36C24418B0594-0001006.docx

DOCX document 18 KB Posted

Attached to
Construct Smoking Shelters, Project 542-18-108 Federal contract opportunity
Solicitation number
36C24418B0594
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24418B0594 0001 Revised Cost Price Schedule.docx

View the file

Other files for this federal contract opportunity

Other files attached to Construct Smoking Shelters, Project 542-18-108, newest first.
File Type Posted
36C24418C0273-000.docx DOCX document
36C24418B0594-0001000.docx DOCX document
36C24418B0594-0001007.pdf PDF
36C24418B0594-0001004.pdf PDF
36C24418B0594-0001001.pdf PDF
36C24418B0594-0001003.pdf PDF
36C24418B0594-0001002.pdf PDF
36C24418B0594-0001005.pdf PDF
36C24418B0594-001.docx DOCX document
36C24418B0594-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVISED COST/PRICE SCHEDULE

A. BASE BID: Scope of Work description, page 4.

ITEM I, BASE BID: GENERAL CONSTRUCTION: Provide all labor, tools, materials, quality supervision, etc. required to construct (6) six aluminum framed smoke shelters with aluminum standing seam metal roofs with ridge vent with intergraded bench and solar powered shelter light assembly including poured‐in place concrete slab. The smoke shelter footprint dimension shall be (5) 5 feet by 10 feet and (1) 10 feet by 10 feet attached to a poured‐in place concrete slab as required by the smoke shelter manufacturer. Shelters shall be located as shown on attachment “A” of this document. Exact location shall be installed per final approval of the project Contracting Officer Representative (COR). See Attachment “B” for shelters performance specifications and concrete slab requirements.

LUMP SUM BASE BID: $ _____________________________

Write bid amount in words

B. ADD-ON ALTERNATE:

ITEM II, ADD-ON ALTERNATE #1: All work described in the Base Bid including the following:

Contractor shall provide 5’ wide 4” deep 4,000 psi concrete side walk. The pricing shall be per smoke shelter unit.

PER UNIT: $ __________________________

Write bid amount in words