36C24419B0003-0003001.pdf

PDF 13 MB Posted

Attached to
693-16-914 Upgrade Elevators - Silver Federal contract opportunity
Solicitation number
36C24419B0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24419B0003 0003 S06 Amended Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to 693-16-914 Upgrade Elevators - Silver, newest first.
File Type Posted
36C24419C0081-000.docx DOCX document
36C24419B0003-0005000.docx DOCX document
36C24419B0003-0004006.docx DOCX document
36C24419B0003-0003002.pdf PDF
36C24419B0003-0003000.docx DOCX document
36C24419B0003-0003003.pdf PDF
36C24419B0003_0002.docx DOCX document
S04_Site_Minutes-_Sign-In.pdf PDF
36C24419B0003_0001.docx DOCX document
S02_Specs.pdf PDF
36C24419B0003_1.docx DOCX document
S02_Drawings.pdf PDF
36C24419B0003-000.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT LOCATION

VICINITY MAP

PROJECT CAMPUS MAP

BUILDING 1

PARKING

PARKING

PARKING

PARKING

PARKING

AREA OF WORK

CONSTRUCTION ACCESS

POINT FROM SITE

UPGRADE ELEVATORS - SILVER

COVER SHEET

KC

SHEET LIST

SHEET NO. SHEET NAME DWG OF DWG

A-102

A-103

A-104

A-201 TYPICAL ELEVATOR CAR PLANS, INTERIOR ELEVATIONS, DETAILS AND

RISER DIAGRAM

A-202 ELEVATION AND SECTION DETAILS

GENERAL INFORMATION

GI001 COVER SHEET

GI002 GENERAL INFORMATION

GI003 ICRA NOTES AND DETAILS

GI004 ICRA AND CONSTRUCTION PHASING PLANS

ARCHITECTURE

A-101

1 4

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

MECHANICAL

ELECTRICAL

E-001 LEGENDS, ABBREVIATIONS AND NOTES

M-001 MECHANICAL GENERAL NOTES, LEGEND, AND SCHEDULES

A-105

A-106

A-107 ARCHITECTURAL PLANS AND DETAILS - LEVEL 10

ARCHITECTURAL PLANS AND DETAILS - LEVEL 9

ARCHITECTURAL PLANS AND DETAILS - LEVEL 8

ARCHITECTURAL PLANS AND DETAILS - LEVEL 7

ARCHITECTURAL PLANS AND DETAILS - LEVEL 5

ARCHITECTURAL PLANS AND DETAILS - LEVEL 4

ARCHITECTURAL PLANS AND DETAILS - BASEMENT (GROUND) LEVEL

MD101 ELEVATOR MACHINE ROOM DEMOLITION PLAN

MH101 ELEVATOR MACHINE ROOM PLAN

PLUMBING

P-001 PLUMBING GENERAL NOTES, LEGEND, AND SCHEDULE

P-101 BASEMENT PLUMBING PLANS

E-101

E-102

E-103

E-104

E-105

E-106

E-107

ELECTRICAL PLANS AND DETAILS - BASEMENT LEVEL

PLANS AND DETAILS - LEVEL 4

A-108 ARCHITECTURAL PLANS AND DETAILS - LEVEL 11

A-109 PENTHOUSE PLAN - LEVEL 12 AND MACHINE ROOM PLAN - LEVEL 13

KEY PLAN

Wilkes-Barre VA Medical Center

1111 East End Blvd., Wilkes-Barre, PA, 18711

VA PROJECT #: 693-16-914

GI001

DGC, GTS

MH102

MECHANICAL PLANS - LEVEL 4MH103

MH104

MH105

MH106

MH107

MH108

MH109

MECHANICAL PLANS - LEVEL 5

MECHANICAL PLANS - LEVEL 7

MECHANICAL PLANS - LEVEL 8

MECHANICAL PLANS - LEVEL 9

MECHANICAL PLANS - LEVEL 10

MECHANICAL PLANS - LEVEL 11

MECHANICAL PLANS - BASEMENT LEVEL

PLANS AND DETAILS - LEVEL 5

PLANS AND DETAILS - LEVEL 7

PLANS AND DETAILS - LEVEL 8

PLANS AND DETAILS - LEVEL 9

PLANS AND DETAILS - LEVEL 10

E-108 PLANS AND DETAILS - LEVEL 11

E-109 PLANS AND DETAILS - LEVEL 12

E-201 RISER DIAGRAM

E-501 ELECTRICAL DETAILS

M-701 MECHANICAL CONTROLS 12 12

11E-110 PLANS AND DETAILS - LEVEL 13

13 13

N

N

DocuSign Envelope ID: 00F8CCBE-4ABC-4997-AA94-D9BAB9539A19

1/21/2019

COORDINATE WORK OF ALL TRADES PRIOR TO

STARTING CONSTRUCTION.

ALL DIMENSIONS ARE TO GRID LINES, FACE OF STUD

FRAMING, FINISHED FACE OF EXISTING WALL SURFACE,

OR FACE OF CONCRETE / MASONRY UNITS UNLESS

NOTED OTHERWISE.

AT FIRE RATED WALLS WHERE OPENINGS ARE

GREATER THAN 16 SQUARE INCHES OR WHERE TOTAL

AREA OF OPENINGS EXCEEDS 100 SQUARE INCHES IN

100 SQUARE FEET, WRAP 5/8" TYPE 'X' GYPSUM BOARD

BEHIND OPENINGS PER U.L. DESIGN #U510.

THE CONTRACTOR AND SUBCONTRACTORS INVOLVED

IN THIS PROJECT SHALL BE RESPONSIBLE FOR

DESIGNING AND INSTALLING THEIR RESPECTIVE WORK

AND SYSTEMS TO MEET ALL APPLICABLE FEDERAL,

STATE, AND LOCAL CODES, LAWS, SAFETY

REGULATIONS, HAZARDOUS WASTE LAWS, ETC. THE

CONTRACTOR SHALL FURNISH ALL NECESSARY

PERMITS.

THE CONTRACTOR SHALL REVIEW THE DRAWINGS AND

UNDERSTAND THE SCOPE OF THE DRAWINGS TO BE

THE FOLLOWING: THESE CONSTRUCTION DOCUMENTS

(DRAWINGS, SPECIFICATIONS, ADDENDA, ETC.)

INDICATE THE GENERAL SCOPE OF THE PROJECT IN

TERMS OF ARCHITECTURAL DESIGN CONCEPTS, THE

DIMENSIONS OF THE BUILDING, THE MAJOR

ARCHITECTURAL ELEMENTS, AND THE MAJOR

STRUCTURAL, MECHANICAL, ELECTRICAL, AND DATA

SYSTEMS. ON THE BASIS OF THE GENERAL SCOPE

INDICATED IN THESE DOCUMENTS, THE TRADE

CONTRACTORS SHALL FURNISH ALL ITEMS REQUIRED

FOR THE PROPER EXECUTION AND COMPLETION OF THEIR

WORK. ALL WORK SHALL BE COMPLETE IN EVERY DETAIL

AND THE CONTRACTORS SHALL PROVIDE A ONE YEAR

WARRANTY FOR THEIR WORK UNLESS A LONGER

WARRANTY IS INDICATED IN THE SPECIFICATIONS.

CONTRACTORS SHALL FOLLOW AND OBEY APPLICABLE

FEDERAL, STATE AND LOCAL CODES, LAWS, SAFETY

REGULATIONS AND HAZARDOUS WASTE LAWS, ETC.

DO NOT SCALE DRAWINGS. DIMENSIONS SHALL

GOVERN EACH BUILDING COMPONENT LOCATION.

BRING DISCREPANCIES TO THE COR'S

ATTENTION IN WRITING IMMEDIATELY.

ALL WORK SHALL BE PERFORMED IN A SKILLED

WORKMANSHIP TYPE AND MANNER ACCEPTABLE TO

THE COR'S.

PROVIDE BLOCKING FOR METAL STUD FRAMING WALL WHERE

NEW WALL MOUNT FIXTURES TO BE INSTALLED.

PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN

DIFFERENT MATERIALS.

EXISTING CONDITIONS SHALL BE FIELD VERIFIED PRIOR

TO BEGINNING OF WORK. ANY ERRORS OR OMISSIONS

SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IN

WRITING IMMEDIATELY.

ALL CARS TO BE CONSTRUCTED ON THE GROUND FLOOR,

INSIDE THE SHAFT.

COMPLETE ONE ELEVATOR BEFORE STARTING ANOTHER.

CONTRACTOR IS RESPONSIBLE FOR ALL SERVICE CALLS AND

SERVICES FOR ALL FOUR ELEVATORS AFTER THE EXECUTION

AND DURING THE DURATION OF THEIR CONTRACT.

FOR OVERHEAD PIPING WORK ABOVE CEILING OUTSIDE THE

ARE OF WORK FOR THIS PROJECT, COORDINATE WITH VA COR

ABOUT OFF-HOUR SCHEDULE AND ICRA PROTECTION

REQUIREMENTS.

FLOOR NUMBERS ON THE WALL AND SIGNAGE ARE TO BE

DONE IN ANOTHER PROJECT.

ALL LOBBY WORK SHALL BE PERFORMED DURING AFTER

HOURS (4:00PM TO 11:00 PM.)

A.

B.

C.

D.

E.

F.

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

Q.

GENERAL NOTES:

SYMBOL LEGEND

ELEVATION INDICATION

FIRE EXTINGUISHER CABINET

SITE PLAN NORTH ARROW

REVISION INDICATION

BUILDING WALL SECTION INDICATION

DETAIL INDICATION

GENERAL DIMENSIONING

ROOM NAME

ROOM NUMBER

AREA DETAILED

STARTING POINT

NOTE: THE ± INDICATES A DIMENSION THAT CAN VARY.

(NOTIFY THE ARCHITECT OF ANY CHANGE IN THAT DIMENSION IF

IT IS GREATER THAN 1")

NOTE: DIMENSIONS ARE TAKEN FROM/TO

FINISH SURFACE, UNLESS OTHERWISE

NOTES.

STARTING POINT

ON ELEVATION

NORTH ARROW

DOOR SYMBOL

WINDOW SYMBOL

ELEVATION TAG

F.E.C

NORTH

ALIGN WITH EXISTING CONSTRUCTION

COLUMN GRID

LIMIT OF WORK

EXISTING COLUMN GRID

DENOTED WITH AN E/

PREFIX

FINISH SYMBOLS

CEILING HEIGHT

MATCHLINE

LINETYPE SYMBOLS

IN PLAN

NEW DOOR DESIGNATION

PARTITION TYPE SYMBOL

EQUIPMENT DESIGNATION

BREAK LINE

SECTION NUMBER

SHEET WHERE SHOWN

SHEET WHERE SHOWN

REVISION NUMBER

DETAIL NUMBER

DENOTES CORNER GUARD

LOCATION

PARTITION TYPE

EQUIPMENT TYPE

(SEE EQUIPMENT MANUAL)

COLUMN GRID CENTERLINE INDICATOR

KEYNOTE INDICATOR

WINDOW TYPE

OR VISION PANEL

CG

INTERIOR

AND/OR

EXTERIOR

MULTIPLE INTERIOR

NEW DOOR

EMERGENCY DOOR DESIGNATION

EMERGENCY SWING

DOUBLE EGRESS DOOR DESIGNATION

ROOM NAME

1t

1t

A.F.F.10' 6"

A101

SIM

RM

CEILING:

WALL:

FLOOR:

BASE:

NAME

CEILING

FINISH

WALL

FINISH

FLOOR

FINISH

BASE

FINISH

ROOM FINISH TAG

NAME

ELEVATION

N

NEW DOOR

NOTE: EXISTING DIMENSIONS INDICATED AS [0'-0"] OR WITH (VIF)

ARE SUPPLIED TO THE ARCHITECT BY OTHERS AND SHALL BE

FIELD VERIFIED BY THE CONTRACTOR. (SEE "GENERAL

CONTRACTOR RESPONSIBILITIES WITH RESPECT TO EXISTING

CONDITION NOTES")

ROOM INDICATION

KEYNOTE SYMBOL

O'-O"

FACE OF SURFACE INDICATOR

O'-O"

O'-O" ±

O'-O"

VIF

NEW DOOR

A101

F2

A201

A1

A3

A4 A2A201

EXISTING DOOR DESIGNATION

EXISTING DOOR

A

A

A102

AREA A

INDICATOR OF AREA SHOWN ON DRAWING

SHEET NUMBER OF ADJACENT DRAWING

A

X

EXISTING WALL

TEMPORARY BARRIER

CONSTRUCTION ROUTE

GENERAL DEMOLITION NOTES:

A. REMOVE EXISTING CONSTRUCTION AS

DESIGNATED HEREIN AND CLEAR AREA

OF DEBRIS PRIOR TO PROCEEDING WITH

NEW CONSTRUCTION.

B. EXISTING EQUIPMENT REMOVED

SHALL BE PROPERLY DISPOSED OFF

MEDICAL CENTER GROUNDS.

COORDINATE WITH VA COR.

C. EXTENSIONS OF EXISTING WALLS AND

PATCHED WALL OPENING SHALL AS A

MINIMUM, MATCH THE INTEGRITY OF

ADJACENT CONSTRUCTION UNLESS

INDICATED OTHERWISE.

D. NOTIFY CONTRACTING OFFICER'S

REPRESENTATIVE OF ANY AREA

REQUIRING DEMOLITION FOR

INSTALLATION OF MECHANICAL,

PLUMBING, STRUCTURAL, ELECTRICAL,

OR DATA ITEMS (INCLUDING ROOF

PENETRATIONS) NOT SHOWN IN THESE

DRAWINGS. AFTER SUCH DEMOLITION

AND INSTALLATION, PATCH OR REPLACE

MATERIALS AND FINISHES TO MATCH

EXISTING.

E. THE INFORMATION CONTAINED IN

THESE DEMOLITION DOCUMENTS DEFINES

GENERAL SCOPE ONLY AND DOES NOT

RELIEVE THE CONTRACTOR OF THE

RESPONSIBILITY OF PROVIDING ALL

DEMOLITION REQUIRED FOR THE

COMPLETION OF THE PROJECT.

F. REFER TO THE ELECTRICAL

DRAWINGS FOR FURTHER INFORMATION

REGARDING DEMOLITION OF ELECTRICAL

SYSTEMS.

G. ALL DEMOLITION WORK SHALL BE

PERFORMED WITH "CARE AND DILIGENCE"

IN ORDER TO PREVENT ARBITRARY

DAMAGE OR INTERRUPTION OF SERVICE

OR CONCEALED UTILITIES INTENDED TO

REMAIN IN SERVICE. DISCOVERY OF

UTILITIES OR CONDITIONS LOCATED

DIFFERENTLY FROM THAT INDICATED OR

THAT ARE NOT IDENTIFIED. SHALL BE

REPORTED TO THE CONTRACTING

OFFICER.

H. SALVAGE ALL EXISTING SIGNAGE,

GRILLE, COVER PLATES AND ELEVATOR

DOOR ACCESS CONTROL KEY PAD AND

CEILING MOUNT SENSORS (ON SOME

LEVELS) WITHIN THE LIMIT OF WORK OF

THE ELEVATOR LOBBY WALL ON EACH

FLOOR.

I. CONTRACTOR IS RESPONSIBLE TO

ENSURE LIGHTING, SMOKE DETECTOR

AND EXIT SIGNS WILL BE AVAILABLE

DURING CONSTRUCTION FOR EACH

PHASE. COORDINATE WITH VA COR AND

SAFETY ABOUT RELOCATION OF THESE

ELEMENTS PRIOR TO ERECTING

TEMPORARY CONSTRUCTION BARRIER.

A/C AIR CONDITIONING

ACOUS ACOUSTICAL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

A&E ARCHITECT AND ENGINEERS

AFF ABOVE FINISH FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITIES HAVING JURISDICTION

AHU AIR HANDLING UNIT

ALT ALTERNATIVE

ALT TRANS ALTERNATIVE TRANSPORTATION

ALUM ALMINUM

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECTURAL

AVG AVERAGE

BB BULLETIN BOARD

BD BOARD

BLDG BUILDING

BLKG BLOCKING

BM BEAM

BOD BASIS OF DESIGN

BRG BEARING

CB CATCH BASIN

CBB CEMENTITIOUS BACKER BOARD

CER CERAMIC

CF CUBIC FEET

CFCI CONTRACTOR FURNISH

CONTRACTOR INSTALL

CFM CUBIC FEET PER MINUTE

CG CORNER GUARD

C & G CURB & GUTTER

CI CAST IRON

CIP CAST IN PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNITS

CO CLEANOUT(S)

COL COLUMN

CONC CONCRETE

CONT COTINUOUS

COORD COORDINATE

CP CONCRETE PIPE

CPT CARPET

CR CRASH RAIL

CRS COLD ROLLED STEEL

CS CAST STONE

CSB CONCRETE SPLASH BLOCK

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CT CERAMIC TILE

CTR CENTER

CU FT CUBIC FEET

CUH CABINET UNIT HEATER

CY CUBIC YARD

D DRYER

DEG DEGREE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DISP DISPENSER

DIV DIVISION

DN DOWN

DR DOOR

DS DOWNSPOUT

DW DISHWASHER

DWG DRAWING

E EAST

(E) EXISTING

EA EACH

EF EXHAUST FAN

EFTR EXISTING FINISH TO REMAIN

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELEC ELECTRICAL

ELEV ELEVATOR

EQ EQUAL

EQUIP EQUIPMENT

EST ESTIMATED

ETR EXISTING TO REMAIN

ETS EXPOSED TO STRUCTURE

ARCHITECTURAL ABBREVIATIONS

EWC ELECTRIC WATER COOLER

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EXT EXTERIOR

FA FIRE ALARM

FAAP FIRE ALARM ANNUNCIATOR PANEL

FACP FIRE ALARM CONTROL PANEL

FCU FAN COIL UNIT

FD FLOOR DRAIN

FDN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FLOOR

FF & E FURNITURE FIXTURES & EQUIPMENT

FIN FINISH

FIXT FIXTURE

FL FLOW LINE

FLR FLOOR

FLUOR FLUORESCENT

FO FINISH OPENING

FOS FACE OF STUD

FR FIRE RATED

FSP FIRE STANDPIPE

FT FOOT / FEET

FTG FOOTING

FURR FURRING

FV FIELD VERIFY

FVC FIRE VALVE CABINET

FWC FABRIC WALLCOVERING

GA GAUGE

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GARBAGE DISPOSAL

GF CMU GROUND FACE CMU

GFCI GROUND FAULT CIRCUIT

INTERRUPTER

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLACK

GLU LAM GLUE LAMINATED WOOD

GND GROUND

GT GROUT

GYP BD GYPSUM BOARD

GYP GYPSUM

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIB

HC HOLLOW CORE

HCP HANDICAPPED

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HGT HEIGHT

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR, HANDRAIL

HT HEIGHT

HVAC HEATING, VENTILATING & AIR

CONDITIONING

IBC INTERNATIONAL BUILDING CODE

ID INSIDE DIAMETER

IG INSULATING GLASS

IN INCH

INCAN INCANDESCENT

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INV INVERT

ITG INSULATED TEMPERED GLASS

JAN JANITOR

J-BOX JUNCTION BOX

JT JOINT

L LONG

LAV LAVATORY

LB(S) # POUND(S)

LF LINEAL FEET

LLV LONG LEG VERTICAL

LT LIGHT

LVR LOUVER

M & BH MOP AND BROOM HOLDER

MAINT MAINTENANCE

MATL MATERIAL

MAX MAXIMUM

MB MARKER BOARD

MECH MECHANICAL

MEPF MECHANICAL, ELECTRICAL,

PLUMBING,

FIRE PROTECTION (CONDUIT)

MFR MANUFACTURER

MH MANHOLE

MIN MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MO MASONRY OPENING

MSB MOP SERVICE BASIN

MTD MOUNTED

MTL METAL

N

NORTH

NA NOT APPLICABLE

NECY NECESSARY

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER,

OVERFLOW DRAIN

OFCI OWNER FURNISHED

CONTRACTOR INSTALLED

OFOI OWNER FURNISHED

OWNER INSTALLED

OH OPPOSITE HAND

OPN OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

P PAINT

PARTN PARTITION

PBD PARTICLE BOARD

PBSW PATIENT BED SERVICE WALL

PCC PRECAST CONCRETE

PI PSYCHIATRIC INPATIENT

PL PLATE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLYWD PLYWOOD

PMU PSYCHIATRIC MEDICAL UNIT

PR PAIR

PRCST PRECAST

PREFAB PREFABRICATED

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT CONCPOST-TENSIONED CONCRETE

PTD PAPER TOWEL DISPENSER

PTL PORCELAIN TILE

PVC POLYVINYL CHLORIDE

QA QUALITY ASSURANCE

QT QUARRY TILE

R-VALUE (INSULATION),

RADIUS, RISER

RB RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

RE: REFERENCE

REBAR REINFORCING BAR

REC RECESSED

RECPT RECEPTACLE

REF REFRIGERATOR

REG REGISTER

REINF REINFORCE

REQD REQUIRED

RESIL RESILIENT

REV REVISION

RFT RESILIENT FLOOR TILE

RH ROOF HATCH

RM ROOM

RO ROUGH OPENING

RT RUBBER STAIR TREAD

S

SOUTH

SAF SEAMLESS ACRYLIC FLOORING

SAP SUSPENDED ACOUSTICAL PANELS

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASHBLOCK

SC SEALED CONCRETE, SOLID CORE

SCHED SCHEDULE

SCP SCUPPER

SD SOAP DISPENSER

SEAL SEALER

SECT SECTION

SECT SECTION

SF SQUARE FOOT

SF CMU SPLIT-FACE CMU

SHR SHOWER

SHT SHEET

SHTG SHEATHING

SIM SIMILAR

SL SLOPE

SLV SHORT LEG VERTICAL

SND SANITARY NAPKIN DISPOSER

SNV SANITARY NAPKIN VENDOR

SPECS SPECIFICATIONS

SQ SQUARE

SS SOLID SURFACE

SST STAINLESS STEEL

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUC STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SYM SYMMETRICAL

SYS SYSTEM

T TREAD

TB TACKBOARD

T&B TOP AND BOTTOM

T&G TONGUE AND GROOVE

TBD TO BE DETERMINED

TD TUBULAR DAYLIGHTING DEVICE

TEL TELEPHONE

TEMP TEMPERATURE

TG TEMPERED GLASS,

TONGUE & GROOVE,

TRANSFER GRILLE

THRU THROUGH

TO TOP OF

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL

TOW TOP OF WALL

TTD TOILET TISSUE DISPENSER

TV TELEVISION

TYP TYPICAL

UGND UNDERGROUND

UL UNDERWRITERS LABORATORY

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

URN URINAL

VB VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VIF VERIFY IN FIELD

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

W WEST

W/ WITH

W/O WITHOUT

WC WATER CLOSET

WD WOOD

WDP WOOD PANELING

WDW WINDOW

WF WIDE FLANGE

WGL WIRED GLASS

WH WATER HEATER

WR WASTE RECEPTACLE,

WATER RESISTANT

WS WATER STOP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

INV INVERT

ITG INSULATED TEMPERED GLASS

TT TERRAZZO TILE

SIX LED DOWNLIGHTS WITH BRUSHED STAINLESS PANELS AND CONCEALED ACCESS PANEL.

BRUSHED STAINLESS STEEL WAINSCOT W/ WOOD VENEERING ON UPPER PORTION W/ MIRROR POLISHED STAINLESS STEEL REVEALS.

BACK WALL PANEL TO HAVE IMPRINT OF EACH SERVICE BRANCH INSIGNIA IN HONORING THE SERVICE. BRANCHES INCLUDE US AIR FORCE, ARMY, US MARINE CORPS, AND NAVY. OBTAIN FINAL IMAGE APPROVAL FROM THE VA INTERIOR DEPARTMENT.

FLEXIBLE TERRAZZO TILE ON 34" PLYWOOD SUBSTRATE.

STAINLESS STEEL RAIL TYPE BASE SLOPED 2" FROM WALL TO FLOOR.

3" WIDE ALUMINUM EXTRUDED HANDRAIL AND GUARDRAILS. SEE ELEVATIONS.

CEILING:

WALLS:

FLOOR:

BASE:

HANDRAILS:

ELEVATORS 1, 2, 3, & 4 CAB FINISH SCHEDULE:

GENERAL INFORMATION

KC DGC, GTS 2 4

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

SHEET NOTES

WALL LEGEND

2HR HOUR FIREWALL

GI002

AIR FORCE

IMAGES FOR ELEVATOR CAB'S BACK WALLS

ARMY MARINE NAVY

(NOTE: IMAGES ARE FOR REFERENCE ONLY. OBTAIN FINAL APPROVAL FROM

VA INTERIOR DESIGNER PRIOR TO ORDER AND FABRICATION.)

ICRA GENERAL NOTES:

1.

2.

NO MAJOR EQUIPMENT ACCESS THROUGH THE BUILDING BETWEEN 7AM TO

5PM. CONTRACTOR TO COORDINATE WITH VA COR.

ALL LOBBY WORK SHALL BE COMPLETED DURING AFTER HOURS 4:00 PM TO

11:00 PM.

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX

OF PRECAUTIONS FOR CONSTRUCTION AND RENOVATION

Class III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction

Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2

Medium Risk

Group 1

Low Risk

- Bldg. #69 Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE

D

TYPE

C

TYPE

B

TYPE

A

Group 4

Highest Risk

Group 3

High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgetn Care

- Laboratories

- CLCs (1B Med, 59B, 138A, 138B)

- SPD; AMCU; 1B Medicine;

- Respiratory Isolation Rooms

III

TYPE DTYPE CTYPE B

o r control procedures are necessary.

C L A

S S

I V

C L A

S S

I I

During Construction Project

C L

I

C L A

S S

I I I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving workareas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area.

Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers.

Shoe covers must be changed each ime the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers work area until completed project is inspected each by the Hospital Department Safety Officer, Facilities Management Maintenance and Engineering and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

Class IV

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control

Precautions depending upon the Area Class Designation

II

I

LOW Risk Group 1

HIGH Risk Group 3

HIGHEST Risk Group 4

MEDIUM Risk Group 2

IV

IV

IV

III/IV

III/IV

III/IV

III/IV

III

III

III

WALL LEGEND

1HR HOUR FIREWALL

1HR HOUR FIRE SMOKE

BARRIER

2HR HOUR FIREWALL

I

AREA OF WORK

LOADING DOCK

CONSTRUCTION

ACCESS

STEAM DRYER

ROLL UP DOOR

200'

CONSTRUCTION ROUTE

ICRA NOTES AND DETAILS

KC DGC, GTS 3 4

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

BASEMENT FLOOR CONSTRUCTION ACCESS PLAN

SCALE: 1/16" = 1'-0"

CONSTRUCTION ROUTE - CONSTRUCTION MATERIALS ROUTE IS THROUGH THE

BASEMENT LEVEL (GROUND FLOOR) AND ELEVATOR SHAFTS. (FOR UPPER

FLOORS, CONTRACTOR TO COORDINATE WITH COR) - MAINTAIN A MINIMUM OF

5'-0" CLEAR WIDTH IN CORRIDORS AT ALL TIMES

STICKY MAT AT ALL CONSTRUCTION ACCESS POINT

USE PORTABLE DUST EXTRACTOR AND AIR SCRUBBER WITH HEPA FILTRATION

SYSTEM. VERIFY DISCHARGE LOCATION WITH COR

REFER TO INFECTION CONTROL RISK ASSESSMENT PACKAGE FOR MORE

INFORMATION

KEY NOTES

GI003

TEMPORARY PARTITION TYPE 'T'

PROVIDE TEMPORARY PROTECTIVE PLASTIC BARRIER WITH ZIPPER ENTRY TO

THE BOTTOM OF CEILING

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C4-74

C4-73

STAIR #3

C4-74A

C4-56

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

CB-82

CB-48

I.V. STOR

CB-89D

CB-82STAIR #3

C4-157

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

P

M

ICRA AND CONSTRUCTION PHASING

PLANS

KC

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

ELEVATOR LOBBY WORK IN LEVELS 4, 5, 7, & 11

SCALE: 1/4" = 1'-0"

FOR ELEVATOR LOBBY WORK IN GROUND LEVEL

SCALE: 1/4" = 1'-0"

SEE SHEET GI003 FOR CONSTRUCTION ACCESS

FROM BASEMENT TO LOADING DOCK

CONTRACTOR TO ENSURE ACCESS TO EXISTING

FIRE EXTINGUISHERS OR FIRE ALARM PULL

STATIONS ARE MAINTAINED. RELOCATE SAID

EXTINGUISHERS OR PULL STATIONS UNTIL SUCH

TIME THAT THEY CAN BE RETURNED TO THEIR

ORIGINAL LOCATIONS. COORDINATE LOCATION WITH

VA COR AND SAFETY IN ADVANCE

DO NOT REMOVE TEMPORARY BARRIERS FOR EACH

PHASE AND ALL HVAC ISOLATION UNTIL

CONTRACTOR HAS CLEANED CONSTRUCTION SITE,

VA INFECTIONS DISEASE CONTROL HAS INSPECTED

AND APPROVED THE CLEANING

SPRINKLER HEADS TO BE CAPPED DURING

CONSTRUCTION WITHIN EACH PHASE - SPRINKLER

SYSTEM OVERALL TO REMAIN PRESSURIZED

VA REQUIRES THAT ALL APPLICABLE PERMITS BE

COMPLETED AND APPROVED PRIOR TO BEGINNING

ANY WORK. PERMITS INCLUDE ICRA, ILSM, ABOVE

CEILING, FIRE ALARM SYSTEM

CONTRACTOR SHALL PROTECT AREA ADJACENT TO

THE DEMOLITION AND NEW CONSTRUCTION WORK

TO PREVENT DAMAGES. (IF DAMAGED, REPAIR,

PATCH, SAND AND REFINISH TO MATCH EXISTING

COORDINATE CONSTRUCTION SCHEDULE WITH VA

COR TO ENSURE STAFF ACCESS FROM ELEVATOR

LOBBIES TO THEIR OFFICES OR OTHER ROOMS

DURING CONSTRUCTION

SEE ARCHITECTURAL PLANS AND DETAILS FOR

DEMOLITION AND RENOVATION WORK

ALL LIGHTING, SMOKE DETECTOR AND EXIT SIGN IN

THE ELEVATOR LOBBY AREAS SHALL REMAIN

AVAILABLE DURING CONSTRUCTION.

SEE SPECIFICATIONS AND THE ASBESTOS SURVEY

DATED 2014/08/29 TO BE PROVIDED BY THE VA FOR

LOCATIONS KNOWN TO INCLUDE ASBESTOS AND

WITHIN THE AREA OF THE SCOPE OF WORK FOR THE

GROUND LEVEL AND LEVELS 4, 5, 7, 8, 9, 10, AND 11.

SHEET NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

SHEET KEY NOTES

PROVIDE TEMPORARY PROTECTIVE PLASTIC BARRIER WITH

ZIPPER ENTRY TO BOTTOM OF CEILING

PROVIDE 1-HR RATED TEMPORARY CONSTRUCTION

BARRIER CONSISTING OF SEALED 5/8" GYPSUM BOARD ON

BOTH SIDES OF 3-5/8" METAL STUD PARTITION EXTEND TO

BOTTOM OF FLOOR OR ROOF DECK ABOVE. SEAL TOP AND

BOTTOM OF PARTITION. PARTITION SHALL BE INSPECTED

BY VA ICRA STAFF PRIOR TO START OF CONSTRUCTION IN

SPACE. SEE TEMPORARY PARTITION TYPE "T" ON SHEET

GI003.

PROVIDE RATED 3' WIDE BY 7' TALL HARD DOOR WITH

ASSOCIATED HARDWARE FOR TEMPORARY PARTITION.

COORDINATE WITH VA COR ON SECURING

EGRESS DOOR DURING THIS CONSTRUCTION

PHASE(S).

CONSTRUCTION ROUTE THRU THE BASEMENT

LEVEL TO LOADING DOCK AS INDICATED ON

SHEET GI003

PROVIDE TEMPORARY CONSTRUCTION SIGN FOR

PHASE 9 CONSTRUCTION WORK IN THE

STAIRWELL AND LOBBY AREA. TEMPORARY

CONSTRUCTION SIGN SHALL INCLUDE

ALTERNATE EGRESS MAP TO DIRECT STAFF AND

VISITORS TO THE NEAREST STAIRS 1, 2 AND 4.

COORDINATE WITH VA COR PRIOR TO ERECTING

SIGN.

PROVIDE CONSTRUCTION SIGN FOR PHASE 8

CONSTRUCTION WORK IN the RESTROOM AND

THE LOBBY AREA TO INDICATE NO ACCESS TO

THE LOBBY.

PROVIDE STICKY MAT AT CONSTRUCTION

ACCESS POINT. (MAT SHALL BE INSPECTED AND

CHANGED FREQUENTLY TO ENSURE

EFFECTIVENESS)

USE PORTABLE DUST EXTRACTOR AND AIR

SCRUBBER WITH HEPA FILTRATION SYSTEM

COORDINATE WITH VA COR ABOUT OFF-HOURS

SCHEDULE AND TEMPORARY REROUTING

ACCESS FOR HOSPITAL STAFF/VISTORS PRIOR

TO ERECTING TEMPORARY BARRIER

CONSULT WITH THE VA SAFETY DEPARTMENT TO

MAINTAIN A MINIMUM CLEARANCE IN HALLWAY

1.

1A.

1B

2.

3.

3A

3B

4.

5.

6.

7.

DO NOT

BLOCK

DOOR

PHASE 6

3A

DO NOT

BLOCK

DOOR

GI004

DGC, GTS 4 4

WALL LEGEND

2HR HOUR FIREWALL

1HR HOUR FIREWALL

3A1A 6

3A

1A6

3A

3A

1A 6

PHASE 6

3A

3A

ICRA & CONSTRUCTION PHASING PLAN

3A

1A 6

ELEVATOR LOBBY WORK IN LEVELS 8, 9 AND 10

SCALE: 1/4" = 1'-0"

DO NOT

BLOCK

DOOR

LEVEL 8:

WINDOW, FRAME

AND FLOOR CABINET

RADIATOR UNIT - NIC

ICRA & CONSTRUCTION PHASING PLAN FOR ICRA & CONSTRUCTION PHASING PLAN FOR

1A

3A

PHASE 6

3A

3A

1A

3B

FIXTURES AND SHAFT WORK FROM GROUND LEVEL TO LEVEL 11

SCALE: 1/4" = 1'-0"

ICRA & CONSTRUCTION PHASING PLAN FOR ELEVATOR, HALL

PHASE 1

PHASE 2

PHASE 3

PHASE 5

PHASE 4

(OFF-HOUR)

(OFF-HOUR)

(OFF-HOUR)

(OFF-HOUR)

(OFF-HOUR)

1A 5

PHASE 7

3A

PHASE 7

NOTE: 1. PHASES 6 TO 9 ARE OFF-HOURS CONSTRUCTION WORK

2. NO FLOORING WORK IN THE GROUND LEVEL

1A

3A

PHASE 7

PHASE 9

PHASE 8

1A

1A

1A

1A

NOTE: 1. PHASES 6 TO 9 ARE OFF-HOURS CONSTRUCTION WORK

PHASE 9

PHASE 8

1A 5

1A

PHASE 8

3A

1A

NOTE: 1. PHASES 6 TO 9 ARE OFF-HOURS CONSTRUCTION WORK

PHASE 9

PHASE 6

1A

1A

1B

1B

1A

1B

1B

3B

1B

1B

3A

1B

1B

1B

1B

1A

1A

NOTE: 1. PHASES 1 TO 5 AND MACHINE ROOM WORK ARE NOT OFF-HOURS

CONSTRUCTION WORK

NOTE:

ALL LOBBY WORK SHALL BE PERFORMED DURING

AFTER HOURS FROM 4:00 PM TO 11:00 PM

PIT B

ELEVATOR

PIT A

1B

1B

1A

1A

1C

1C

ELEVATOR

PIT B

ELEVATOR

PIT A

1B

1B

1A

1A

1C

1C

BASEMENT

(GROUND) LEVEL

SUMP PIT

EXISTING CONCRETE

PIT WALL TO REMAIN

CUT EXISTING CONCRETE

FLOOR AND INSTALL FORM

WORK FOR SUMP PIT'S

INSTALLATION

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

CB-153

CB-82

CB-48

I.V. STOR

CB-89D

CB-82STAIR #3

UP

LIMIT OF

WORK

CB-81

CB-48

CB-80G

D1

D2

D3

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

CB-153

CB-82

CB-48

I.V. STOR

CB-89D

CB-82STAIR #3

CB-81

CB-48

CB-80G

AREA OF

WORK

EXISTING

EXISTING

7'-5"

A.F.F.

7'-5"

A.F.F.

AREA OF

WORK

4 4

ALIGN

3/4" ℄ STEEL

RUNGS WELD TO

STRINGER

2 1/2" x 1/4" STEEL

BAR STRINGER

2 1/2" x 1/4" STEEL

BAR STRINGER

FINISH FLOOR AT

ELEV. PIT

ELEVATOR MFR

CLEARANCE

REQUIREMENTS.

VERIFY REQUIRED

OSHA TOE

CLEARANCE

NOTE: EXTEND LADDER

5'-0" ABOVE BASEMENT

(GROUND) LEVEL'S FLOOR

SILL ENTRANCE

1/2" CONC EXP

ANCHOR

FINISH FLOOR

P

M

A-101

ARCHITECTURAL PLANS AND DETAILS -

BASEMENT (GROUND) LEVEL

KC DGC 1 11

ELEVATOR PIT PLAN

SCALE: 1/8" = 1'-0"

ELEVATOR SUMP PIT SECTION

SCALE: 1/4" = 1'-0"

SUMP PUMPS - SEE PLUMBING DRAWINGS

EXISTING WALL TO REMAIN

SHEET KEY NOTES - NEW#

BASEMENT (GROUND) LEVEL NEW FLOOR PLANS

SCALE: 1/4" = 1'-0"

BASEMENT (GROUND) LEVEL NEW CEILING PLANS

SCALE: 1/4" = 1'-0"

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

SHEET NOTES - DEMO

D#

PROTECT PIT AREA FROM SUMP WORK

SPRINKLER HEAD TO REMAIN

EXISTING SPEAKER TO REMAIN

RELOCATED SPEAKER

INDIRECT LIGHT COVE

INSTALL NEW CEILING, ELEVATION TO MATCH

EXISTING

NEW LIGHTING - SEE ELECTRICAL DRAWINGS

CEILING MOUNTED EXIST. SIGN TO REMAIN

EXISTING CEILING MOUNTED WIFI UNIT TO

REMAIN.

EXISTING BULKHEAD TO REMAIN - (N.I.C.)

EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)

WALL MT. ALARM SPEAKER TO REMAIN

EXISTING SMOKE DETECTOR TO REMAIN

NEW 2'x2' DIFUSSER. - SEE MECHANICAL

DRAWINGS

REMOVE EXISTING CEILING SYSTEM, LIGHTING FIXTURES,

AND MECHANICAL GRILLS ONLY ON BASEMENT (GROUND)

LEVEL

D1

NEW FLEXIBLE TERRAZZO TILE FLOORING

SYSTEM

WALL LEGEND

2HR HOUR FIREWALL

REPAIR OR REPLACE DAMAGED CEILING

OUTSIDE OF CONSTRUCTION AREA CAUSED

BY NEW CONSTRUCTION

1A

EXISTING FLOORING SYSTEM TO REMAIN

NEW 2'x2' RETURN. - SEE MECHANICAL

DRAWINGS

1B

2' (W) X 2' (D) X 2'-6" (H) CONCRETE SUMP PIT

PIT LADDER DETAILS

SCALE: 1" = 1'-0"

1C

PIT LADDER

D2

REMOVE MAIL CHUTE AND LETTER BOX. ALSO SEE

DRAWINGS 1, 2, AND 3 OF SHEET A-202 FOR MORE

DETAILS

INSTALL TILE OVER TILE WALL AND BASE ON

THE ELEVATOR SIDE WALL ON THIS LEVEL.

INSTALL ALUMINUM TERMINATION TRIM ON

THE EXPOSED EDGE OF TILE. SEE SHEET

A-202 FOR DETAILS

REFURBISH, REPAIR DAMAGED AREA ON DOOR

AND FRAME AND REFINISH TO MATCH EXISTING

SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS

TO BE RENOVATED ON THE ELEVATOR SIDE WALL

IN THE ELEVATOR LOBBY AREA

D3

EXISTING FLOORING TO REMAIN

C4-74

C4-73

N4-76

N4-127

DN

C4-157

C4-56

C4-132

C4-57B

C4-57A

C4-56D

N4-130

1A

11B

LIMIT OF

WORK

1A

1A

11A

11A

11A

11A

11B

13 EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

11B

11A

11B

11A

11B

11B

11A

11B

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C4-157

STAIR #3

C4-56

C4-57B

C4-57A

C4-56D

N4-130

LIMIT OF

WORK

13 EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)

7'-4"

AFF

7'-11"

AFF

8'-0 1/2"

AFF

C4-74

C4-73

N4-76

N4-127

DN

C4-157

C4-56

C4-132

C4-57B

C4-57A

C4-56D

N4-130

D1

LIMIT OF

WORK

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

D1

D3

D1

D1

13 EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

D2

D3

D3

P

M

A-102

ARCHITECTURAL PLANS AND DETAILS -

LEVEL 4

KC DGC 2 11

LEVEL 4 NEW FLOOR PLAN

SCALE: 1/4" = 1'-0"

LEVEL 4 NEW REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

LEVEL 4 DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

SHEET NOTES - DEMO

D#

1A

SHEET KEY NOTES - NEW#

SPRINKLER HEAD TO REMAIN

EXISTING SPEAKER TO REMAIN

INDIRECT LIGHT COVE

INSTALL NEW CEILING, ELEVATION TO MATCH

EXISTING

NEW LIGHTING - SEE ELECTRICAL DRAWINGS

CEILING MOUNTED EXIT SIGN TO REMAIN

RELOCATED CEILING MOUNTED WI-FI UNIT TO

REMAIN

EXISTING CEILING SYSTEM TO REMAIN - N.I.C.

EXISTING SMOKE DETECTOR TO REMAIN

NEW 2'x2' DIFFUSER - SEE MECHANICAL DRAWINGS

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

INSTALL NEW FLEXIBLE TERRAZZO TILE FLOORING

SYSTEM

REMOVE EXISTING CEILING SYSTEM, LIGHTING,

GRILLS AND FLOORING SYSTEM AS INDICATED

D1

WALL LEGEND

2HR HOUR FIREWALL

EXISTING FLOORING SYSTEM TO REMAIN

REPAIR OR REPLACE DAMAGED FLOORING AND

CEILING OUTSIDE OF CONSTRUCTION AREA

CAUSED BY NEW CONSTRUCTION

15 EXISTING WALL FIRE EXTINGUISHER TO REMAIN

RELOCATED 2'x2' DIFFUSER - SEE MECHANICAL

DRAWINGS

EXISTING BULKHEAD TO REMAIN - (N.I.C.)

FLOOR LEGEND

TT FIELD

TT ACCENT #1

TT ACCENT #2

SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS

TO BE RENOVATED IN THE ELEVATOR LOBBY

AREA

INSTALL TILE OVER TILE WALL AND BASE ON THE

ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL

ALUMINUM TERMINATION TRIM ON THE EXPOSED

EDGE OF TILE. SEE SHEET A-203 FOR DETAILS

REFURBISH, REPAIR DAMAGED AREA ON DOOR AND

FRAME AND REFINISH TO MATCH EXISTING

INSTALL TILE OVER TILE WALL AND BASE ON THE

LOWER PORTION TO MATCH EXISTING TILE WALL

HEIGHT OF REMAINING ELEVATOR LOBBY WALL ON

THIS LEVEL. FINISH TOP OF WAINSCOT WALL WITH

BULLNOSE . INSTALL ALUMINUM TERMINATION TRIM

ON THE EXPOSED EDGE OF TILE. PAINT WALL

ABOVE WAINSCOT

REFURBISH AND PAINT EXISTING WALL TO

UNDERSIDE OF CEILING

D2

REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF

SHEET A-202 FOR MORE DETAILS

11A

11B

D3

REMOVE AND SALVAGE EXISTING HANDRAILS

INSTALL SALVAGED HANDRAILS

PARTIAL EXISTING ELEVATOR LOBBY

SCALE: NTS (CORRIDOR EXTENSION FROM ELEVATOR LOBBY)

11A 11B

11A 11B

11A 11B

C5-56C

STAIR #3

C5-79

C5-57

C5-57B

C5-57A

C5-74

C5-74A

LIMIT OF

WORK

1A

1A

1A

11A

11A

11A

11B

11A

1A

1A

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

11B

11B

11B

11A

11B

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

STAIR #3

LIMIT OF

WORK

7'-10"

AFF

C5-56C

STAIR #3

C5-57

C5-57B

C5-57A

C5-74

C5-74A

LIMIT OF

WORK

D1

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

D1

D1

D1

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

D2

P

M

A-103

ARCHITECTURAL PLANS AND DETAILS -

LEVEL 5

KC DGC 3 11

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

LEVEL 5 NEW FLOOR PLAN

SCALE: 1/4" = 1'-0"

LEVEL 5 NEW REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

SHEET NOTES

LEVEL 5 DEMOLITION FLOOR PLAN

SCALE: 1/4" = 1'-0"

SHEET KEY NOTES - NEW#

EXISTING CEILING SYSTEM TO REMAIN

SPRINKLER HEAD TO REMAIN

EXISTING SPEAKER TO REMAIN

INDIRECT LIGHT COVE

INSTALL NEW CEILING, ELEVATION TO

MATCH EXISTING

NEW LIGHTING - SEE ELECTRICAL DRAWINGS

CEILING MOUNTED EXIT SIGN TO REMAIN

EXISTING CEILING MOUNTED WI-FI UNIT TO REMAIN

EXISTING SMOKE DETECTOR TO REMAIN

NEW 2'x2' DIFFUSER - SEE MECHANICAL DRAWINGS

NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM

REMOVE EXISTING CEILING SYSTEM, LIGHTING,

GRILLS AND FLOORING SYSTEM AS INDICATED

D1

1A

EXISTING FLOORING SYSTEM TO REMAIN

REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE

OF CONSTRUCTION AREA CAUSED BY NEW

CONSTRUCTION

WALL LEGEND

2HR HOUR FIREWALL

FLOOR LEGEND

TT FIELD

TT ACCENT #1

TT ACCENT #2

PARTIAL EXISTING ELEVATOR LOBBY

SCALE: NTS

INSTALL TILE OVER TILE WALL AND BASE ON THE

ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL

ALUMINUM TERMINATION TRIM ON THE EXPOSED

EDGE OF TILE. SEE SHEET A-202 FOR DETAILS

REFURBISH, REPAIR DAMAGED AREA ON DOOR AND

FRAME AND REFINISH TO MATCH EXISTING

INSTALL TILE OVER TILE WALL AND BASE ON THE

LOWER PORTION TO MATCH EXISTING TILE WALL

HEIGHT OF REMAINING ELEVATOR LOBBY WALL ON

THIS LEVEL. FINISH TOP OF WAINSCOT WALL WITH

BULLNOSE . INSTALL ALUMINUM TERMINATION TRIM

ON THE EXPOSED EDGE OF TILE. PAINT WALL

ABOVE WAINSCOT

REFURBISH AND PAINT EXISTING WALL TO

UNDERSIDE OF CEILING

11A

11B

D2

REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF

SHEET A-202 FOR MORE DETAILS

SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS

TO BE RENOVATED IN THE ELEVATOR LOBBY

AREA

11A

11B

11A

11B

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C7-48A

C7-50

C7-48

STAIR #3

C7-16

C4-57B

C4-57A

C7-44

C7-52

C7-59

LIMIT OF

WORK

C7-47B

UP

DN

1A

1A

1A

11A

11A

11B

11A

11A

11B

11A

11B

C7-59

LIMIT OF

WORK

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

8'-0"

AFF

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C7-48A

C7-50

C7-48

STAIR #3

C7-16

C4-57B

C4-57A

C7-44

C7-52

C7-59

LIMIT OF

WORK

C7-47B

UP

DN

D1

D1

D1

1A

D3

D2D3

1A

EXISTING CEILING SYSTEM TO REMAIN - (N.I.C.)

P

M

A-104

ARCHITECTURAL PLANS AND DETAILS -

LEVEL 7

KC JGG, DGC 4 11

LEVEL 7 NEW FLOOR PLAN

SCALE: 1/4" = 1'-0"

LEVEL 7 NEW RCP REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

SHEET NOTES - DEMO

D#

SHEET KEY NOTES - NEW#

RELOCATED SPEAKER

INDIRECT LIGHT COVE

INSTALL NEW CEILING, ELEVATION TO MATCH

EXISTING

NEW LIGHTING - SEE ELECTRICAL DRAWINGS

CEILING MOUNTED EXIT SIGN TO REMAIN

EXISTING CEILING SYSTEM TO REMAIN

RELOCATED SMOKE DETECTOR TO REMAIN

NEW 2'x2' DIFFUSER - SEE MECHANICAL DRAWINGS

NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM

SPRINKLER HEAD TO REMAIN

REWORK EXISTING CEILING PANEL

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

LEVEL 7 DEMOLITION FLOOR PLAN

SCALE: 1/4" = 1'-0"

REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE

OF CONSTRUCTION AREA CAUSED BY NEW

CONSTRUCTION

1A

EXISTING FLOORING SYSTEM TO REMAIN

WALL LEGEND

2HR HOUR FIREWALL

FLOOR LEGEND

TT FIELD

TT ACCENT #1

TT ACCENT #2

PARTIAL EXISTING ELEVATOR LOBBY

SCALE: NTS (EXISTING ELEVATOR SIDE WALL)

REMOVE EXISTING CEILING SYSTEM, LIGHTING,

GRILLS AND FLOORING SYSTEM IN THE ELEVATOR

LOBBY AREA

D1

D2

REMOVE ABANDONED SENSOR CONTROLS AND WALL

MOUNTED CONDUITS AT CEILING AND ELEVATOR DOOR

FRAME

D3

REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF

SHEET A-202 FOR MORE DETAILS

D3

D2

D1

D3

D3

D1

INSTALL TILE OVER TILE WALL AND BASE ON THE

ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL

ALUMINUM TERMINATION TRIM ON THE EXPOSED

EDGE OF TILE. SEE SHEET A-202 FOR DETAILS

REFURBISH, REPAIR DAMAGED AREA ON DOOR AND

FRAME AND REFINISH TO MATCH EXISTING

SEE SHEETS A-105 AND A-202 FOR OTHER ITEMS

TO BE RENOVATED IN THE ELEVATOR LOBBY

AREA

11A

INSTALL TILE OVER TILE WALL AND BASE ON THE

LOWER PORTION TO MATCH EXISTING TILE WALL

HEIGHT OF REMAINING ELEVATOR LOBBY WALL ON

THIS LEVEL. FINISH TOP OF WAINSCOT WALL WITH

BULLNOSE . INSTALL ALUMINUM TERMINATION TRIM

ON THE EXPOSED EDGE OF TILE. PAINT WALL

ABOVE WAINSCOT.

REFURBISH AND PAINT EXISTING WALL TO

UNDERSIDE OF CEILING.

11B

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C8-54

C8-56

C8-54A

STAIR #3

C7-51A

C8-26A

C8-54B

C8-54A

C7-44

LIMIT OF

WORK

C7-47B

UP

DN

C8-55

C8-59B

1A

1A

1A

1A

10A

10B

10A

10A

10A

10A

10A

10A

10B

10B

10B

10B

10B

10B

ALIGN

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C8-54

C8-56

C8-54A

STAIR #3

C7-51A

C8-54B

C8-54A

C7-44

C7-47B

C8-55

C8-59B

LIMIT OF

WORK

8'-0"

AFF

S L O

P E

2 2

ALIGN

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C8-54

C8-56

C8-54A

STAIR #3

C7-51A

C8-26A

C8-54B

C8-54A

C7-44

LIMIT OF

WORK

C7-47B

UP

DN

C8-55

C8-59B

D1

1A

D1

D3

D3

D2

P

M

A-105

ARCHITECTURAL PLANS AND DETAILS -

LEVEL 8

KC 5 11

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

LEVEL 8 NEW FLOOR PLAN

SCALE: 1/4" = 1'-0"

LEVEL 8 DEMOLITION FLOOR PLAN

SCALE: 1/4" = 1'-0"

LEVEL 8 NEW REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

SHEET NOTES - DEMO

D#

REMOVE EXISTING CEILING SYSTEM, LIGHTING,

GRILLS AND FLOORING SYSTEM IN THE ELEVATOR

LOBBY AREA

D1

SHEET KEY NOTES - NEW#

SPRINKLER HEAD TO REMAIN

INDIRECT LIGHT COVE

ALIGN AND MATCH NEW CEILING ELEVATION

WITH EXISTING

NEW LIGHTING - SEE ELECTRICAL DRAWINGS

EXISTING CEILING MOUNTED WI-FI UNIT TO REMAIN

EXISTING CEILING SYSTEM TO REMAIN - N.I.C.

NEW 2'x2' DIFFUSER - SEE MECHANICAL DRAWINGS

RELOCATED SPEAKER

EXISTING SMOKE DETECTOR TO REMAIN

REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE

OF CONSTRUCTION AREA CAUSED BY NEW

CONSTRUCTION

1A

EXISTING FLOORING SYSTEM TO REMAIN

EXISTING SECURITY CAMERA TO REMAIN

D2

DOOR TO REMAIN, REFURBISH, REPAINT TO

MATCH EXISTING (TYP)

JNG, DGC

PARTIAL EXISTING ELEVATOR LOBBY

SCALE: NTS

D3

D3

D3

INSTALL TILE OVER TILE WALL AND BASE ON THE

ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL

ALUMINUM TERMINATION TRIM ON THE EXPOSED

EDGE OF TILE. SEE SHEET A-202 FOR DETAILS

REFURBISH, REPAIR DAMAGED AREA ON DOOR AND

FRAME AND REFINISH TO MATCH EXISTING

SEE SHEETS A-105 AND A-202 FOR OTHER ITEMS

TO BE RENOVATED IN THE ELEVATOR LOBBY

AREA

REMOVE ABANDONED SENSOR CONTROLS AND WALL

MOUNTED CONDUITS AT CEILING AND ELEVATOR DOOR

FRAME

D3

REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF

SHEET A-202 FOR MORE DETAILS

D2

WALL LEGEND

2HR HOUR FIREWALL

FLOOR LEGEND

TT FIELD

TT ACCENT #1

TT ACCENT #2

NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM

D1

D1

INSTALL TILE OVER TILE WALL AND BASE ON THE

LOWER PORTION TO MATCH EXISTING TILE WALL

HEIGHT OF REMAINING ELEVATOR LOBBY WALL ON

THIS LEVEL. FINISH TOP OF WAINSCOT WALL WITH

BULLNOSE . INSTALL ALUMINUM TERMINATION TRIM

ON THE EXPOSED EDGE OF TILE. PAINT WALL

ABOVE WAINSCOT

REFURBISH AND PAINT EXISTING WALL TO

UNDERSIDE OF CEILING

10A

10B

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

ELEV

LOBBY

C9-35

SOCIAL

WORKER

C9-38

ELEC

CLOSET

C9-37

STAIR #3

C9-39

C8-26A

TELEPHONE

CLOSET

C9-44

MECH

C9-45

DOCTOR'S

OFFICE

C9-40

LIMIT OF

WORK

CORRIDOR

C9-33A

UP

DN

ELEC

C9-36

TOILET

C9-43A

ELEV

LOBBY

C9-33B

1A

1A

1A

12A

12B

12B

12A

12A

12B

12A

12B

12B

12A

12B

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

ELEV

LOBBY

C9-35

SOCIAL

WORKER

C9-38

ELEC

CLOSET

C9-37

STAIR #3

C9-39

C8-26A

TELEPHONE

CLOSET

C9-44

MECH

C9-45

DOCTOR'S

OFFICE

C9-40

CORRIDOR

C9-33A

ELEC

C9-36

TOILET

C9-43A

ELEV

LOBBY

C9-33B

LIMIT OF

WORK

8'-1"

AFF

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

ELEV

LOBBY

C9-35

SOCIAL

WORKER

C9-38

ELEC

CLOSET

C9-37

STAIR #3

C9-39

C8-26A

TELEPHONE

CLOSET

C9-44

MECH

C9-45

DOCTOR'S

OFFICE

C9-40

LIMIT OF

WORK

CORRIDOR

C9-33A

UP

DN

ELEC

C9-36

TOILET

C9-43A

ELEV

LOBBY

C9-33B

D1

1A

1A

1A

D1

D1

D2

P

M

A-106

ARCHITECTURAL PLANS AND DETAILS -

LEVEL 9

KC 6 11

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

LEVEL 9 NEW FLOOR PLAN

SCALE: 1/4" = 1'-0"

LEVEL 9 NEW REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

LEVEL 9 NEW DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

SHEET NOTES - DEMO

SHEET KEY NOTES - NEW

D#

REMOVE EXISTING CEILING SYSTEM, LIGHTING,

GRILLS AND FLOORING SYSTEM AS INDICATED

D1

SPRINKLER HEAD TO REMAIN

INDIRECT LIGHT COVE

INSTALL NEW CEILING, ELEVATION TO MATCH

EXISTING

NEW LIGHTING - SEE ELECTRICAL DRAWINGS

EXISTING CEILING MOUNTED WIFI UNIT TO REMAIN

EXISTING CEILING SYSTEM TO REMAIN - N.I.C.

NEW 2'x2' DIFFUSER. - SEE MECHANICAL

DRAWINGS

NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM

RELOCATED SPEAKER

EXISTING SMOKE DETECTOR TO REMAIN

EXISTING SECURITY CAMERA TO REMAIN

CEILING MOUNTED EXIT SIGN TO REMAIN

REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE

OF CONSTRUCTION AREA CAUSED BY NEW

CONSTRUCTION

1A

EXISTING FLOORING SYSTEM TO REMAIN

JGG, DGC

WALL LEGEND

TT FIELD

TT ACCENT #1

TT ACCENT #2

INSTALL TILE OVER TILE WALL AND BASE ON THE

ELEVATOR SIDE WALL ON THIS LEVEL. INSTALL

ALUMINUM TERMINATION TRIM ON THE EXPOSED

EDGE OF TILE

12A

INSTALL TILE OVER TILE WALL AND BASE ON THE

LOWER PORTION AS INDICATED OF REMAINING

ELEVATOR LOBBY WALL ON THIS LEVEL. FINISH TOP

OF WAINSCOT WALL WITH BULLNOSE . INSTALL

ALUMINUM TERMINATION TRIM ON THE EXPOSED

EDGE OF TILE. PAINT WALL ABOVE WAINSCOT

REFURBISH, REPAIR DAMAGED AREA ON DOOR AND

FRAME AND REFINISH TO MATCH EXISTING

REFURBISH AND PAINT EXISTING WALL TO

UNDERSIDE OF CEILING. PROTECT AND PAINT

AROUND EXISTING MURAL ART WORK

12B

12A

12B

12A

12B

TOP OF WAINSCOT AT 4'-0"

A.F.F. OR BELOW THE

BOTTOM OF EXISTING

MURAL ART

PARTIAL WALL ELEVATION

SCALE: NTS (OPPOSITE SIDE OF ELEVATORS)

REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF

SHEET A-202 FOR MORE DETAILS

D2

SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS

TO BE RENOVATED IN THE ELEVATOR LOBBY

AREA

WALL LEGEND

2HR HOUR FIREWALL

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

10-61

10-36

10-37

STAIR #3

10-35

10-30

10-28

LIMIT OF

WORK

UP

DN

10-60

1A

1A

1A

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

10-61

10-36

10-37

10-35

10-62

10-30

10-28

10-60

LIMIT OF

WORK

7'-5"

AFF

6 15

LIMIT OF

WORK

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

10-61

10-36

10-37

STAIR #3

10-35

10-30

10-28

10-33

LIMIT OF

WORK

UP

DN

10-60

D1

D1

D1

D1

P

M

A-107

ARCHITECTURAL PLANS AND DETAILS -

LEVEL 10

KC JGG, DGC 7 11

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

LEVEL 10 NEW FLOOR PLAN

SCALE: 1/4" = 1'-0"

LEVEL 10 NEW REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

LEVEL 10 DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

SHEET NOTES - DEMO

SHEET KEY NOTES - NEW

D#

# SHEET KEY NOTES - NEW

REMOVE EXISTING CEILING SYSTEM, LIGHTING,

GRILLS AND FLOORING SYSTEM AS INDICATED

SPRINKLER HEAD TO REMAIN

INDIRECT LIGHT COVE

INSTALL NEW CEILING, ELEVATION TO MATCH

EXISTING

NEW LIGHTING - SEE ELECTRICAL DRAWINGS

EXISTING CEILING MOUNTED WIFI UNIT TO REMAIN

EXISTING CEILING SYSTEM TO REMAIN - N.I.C.

NEW 2'x2' DIFUSSER. - SEE MECHANICAL DRAWINGS

RELOCATED SPEAKER

EXISTING SMOKE DETECTOR TO REMAIN

EXISTING CAMERA TO REMAIN

CEILING MOUNTED EXIT SIGN TO REMAIN

D1

REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE

OF CONSTRUCTION AREA CAUSED BY NEW

CONSTRUCTION

1A

EXISTING FLOORING SYSTEM TO REMAIN

WALL LEGEND

2HR HOUR FIREWALL

REFURBISH, REPAIR DAMAGED AREA ON DOOR AND

FRAME AND REFINISH TO MATCH EXISTING

FLOOR LEGEND

INSTALL TILE OVER TILE WALL, AND BASE THROUGH

OUT LOBBY ON THIS LEVEL. INSTALL ALUMINUM

TERMINATION TRIM ON THE EXPOSED EDGE OF TILE

SEE SHEETS A-107 AND A-202 FOR OTHER ITEMS

TO BE RENOVATED IN THE ELEVATOR LOBBY

AREA

D2

REMOVE MAIL CHUTE, ALSO SEE DRAWINGS 1, 2, AND 3 OF

SHEET A-202 FOR MORE DETAILS

TT FIELD

TT ACCENT #1

TT ACCENT #2

NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C11-32

C11-30B

C11-30

C11-31

C11-28P

1A

1A

LIMIT OF

WORK

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C11-32

C11-30B

C11-30

C11-31

C11-28P

D1

D1

D1

LIMIT OF

WORK

D2

ELEVATOR

#3

ELEVATOR

#4

ELEVATOR

#2

ELEVATOR

#1

C11-32

C11-30B

C11-30

C11-31

C11-28P

1 2A

8'-0"

AFF

16A

LIMIT OF

WORK

6A

P

M

A-108

ARCHITECTURAL PLANS AND DETAILS -

LEVEL 11

KC DGC 8 11

Drawing Title:

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg. of

#1

Date Checked Drawn Wilkes-Barre VA Medical Center

1111 East End Blvd.

\Wilkes-Barre, PA, 18711

UPGRADE ELEVATORS -

SILVER

JANUARY 22, 2019

675-16-100

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C D

E

Revisions: Date

N

AREA OF WORK

WITHIN BUILDING #1

KEY PLAN

FULLY SPRINKLERED

CONSTRUCTION DOCUMENTS

Office of

Construction and Facilities

Management

PROJECT MANAGER:

ACG Project Number

17-111

CONSULTANTS:

LEVEL 11 NEW FLOOR PLAN

SCALE: 1/4" = 1'-0"

LEVEL 11 DEMOLITION PLAN

SCALE: 1/4" = 1'-0"

SHEET NOTES - DEMO

D#

LEVEL 11 NEW REFLECTED CEILING PLAN

SCALE: 1/4" = 1'-0"

REMOVE EXISTING CEILING SYSTEM, LIGHTING,

GRILLS AND FLOORING SYSTEM AS INDICATED

D1

SHEET KEY NOTES - NEW# SHEET KEY NOTES - NEW

SPRINKLER HEAD TO REMAIN

INDIRECT LIGHT COVE

INSTALL NEW CEILING, ELEVATION TO MATCH

EXISTING

NEW LIGHTING - SEE ELECTRICAL DRAWINGS

EXISTING MOUNTED WI-FI UNIT TO REMAIN

EXISTING CEILING SYSTEM TO REMAIN - N.I.C.

NEW 2'x2' DIFFUSER. - SEE MECHANICAL DRAWINGS

INSTALL NEW TILE WALL, AND BASE THROUGH OUT

LOBBY ON THIS LEVEL. INSTALL ALUMINUM

TERMINATION TRIM ON THE EXPOSED EDGE OF TILE

REFURBISH, REPAIR DAMAGED AREA ON DOOR AND

FRAME AND REFINISH TO MATCH EXISTING

NEW FLEXIBLE TERRAZZO TILE FLOORING SYSTEM

RELOCATED SPEAKER

EXISTING SMOKE DETECTOR TO REMAIN

EXISTING CAMERA TO REMAIN

CEILING MOUNTED EXIT SIGN TO REMAIN

EXISTING SOFFIT TO REMAIN

EXISTING TRAP DOOR TO REMAIN ABOVE CEILING

REPAIR OR REPLACE DAMAGED FLOORING OUTSIDE

OF CONSTRUCTION AREA CAUSED BY NEW

CONSTRUCTION

1A

EXISTING FLOORING SYSTEM TO REMAIN

NEW CEILING ACCESS PANEL TO TRAP DOOR ABOVE.

SUSPEND PANEL FROM…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.