36C24419B0003-0003001.pdf
PDF 13 MB Posted
- Attached to
- 693-16-914 Upgrade Elevators - Silver Federal contract opportunity
- Solicitation number
- 36C24419B0003
About this file
36C24419B0003 0003 S06 Amended Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24419C0081-000.docx | DOCX document | |
| 36C24419B0003-0005000.docx | DOCX document | |
| 36C24419B0003-0004006.docx | DOCX document | |
| 36C24419B0003-0003002.pdf | ||
| 36C24419B0003-0003000.docx | DOCX document | |
| 36C24419B0003-0003003.pdf | ||
| 36C24419B0003_0002.docx | DOCX document | |
| S04_Site_Minutes-_Sign-In.pdf | ||
| 36C24419B0003_0001.docx | DOCX document | |
| S02_Specs.pdf | ||
| 36C24419B0003_1.docx | DOCX document | |
| S02_Drawings.pdf | ||
| 36C24419B0003-000.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT LOCATION
VICINITY MAP
PROJECT CAMPUS MAP
BUILDING 1
PARKING
PARKING
PARKING
PARKING
PARKING
AREA OF WORK
CONSTRUCTION ACCESS
POINT FROM SITE
UPGRADE ELEVATORS - SILVER
COVER SHEET
KC
SHEET LIST
SHEET NO. SHEET NAME DWG OF DWG
A-102
A-103
A-104
A-201 TYPICAL ELEVATOR CAR PLANS, INTERIOR ELEVATIONS, DETAILS AND
RISER DIAGRAM
A-202 ELEVATION AND SECTION DETAILS
GENERAL INFORMATION
GI001 COVER SHEET
GI002 GENERAL INFORMATION
GI003 ICRA NOTES AND DETAILS
GI004 ICRA AND CONSTRUCTION PHASING PLANS
ARCHITECTURE
A-101
1 4
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
MECHANICAL
ELECTRICAL
E-001 LEGENDS, ABBREVIATIONS AND NOTES
M-001 MECHANICAL GENERAL NOTES, LEGEND, AND SCHEDULES
A-105
A-106
A-107 ARCHITECTURAL PLANS AND DETAILS - LEVEL 10
ARCHITECTURAL PLANS AND DETAILS - LEVEL 9
ARCHITECTURAL PLANS AND DETAILS - LEVEL 8
ARCHITECTURAL PLANS AND DETAILS - LEVEL 7
ARCHITECTURAL PLANS AND DETAILS - LEVEL 5
ARCHITECTURAL PLANS AND DETAILS - LEVEL 4
ARCHITECTURAL PLANS AND DETAILS - BASEMENT (GROUND) LEVEL
MD101 ELEVATOR MACHINE ROOM DEMOLITION PLAN
MH101 ELEVATOR MACHINE ROOM PLAN
PLUMBING
P-001 PLUMBING GENERAL NOTES, LEGEND, AND SCHEDULE
P-101 BASEMENT PLUMBING PLANS
E-101
E-102
E-103
E-104
E-105
E-106
E-107
ELECTRICAL PLANS AND DETAILS - BASEMENT LEVEL
PLANS AND DETAILS - LEVEL 4
A-108 ARCHITECTURAL PLANS AND DETAILS - LEVEL 11
A-109 PENTHOUSE PLAN - LEVEL 12 AND MACHINE ROOM PLAN - LEVEL 13
KEY PLAN
Wilkes-Barre VA Medical Center
1111 East End Blvd., Wilkes-Barre, PA, 18711
VA PROJECT #: 693-16-914
GI001
DGC, GTS
MH102
MECHANICAL PLANS - LEVEL 4MH103
MH104
MH105
MH106
MH107
MH108
MH109
MECHANICAL PLANS - LEVEL 5
MECHANICAL PLANS - LEVEL 7
MECHANICAL PLANS - LEVEL 8
MECHANICAL PLANS - LEVEL 9
MECHANICAL PLANS - LEVEL 10
MECHANICAL PLANS - LEVEL 11
MECHANICAL PLANS - BASEMENT LEVEL
PLANS AND DETAILS - LEVEL 5
PLANS AND DETAILS - LEVEL 7
PLANS AND DETAILS - LEVEL 8
PLANS AND DETAILS - LEVEL 9
PLANS AND DETAILS - LEVEL 10
E-108 PLANS AND DETAILS - LEVEL 11
E-109 PLANS AND DETAILS - LEVEL 12
E-201 RISER DIAGRAM
E-501 ELECTRICAL DETAILS
M-701 MECHANICAL CONTROLS 12 12
11E-110 PLANS AND DETAILS - LEVEL 13
13 13
N
N
DocuSign Envelope ID: 00F8CCBE-4ABC-4997-AA94-D9BAB9539A19
1/21/2019
COORDINATE WORK OF ALL TRADES PRIOR TO
STARTING CONSTRUCTION.
ALL DIMENSIONS ARE TO GRID LINES, FACE OF STUD
FRAMING, FINISHED FACE OF EXISTING WALL SURFACE,
OR FACE OF CONCRETE / MASONRY UNITS UNLESS
NOTED OTHERWISE.
AT FIRE RATED WALLS WHERE OPENINGS ARE
GREATER THAN 16 SQUARE INCHES OR WHERE TOTAL
AREA OF OPENINGS EXCEEDS 100 SQUARE INCHES IN
100 SQUARE FEET, WRAP 5/8" TYPE 'X' GYPSUM BOARD
BEHIND OPENINGS PER U.L. DESIGN #U510.
THE CONTRACTOR AND SUBCONTRACTORS INVOLVED
IN THIS PROJECT SHALL BE RESPONSIBLE FOR
DESIGNING AND INSTALLING THEIR RESPECTIVE WORK
AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL,
STATE, AND LOCAL CODES, LAWS, SAFETY
REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE
CONTRACTOR SHALL FURNISH ALL NECESSARY
PERMITS.
THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND
UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE
THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS
(DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)
INDICATE THE GENERAL SCOPE OF THE PROJECT IN
TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE
DIMENSIONS OF THE BUILDING, THE MAJOR
ARCHITECTURAL ELEMENTS, AND THE MAJOR
STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA
SYSTEMS. ON THE BASIS OF THE GENERAL SCOPE
INDICATED IN THESE DOCUMENTS, THE TRADE
CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED
FOR THE PROPER EXECUTION AND COMPLETION OF THEIR
WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL
AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR
WARRANTY FOR THEIR WORK UNLESS A LONGER
WARRANTY IS INDICATED IN THE SPECIFICATIONS.
CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE
FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY
REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.
DO NOT SCALE DRAWINGS. DIMENSIONS SHALL
GOVERN EACH BUILDING COMPONENT LOCATION.
BRING DISCREPANCIES TO THE COR'S
ATTENTION IN WRITING IMMEDIATELY.
ALL WORK SHALL BE PERFORMED IN A SKILLED
WORKMANSHIP TYPE AND MANNER ACCEPTABLE TO
THE COR'S.
PROVIDE BLOCKING FOR METAL STUD FRAMING WALL WHERE
NEW WALL MOUNT FIXTURES TO BE INSTALLED.
PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN
DIFFERENT MATERIALS.
EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR
TO BEGINNING OF WORK. ANY ERRORS OR OMISSIONS
SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IN
WRITING IMMEDIATELY.
ALL CARS TO BE CONSTRUCTED ON THE GROUND FLOOR,
INSIDE THE SHAFT.
COMPLETE ONE ELEVATOR BEFORE STARTING ANOTHER.
CONTRACTOR IS RESPONSIBLE FOR ALL SERVICE CALLS AND
SERVICES FOR ALL FOUR ELEVATORS AFTER THE EXECUTION
AND DURING THE DURATION OF THEIR CONTRACT.
FOR OVERHEAD PIPING WORK ABOVE CEILING OUTSIDE THE
ARE OF WORK FOR THIS PROJECT, COORDINATE WITH VA COR
ABOUT OFF-HOUR SCHEDULE AND ICRA PROTECTION
REQUIREMENTS.
FLOOR NUMBERS ON THE WALL AND SIGNAGE ARE TO BE
DONE IN ANOTHER PROJECT.
ALL LOBBY WORK SHALL BE PERFORMED DURING AFTER
HOURS (4:00PM TO 11:00 PM.)
A.
B.
C.
D.
E.
F.
G.
H.
I.
J.
K.
L.
M.
N.
O.
P.
Q.
GENERAL NOTES:
SYMBOL LEGEND
ELEVATION INDICATION
FIRE EXTINGUISHER CABINET
SITE PLAN NORTH ARROW
REVISION INDICATION
BUILDING WALL SECTION INDICATION
DETAIL INDICATION
GENERAL DIMENSIONING
ROOM NAME
ROOM NUMBER
AREA DETAILED
STARTING POINT
NOTE: THE ± INDICATES A DIMENSION THAT CAN VARY.
(NOTIFY THE ARCHITECT OF ANY CHANGE IN THAT DIMENSION IF
IT IS GREATER THAN 1")
NOTE: DIMENSIONS ARE TAKEN FROM/TO
FINISH SURFACE, UNLESS OTHERWISE
NOTES.
STARTING POINT
ON ELEVATION
NORTH ARROW
DOOR SYMBOL
WINDOW SYMBOL
ELEVATION TAG
F.E.C
NORTH
ALIGN WITH EXISTING CONSTRUCTION
COLUMN GRID
LIMIT OF WORK
EXISTING COLUMN GRID
DENOTED WITH AN E/
PREFIX
FINISH SYMBOLS
CEILING HEIGHT
MATCHLINE
LINETYPE SYMBOLS
IN PLAN
NEW DOOR DESIGNATION
PARTITION TYPE SYMBOL
EQUIPMENT DESIGNATION
BREAK LINE
SECTION NUMBER
SHEET WHERE SHOWN
SHEET WHERE SHOWN
REVISION NUMBER
DETAIL NUMBER
DENOTES CORNER GUARD
LOCATION
PARTITION TYPE
EQUIPMENT TYPE
(SEE EQUIPMENT MANUAL)
COLUMN GRID CENTERLINE INDICATOR
KEYNOTE INDICATOR
WINDOW TYPE
OR VISION PANEL
CG
INTERIOR
AND/OR
EXTERIOR
MULTIPLE INTERIOR
NEW DOOR
EMERGENCY DOOR DESIGNATION
EMERGENCY SWING
DOUBLE EGRESS DOOR DESIGNATION
ROOM NAME
1t
1t
A.F.F.10' 6"
A101
SIM
RM
CEILING:
WALL:
FLOOR:
BASE:
NAME
CEILING
FINISH
WALL
FINISH
FLOOR
FINISH
BASE
FINISH
ROOM FINISH TAG
NAME
ELEVATION
N
NEW DOOR
NOTE: EXISTING DIMENSIONS INDICATED AS [0'-0"] OR WITH (VIF)
ARE SUPPLIED TO THE ARCHITECT BY OTHERS AND SHALL BE
FIELD VERIFIED BY THE CONTRACTOR. (SEE "GENERAL
CONTRACTOR RESPONSIBILITIES WITH RESPECT TO EXISTING
CONDITION NOTES")
ROOM INDICATION
KEYNOTE SYMBOL
O'-O"
FACE OF SURFACE INDICATOR
O'-O"
O'-O" ±
O'-O"
VIF
NEW DOOR
A101
F2
A201
A1
A3
A4 A2A201
EXISTING DOOR DESIGNATION
EXISTING DOOR
A
A
A102
AREA A
INDICATOR OF AREA SHOWN ON DRAWING
SHEET NUMBER OF ADJACENT DRAWING
A
X
EXISTING WALL
TEMPORARY BARRIER
CONSTRUCTION ROUTE
GENERAL DEMOLITION NOTES:
A. REMOVE EXISTING CONSTRUCTION AS
DESIGNATED HEREIN AND CLEAR AREA
OF DEBRIS PRIOR TO PROCEEDING WITH
NEW CONSTRUCTION.
B. EXISTING EQUIPMENT REMOVED
SHALL BE PROPERLY DISPOSED OFF
MEDICAL CENTER GROUNDS.
COORDINATE WITH VA COR.
C. EXTENSIONS OF EXISTING WALLS AND
PATCHED WALL OPENING SHALL AS A
MINIMUM, MATCH THE INTEGRITY OF
ADJACENT CONSTRUCTION UNLESS
INDICATED OTHERWISE.
D. NOTIFY CONTRACTING OFFICER'S
REPRESENTATIVE OF ANY AREA
REQUIRING DEMOLITION FOR
INSTALLATION OF MECHANICAL,
PLUMBING, STRUCTURAL, ELECTRICAL,
OR DATA ITEMS (INCLUDING ROOF
PENETRATIONS) NOT SHOWN IN THESE
DRAWINGS. AFTER SUCH DEMOLITION
AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH
EXISTING.
E. THE INFORMATION CONTAINED IN
THESE DEMOLITION DOCUMENTS DEFINES
GENERAL SCOPE ONLY AND DOES NOT
RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY OF PROVIDING ALL
DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
F. REFER TO THE ELECTRICAL
DRAWINGS FOR FURTHER INFORMATION
REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
G. ALL DEMOLITION WORK SHALL BE
PERFORMED WITH "CARE AND DILIGENCE"
IN ORDER TO PREVENT ARBITRARY
DAMAGE OR INTERRUPTION OF SERVICE
OR CONCEALED UTILITIES INTENDED TO
REMAIN IN SERVICE. DISCOVERY OF
UTILITIES OR CONDITIONS LOCATED
DIFFERENTLY FROM THAT INDICATED OR
THAT ARE NOT IDENTIFIED. SHALL BE
REPORTED TO THE CONTRACTING
OFFICER.
H. SALVAGE ALL EXISTING SIGNAGE,
GRILLE, COVER PLATES AND ELEVATOR
DOOR ACCESS CONTROL KEY PAD AND
CEILING MOUNT SENSORS (ON SOME
LEVELS) WITHIN THE LIMIT OF WORK OF
THE ELEVATOR LOBBY WALL ON EACH
FLOOR.
I. CONTRACTOR IS RESPONSIBLE TO
ENSURE LIGHTING, SMOKE DETECTOR
AND EXIT SIGNS WILL BE AVAILABLE
DURING CONSTRUCTION FOR EACH
PHASE. COORDINATE WITH VA COR AND
SAFETY ABOUT RELOCATION OF THESE
ELEMENTS PRIOR TO ERECTING
TEMPORARY CONSTRUCTION BARRIER.
A/C AIR CONDITIONING
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
A&E ARCHITECT AND ENGINEERS
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITIES HAVING JURISDICTION
AHU AIR HANDLING UNIT
ALT ALTERNATIVE
ALT TRANS ALTERNATIVE TRANSPORTATION
ALUM ALMINUM
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECTURAL
AVG AVERAGE
BB BULLETIN BOARD
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BM BEAM
BOD BASIS OF DESIGN
BRG BEARING
CB CATCH BASIN
CBB CEMENTITIOUS BACKER BOARD
CER CERAMIC
CF CUBIC FEET
CFCI CONTRACTOR FURNISH
CONTRACTOR INSTALL
CFM CUBIC FEET PER MINUTE
CG CORNER GUARD
C & G CURB & GUTTER
CI CAST IRON
CIP CAST IN PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNITS
CO CLEANOUT(S)
COL COLUMN
CONC CONCRETE
CONT COTINUOUS
COORD COORDINATE
CP CONCRETE PIPE
CPT CARPET
CR CRASH RAIL
CRS COLD ROLLED STEEL
CS CAST STONE
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS
INSTITUTE
CT CERAMIC TILE
CTR CENTER
CU FT CUBIC FEET
CUH CABINET UNIT HEATER
CY CUBIC YARD
D DRYER
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DISP DISPENSER
DIV DIVISION
DN DOWN
DR DOOR
DS DOWNSPOUT
DW DISHWASHER
DWG DRAWING
E EAST
(E) EXISTING
EA EACH
EF EXHAUST FAN
EFTR EXISTING FINISH TO REMAIN
EIFS EXTERIOR INSULATION AND FINISH
SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEV ELEVATOR
EQ EQUAL
EQUIP EQUIPMENT
EST ESTIMATED
ETR EXISTING TO REMAIN
ETS EXPOSED TO STRUCTURE
ARCHITECTURAL ABBREVIATIONS
EWC ELECTRIC WATER COOLER
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FCU FAN COIL UNIT
FD FLOOR DRAIN
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISH FLOOR
FF & E FURNITURE FIXTURES & EQUIPMENT
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLR FLOOR
FLUOR FLUORESCENT
FO FINISH OPENING
FOS FACE OF STUD
FR FIRE RATED
FSP FIRE STANDPIPE
FT FOOT / FEET
FTG FOOTING
FURR FURRING
FV FIELD VERIFY
FVC FIRE VALVE CABINET
FWC FABRIC WALLCOVERING
GA GAUGE
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GD GARBAGE DISPOSAL
GF CMU GROUND FACE CMU
GFCI GROUND FAULT CIRCUIT
INTERRUPTER
GI GALVANIZED IRON
GL GLASS
GL BLK GLASS BLACK
GLU LAM GLUE LAMINATED WOOD
GND GROUND
GT GROUT
GYP BD GYPSUM BOARD
GYP GYPSUM
HAZ MAT HAZARDOUS MATERIALS
HB HOSE BIB
HC HOLLOW CORE
HCP HANDICAPPED
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HGT HEIGHT
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR, HANDRAIL
HT HEIGHT
HVAC HEATING, VENTILATING & AIR
CONDITIONING
IBC INTERNATIONAL BUILDING CODE
ID INSIDE DIAMETER
IG INSULATING GLASS
IN INCH
INCAN INCANDESCENT
INFO INFORMATION
INSUL INSULATION
INT INTERIOR
INV INVERT
ITG INSULATED TEMPERED GLASS
JAN JANITOR
J-BOX JUNCTION BOX
JT JOINT
L LONG
LAV LAVATORY
LB(S) # POUND(S)
LF LINEAL FEET
LLV LONG LEG VERTICAL
LT LIGHT
LVR LOUVER
M & BH MOP AND BROOM HOLDER
MAINT MAINTENANCE
MATL MATERIAL
MAX MAXIMUM
MB MARKER BOARD
MECH MECHANICAL
MEPF MECHANICAL, ELECTRICAL,
PLUMBING,
FIRE PROTECTION (CONDUIT)
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MIRR MIRROR
MISC MISCELLANEOUS
MO MASONRY OPENING
MSB MOP SERVICE BASIN
MTD MOUNTED
MTL METAL
N
NORTH
NA NOT APPLICABLE
NECY NECESSARY
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER,
OVERFLOW DRAIN
OFCI OWNER FURNISHED
CONTRACTOR INSTALLED
OFOI OWNER FURNISHED
OWNER INSTALLED
OH OPPOSITE HAND
OPN OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
P PAINT
PARTN PARTITION
PBD PARTICLE BOARD
PBSW PATIENT BED SERVICE WALL
PCC PRECAST CONCRETE
PI PSYCHIATRIC INPATIENT
PL PLATE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLYWD PLYWOOD
PMU PSYCHIATRIC MEDICAL UNIT
PR PAIR
PRCST PRECAST
PREFAB PREFABRICATED
PROP PROPERTY
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT CONCPOST-TENSIONED CONCRETE
PTD PAPER TOWEL DISPENSER
PTL PORCELAIN TILE
PVC POLYVINYL CHLORIDE
QA QUALITY ASSURANCE
QT QUARRY TILE
R-VALUE (INSULATION),
RADIUS, RISER
RB RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
RE: REFERENCE
REBAR REINFORCING BAR
REC RECESSED
RECPT RECEPTACLE
REF REFRIGERATOR
REG REGISTER
REINF REINFORCE
REQD REQUIRED
RESIL RESILIENT
REV REVISION
RFT RESILIENT FLOOR TILE
RH ROOF HATCH
RM ROOM
RO ROUGH OPENING
RT RUBBER STAIR TREAD
S
SOUTH
SAF SEAMLESS ACRYLIC FLOORING
SAP SUSPENDED ACOUSTICAL PANELS
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASHBLOCK
SC SEALED CONCRETE, SOLID CORE
SCHED SCHEDULE
SCP SCUPPER
SD SOAP DISPENSER
SEAL SEALER
SECT SECTION
SECT SECTION
SF SQUARE FOOT
SF CMU SPLIT-FACE CMU
SHR SHOWER
SHT SHEET
SHTG SHEATHING
SIM SIMILAR
SL SLOPE
SLV SHORT LEG VERTICAL
SND SANITARY NAPKIN DISPOSER
SNV SANITARY NAPKIN VENDOR
SPECS SPECIFICATIONS
SQ SQUARE
SS SOLID SURFACE
SST STAINLESS STEEL
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUC STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SYM SYMMETRICAL
SYS SYSTEM
T TREAD
TB TACKBOARD
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
TBD TO BE DETERMINED
TD TUBULAR DAYLIGHTING DEVICE
TEL TELEPHONE
TEMP TEMPERATURE
TG TEMPERED GLASS,
TONGUE & GROOVE,
TRANSFER GRILLE
THRU THROUGH
TO TOP OF
TOC TOP OF CONCRETE
TOM TOP OF MASONRY
TOS TOP OF STEEL
TOW TOP OF WALL
TTD TOILET TISSUE DISPENSER
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
URN URINAL
VB VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VIF VERIFY IN FIELD
VTR VENT THROUGH ROOF
VWC VINYL WALL COVERING
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WD WOOD
WDP WOOD PANELING
WDW WINDOW
WF WIDE FLANGE
WGL WIRED GLASS
WH WATER HEATER
WR WASTE RECEPTACLE,
WATER RESISTANT
WS WATER STOP
WSCT WAINSCOT
WT WEIGHT
WWF WELDED WIRE FABRIC
INV INVERT
ITG INSULATED TEMPERED GLASS
TT TERRAZZO TILE
SIX LED DOWNLIGHTS WITH BRUSHED STAINLESS PANELS AND CONCEALED ACCESS PANEL.
BRUSHED STAINLESS STEEL WAINSCOT W/ WOOD VENEERING ON UPPER PORTION W/ MIRROR POLISHED STAINLESS STEEL REVEALS.
BACK WALL PANEL TO HAVE IMPRINT OF EACH SERVICE BRANCH INSIGNIA IN HONORING THE SERVICE. BRANCHES INCLUDE US AIR FORCE, ARMY, US MARINE CORPS, AND NAVY. OBTAIN FINAL IMAGE APPROVAL FROM THE VA INTERIOR DEPARTMENT.
FLEXIBLE TERRAZZO TILE ON 34" PLYWOOD SUBSTRATE.
STAINLESS STEEL RAIL TYPE BASE SLOPED 2" FROM WALL TO FLOOR.
3" WIDE ALUMINUM EXTRUDED HANDRAIL AND GUARDRAILS. SEE ELEVATIONS.
CEILING:
WALLS:
FLOOR:
BASE:
HANDRAILS:
ELEVATORS 1, 2, 3, & 4 CAB FINISH SCHEDULE:
GENERAL INFORMATION
KC DGC, GTS 2 4
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
SHEET NOTES
WALL LEGEND
2HR HOUR FIREWALL
GI002
AIR FORCE
IMAGES FOR ELEVATOR CAB'S BACK WALLS
ARMY MARINE NAVY
(NOTE: IMAGES ARE FOR REFERENCE ONLY. OBTAIN FINAL APPROVAL FROM
VA INTERIOR DESIGNER PRIOR TO ORDER AND FABRICATION.)
ICRA GENERAL NOTES:
1.
2.
NO MAJOR EQUIPMENT ACCESS THROUGH THE BUILDING BETWEEN 7AM TO
5PM. CONTRACTOR TO COORDINATE WITH VA COR.
ALL LOBBY WORK SHALL BE COMPLETED DURING AFTER HOURS 4:00 PM TO
11:00 PM.
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX
OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION
Class III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction
Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2
Medium Risk
Group 1
Low Risk
- Bldg. #69 Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE
D
TYPE
C
TYPE
B
TYPE
A
Group 4
Highest Risk
Group 3
High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgetn Care
- Laboratories
- CLCs (1B Med, 59B, 138A, 138B)
- SPD; AMCU; 1B Medicine;
- Respiratory Isolation Rooms
III
TYPE DTYPE CTYPE B
o r control procedures are necessary.
C L A
S S
I V
C L A
S S
I I
During Construction Project
C L
I
C L A
S S
I I I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving workareas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area.
Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers.
Shoe covers must be changed each ime the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers work area until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Class IV
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control
Precautions depending upon the Area Class Designation
II
I
LOW Risk Group 1
HIGH Risk Group 3
HIGHEST Risk Group 4
MEDIUM Risk Group 2
IV
IV
IV
III/IV
III/IV
III/IV
III/IV
III
III
III
WALL LEGEND
1HR HOUR FIREWALL
1HR HOUR FIRE SMOKE
BARRIER
2HR HOUR FIREWALL
I
AREA OF WORK
LOADING DOCK
CONSTRUCTION
ACCESS
STEAM DRYER
ROLL UP DOOR
200'
CONSTRUCTION ROUTE
ICRA NOTES AND DETAILS
KC DGC, GTS 3 4
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
BASEMENT FLOOR CONSTRUCTION ACCESS PLAN
SCALE: 1/16" = 1'-0"
CONSTRUCTION ROUTE - CONSTRUCTION MATERIALS ROUTE IS THROUGH THE
BASEMENT LEVEL (GROUND FLOOR) AND ELEVATOR SHAFTS. (FOR UPPER
FLOORS, CONTRACTOR TO COORDINATE WITH COR) - MAINTAIN A MINIMUM OF
5'-0" CLEAR WIDTH IN CORRIDORS AT ALL TIMES
STICKY MAT AT ALL CONSTRUCTION ACCESS POINT
USE PORTABLE DUST EXTRACTOR AND AIR SCRUBBER WITH HEPA FILTRATION
SYSTEM. VERIFY DISCHARGE LOCATION WITH COR
REFER TO INFECTION CONTROL RISK ASSESSMENT PACKAGE FOR MORE
INFORMATION
KEY NOTES
GI003
TEMPORARY PARTITION TYPE 'T'
PROVIDE TEMPORARY PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY TO
THE BOTTOM OF CEILING
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C4-74
C4-73
STAIR #3
C4-74A
C4-56
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
CB-82
CB-48
I.V. STOR
CB-89D
CB-82STAIR #3
C4-157
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
P
M
ICRA AND CONSTRUCTION PHASING
PLANS
KC
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
ELEVATOR LOBBY WORK IN LEVELS 4, 5, 7, & 11
SCALE: 1/4" = 1'-0"
FOR ELEVATOR LOBBY WORK IN GROUND LEVEL
SCALE: 1/4" = 1'-0"
SEE SHEET GI003 FOR CONSTRUCTION ACCESS
FROM BASEMENT TO LOADING DOCK
CONTRACTOR TO ENSURE ACCESS TO EXISTING
FIRE EXTINGUISHERS OR FIRE ALARM PULL
STATIONS ARE MAINTAINED. RELOCATE SAID
EXTINGUISHERS OR PULL STATIONS UNTIL SUCH
TIME THAT THEY CAN BE RETURNED TO THEIR
ORIGINAL LOCATIONS. COORDINATE LOCATION WITH
VA COR AND SAFETY IN ADVANCE
DO NOT REMOVE TEMPORARY BARRIERS FOR EACH
PHASE AND ALL HVAC ISOLATION UNTIL
CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA INFECTIONS DISEASE CONTROL HAS INSPECTED
AND APPROVED THE CLEANING
SPRINKLER HEADS TO BE CAPPED DURING
CONSTRUCTION WITHIN EACH PHASE - SPRINKLER
SYSTEM OVERALL TO REMAIN PRESSURIZED
VA REQUIRES THAT ALL APPLICABLE PERMITS BE
COMPLETED AND APPROVED PRIOR TO BEGINNING
ANY WORK. PERMITS INCLUDE ICRA, ILSM, ABOVE
CEILING, FIRE ALARM SYSTEM
CONTRACTOR SHALL PROTECT AREA ADJACENT TO
THE DEMOLITION AND NEW CONSTRUCTION WORK
TO PREVENT DAMAGES. (IF DAMAGED, REPAIR,
PATCH, SAND AND REFINISH TO MATCH EXISTING
COORDINATE CONSTRUCTION SCHEDULE WITH VA
COR TO ENSURE STAFF ACCESS FROM ELEVATOR
LOBBIES TO THEIR OFFICES OR OTHER ROOMS
DURING CONSTRUCTION
SEE ARCHITECTURAL PLANS AND DETAILS FOR
DEMOLITION AND RENOVATION WORK
ALL LIGHTING, SMOKE DETECTOR AND EXIT SIGN IN
THE ELEVATOR LOBBY AREAS SHALL REMAIN
AVAILABLE DURING CONSTRUCTION.
SEE SPECIFICATIONS AND THE ASBESTOS SURVEY
DATED 2014/08/29 TO BE PROVIDED BY THE VA FOR
LOCATIONS KNOWN TO INCLUDE ASBESTOS AND
WITHIN THE AREA OF THE SCOPE OF WORK FOR THE
GROUND LEVEL AND LEVELS 4, 5, 7, 8, 9, 10, AND 11.
SHEET NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
SHEET KEY NOTES
PROVIDE TEMPORARY PROTECTIVE PLASTIC BARRIER WITH
ZIPPER ENTRY TO BOTTOM OF CEILING
PROVIDE 1-HR RATED TEMPORARY CONSTRUCTION
BARRIER CONSISTING OF SEALED 5/8" GYPSUM BOARD ON
BOTH SIDES OF 3-5/8" METAL STUD PARTITION EXTEND TO
BOTTOM OF FLOOR OR ROOF DECK ABOVE. SEAL TOP AND
BOTTOM OF PARTITION. PARTITION SHALL BE INSPECTED
BY VA ICRA STAFF PRIOR TO START OF CONSTRUCTION IN
SPACE. SEE TEMPORARY PARTITION TYPE "T" ON SHEET
GI003.
PROVIDE RATED 3' WIDE BY 7' TALL HARD DOOR WITH
ASSOCIATED HARDWARE FOR TEMPORARY PARTITION.
COORDINATE WITH VA COR ON SECURING
EGRESS DOOR DURING THIS CONSTRUCTION
PHASE(S).
CONSTRUCTION ROUTE THRU THE BASEMENT
LEVEL TO LOADING DOCK AS INDICATED ON
SHEET GI003
PROVIDE TEMPORARY CONSTRUCTION SIGN FOR
PHASE 9 CONSTRUCTION WORK IN THE
STAIRWELL AND LOBBY AREA. TEMPORARY
CONSTRUCTION SIGN SHALL INCLUDE
ALTERNATE EGRESS MAP TO DIRECT STAFF AND
VISITORS TO THE NEAREST STAIRS 1, 2 AND 4.
COORDINATE WITH VA COR PRIOR TO ERECTING
SIGN.
PROVIDE CONSTRUCTION SIGN FOR PHASE 8
CONSTRUCTION WORK IN the RESTROOM AND
THE LOBBY AREA TO INDICATE NO ACCESS TO
THE LOBBY.
PROVIDE STICKY MAT AT CONSTRUCTION
ACCESS POINT. (MAT SHALL BE INSPECTED AND
CHANGED FREQUENTLY TO ENSURE
EFFECTIVENESS)
USE PORTABLE DUST EXTRACTOR AND AIR
SCRUBBER WITH HEPA FILTRATION SYSTEM
COORDINATE WITH VA COR ABOUT OFF-HOURS
SCHEDULE AND TEMPORARY REROUTING
ACCESS FOR HOSPITAL STAFF/VISTORS PRIOR
TO ERECTING TEMPORARY BARRIER
CONSULT WITH THE VA SAFETY DEPARTMENT TO
MAINTAIN A MINIMUM CLEARANCE IN HALLWAY
1.
1A.
1B
2.
3.
3A
3B
4.
5.
6.
7.
DO NOT
BLOCK
DOOR
PHASE 6
3A
DO NOT
BLOCK
DOOR
GI004
DGC, GTS 4 4
WALL LEGEND
2HR HOUR FIREWALL
1HR HOUR FIREWALL
3A1A 6
3A
1A6
3A
3A
1A 6
PHASE 6
3A
3A
ICRA & CONSTRUCTION PHASING PLAN
3A
1A 6
ELEVATOR LOBBY WORK IN LEVELS 8, 9 AND 10
SCALE: 1/4" = 1'-0"
DO NOT
BLOCK
DOOR
LEVEL 8:
WINDOW, FRAME
AND FLOOR CABINET
RADIATOR UNIT - NIC
ICRA & CONSTRUCTION PHASING PLAN FOR ICRA & CONSTRUCTION PHASING PLAN FOR
1A
3A
PHASE 6
3A
3A
1A
3B
FIXTURES AND SHAFT WORK FROM GROUND LEVEL TO LEVEL 11
SCALE: 1/4" = 1'-0"
ICRA & CONSTRUCTION PHASING PLAN FOR ELEVATOR, HALL
PHASE 1
PHASE 2
PHASE 3
PHASE 5
PHASE 4
(OFF-HOUR)
(OFF-HOUR)
(OFF-HOUR)
(OFF-HOUR)
(OFF-HOUR)
1A 5
PHASE 7
3A
PHASE 7
NOTE: 1. PHASES 6 TO 9 ARE OFF-HOURS CONSTRUCTION WORK
2. NO FLOORING WORK IN THE GROUND LEVEL
1A
3A
PHASE 7
PHASE 9
PHASE 8
1A
1A
1A
1A
NOTE: 1. PHASES 6 TO 9 ARE OFF-HOURS CONSTRUCTION WORK
PHASE 9
PHASE 8
1A 5
1A
PHASE 8
3A
1A
NOTE: 1. PHASES 6 TO 9 ARE OFF-HOURS CONSTRUCTION WORK
PHASE 9
PHASE 6
1A
1A
1B
1B
1A
1B
1B
3B
1B
1B
3A
1B
1B
1B
1B
1A
1A
NOTE: 1. PHASES 1 TO 5 AND MACHINE ROOM WORK ARE NOT OFF-HOURS
CONSTRUCTION WORK
NOTE:
ALL LOBBY WORK SHALL BE PERFORMED DURING
AFTER HOURS FROM 4:00 PM TO 11:00 PM
PIT B
ELEVATOR
PIT A
1B
1B
1A
1A
1C
1C
ELEVATOR
PIT B
ELEVATOR
PIT A
1B
1B
1A
1A
1C
1C
BASEMENT
(GROUND) LEVEL
SUMP PIT
EXISTING CONCRETE
PIT WALL TO REMAIN
CUT EXISTING CONCRETE
FLOOR AND INSTALL FORM
WORK FOR SUMP PIT'S
INSTALLATION
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
CB-153
CB-82
CB-48
I.V. STOR
CB-89D
CB-82STAIR #3
UP
LIMIT OF
WORK
CB-81
CB-48
CB-80G
D1
D2
D3
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
CB-153
CB-82
CB-48
I.V. STOR
CB-89D
CB-82STAIR #3
CB-81
CB-48
CB-80G
AREA OF
WORK
EXISTING
EXISTING
7'-5"
A.F.F.
7'-5"
A.F.F.
AREA OF
WORK
4 4
ALIGN
3/4" ℄ STEEL
RUNGS WELD TO
STRINGER
2 1/2" x 1/4" STEEL
BAR STRINGER
2 1/2" x 1/4" STEEL
BAR STRINGER
FINISH FLOOR AT
ELEV. PIT
ELEVATOR MFR
CLEARANCE
REQUIREMENTS.
VERIFY REQUIRED
OSHA TOE
CLEARANCE
NOTE: EXTEND LADDER
5'-0" ABOVE BASEMENT
(GROUND) LEVEL'S FLOOR
SILL ENTRANCE
1/2" CONC EXP
ANCHOR
FINISH FLOOR
P
M
A-101
ARCHITECTURAL PLANS AND DETAILS -
BASEMENT (GROUND) LEVEL
KC DGC 1 11
ELEVATOR PIT PLAN
SCALE: 1/8" = 1'-0"
ELEVATOR SUMP PIT SECTION
SCALE: 1/4" = 1'-0"
SUMP PUMPS - SEE PLUMBING DRAWINGS
EXISTING WALL TO REMAIN
SHEET KEY NOTES - NEW#
BASEMENT (GROUND) LEVEL NEW FLOOR PLANS
SCALE: 1/4" = 1'-0"
BASEMENT (GROUND) LEVEL NEW CEILING PLANS
SCALE: 1/4" = 1'-0"
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
SHEET NOTES - DEMO
D#
PROTECT PIT AREA FROM SUMP WORK
SPRINKLER HEAD TO REMAIN
EXISTING SPEAKER TO REMAIN
RELOCATED SPEAKER
INDIRECT LIGHT COVE
INSTALL NEW CEILING, ELEVATION TO MATCH
EXISTING
NEW LIGHTING - SEE ELECTRICAL DRAWINGS
CEILING MOUNTED EXIST. SIGN TO REMAIN
EXISTING CEILING MOUNTED WIFI UNIT TO
REMAIN.
EXISTING BULKHEAD TO REMAIN - (N.I.C.)
EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)
WALL MT. ALARM SPEAKER TO REMAIN
EXISTING SMOKE DETECTOR TO REMAIN
NEW 2'x2' DIFUSSER. - SEE MECHANICAL
DRAWINGS
REMOVE EXISTING CEILING SYSTEM, LIGHTING FIXTURES,
AND MECHANICAL GRILLS ONLY ON BASEMENT (GROUND)
LEVEL
D1
NEW FLEXIBLE TERRAZZO TILE FLOORING
SYSTEM
WALL LEGEND
2HR HOUR FIREWALL
REPAIR OR REPLACE DAMAGED CEILING
OUTSIDE OF CONSTRUCTION AREA CAUSED
BY NEW CONSTRUCTION
1A
EXISTING FLOORING SYSTEM TO REMAIN
NEW 2'x2' RETURN. - SEE MECHANICAL
DRAWINGS
1B
2' (W) X 2' (D) X 2'-6" (H) CONCRETE SUMP PIT
PIT LADDER DETAILS
SCALE: 1" = 1'-0"
1C
PIT LADDER
D2
REMOVE MAIL CHUTE AND LETTER BOX. ALSO SEE
DRAWINGS 1, 2, AND 3 OF SHEET A-202 FOR MORE
DETAILS
INSTALL TILE OVER TILE WALL AND BASE ON
THE ELEVATOR SIDE WALL ON THIS LEVEL.
INSTALL ALUMINUM TERMINATION TRIM ON
THE EXPOSED EDGE OF TILE. SEE SHEET
A-202 FOR DETAILS
REFURBISH, REPAIR DAMAGED AREA ON DOOR
AND FRAME AND REFINISH TO MATCH EXISTING
SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS
TO BE RENOVATED ON THE ELEVATOR SIDE WALL
IN THE ELEVATOR LOBBY AREA
D3
EXISTING FLOORING TO REMAIN
C4-74
C4-73
N4-76
N4-127
DN
C4-157
C4-56
C4-132
C4-57B
C4-57A
C4-56D
N4-130
1A
11B
LIMIT OF
WORK
1A
1A
11A
11A
11A
11A
11B
13 EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
11B
11A
11B
11A
11B
11B
11A
11B
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C4-157
STAIR #3
C4-56
C4-57B
C4-57A
C4-56D
N4-130
LIMIT OF
WORK
13 EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)
7'-4"
AFF
7'-11"
AFF
8'-0 1/2"
AFF
C4-74
C4-73
N4-76
N4-127
DN
C4-157
C4-56
C4-132
C4-57B
C4-57A
C4-56D
N4-130
D1
LIMIT OF
WORK
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
D1
D3
D1
D1
13 EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
D2
D3
D3
P
M
A-102
ARCHITECTURAL PLANS AND DETAILS -
LEVEL 4
KC DGC 2 11
LEVEL 4 NEW FLOOR PLAN
SCALE: 1/4" = 1'-0"
LEVEL 4 NEW REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
LEVEL 4 DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
SHEET NOTES - DEMO
D#
1A
SHEET KEY NOTES - NEW#
SPRINKLER HEAD TO REMAIN
EXISTING SPEAKER TO REMAIN
INDIRECT LIGHT COVE
INSTALL NEW CEILING, ELEVATION TO MATCH
EXISTING
NEW LIGHTING - SEE ELECTRICAL DRAWINGS
CEILING MOUNTED EXIT SIGN TO REMAIN
RELOCATED CEILING MOUNTED WI-FI UNIT TO
REMAIN
EXISTING CEILING SYSTEM TO REMAIN - N.I.C.
EXISTING SMOKE DETECTOR TO REMAIN
NEW 2'x2' DIFFUSER - SEE MECHANICAL DRAWINGS
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
INSTALL NEW FLEXIBLE TERRAZZO TILE FLOORING
SYSTEM
REMOVE EXISTING CEILING SYSTEM, LIGHTING,
GRILLS AND FLOORING SYSTEM AS INDICATED
D1
WALL LEGEND
2HR HOUR FIREWALL
EXISTING FLOORING SYSTEM TO REMAIN
REPAIR OR REPLACE DAMAGED FLOORING AND
CEILING OUTSIDE OF CONSTRUCTION AREA
CAUSED BY NEW CONSTRUCTION
15 EXISTING WALL FIRE EXTINGUISHER TO REMAIN
RELOCATED 2'x2' DIFFUSER - SEE MECHANICAL
DRAWINGS
EXISTING BULKHEAD TO REMAIN - (N.I.C.)
FLOOR LEGEND
TT FIELD
TT ACCENT #1
TT ACCENT #2
SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS
TO BE RENOVATED IN THE ELEVATOR LOBBY
AREA
INSTALL TILE OVER TILE WALL AND BASE ON THE
ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL
ALUMINUM TERMINATION TRIM ON THE EXPOSED
EDGE OF TILE. SEE SHEET A-203 FOR DETAILS
REFURBISH, REPAIR DAMAGED AREA ON DOOR AND
FRAME AND REFINISH TO MATCH EXISTING
INSTALL TILE OVER TILE WALL AND BASE ON THE
LOWER PORTION TO MATCH EXISTING TILE WALL
HEIGHT OF REMAINING ELEVATOR LOBBY WALL ON
THIS LEVEL. FINISH TOP OF WAINSCOT WALL WITH
BULLNOSE . INSTALL ALUMINUM TERMINATION TRIM
ON THE EXPOSED EDGE OF TILE. PAINT WALL
ABOVE WAINSCOT
REFURBISH AND PAINT EXISTING WALL TO
UNDERSIDE OF CEILING
D2
REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF
SHEET A-202 FOR MORE DETAILS
11A
11B
D3
REMOVE AND SALVAGE EXISTING HANDRAILS
INSTALL SALVAGED HANDRAILS
PARTIAL EXISTING ELEVATOR LOBBY
SCALE: NTS (CORRIDOR EXTENSION FROM ELEVATOR LOBBY)
11A 11B
11A 11B
11A 11B
C5-56C
STAIR #3
C5-79
C5-57
C5-57B
C5-57A
C5-74
C5-74A
LIMIT OF
WORK
1A
1A
1A
11A
11A
11A
11B
11A
1A
1A
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
11B
11B
11B
11A
11B
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
STAIR #3
LIMIT OF
WORK
7'-10"
AFF
C5-56C
STAIR #3
C5-57
C5-57B
C5-57A
C5-74
C5-74A
LIMIT OF
WORK
D1
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
D1
D1
D1
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
D2
P
M
A-103
ARCHITECTURAL PLANS AND DETAILS -
LEVEL 5
KC DGC 3 11
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
LEVEL 5 NEW FLOOR PLAN
SCALE: 1/4" = 1'-0"
LEVEL 5 NEW REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
SHEET NOTES
LEVEL 5 DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1'-0"
SHEET KEY NOTES - NEW#
EXISTING CEILING SYSTEM TO REMAIN
SPRINKLER HEAD TO REMAIN
EXISTING SPEAKER TO REMAIN
INDIRECT LIGHT COVE
INSTALL NEW CEILING, ELEVATION TO
MATCH EXISTING
NEW LIGHTING - SEE ELECTRICAL DRAWINGS
CEILING MOUNTED EXIT SIGN TO REMAIN
EXISTING CEILING MOUNTED WI-FI UNIT TO REMAIN
EXISTING SMOKE DETECTOR TO REMAIN
NEW 2'x2' DIFFUSER - SEE MECHANICAL DRAWINGS
NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM
REMOVE EXISTING CEILING SYSTEM, LIGHTING,
GRILLS AND FLOORING SYSTEM AS INDICATED
D1
1A
EXISTING FLOORING SYSTEM TO REMAIN
REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE
OF CONSTRUCTION AREA CAUSED BY NEW
CONSTRUCTION
WALL LEGEND
2HR HOUR FIREWALL
FLOOR LEGEND
TT FIELD
TT ACCENT #1
TT ACCENT #2
PARTIAL EXISTING ELEVATOR LOBBY
SCALE: NTS
INSTALL TILE OVER TILE WALL AND BASE ON THE
ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL
ALUMINUM TERMINATION TRIM ON THE EXPOSED
EDGE OF TILE. SEE SHEET A-202 FOR DETAILS
REFURBISH, REPAIR DAMAGED AREA ON DOOR AND
FRAME AND REFINISH TO MATCH EXISTING
INSTALL TILE OVER TILE WALL AND BASE ON THE
LOWER PORTION TO MATCH EXISTING TILE WALL
HEIGHT OF REMAINING ELEVATOR LOBBY WALL ON
THIS LEVEL. FINISH TOP OF WAINSCOT WALL WITH
BULLNOSE . INSTALL ALUMINUM TERMINATION TRIM
ON THE EXPOSED EDGE OF TILE. PAINT WALL
ABOVE WAINSCOT
REFURBISH AND PAINT EXISTING WALL TO
UNDERSIDE OF CEILING
11A
11B
D2
REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF
SHEET A-202 FOR MORE DETAILS
SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS
TO BE RENOVATED IN THE ELEVATOR LOBBY
AREA
11A
11B
11A
11B
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C7-48A
C7-50
C7-48
STAIR #3
C7-16
C4-57B
C4-57A
C7-44
C7-52
C7-59
LIMIT OF
WORK
C7-47B
UP
DN
1A
1A
1A
11A
11A
11B
11A
11A
11B
11A
11B
C7-59
LIMIT OF
WORK
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
8'-0"
AFF
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C7-48A
C7-50
C7-48
STAIR #3
C7-16
C4-57B
C4-57A
C7-44
C7-52
C7-59
LIMIT OF
WORK
C7-47B
UP
DN
D1
D1
D1
1A
D3
D2D3
1A
EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)
P
M
A-104
ARCHITECTURAL PLANS AND DETAILS -
LEVEL 7
KC JGG, DGC 4 11
LEVEL 7 NEW FLOOR PLAN
SCALE: 1/4" = 1'-0"
LEVEL 7 NEW RCP REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
SHEET NOTES - DEMO
D#
SHEET KEY NOTES - NEW#
RELOCATED SPEAKER
INDIRECT LIGHT COVE
INSTALL NEW CEILING, ELEVATION TO MATCH
EXISTING
NEW LIGHTING - SEE ELECTRICAL DRAWINGS
CEILING MOUNTED EXIT SIGN TO REMAIN
EXISTING CEILING SYSTEM TO REMAIN
RELOCATED SMOKE DETECTOR TO REMAIN
NEW 2'x2' DIFFUSER - SEE MECHANICAL DRAWINGS
NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM
SPRINKLER HEAD TO REMAIN
REWORK EXISTING CEILING PANEL
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
LEVEL 7 DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1'-0"
REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE
OF CONSTRUCTION AREA CAUSED BY NEW
CONSTRUCTION
1A
EXISTING FLOORING SYSTEM TO REMAIN
WALL LEGEND
2HR HOUR FIREWALL
FLOOR LEGEND
TT FIELD
TT ACCENT #1
TT ACCENT #2
PARTIAL EXISTING ELEVATOR LOBBY
SCALE: NTS (EXISTING ELEVATOR SIDE WALL)
REMOVE EXISTING CEILING SYSTEM, LIGHTING,
GRILLS AND FLOORING SYSTEM IN THE ELEVATOR
LOBBY AREA
D1
D2
REMOVE ABANDONED SENSOR CONTROLS AND WALL
MOUNTED CONDUITS AT CEILING AND ELEVATOR DOOR
FRAME
D3
REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF
SHEET A-202 FOR MORE DETAILS
D3
D2
D1
D3
D3
D1
INSTALL TILE OVER TILE WALL AND BASE ON THE
ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL
ALUMINUM TERMINATION TRIM ON THE EXPOSED
EDGE OF TILE. SEE SHEET A-202 FOR DETAILS
REFURBISH, REPAIR DAMAGED AREA ON DOOR AND
FRAME AND REFINISH TO MATCH EXISTING
SEE SHEETS A-105 AND A-202 FOR OTHER ITEMS
TO BE RENOVATED IN THE ELEVATOR LOBBY
AREA
11A
INSTALL TILE OVER TILE WALL AND BASE ON THE
LOWER PORTION TO MATCH EXISTING TILE WALL
HEIGHT OF REMAINING ELEVATOR LOBBY WALL ON
THIS LEVEL. FINISH TOP OF WAINSCOT WALL WITH
BULLNOSE . INSTALL ALUMINUM TERMINATION TRIM
ON THE EXPOSED EDGE OF TILE. PAINT WALL
ABOVE WAINSCOT.
REFURBISH AND PAINT EXISTING WALL TO
UNDERSIDE OF CEILING.
11B
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C8-54
C8-56
C8-54A
STAIR #3
C7-51A
C8-26A
C8-54B
C8-54A
C7-44
LIMIT OF
WORK
C7-47B
UP
DN
C8-55
C8-59B
1A
1A
1A
1A
10A
10B
10A
10A
10A
10A
10A
10A
10B
10B
10B
10B
10B
10B
ALIGN
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C8-54
C8-56
C8-54A
STAIR #3
C7-51A
C8-54B
C8-54A
C7-44
C7-47B
C8-55
C8-59B
LIMIT OF
WORK
8'-0"
AFF
S L O
P E
2 2
ALIGN
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C8-54
C8-56
C8-54A
STAIR #3
C7-51A
C8-26A
C8-54B
C8-54A
C7-44
LIMIT OF
WORK
C7-47B
UP
DN
C8-55
C8-59B
D1
1A
D1
D3
D3
D2
P
M
A-105
ARCHITECTURAL PLANS AND DETAILS -
LEVEL 8
KC 5 11
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
LEVEL 8 NEW FLOOR PLAN
SCALE: 1/4" = 1'-0"
LEVEL 8 DEMOLITION FLOOR PLAN
SCALE: 1/4" = 1'-0"
LEVEL 8 NEW REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
SHEET NOTES - DEMO
D#
REMOVE EXISTING CEILING SYSTEM, LIGHTING,
GRILLS AND FLOORING SYSTEM IN THE ELEVATOR
LOBBY AREA
D1
SHEET KEY NOTES - NEW#
SPRINKLER HEAD TO REMAIN
INDIRECT LIGHT COVE
ALIGN AND MATCH NEW CEILING ELEVATION
WITH EXISTING
NEW LIGHTING - SEE ELECTRICAL DRAWINGS
EXISTING CEILING MOUNTED WI-FI UNIT TO REMAIN
EXISTING CEILING SYSTEM TO REMAIN - N.I.C.
NEW 2'x2' DIFFUSER - SEE MECHANICAL DRAWINGS
RELOCATED SPEAKER
EXISTING SMOKE DETECTOR TO REMAIN
REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE
OF CONSTRUCTION AREA CAUSED BY NEW
CONSTRUCTION
1A
EXISTING FLOORING SYSTEM TO REMAIN
EXISTING SECURITY CAMERA TO REMAIN
D2
DOOR TO REMAIN, REFURBISH, REPAINT TO
MATCH EXISTING (TYP)
JNG, DGC
PARTIAL EXISTING ELEVATOR LOBBY
SCALE: NTS
D3
D3
D3
INSTALL TILE OVER TILE WALL AND BASE ON THE
ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL
ALUMINUM TERMINATION TRIM ON THE EXPOSED
EDGE OF TILE. SEE SHEET A-202 FOR DETAILS
REFURBISH, REPAIR DAMAGED AREA ON DOOR AND
FRAME AND REFINISH TO MATCH EXISTING
SEE SHEETS A-105 AND A-202 FOR OTHER ITEMS
TO BE RENOVATED IN THE ELEVATOR LOBBY
AREA
REMOVE ABANDONED SENSOR CONTROLS AND WALL
MOUNTED CONDUITS AT CEILING AND ELEVATOR DOOR
FRAME
D3
REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF
SHEET A-202 FOR MORE DETAILS
D2
WALL LEGEND
2HR HOUR FIREWALL
FLOOR LEGEND
TT FIELD
TT ACCENT #1
TT ACCENT #2
NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM
D1
D1
INSTALL TILE OVER TILE WALL AND BASE ON THE
LOWER PORTION TO MATCH EXISTING TILE WALL
HEIGHT OF REMAINING ELEVATOR LOBBY WALL ON
THIS LEVEL. FINISH TOP OF WAINSCOT WALL WITH
BULLNOSE . INSTALL ALUMINUM TERMINATION TRIM
ON THE EXPOSED EDGE OF TILE. PAINT WALL
ABOVE WAINSCOT
REFURBISH AND PAINT EXISTING WALL TO
UNDERSIDE OF CEILING
10A
10B
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
ELEV
LOBBY
C9-35
SOCIAL
WORKER
C9-38
ELEC
CLOSET
C9-37
STAIR #3
C9-39
C8-26A
TELEPHONE
CLOSET
C9-44
MECH
C9-45
DOCTOR'S
OFFICE
C9-40
LIMIT OF
WORK
CORRIDOR
C9-33A
UP
DN
ELEC
C9-36
TOILET
C9-43A
ELEV
LOBBY
C9-33B
1A
1A
1A
12A
12B
12B
12A
12A
12B
12A
12B
12B
12A
12B
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
ELEV
LOBBY
C9-35
SOCIAL
WORKER
C9-38
ELEC
CLOSET
C9-37
STAIR #3
C9-39
C8-26A
TELEPHONE
CLOSET
C9-44
MECH
C9-45
DOCTOR'S
OFFICE
C9-40
CORRIDOR
C9-33A
ELEC
C9-36
TOILET
C9-43A
ELEV
LOBBY
C9-33B
LIMIT OF
WORK
8'-1"
AFF
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
ELEV
LOBBY
C9-35
SOCIAL
WORKER
C9-38
ELEC
CLOSET
C9-37
STAIR #3
C9-39
C8-26A
TELEPHONE
CLOSET
C9-44
MECH
C9-45
DOCTOR'S
OFFICE
C9-40
LIMIT OF
WORK
CORRIDOR
C9-33A
UP
DN
ELEC
C9-36
TOILET
C9-43A
ELEV
LOBBY
C9-33B
D1
1A
1A
1A
D1
D1
D2
P
M
A-106
ARCHITECTURAL PLANS AND DETAILS -
LEVEL 9
KC 6 11
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
LEVEL 9 NEW FLOOR PLAN
SCALE: 1/4" = 1'-0"
LEVEL 9 NEW REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
LEVEL 9 NEW DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
SHEET NOTES - DEMO
SHEET KEY NOTES - NEW
D#
REMOVE EXISTING CEILING SYSTEM, LIGHTING,
GRILLS AND FLOORING SYSTEM AS INDICATED
D1
SPRINKLER HEAD TO REMAIN
INDIRECT LIGHT COVE
INSTALL NEW CEILING, ELEVATION TO MATCH
EXISTING
NEW LIGHTING - SEE ELECTRICAL DRAWINGS
EXISTING CEILING MOUNTED WIFI UNIT TO REMAIN
EXISTING CEILING SYSTEM TO REMAIN - N.I.C.
NEW 2'x2' DIFFUSER. - SEE MECHANICAL
DRAWINGS
NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM
RELOCATED SPEAKER
EXISTING SMOKE DETECTOR TO REMAIN
EXISTING SECURITY CAMERA TO REMAIN
CEILING MOUNTED EXIT SIGN TO REMAIN
REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE
OF CONSTRUCTION AREA CAUSED BY NEW
CONSTRUCTION
1A
EXISTING FLOORING SYSTEM TO REMAIN
JGG, DGC
WALL LEGEND
TT FIELD
TT ACCENT #1
TT ACCENT #2
INSTALL TILE OVER TILE WALL AND BASE ON THE
ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL
ALUMINUM TERMINATION TRIM ON THE EXPOSED
EDGE OF TILE
12A
INSTALL TILE OVER TILE WALL AND BASE ON THE
LOWER PORTION AS INDICATED OF REMAINING
ELEVATOR LOBBY WALL ON THIS LEVEL. FINISH TOP
OF WAINSCOT WALL WITH BULLNOSE . INSTALL
ALUMINUM TERMINATION TRIM ON THE EXPOSED
EDGE OF TILE. PAINT WALL ABOVE WAINSCOT
REFURBISH, REPAIR DAMAGED AREA ON DOOR AND
FRAME AND REFINISH TO MATCH EXISTING
REFURBISH AND PAINT EXISTING WALL TO
UNDERSIDE OF CEILING. PROTECT AND PAINT
AROUND EXISTING MURAL ART WORK
12B
12A
12B
12A
12B
TOP OF WAINSCOT AT 4'-0"
A.F.F. OR BELOW THE
BOTTOM OF EXISTING
MURAL ART
PARTIAL WALL ELEVATION
SCALE: NTS (OPPOSITE SIDE OF ELEVATORS)
REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF
SHEET A-202 FOR MORE DETAILS
D2
SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS
TO BE RENOVATED IN THE ELEVATOR LOBBY
AREA
WALL LEGEND
2HR HOUR FIREWALL
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
10-61
10-36
10-37
STAIR #3
10-35
10-30
10-28
LIMIT OF
WORK
UP
DN
10-60
1A
1A
1A
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
10-61
10-36
10-37
10-35
10-62
10-30
10-28
10-60
LIMIT OF
WORK
7'-5"
AFF
6 15
LIMIT OF
WORK
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
10-61
10-36
10-37
STAIR #3
10-35
10-30
10-28
10-33
LIMIT OF
WORK
UP
DN
10-60
D1
D1
D1
D1
P
M
A-107
ARCHITECTURAL PLANS AND DETAILS -
LEVEL 10
KC JGG, DGC 7 11
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
LEVEL 10 NEW FLOOR PLAN
SCALE: 1/4" = 1'-0"
LEVEL 10 NEW REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
LEVEL 10 DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
SHEET NOTES - DEMO
SHEET KEY NOTES - NEW
D#
# SHEET KEY NOTES - NEW
REMOVE EXISTING CEILING SYSTEM, LIGHTING,
GRILLS AND FLOORING SYSTEM AS INDICATED
SPRINKLER HEAD TO REMAIN
INDIRECT LIGHT COVE
INSTALL NEW CEILING, ELEVATION TO MATCH
EXISTING
NEW LIGHTING - SEE ELECTRICAL DRAWINGS
EXISTING CEILING MOUNTED WIFI UNIT TO REMAIN
EXISTING CEILING SYSTEM TO REMAIN - N.I.C.
NEW 2'x2' DIFUSSER. - SEE MECHANICAL DRAWINGS
RELOCATED SPEAKER
EXISTING SMOKE DETECTOR TO REMAIN
EXISTING CAMERA TO REMAIN
CEILING MOUNTED EXIT SIGN TO REMAIN
D1
REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE
OF CONSTRUCTION AREA CAUSED BY NEW
CONSTRUCTION
1A
EXISTING FLOORING SYSTEM TO REMAIN
WALL LEGEND
2HR HOUR FIREWALL
REFURBISH, REPAIR DAMAGED AREA ON DOOR AND
FRAME AND REFINISH TO MATCH EXISTING
FLOOR LEGEND
INSTALL TILE OVER TILE WALL, AND BASE THROUGH
OUT LOBBY ON THIS LEVEL. INSTALL ALUMINUM
TERMINATION TRIM ON THE EXPOSED EDGE OF TILE
SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS
TO BE RENOVATED IN THE ELEVATOR LOBBY
AREA
D2
REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF
SHEET A-202 FOR MORE DETAILS
TT FIELD
TT ACCENT #1
TT ACCENT #2
NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C11-32
C11-30B
C11-30
C11-31
C11-28P
1A
1A
LIMIT OF
WORK
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C11-32
C11-30B
C11-30
C11-31
C11-28P
D1
D1
D1
LIMIT OF
WORK
D2
ELEVATOR
#3
ELEVATOR
#4
ELEVATOR
#2
ELEVATOR
#1
C11-32
C11-30B
C11-30
C11-31
C11-28P
1 2A
8'-0"
AFF
16A
LIMIT OF
WORK
6A
P
M
A-108
ARCHITECTURAL PLANS AND DETAILS -
LEVEL 11
KC DGC 8 11
Drawing Title:
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg. of
#1
Date Checked Drawn Wilkes-Barre VA Medical Center
1111 East End Blvd.
\Wilkes-Barre, PA, 18711
UPGRADE ELEVATORS -
SILVER
JANUARY 22, 2019
675-16-100
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C D
E
Revisions: Date
N
AREA OF WORK
WITHIN BUILDING #1
KEY PLAN
FULLY SPRINKLERED
CONSTRUCTION DOCUMENTS
Office of
Construction and Facilities
Management
PROJECT MANAGER:
ACG Project Number
17-111
CONSULTANTS:
LEVEL 11 NEW FLOOR PLAN
SCALE: 1/4" = 1'-0"
LEVEL 11 DEMOLITION PLAN
SCALE: 1/4" = 1'-0"
SHEET NOTES - DEMO
D#
LEVEL 11 NEW REFLECTED CEILING PLAN
SCALE: 1/4" = 1'-0"
REMOVE EXISTING CEILING SYSTEM, LIGHTING,
GRILLS AND FLOORING SYSTEM AS INDICATED
D1
SHEET KEY NOTES - NEW# SHEET KEY NOTES - NEW
SPRINKLER HEAD TO REMAIN
INDIRECT LIGHT COVE
INSTALL NEW CEILING, ELEVATION TO MATCH
EXISTING
NEW LIGHTING - SEE ELECTRICAL DRAWINGS
EXISTING MOUNTED WI-FI UNIT TO REMAIN
EXISTING CEILING SYSTEM TO REMAIN - N.I.C.
NEW 2'x2' DIFFUSER. - SEE MECHANICAL DRAWINGS
INSTALL NEW TILE WALL, AND BASE THROUGH OUT
LOBBY ON THIS LEVEL. INSTALL ALUMINUM
TERMINATION TRIM ON THE EXPOSED EDGE OF TILE
REFURBISH, REPAIR DAMAGED AREA ON DOOR AND
FRAME AND REFINISH TO MATCH EXISTING
NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM
RELOCATED SPEAKER
EXISTING SMOKE DETECTOR TO REMAIN
EXISTING CAMERA TO REMAIN
CEILING MOUNTED EXIT SIGN TO REMAIN
EXISTING SOFFIT TO REMAIN
EXISTING TRAP DOOR TO REMAIN ABOVE CEILING
REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE
OF CONSTRUCTION AREA CAUSED BY NEW
CONSTRUCTION
1A
EXISTING FLOORING SYSTEM TO REMAIN
NEW CEILING ACCESS PANEL TO TRAP DOOR ABOVE.
SUSPEND PANEL FROM…