 6 CABLING FROM EXISTING SWITCH TO SALTO WIRELESS

GATEWAY AND NODES TO ESTABLISH SALTO NETWORK. USE EXISTING J-HOOKS OR INSTALL NEW

AS NEEDED. WIRELESS GATEWAYS AND NODES AS SHOWN ON FLOOR PLANS.

THE PLAN IS DIAGRAMMATIC ONLY AND HAVE BEEN PROVIDED TO DEPICT THE

GENERAL ARRANGEMENT AND INSTALLATION REQUIREMENTS OF EXISTING EQUIPMENT

CABINETS. THE CONTRACTOR SHALL PROVIDE EQUIPMENT IN ACCORDANCE WITH THE

REQUIREMENTS OF THE CONTRACT DOCUMENTS AND SHALL BE CONFIGURED TO SUPPORT ALL

EQUIPMENT, COMPONENTS AND CABLING NECESSARY TO MEET THE PERFORMANCE

REQUIREMENTS OF ALL SYSTEMS SPECIFIED. THE CONTRACTOR SHALL PROVIDE ALL ELECTRICAL

POWER, SYSTEM COMPONENTS, AND ALL APPURTENANCES AS REQUIRED TO PROVIDE FULLY

OPERATING SYSTEMS IN ACCORDANCE WITH ALL PROJECT REQUIREMENTS.

COORDINATE ALL EQUIPMENT CONFIGURATIONS PRIOR TO THE SUBMITTAL OF SHOP DRAWINGS

AND THE INSTALLATION OF ALL SYSTEMS AND SYSTEM COMPONENTS. ALL SHOP DRAWINGS

SHALL DETAIL SPACE CONDITIONS IN ORDER TO ACCOMMODATE EXISTING CONDITIONS, ALL

EQUIPMENT LOCATIONS ARE SUBJECT TO FINAL REVIEW BY THE DESIGN PROFESSIONAL.

PROVIDE IDENTIFICATION OF ALL EQUIPMENT CABINETS / RACKS, CONTROL PANELS,

SUB-CONTROL PANELS, REMOTE RELAY CABINETS AND SECURITY EQUIPMENT PANELS, SYSTEM

INTERFACE CABINETS, AND SIMILAR EQUIPMENT WITH 1-1/2 INCH WHITE LETTERING. ENGRAVED

LAMINATED PLASTIC SIGNS SHALL BE USED FOR IDENTIFICATION AND SECURELY FASTENED IN

ACCORDANCE WITH THE PROJECT REQUIREMENTS.

WORK SHALL BE NEAT IN APPEARANCE, FREE OF ROUGH EDGES, SCRATCHES, BLEMISHES,

CRACKS AND EXPOSED GAPS. ALL EQUIPMENT SHALL BE SECURED TO THE MOUNTING SURFACE,

AND FASTENED WITH HARDWARE APPROVED BY THE MANUFACTURER AND CAPABLE OF

SUPPORTING THE RATED LOAD. ALL CABLES WITHIN ENCLOSURES SHALL BE NEATLY ROUTED AND

TIE WRAPPED AT 6 INCHES ON CENTER, ALL WIRE SPLICES SHALL BE TERMINATED ON TERMINAL

STRIPS, SPLICES UTILIZING WIRE NUTS SHALL NOT BE ACCEPTABLE.

ALL WIRING SHALL TERMINATE ON FIXED TERMINAL STRIPS, PUNCH BLOCKS OR PATCH PANELS

IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. NO SPLICES SHALL BE PERMITTED IN

UNDERGROUND PULL BOXES AND NON-ACCESSIBLE JUNCTION BOXES. ALL JUNCTION BOXES

CONTAINING ANY SYSTEM SPLICES SHALL BE UNIQUELY IDENTIFIED.

ALL PENETRATIONS OF WALLS AND FLOORS SHALL BE FIRE STOPPED IN ACCORDANCE WITH

THE ASTM AND NFPA. REFER TO RELATED SPECIFICATION SECTIONS FOR ADDITIONAL

INFORMATION. INSTALLATION OF FIRE-STOPS SHALL BE PERFORMED BY AN

APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE MANUFACTURER. INSTALLATION SHALL

BE PERFORMED IN STRICT ACCORDANCE WITH MANUFACTURER'S DETAILED INSTALLATION

PROCEDURES.

ALL CONDUITS / RACEWAYS SHALL BE INSTALLED IN A MANNER THAT PREVENTS TAMPERING

OR REMOVAL WHEN INSTALLED IN AREAS EXPOSED TO THE GENERAL POPULATION. PROVIDE

TAMPER-RESISTANT INSTALLATION UTILIZING "TORX WITH PEG" SECURITY-FASTENING DEVICES

FOR ALL CONDUITS/RACEWAYS, EQUIPMENT, DEVICES AND APPURTENANCES IN ALL AREAS

ACCESSIBLE TO THE GENERAL POPULATION AND/OR AREAS SUBJECTED TO TAMPERING OR

VANDALISM.

FOR CONTRACTOR AND STAFF SAFETY, PRIOR TO ANY WORK IN THIS AREA , IT SHALL BE

COORDINATED WITH COR.

KEYED NOTES:

S802

WG

800A

MECHANICAL ROOM

STAIRS

S802

800B

WN

WN

WP

WP

WP

SCREENED ROOF

PASSAGE

STAIRS

S902

ELEV. ROOM

SCREENED ROOF

WN

S902A

WP

WP

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/ 7/

:2

6:

P M

REPLACE KEYING SYSTEM FOR

OUTBUILDINGS

503-17-106

AEW REC

2907 Pleasant Valley Blvd, Altoona, PA 16602

01-ET101

BUILDING 1 - PARTIAL FIRST FLOOR, EIGHTH

FLOOR, AND NINTH FLOOR PLANS

02/08/2019

17044

100% DESIGN DOCUMENTS

NORTH

TRUE NORTH

PROJECT

1/8" = 1'-0"

BUILDING 01-1ST FLOOR

1/8" = 1'-0"

BUILDING 01 - 8TH FLOOR PLAN

1/8" = 1'-0"

BUILDING 01 - 9TH FLOOR PLAN

REFER TO SPECIFICATIONS

SECTION 08 71 00 FOR DOOR AND

HARDWARE SET SCHEDULES.

7th

S

TR

E ET

P

A

RKING

P

A RKING

P A RKING

P A RKING

15 1 1

1 0

26 ' 2 -2

3 03' 2-2 3 30' 2-2

70'

F8

F2

3 92 ' 2 -1 3 21 ' 2 -1

6-54-3

P A RKING

T-2

2-2

F4

F5

F5

F1

90'6-2

F1

D UPLE X DA TA O U TLET

P RINTER O UTLET

S ING LE VO I CE O UTLET

C O NCENTRATO R

PO W ER PO LE

HUB

P

S ERVER

W O RK STATIO N

C O RE SLEEVE DO W N

C O RE SL EEVE UP

W ALL CO RE

S YM B O L LEG END

4 8 STRA ND FIB ER (FL O O DED)

2 4 STRA ND FIB ER (FL O O DED)

1 2 STR AND F IBER (FLO O DED)

D ISTRIB UTIO N FRAM E

E Q UIPM E NT RACK

CO M M . CABINET

PBX

CPU

L I NE T YP ES

S6.DW G

F AIR W AY DR IVE

T3

1 08'

1 08 ' 2-1 F4 F5

F 10 F9

' 4 -3 x x x x

( 61 4) -8 95- 13 13C O LUM BUS O HIO 43229

1 900 E AST DU BLIN-G RANVIL LE RD

NaCom

8 /3/94

NO D ATE

DW K

BY

R EVIS IO NS

A LTO O NA, PENN SYLV ANIA

S ITE PLAN S CA LE:

D ATE:

A PP'D FO R CO NST.

C HK 'D

D RAW N BY: DCV

8 /3/94

NO NE

1 -E1 THRU 1-E6

V ETER ANS A DM IN ISTRA TIO N

M EDIC AL CE NTER

( 513 )-4 29-2 091B eave rcre ek, O hio , 4 5431 2 29 0 L ake vie w D rive, Su ite E

X-Y X = TO TAL C O NDUIT AVAI LABLE

Y = CO NDUIT USED

x x

X

XX X X X

A s -B u ilt

110111112113114115

133 135 137 139

138136 140 142 144

143141 148

BASEMENT ENTRANCE

EXISTING RACK

LOCATION BELOW

WN

WG

WN

OFFICE

A121

OFFICE

A120

OFFICE

A119 OFFICE

A118

CORRIDOR

A126

OFFICE

A122

OFFICE

A123 OFFICE

A124

A125

CLOSET

A124A

OFFICE

A115

OFFICE

A114

OFFICE

A113

OFFICE

A112

OFFICE

A111

OFFICE

A110

CORRIDOR

A116

FIRE/SPRINKER/

JAN CLOSET

A109

VEST

A108

CONFERENCE

A107

OFFICE

A106

CORRIDOR

A105

VESTIBULE

A150

MEN'S

TOILET

A104

WOMEN'S

TOILET

A103

KITCHEN

A102

OFFICE

A101

OFFICE

A100

OFFICE

A134

OFFICE

A136

OFFICE

A138

OFFICE

A140

OFFICE

A142

OFFICE

A144

OFFICE

A146

OFFICE

A148

CLOSET

A147OFFICE

A145OFFICE

A143

OFFICE

A141

OFFICE

A139

OFFICE

A137

OFFICE

A135

OFFICE

A133

EXISTING

SALTO

PAD LOCK

1 2 3 4

5 6 7 8

U

WN

ES

WN

WN

WN

WNWG

EXISTING PANEL

RP

TO PANEL

RP

ES

TO PANEL

RP

B01

LOCATION OF EXISTING RACK AT BASEMENT

LEVEL. CONTAINS SHELF MOUNT 802.3 HUB

MOUNT 12 PORT FIBER CONNECTOR PANEL IN

EXISTING RACK IF POSSIBLE, OTHERWISE IT SHALL

BE WALL MOUNTED. EC SHALL PROVIDE WALL

MOUNTED BRACKETS AND HARDWARE AS REQUIRED.

ACCESS AREA

B00

CRAWL SPACE

B01

1 2 3 4

5 6 7 8

WN

WP

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/ 7/

:4

4:

A M

REPLACE KEYING SYSTEM FOR

OUTBUILDINGS

503-17-106

AEW TA

2907 Pleasant Valley Blvd, Altoona, PA 16602

02-ET101

BUILDING 2 - FLOOR PLANS

02/08/2019 17044

100% DESIGN DOCUMENTS

NORTH

TRUE NORTH

PROJECT

1/8" = 1'-0"

BUILDING 2 - FIRST FLOOR PLAN

1/8" = 1'-0"

BUILDING 2 - BASEMENT FLOOR PLAN

FURNISH AND INSTALL NEW CAT. 6 CABLING FROM EXISTING SWITCH TO SALTO

WIRELESS GATEWAY AND NODES TO ESTABLISH SALTO NETWORK. USE EXISTING J-

HOOKS OR INSTALL NEW AS NEEDED. WIRELESS GATEWAYS AND NODES AS SHOWN

ON FLOOR PLANS.

THE PLAN IS DIAGRAMMATIC ONLY AND HAVE BEEN PROVIDED TO DEPICT THE

GENERAL ARRANGEMENT AND INSTALLATION REQUIREMENTS OF EXISTING

EQUIPMENT CABINETS. THE CONTRACTOR SHALL PROVIDE EQUIPMENT IN

ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND SHALL

BE CONFIGURED TO SUPPORT ALL EQUIPMENT, COMPONENTS AND CABLING

NECESSARY TO MEET THE PERFORMANCE REQUIREMENTS OF ALL SYSTEMS

SPECIFIED. THE CONTRACTOR SHALL PROVIDE ALL ELECTRICAL POWER, SYSTEM

COMPONENTS, AND ALL APPURTENANCES AS REQUIRED TO PROVIDE FULLY

OPERATING SYSTEMS IN ACCORDANCE WITH ALL PROJECT REQUIREMENTS.

COORDINATE ALL EQUIPMENT CONFIGURATIONS PRIOR TO THE SUBMITTAL OF SHOP

DRAWINGS AND THE INSTALLATION OF ALL SYSTEMS AND SYSTEM COMPONENTS. ALL

SHOP DRAWINGS SHALL DETAIL SPACE CONDITIONS IN ORDER TO ACCOMMODATE

EXISTING CONDITIONS, ALL EQUIPMENT LOCATIONS ARE SUBJECT TO FINAL REVIEW

BY THE DESIGN PROFESSIONAL.

PROVIDE IDENTIFICATION OF ALL EQUIPMENT CABINETS / RACKS, CONTROL PANELS,

SUB-CONTROL PANELS, REMOTE RELAY CABINETS AND SECURITY EQUIPMENT

PANELS, SYSTEM INTERFACE CABINETS, AND SIMILAR EQUIPMENT WITH 1-1/2 INCH

WHITE LETTERING. ENGRAVED LAMINATED PLASTIC SIGNS SHALL BE USED FOR

IDENTIFICATION AND SECURELY FASTENED IN ACCORDANCE WITH THE PROJECT

REQUIREMENTS.

WORK SHALL BE NEAT IN APPEARANCE, FREE OF ROUGH EDGES, SCRATCHES,

BLEMISHES, CRACKS AND EXPOSED GAPS. ALL EQUIPMENT SHALL BE SECURED TO

THE MOUNTING SURFACE, AND FASTENED WITH HARDWARE APPROVED BY THE

MANUFACTURER AND CAPABLE OF SUPPORTING THE RATED LOAD. ALL CABLES

WITHIN ENCLOSURES SHALL BE NEATLY ROUTED AND TIE WRAPPED AT 6 INCHES ON

CENTER, ALL WIRE SPLICES SHALL BE TERMINATED ON TERMINAL

STRIPS, SPLICES UTILIZING WIRE NUTS SHALL NOT BE ACCEPTABLE.

ALL WIRING SHALL TERMINATE ON FIXED TERMINAL STRIPS, PUNCH BLOCKS OR

PATCH PANELS IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. NO SPLICES

SHALL BE PERMITTED IN UNDERGROUND PULL BOXES AND NON-ACCESSIBLE

JUNCTION BOXES. ALL JUNCTION BOXES CONTAINING ANY SYSTEM SPLICES SHALL

BE UNIQUELY IDENTIFIED.

ALL PENETRATIONS OF WALLS AND FLOORS SHALL BE FIRE STOPPED IN

ACCORDANCE WITH THE ASTM AND NFPA. REFER TO RELATED SPECIFICATION

SECTIONS FOR ADDITIONAL INFORMATION. INSTALLATION OF FIRE-STOPS SHALL BE

PERFORMED BY AN APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE

MANUFACTURER. INSTALLATION SHALL BE PERFORMED IN STRICT ACCORDANCE

WITH MANUFACTURER'S DETAILED INSTALLATION PROCEDURES.

ALL CONDUITS / RACEWAYS SHALL BE INSTALLED IN A MANNER THAT PREVENTS

TAMPERING OR REMOVAL WHEN INSTALLED IN AREAS EXPOSED TO THE GENERAL

POPULATION. PROVIDE TAMPER-RESISTANT INSTALLATION UTILIZING "TORX WITH

PEG" SECURITY-FASTENING DEVICES FOR ALL CONDUITS/RACEWAYS, EQUIPMENT,

DEVICES AND APPURTENANCES IN ALL AREAS ACCESSIBLE TO THE GENERAL

POPULATION AND/OR AREAS SUBJECTED TO TAMPERING OR VANDALISM.

BUILDING TO RECEIVE NEW 12 STRAND, 50µ

MULTIMODE LASER OPTIMIZED FIBER TERMINATED ON NEW FIBER PATCH PANEL.

PROVIDE NEW FIBER PATCH CABLE TO EXISTNG / NEW SWITCH TO ESTABLISH

CONNECTIVETY TO NEW NETWORK.

BUILDING SHALL INCLUDE (1) ONE KEY CARD NETWORK ENCODER. THE ENCODER

SHALL BE NETWORKED SO LOCATION CAN BE ANYWHERE THERE'S A DATA OUTLET.

COORDINATE LOCATION WITH COR.

UTILIZE EXISTING 20A, 1P CIRCUIT BREAKER IN PANEL RP AND EXTEND 2#12, 1#12G IN

3/4" C AND CONNECT TO ELECTRIC STRIKE INDICATED ON PLAN.

KEYNOTES

FOR CONTINUATION

SEE DRAWING ET100

REFER TO SPECIFICATIONS

SECTION 08 71 00 FOR DOOR AND

102A

109A 111A

111B

APPROX. LOCATION OF CONTAINMENT AREAS TO

RECEIVE SALTO PADLOCK DEVICES. CONFIRM

QUANTITIES AND LOCATIONS WITH OWNER.

100A

WN

GENERATOR BLDG

ELEC. DISTR. ROOM

OFFICE

WORK

104A

WORK AREA

BATH

WORK AREA

HAC

109A

WORKSHOP

WN

TRACTOR BAYS

MECH

111A

WASH BAY

SERVICE BAY

110A

OFFICE

OFFICE

CORR

LOCKER/SHOWER

WN

TLT

GARAGE BAYS

AMBULANCE GARAGE

OPEN AREA

STORAGE

102A

GATE

WP

WP

U

U

ES

E S

WN

WN

WG

EXISTING PANEL

PPC

TO

PANEL

PPC

TO

PANEL

PPC

110B

WP

102B

101A

WP

WIRELESS GATEWAY (TYP)

EXISTING IT RACK LOCATION

WG FIRE PUMP ROOM

STORAGE

SOLVENT

STORAGE

MECHANICAL SPACE

SUMP PIT

WATER

SUPPLY

TANK

WATER RESERVOIR

FOR CONTINUATION

SEE DRAWING ET100 ~

CONSULTANTS:

Drawing Title

Approved: Project Director

Project Title:

Location:

Date: Checked: Drawn:

Drawing Number

Building Number

Project Number

Office of Construction and Facilities Management

VA FORM 08-6231

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

A

B

C

D

E

F

6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t

209 SANDUSKY STREET

PITTSBURGH, PA 15212

PH: 412.287.7333

www.ae-works.com

AE WORKS PROJECT NUMBER:

ARCHITECTS/ENGINEERS:SEAL

Revision# Date

8/ 6/

:5

3:

P M

REPLACE KEYING SYSTEM FOR

OUTBUILDINGS

503-17-106

AEW RC

2907 Pleasant Valley Blvd, Altoona, PA 16602

03-ET101

BUILDING 3 - FLOOR PLANS

02/08/2019

17044

100% DESIGN DOCUMENTS1/8" = 1'-0"

BUILDING 3 - FIRST FLOOR

1/8" = 1'-0"

BUILDING 3 - BASEMENT PLAN

NORTH

TRUE NORTH

PROJECT

FURNISH AND INSTALL NEW CAT. 6 CABLING FROM EXISTING SWITCH TO SALTO

WIRELESS GATEWAY AND NODES TO ESTABLISH SALTO NETWORK. USE EXISTING J-

HOOKS OR INSTALL NEW AS NEEDED. WIRELESS GATEWAYS AND NODES AS SHOWN

ON FLOOR PLANS.

THE PLAN IS DIAGRAMMATIC ONLY AND HAVE BEEN PROVIDED TO DEPICT THE

GENERAL ARRANGEMENT AND INSTALLATION REQUIREMENTS OF EXISTING

EQUIPMENT CABINETS. THE CONTRACTOR SHALL PROVIDE EQUIPMENT IN

ACCORDANCE WITH THE REQUIREMENTS OF THE CONTRACT DOCUMENTS AND SHALL

BE CONFIGURED TO SUPPORT ALL EQUIPMENT, COMPONENTS AND CABLING

NECESSARY TO MEET THE PERFORMANCE REQUIREMENTS OF ALL SYSTEMS

SPECIFIED. THE CONTRACTOR SHALL PROVIDE ALL ELECTRICAL POWER, SYSTEM

COMPONENTS, AND ALL APPURTENANCES AS REQUIRED TO PROVIDE FULLY

OPERATING SYSTEMS IN ACCORDANCE WITH ALL PROJECT REQUIREMENTS.

COORDINATE ALL EQUIPMENT CONFIGURATIONS PRIOR TO THE SUBMITTAL OF SHOP

DRAWINGS AND THE INSTALLATION OF ALL SYSTEMS AND SYSTEM COMPONENTS. ALL

SHOP DRAWINGS SHALL DETAIL SPACE CONDITIONS IN ORDER TO ACCOMMODATE

EXISTING CONDITIONS, ALL EQUIPMENT LOCATIONS ARE SUBJECT TO FINAL REVIEW

BY THE DESIGN PROFESSIONAL.

PROVIDE IDENTIFICATION OF ALL EQUIPMENT CABINETS / RACKS, CONTROL PANELS,

SUB-CONTROL PANELS, REMOTE RELAY CABINETS AND SECURITY EQUIPMENT

PANELS, SYSTEM INTERFACE CABINETS, AND SIMILAR EQUIPMENT WITH 1-1/2 INCH

WHITE LETTERING. ENGRAVED LAMINATED PLASTIC SIGNS SHALL BE USED FOR

IDENTIFICATION AND SECURELY FASTENED IN ACCORDANCE WITH THE PROJECT

REQUIREMENTS.

WORK SHALL BE NEAT IN APPEARANCE, FREE OF ROUGH EDGES, SCRATCHES,

BLEMISHES, CRACKS AND EXPOSED GAPS. ALL EQUIPMENT SHALL BE SECURED TO

THE MOUNTING SURFACE, AND FASTENED WITH HARDWARE APPROVED BY THE

MANUFACTURER AND CAPABLE OF SUPPORTING THE RATED LOAD. ALL CABLES

WITHIN ENCLOSURES SHALL BE NEATLY ROUTED AND TIE WRAPPED AT 6 INCHES ON

CENTER, ALL WIRE SPLICES SHALL BE TERMINATED ON TERMINAL

STRIPS, SPLICES UTILIZING WIRE NUTS SHALL NOT BE ACCEPTABLE.

ALL WIRING SHALL TERMINATE ON FIXED TERMINAL STRIPS, PUNCH BLOCKS OR

PATCH PANELS IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS. NO SPLICES

SHALL BE PERMITTED IN UNDERGROUND PULL BOXES AND NON-ACCESSIBLE

JUNCTION BOXES. ALL JUNCTION BOXES CONTAINING ANY SYSTEM SPLICES SHALL

BE UNIQUELY IDENTIFIED.

ALL PENETRATIONS OF WALLS AND FLOORS SHALL BE FIRE STOPPED IN

ACCORDANCE WITH THE ASTM AND NFPA. REFER TO RELATED SPECIFICATION

SECTIONS FOR ADDITIONAL INFORMATION. INSTALLATION OF FIRE-STOPS SHALL BE

PERFORMED BY AN APPLICATOR/INSTALLER QUALIFIED AND TRAINED BY THE

MANUFACTURER. INSTALLATION SHALL BE PERFORMED IN STRICT ACCORDANCE

WITH MANUFACTURER'S DETAILED INSTALLATION PROCEDURES.

ALL CONDUITS / RACEWAYS SHALL BE INSTALLED IN A MANNER THAT PREVENTS

TAMPERING OR REMOVAL WHEN INSTALLED IN AREAS EXPOSED TO THE GENERAL

POPULATION. PROVIDE TAMPER-RESISTANT INSTALLATION UTILIZING "TORX WITH

PEG" SECURITY-FASTENING DEVICES FOR ALL CONDUITS/RACEWAYS, EQUIPMENT,

DEVICES AND APPURTENANCES IN ALL AREAS ACCESSIBLE TO THE GENERAL

POPULATION AND/OR AREAS SUBJECTED TO TAMPERING OR VANDALISM.

BUILDING TO RECEIVE NEW 12 STRAND, 50µ

MULTIMODE LASER OPTIMIZED FIBER TERMINATED ON NEW FIBER PATCH PANEL.

PROVIDE NEW FIBER PATCH CABLE TO EXISTNG / NEW SWITCH TO ESTABLISH

CONNECTIVETY TO NEW NETWORK.

UTILIZE EXISTING 20A, 1P CIRCUIT BREAKER IN PANEL PPC AND EXTEND 2#12, 1#12G

IN 3/4" C AND CONNECT TO ELECTRIC STRIKE(S) INDICATED ON PLAN.

KEYNOTES

1 2 3 4

5 6 7 8

REFER TO SPECIFICATIONS

SECTION 08 71 00 FOR DOOR AND

UP

UP

B03

WIRELESS

NODE

B00

B01 B02

EXISTING IT

RACK LOCATION

WN

SERVICE ROOM

B00

CRAWL SPACE

BOILER ROOM

B02

STORAGE

B03

CORRIDOR

B01

STAIRS

SB00

1 2 3 4

5 6 7 8

~FOR CONTINUATION,

SEE DRAWING ET100

9WP

108B

S100102

104A

WG

PORCH

LIVING ROOM

DINING ROOM

HALL

KITCHEN

DEN

GARAGE

ELEC RM

VEST

TOILET

STAIRS

S100

VEST

WP

WP

WP

WN

U

ES

EXISTING

PANEL LP4B

204 205

WN

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.