36C24419B0012-0003000.docx
DOCX document 20 KB Posted
- Attached to
- Replace Legacy UPS/Power System Federal contract opportunity
- Solicitation number
- 36C24419B0012
About this file
36C24419B0012 0003 36C24419B0012 0003.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419B0012-0004000.docx | DOCX document | |
| 36C24419B0012-0003001.pdf | ||
| 36C24419B0012-0002001.pdf | ||
| 36C24419B0012-0002002.pdf | ||
| 36C24419B0012-0002000.docx | DOCX document | |
| 36C24419B0012-0001000.docx | DOCX document | |
| 36C24419B0012-014.pdf | ||
| 36C24419B0012-006.pdf | ||
| 36C24419B0012-004.pdf | ||
| 36C24419B0012-010.pdf | ||
| 36C24419B0012-011.pdf | ||
| 36C24419B0012-012.pdf | ||
| 36C24419B0012-002.pdf | ||
| 36C24419B0012-013.pdf | ||
| 36C24419B0012-008.docx | DOCX document | |
| 36C24419B0012-001.docx | DOCX document | |
| 36C24419B0012-007.pdf | ||
| 36C24419B0012-003.pdf | ||
| 36C24419B0012-009.pdf | ||
| 36C24419B0012-005.pdf | ||
| 36C24419B0012-000.docx | DOCX document |
Show all 21
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-24-2019 562-17-314 00244 Department of Veterans Affairs Network Contracting Office 4
00244 Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders
36C24419B0012 06-05-2019
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:
X Amendment A00003 is issued to extend the bid due date to 7/30/2019.
At this time all questions that were recieved during the pre-bid conference held on 6/17/2019 have been answered.
The bid opening will take place in the Bldg 6 conference room. Bldg 6 is next to bldg 9 (trailer).
The Wage rate applicable to this solicitation is General Decision Number-PA20190088
Bid due date is now 7/30/2019 at 1:00 pm local time (EST). Bid opening will take place in the bldg 6 conference room.
Paul J. Bosak Contracting Officer Questions received for Replace Legacy UPS/Power System - 36C24419B0012
1. *NEW* What is the ICRA level in WB-35, were existing panel, C-2, WB-36A-4, WB-36A-3, WB-40D, B-20, B-02, B-19 and the hallways. This pertains to work being done in the basement. Although the basement is not a patient care area, patients do need to go down there for the Canteen and other services so dust must be managed so it does not affect them. WB-35 is a mechanical room so as long as work is confined to that area and measures will need to be established so that dust does not escape the space and is disposed of properly. Work in the hallway will need to ensure dust is managed so sections worked on will need plastic to isolate work areas off or work to be done in a cube. We anticipate some short shutdowns of affected hallways may need to be done.
2. Can you confirm the Pre-action / Dry pipe system has been pulled from the scope?
Answer: The Dry Pipe system has been pulled from the solicitation. Revised wet system drawing is attached to the amendment.
3. *NEW* Can you confirm if the Voltage regulator in the Penthouse has been pulled from the scope or will it be relocated to alternate location based on no space available drawn in the plans? The voltage regulator in the penthouse has not been pulled from the solicitation and there has been no alternate location change. In other words, nothing has changed in regards to the voltage regulator. It has not been pulled and the location has not changed.
4. While walking the site, it was determined the existing UPS load is less than 18kW. The size of the UPS will have direct implications on many aspects of pricing (Voltage regulator, wire, number of batteries to meet the 1 or 2 hour specification. Can you confirm the size UPS required? Increased capacity to facilitate future infrastructure expansion is desired, but more so an increase in battery support time is the goal of this project.
5. In the drawing, the main feeder from the ATS is called out as 300A. This size feeder will not support a 100kW UPS at full load. Is the intent to de-rate the UPS to this feeder size? No, the intent is not to derate the UPS. The specified 350kcm conductor (with THHN-THWN insulation per specs) are rated for 350A (280A derated for 4 conductors). The 100kVA UPS will have a 278A output and the 80kVA UPS will have a 222.3A output. In either case, the 350kcm conductors are sufficient.
6. Can we use the existing winch in the Penthouse for this installation of the penthouse voltage regulator if this stays in the scope? If load rating is not exceeded and M&R approves the use of their equipment.
7. Will the bid due date be extended as items 1 through 4 completely change the scope and materials needed.
Answer: This depends on how extensive the answers to these questions are.
8. What kind of arrangement will need to be made to get into the I T room to do work. OI&T requires advanced notification and a full-time escort. Access to IT room will need to be arranged similar to an outage.
9. What kind of time frame should we figure for shut down work and time the system can be shut down. Historically, after 12:00 am and completed NLT 5:00 am
10. Is the existing computer room floor rated for new UPS System. New flooring with the proper rating to accommodate the load of the UPS is called for in the drawings – new work keynote #8 on E100.
11. Do you need a house keeping pad for the new voltage regulator. EE200 unit – Yes. Elevator Penthouse - No.
12. Can the voltage regulator be relocated to the East end of E-200. Yes, regulator can be relocated to the east end of E-200.
13. Are we still to install Dry alarm valve wall mounted compressor and extend 2” branch line to existing zone control valve. No, the dry system has been removed from the scope of this project.
14. Are we responsible for removing old 65 UPS unit and housekeeping pad. UPS – yes. Housekeeping pad – no.
15. Where system is being removed do we need to demo conduits and wires or are we to leave conduit and just demo wire out of conduits. Remove conduit and wire to a neat and workmanlike appearance (to the nearest fitting/JB, don’t leave hanging down). Patch wall/floor opening to match finishes and fire rating of the surrounding area.
16. Are we to remove white board in I T room. VA staff can remove the white board.
17. Do we need to relocate thermostats and controls in I T room were new UPS is going to be installed. Yes, thermostats and controls in the IT room where the new UPS is going to be installed will need to be relocated because the UPS will completely block and cover it. They need to be relocated to the other side of the door, close to where the new panel-MDP UPS is being located, at the same height it is currently installed at.
18. Do you need any network connections to monitor status of the UPS system. Yes, connection to the building automation systems via cat6 cable and existing network is needed.
19. Do we need any Cat 6 cable to UPS for alarms. Refer to new work keynote #5 on E100.
See attached document: General Decision Number-PA20190088-Updated.