36C24419B0010-0002000.docx
DOCX document 20 KB Posted
- Attached to
- 460-15-102 Renovate CLC Tranquility Garden Federal contract opportunity
- Solicitation number
- 36C24419B0010
About this file
36C24419B0010 0002 36C24419B0010 0002.docx
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0083-000.docx | DOCX document | |
| Sign_in_roster.pdf | ||
| 36C24419B0010_0001.docx | DOCX document | |
| Tranquility_Garden_SITE_VISIT_AGENDA.NOTES.COMMENTS.pdf | ||
| S02_-__460-15-102_Tranquility_Garden_100_Dwgs_part_2.pdf | ||
| S02_-__460-15-102_Tranquility_Garden_100_Specs.pdf | ||
| S02_-__460-15-102_Tranquility_Garden_100_Dwgs_part_1.pdf | ||
| 36C24419B0010_1.docx | DOCX document | |
| 36C24419B0010_2.docx | DOCX document | |
| 36C24419B0010.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 460-15-102 00244 Department of Veterans Affairs Network Contracting Office 4
00244 Department of Veterans Affairs Network Contracting Office 4
To all Offerors/Bidders
36C24419B0010 01-30-2019
X X X
X The purpose of this amendment is to provide answers to submitted Requests For Information (RFIs). See attached.
This amendment also changes the bid date FROM: January 31, 2019 TO: February 11, 2019. The time remaons the same.
MICHAEL F. WHITE
Contract Officer michael.white9@va.gov Renovate CLC Tranquility Garden VA Medical Center, Wilmington DE Pre-Bid RFIs
Irrigation questions:
VA Response: Please eliminate anything related to spray irrigation systems. Drip line irrigation systems are to remain as part of this project.
-Will we be provided with an underground utility as built plan?
VA Response: Unable to provide underground utility as-built plans.
-What brand and color of paint is to be used on garden shed AE Response: Per Keyed Note #10 on Sheet C200, repaint garden shed to match existing colors. Paint brand to be Sherwin Williams, or VA approved manufacturer.
-Can the loropetalum be substituted with a small variety of purple Ninebark?
AE Response: Loropetalum Purple Pixie is suitable for Hardiness Zones 7-10. Wilmington is located in Zone 7a. Substitution with hardier purple Ninebark variety will be considered pending more information re proposed variety. Any proposed substitution must be approved by AE and VA.
-Can the Indian Hawthorne be substituted with Cephalotaxus or Boxwood due to their lack of cold hardiness?
AE Response: Indian Hawthorne (Rhaphiolepsis species) is suitable for Hardiness Zones 7-11. Wilmington is located in Zone 7a. Any proposed substitution must be approved by AE and VA, pending more information re species, etc.
-Can the Crape Myrtle be substituted with Witch Hazel or Hydrangea or Lilac on standard due to their lack of cold hardiness?
AE Response: Crape Myrtle (Lagerstroemia x Tonto) is suitable for Hardiness Zones 6-9. Wilmington is located in Zone 7a. Any proposed substitution must be approved by AE and VA, pending more information re species, etc.
-Can the Pieris be substituted?
AE Response: Pieris Japonica Mountain Fire is suitable for Hardiness Zones 5-8. Wilmington is located in Zone 7a. Any proposed substitution must be approved by AE and VA, pending more information re species, etc.
-Has a specific grill been picked out for the grill surround?
–VA Response: Grill specifications to be supplied at a later date.
-Do the raised garden planters receive irrigation via automatic system or hand? Do you want toElectri add if not automatic?
AE Response: Raised garden planters are not served by automatic system and are to be hand-watered.
- We didn’t see any coverage on the plans -will a percentage be held for retain-age once job is complete?
VA Response: 10% retainage will be held until all close out documents have been received by the VA.
-There is a missing plant specification in lower wedge area? Need confirmation. Is it supposed to be Oakleaf Hydrangea?
AE Response: The (3) plants with a missing label in the lower wedge area are to be “HM” Munchkin Oakleaf Hydrangea.
-Irrigation electrical source? Has it been defined? Existing/new? Does this need to be included?
VA Response: Electrical source is located on the East Wing of the Community Living Center -Room E16 – Panel B-1. Contractor is responsible for verifying location of all site utilities and making necessary adjustments to the irrigation system to accommodate the infrastructure as noted on the drawings.
-Need details on central garden statue to be supplied ‘by others’. Does it need a base? No spec.
VA Response: No base needed
-What ‘Dimensional Block’ should we use for the grill enclosure? Brussels or Lineo Dimensional Wall?
AE Response: Provide Brussels Dimensional Stone or approved equal.
-How should the concrete block to create grill surround be adhered to the existing concrete? Concrete adhesive?
AE Response: Per Detail 11, Sheet L200, grill surround is to be dry stacked on existing concrete.
-Is there an elevation drawing of the pavilion that shows a finished height?
AE Response: Per preliminary drawings provided by manufacturer, pavilion height is 10’-9” to peak of gable roof.
-Does the existing electrical panel have the capacity to add the (2) proposed outlets?
AE Response: Per Sheet EL-100, Contractor is to verify that existing circuit and panel have enough capacity to accommodate additional electrical load.
-Where is the electrical source located for the light bollards?
VA Response: Electrical source is located on the East Wing of the Community Living Center -Room E16 – Panel B-1
Irrigation questions:
-Is backflow being provided by others?
AE Response: The backflow preventer is part of this project and noted on the drawings. It would be installed by a plumbing contractor, not the irrigation system installer.
-Would we be able to switch some of the drip irrigation in the beds to spray heads?
VA response: No spray heads are to be installed on this project. All drip irrigations are to remain part of this project.
End of Document
File details come from the government source that posted it.