36C24418B0575-003.pdf
PDF 3 MB Posted
- Attached to
- Correct AC Deficiencies in Biomedical and Mailroom Federal contract opportunity
- Solicitation number
- 36C24418B0575
About this file
36C24418B0575 Correct Air Conditioning Deficiencies in Biomedical Shop and Mailroom, Project No 503-17-104, 100_ Bid Documents Drawings.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24418B0575-0001001.pdf | ||
| 36C24418B0575-0001000.docx | DOCX document | |
| 36C24418B0575-0001002.pdf | ||
| 36C24418B0575-0001003.pdf | ||
| 36C24418B0575-005.docx | DOCX document | |
| 36C24418B0575-007.docx | DOCX document | |
| 36C24418B0575-006.docx | DOCX document | |
| 36C24418B0575-004.docx | DOCX document | |
| 36C24418B0575-002.pdf | ||
| 36C24418B0575-001.docx | DOCX document | |
| 36C24418B0575-000.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
3/
/2
3:
:4
P
M CORRECT AIR CONDITIONING
DEFICIENCIES IN BIOMEDICAL
SHOP AND MAILROOM
503-17-104
JG JA
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
G001
COVER SHEET
MARCH 27, 2018
17029
BID DOCUMENTS
CORRECT AIR CONDITIONING
DEFICEINCIES IN BIOMEDICAL
SHOP AND MAILROOM
JAMES E. VAN ZANDT VA MEDICAL CENTER
2907 PLEASANT VALLEY BLVD.
ALTOONA, PA 16602
VICINITY MAP: ALTOONA, PENNSYLVANIA
SITE
LOCATION MAP:
JAMES E. VAN ZANDT VA MEDICAL CENTER
SITE
PROJECT DIRECTORY
OWNER:
JAMES E. VAN ZANDT VA MEDICAL CENTER
2907 PLEASANT VALLEY BLVD.
ALTOONA, PA 16602
(814) 943-8164
CONTACT: ZACH WASSER
ARCHITECT/ENGINEER:
AE WORKS, LTD
209 SANDUSKY STREET
PITTSBURGH, PA 15206
(412) 287-7333
CONTACT: JULIE GOOD, PE
DRAWING INDEX
SHEET # SHEET NAME IS
S
U E
IS
S
U E
GENERAL
G001 COVER SHEET •
ARCHITECTURAL
A001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
A002 BASEMENT - CONTRACTOR WORK PATH PLAN
A130 BASEMENT CEILING PLANS
MECHANICAL
H001 HVAC SYMBOLS, ABBREVIATIONS AND GENERAL NOTES
HD100 PARTIAL BASEMENT HVAC DEMOLITION PLAN
H100 PARTIAL BASEMENT HVAC PLAN
H600 HVAC DETAILS
H700 HVAC SCHEDULES AND CONRTOLS
ELECTRICAL
E001 ELECTRICAL SYMBOLS, ABBREVIATIONS AND NOTES
E101 BIO MEDICAL SHOP LIGHTING PLAN, SCHEDULES AND DETAILS
SYMBOLS LEGEND
DESCRIPTION SYMBOL
DRAWING BLOCK TITLE MARK
ITEM SCALE
ITEM TITLE / DESCRIPTION
ITEM NUMBER / LETTER
WALL SECTION MARK
A101
SHEET NUMBER
SECTION IDENTIFIER
BUILDING SECTION MARK
A101
SHEET NUMBER
SECTION IDENTIFIER
DETAIL INDICATOR
A101
DETAIL IDENTIFIER
SHEET NUMBER
LEADER
DETAIL BOUNDARY
EXTERIOR ELEVATION MARK
A100
INTERIOR ELEVATION MARK
(SINGLE VIEW)
A100
INTERIOR ELEVATION MARK
(MULTIPLE VIEWS)
A100
ELEVATION IDENTIFIER
SHEET NUMBER
ELEVATION IDENTIFIER
SHEET NUMBER
ELEVATION IDENTIFIER
SHEET NUMBER
NORTH ARROW
NORTH
TRUE NORTH
PROJECT
ROOM NAME
ROOM NUMBER
ROOM NAME INDICATOR
COLUMN GRID IDENTIFICATION
GRID LINE IDENTICATION
COLUMN GRID LINE
DOOR IDENTIFICATION
1 DOOR NUMBER
W#WINDOW IDENTIFICATION WINDOW / CURTAINWALL TYPE
WALL TYPE IDENTIFICATION
M8 WALL TYPE INDICATOR
WALL
KEYED NOTE IDENTIFICATION
REVISION IDENTIFICATION
REVISION CLOUD
REVISION NUMBER
DATUM POINT IDENTIFICATION
LEVEL
10'-0"
ELEVATION RELATIVE TO
FIRST FLOOR TOP OF SLAB
WALL FINISH PT#
FINISH
EXTENT OF FINISH
ROOM NAME
DEMO PLAN - KEYED NOTE
PLAN - KEYED NOTE
WALL SECTION / EXTERIOR ELEVATION - KEYED NOTE
EARTH -
COMPACTED FILL
GRAVEL, CRUSHED STONE
SAND, GROUT, LIMESTONE
WOOD, FINISH
WOOD, FRAMING
THROUGH MEMBER
WOOD, FRAMING
INTERRUPTED MEMBER
PLYWOOD
ACOUSTIC TILE
RIGID INSULATION
TAPERED
INSULATION
BATT INSULATION
CONCRETE
BRICK
CONCRETE BLOCK
STEEL
GYPSUM BOARD, PLASTER
MATERIALS LEGEND :
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
3/
/2
3:
:4
P
M CORRECT AIR CONDITIONING
DEFICIENCIES IN BIOMEDICAL
SHOP AND MAILROOM
503-17-104
JG TP
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
A001
ARCHITECTURAL SYMBOLS, ABBREVIATIONS
AND GENERAL NOTES
MARCH 27, 2018
14-
BID DOCUMENTS
SS SOIL STACK
ST PR STATIC PRESSURE
ST STL STAINLESS STEEL
STD STANDARD
STER STERILIZER
STL STEEL
STOR STORAGE
STR STRAINER
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
SYM SYMMETRICAL TOP
T TOP
TA THROWAWAY
TAN TANGENT
TC TELECOMMUNICATIONS
CONTRACTOR
TCV TEMPERATURE CONTROL VALVE
TDV TRIPLE DUTY VALVE
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TG TONGUE & GROOVE
TH THERMOMETER
THRES THRESHOLD
TR TEMPERATURE RISE
TRANS TRANSITION
TRANSR TRANSFORMER
TSTAT THERMOSTAT
TV TURNING VANES OR TELEVISION
TYP TYPICAL
UC UNDER CABINET OR UNDER CUT
UFD UNDER FLOOR DUCT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VAL VALVE
VD VOLUME DAMPER
VENT VENTILATION
VERT VERTICAL
VFS VENTURI FLOW STATION
VIF VERIFY IN FIELD
VL VENT LINE
VR VAPOR RETARDER
VS VENT STACK
VTR VENT THROUGH ROOF
W WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WALL COVERING
WCL WATER CLOSET
WD WOOD
WF WIDE FLANGE
WFMD WATER FLOW MEASURING DEVICE
WG WALL GUARD OR WATER GAUGE
WHCH WHEEL CHAIR
WIN WINDOW
WMS WIRE MESH SCREEN
WP WEATHERPROOF
WPS WALL PROTECTION SYSTEM
WSCT WAINSCOT
WT WINDOW TREATMENT
WTD WATER TEMPERATURE DROP
WWF WELDED WIRE FABRIC
X DEMO
XN TO BE RELOCATED / NEW LOCATION
XR EXISTING TO REMAIN
ZVB ZONE VALVE BOX
ZVC ZONE VALVE CABINET
LDB LEAVING DRY BULB
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LIN LINEAR
LOC LOCATION OR LOCATE
LPT LOW POINT
LSDC LINEAR SUPPLY DIFFUSER CEILING
LT LIGHT
LTG LIGHTING
LV LOW VOLTAGE
LVR LOUVER
LWB LEAVING WET BULB
LWC LINEAR WOOD CEILING
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MAT MIXED AIR TEMPERATURE
MATL MATERIAL
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH ONE THOUSAND BTU / HOUR
MC MECHANICAL CONTRACTOR
MC METAL CLAD CABLE
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MO MASONRY OPENING
MOD MOTOR OPERATED DAMPER
MONO MONOLITHIC
MTD MOUNTED
MTG HT MOUNTING HEIGHT
MTL METAL
MTLH METAL HALIDE
MTR MOTOR
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NUMBER OR NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OPER OPERATED
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
PB PULL BOX
PC PLUMBING CONTRACTOR
PD PUMP DISCHARGE
PG PRESSURE GAUGE WITH COCK
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRD PRESSURE DIFFERENTIAL VALVE
PRELIM PRELIMINARY
PRT PRESSURE TAP
PRV PRESSURE REDUCING VALVE
PT PAINT OR POTENTIAL
TRANSFORMER
RO ROUGH OPENING
QT QUARRY TILE
R RADIUS
RA RETURN AIR / RELIEF AIR
RB RUBBER BASE
RC REMOVE COMPLETELY
RD ROOF DRAIN
RE RELOCATE EXISTING
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFL REFLECTOR
REG REGISTER
REINF REINFORCING
REM REMOVE
REQD REQUIRED
RET RETURN
REV REVISE
REX REMOVE EXISTING
RF RESILIENT FLOOR
RFI REQUEST FOR INFORMATION
RGS RIGID GALVANIZED STEEL CONDUIT
RH ROOF HATCH
RM ROOM
RN REMOVE AND REPLACE WITH NEW
RR REMOVE AND REPLACE
RS RAPID START
RV RELIEF VALVE
RWC RAIN WATER CONDUCTOR
SA SUPPLY AIR
SAN SANITARY SEWER ABOVE GROUND
SAN-BXR SANITARY SEWER - BURIED
EXISTING TO REMAIN
SAN-XR SANITARY SEWER ABOVE GROUND -
EXISTING TO REMAIN
SCHED SCHEDULE
SD SMOKE DAMPER OR SMOKE
DETECTOR
SDISP SOAP DISPENSER
SF SQUARE FOOT
SHT SHEET
SHT MTL SHEET METAL
SHTG SHEATHING
SIM SIMILAR
SM SURFACE MOUNTED
SNC SANITARY NAPKIN CABINET
SND SANITARY NAPKIN DISPOSER
SP STANDPIPE OR STATIC PRESSURE
SPC SPECIMEN PASS-THRU CABINET
SPEC SPECIFICATIONS
SPS STATIC PRESSURE SENSOR
SR SERVICE RECEPTOR
EIFS EXTERIOR INSULATION AND
FINISHING SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEC CAB ELECTRICAL CABINET
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENTR ENTRANCE
EO ELECTRICAL OUTLET
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWB ENTERING WET BULB
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXAUST AIR
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
XP EXPLOSION PROOF
F/S FIRE / SMOKE DAMPER
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FAT FINAL AIR TEMPERATURE
FB FIRE BLANKET
FC FLEXIBLE CONNECTION OR
FOOTCANDLE
FD FLOOR DRAIN OR FIRE DAMPER
FDN FOUNDATION
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HOSE
FHC FIRE HOSE CABINET
FHP FULL HEIGHT PARTITION
FHV FIRE HOSE VALVE
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLA FULL LOAD AMPERES
FLASH FLASHING
FLEX FLEXIBLE
FLG FLANGE
FLG C FLANGE CONNECTION
FLR FLOOR
FLUOR FLUORESCENT
FP FIRE PROOFING
FRMG FRAMING
FS FLOOR SINK
FSTOP FIRESTOPPING
FT FOOT / FEET
FT HD FEET OF HEAD
FTC FOOTCANDLES
FTG FOOTING
FUR FURRING
G GAS OR ELECTRICAL GROUND
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERATOR
GENL GENERAL
GFCI GROUND FAULT CIRCUIT
INTERRUPTOR
GL GLASS
GLV GLOBE VALVE
GND GROUND
GPM GALLONS PER MINUTE
GR GRADE
GRAV GRAVITY
GRD BM GRADE BEAM
GV GATE VALVE
GWB GYPSUM BOARD
H HIGH
HB HOSE BIB
HC HEATING CONTRACTOR
HDCP HANDICAP
HDR HEADER
HDW HARDWARE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER
HPD HIGH PRESSURE DRIP
HPF HIGH POWER FACTOR
HR HANDRAIL
HSKP HOUSEKEEPING
HT HEIGHT
HTG HEATING
HTR HEATER
HV HIGH VELOCITY
HVAC HEATING, VENTILATING, AIR
CONDITIONING
HW HOT WATER
HWD HARD WOOD
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWS&R HOT WATER SUPPLY AND RETURN
HZ HERTZ
ID INSIDE DIAMETER
IER INVERTED ECCENTRIC REDUCER
IG ISOLATED GROUND
IME INSULATED METAL ENCLOSURE
IN INCH
INCAND INCANDESCENT
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INTERL INTERLOCK
INV INVERT
ISO ISOLATION
IVS ISOLATED VALVE STATION
J-BOX JUNCTION BOX
JST JOIST
JT JOINT
KO KNOCK OUT
kVA KILOVOLT AMPERE kVAR KILOVAR (REACTANCE) kW KILOWATT kWH KILOWATT HOUR METER
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
LB POUND
& AND
A AIR (CLINICAL)
AAP ALARM ANNUNCIATOR PANEL
AAV AUTOMATIC AIR VENT
AB ANCHOR BOLT
ABV ABOVE
ACC DR ACCESS DOOR
ACFL ACCESS
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICAN DISABILITIES ACT
ADD ADDENDUM
ADDL ADDITIONAL
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AFMD AIR FLOW MEASURING DEVICE
AHU AIR HANDLING UNIT
AL ALIGN
ALT ALTERNATE
ALUM ALUMINUM
AMP AMPERE
AP ACCESS PANEL
APC ARCHITECTURAL PRECAST
CONCRETE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASY ASYMMETRIC
ATC AUTOMATIC TEMPERATURE
CONTROL
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AWT AVERAGE WATER TEMPERATURE
BAT BATTERY
BC BALANCING COCK OR BARE
COPPER
BDD BACKDRAFT DAMPER
BFC BELOW FINISH CEILING
BFE BOTTOM FOOTING ELEVATION
BFG BELOW FINISHED GRADE
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT BORROWED LIGHT
BLW BELOW
BM BEAM
BO BY OWNER
BOF BY OWNER FUTURE
BOT BOTTOM
BR BRICK
BRG BEARING
BRKR BREAKER
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
C CONDUIT
CAB CABINET
CANTL CANTILEVER
CAP CAPACITY
CATV CABLE TELEVISION
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CFH CUBIC FEET / HOUR
CFM CUBIC FEET / MINUTE
CH CHANNEL
CHK V CHECK VALVE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CHWS&R CHILLED WATER SUPPLY AND
RETURN
CJ CONTROL JOINT
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CL CENTERLINE
CLG CEILING
CLG MTD CEILING MOUNTED
CLR CLR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE / CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET OR CONTROL POWER
TRANSFORMER
CT CERAMIC TILE
CTR CENTER
CU COPPER
CV CONTROL VALVE
CW COLD WATER
D DEPTH OR DEEP
DB DRY BULB
dB DECIBEL
DCW DOMESTIC COLD WATER
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAILS
DF DRINKING FOUNTAIN
DHW DOMESTIC HOT WATER
DIA DIAMETER
DIAG DIAGONAL OR DIAGRAM
DIFF DIFFUSER
DIM DIMENSION
DISC DISCONNECT
DISCH DISCHARGE
DISP DISPENSER
DIST DISTRIBUTION
DIV DIVISION
DL DOWN LIGHT
DN DOWN
DP DISTRIBUTION PANEL
DPR DAMPER
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EDB ENTERING DRY BULB
EF EXHAUST FAN
ABBREVATION LEGEND
1/8" = 1'-0"
TITLE
GENERAL PROJECT NOTES
1 ALL CONSTRUCTION WORK SHALL CONFORM WITH THE APPLICABLE CODES AND ORDINANCES OF THE LOCAL JURISDICTION, THE COMMONWEALTH OF PENNSYLVANIA, AND THE CURRENT ADOPTED VERSION OF THE INTERNATIONAL BUILDING CODE FAMILY. THE CONTRACTOR SHALL POST NOTICES AND COMPLY
WITH THE GOVERNING LAWS OF THE JURISDICTION.
2 INSTALLATIONS PERFORMED IN CONNECTION WITH THESE DRAWINGS SHALL COMPLY WITH THE MOST
RECENT NFPA EDITION.
3 THE SITE WORK SHALL BE PROPERLY SUPERVISED BY THE CONTRACTORS JOB SITE SUPERINTENDANT.
SUFFICIENT PERSONNEL SHALL BE EMPLOYED TO COMPLETE THE WORK WITHIN THE CONTRACTED TIME.
PERSONNEL SHALL BE SKILLED IN THE TASK ASSIGNED.
4 THE CONTRACTOR SHALL, AT ALL TIMES, MAINTAIN ADEQUATE PROTECTION TO SAFEGUARD THE PUBLIC
AND ALL PERSONS ENGAGED IN THE PERFORMANCE OF THE WORK.
5 THE DRAWINGS REFLECT CONDITIONS AS CAN BE INFERRED FROM VISIBLE CONDITIONS, OR FROM
DRAWINGS AND INFORMATION FURNISHED BY THE OWNER, BUT CANNOT BE GUARANTEED. THE
CONTRACTOR SHALL VERIFY ALL GRADES, LINE LEVELS AND DIMENSIONS INDICATED ON THE DRAWNGS AND SHALL REPORT ALL INCONSISTENCIES TO THE ARCHITECT PRIOR TO THE EXECUTION OF THE WORK.
RECHECK ALL DIMENSIONS PRIOR TO ORDERING MANUFACTURED AND/OR FABRICATED ITEMS.
6 PLAN DIMENSIONS, UNLESS NOTED OTHERWISE, ARE TO THE FACE OF THE WALL FINISH OR CENTERLINE
OF COLUMN.
7 ALL INDICATIONS OF MASONRY ARE SHOWN IN ACTUAL DIMENSIONS (NOT NOMINAL), UNLESS NOTED
OTHERWISE.
8 THE CONTRACTOR SHALL ASSUME FULL RESPONSIBILITY FOR PROTECTION AND SAFEKEEPING OF PRODUCTS PURCHASED FOR THIS PRODUCT AND STORED ON THE PROJECT SITE. THE CONTRACTOR SHALL COORDINATE WITH THE OWNER ON PREFERRED LOCATIONS FOR STORED MATERIALS ON THE
PROJECT SITE, IF ALLOWED AS PART OF THE REQUIREMENTS OF THIS PROJECT.
9 THE CONTRACTOR SHALL MAINTAIN AREAS UNDER THE CONTRACTOR'S CONTROL TO BE FREE OF WASTE MATERIALS, DEBRIS, AND RUBBISH. CONTAINERS FOR DEPOSIT OF DEBRIS AND RUBBISH SHALL BE
PROVIDED BY THE CONTRACTOR. COORDINATE LOCATION OF CONTAINERS WITH THE OWNER'S
REPRESENTATIVE PRIOR TO PLACEMENT. REMOVE AND DISPOSE OF DEMOLITION MATERIAL OFF SITE IN
ACCORDANCE WITH APPLICABLE CODES AND/OR SPECIFICATIONS.
10 EXTRANEOUS MATERIALS SHALL BE PERIODICALLY REMOVED, AND AT THE CONCLUSION OF THE PROJECT. ALL UNUSED TOP SOIL SHALL BE STOCKPILED ON THE SITE FOR THE OWNER'S USE.
11 THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL FIRESAFING / FIRESTOPPING MATERIALS AT ALL THROUGH-WALL AND THROUGH-CEILING PENETRATIONS AS REQUIRED FOR THE CONSTRUCTION WORK AND TO MAINTAIN FIRE RATINGS OF FLOORS AND WALLS. MATERIALS AND INSTALLATION DETAILS SHALL CONFORM TO UNDERWRITER LABORATORIES LISTING FOR RATED
ASSEMBLIES.
12 ALL WOOD FRAMING AND SHEATHING SHALL BE FIRE RETARDANT TREATED AS REQUIRED BY THE
BUILDING CODE CLASSIFICATION OF 'NONCOMBUSTIBLE'
13 DO NOT SCALE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND CONDITIONS PRIOR TO CONSTRUCTION.
NOTIFY THE ARCHITECT OF ANY DEVIATIONS OR DISCREPANCIES FOUND AND RECEIVE DIRECTION
BEFORE PROCEEDING.
14 DURING CONSTRUCTION THE CONTRACTOR WILL WORK ADJACENT TO PATIENT OCCUPIED FLOORS.
CONSTRUCTION RELATED ACTIVITIES ARE NOT TO ADVERSELY IMPACT THESE AREAS. CONSTRUCTION RELATED ACTIVITIES THAT MIGHT AFFECT THESE AREAS MUST BE COORDINATED WITH AND APPROVED
BY THE VA PRIOR TO OCCURRENCE.
15 CONTRACTOR SHALL PROVIDE TEMPORARY DUST ENCLOSURES DURING ALL DEMOLITION AND
CONSTRUCTION ACTIVITIES. CONTRACTOR TO COORDINATE LOCATIONS WITH CONTRACTING OFFICER. IF EXISTING WALLS ARE USED, PENETRATIONS MUST BE SEALED TO CREATE A DUST PROOF ENCLOSURE.
16 MODIFICATIONS TO THE EXISTING MEP SYSTEMS WILL IMPACT ADJACENT SPACES OUTSIDE THE GENERAL SCOPE OF WORK. ANY DISTURBANCE OF EXISTING CONDITIONS AND FINISHES MUST BE
REPAIRED TO MATCH THE CONDITIONS PRIOR TO CONSTRUCTION IMPACTS.
17 THE FACILITY IS OPERATIONAL. CONTRACTOR SHALL MAKE PROVISIONS FOR OWNER AND PUBLIC USE OF THE BUILDING AROUND THE CONSTRUCTION AREA. DELIVERIES, STAGING, STORAGE OF MATERIALS AND OTHER CONSTRUCTION RELATED ACTIVITIES SHALL BE COORDINATED WITH THE CONTRACTING OFFICER
SO AS TO NOT ADVERSELY AFFECT THE BUILDING OPERATIONS.
18 ASBESTOS AND LEAD ARE NOT ANTICIPATED TO EXIST IN THE WORK AREA. HOWEVER, IF
ASBESTOS-CONTAINING MATERIAL IS DISCOVERED OR SUSPECTED, STOP WORKING IN THE AREA
IMMEDIATELY AND CONTACT THE CONTRACTING OFFICER.
19 ALL REVISIONS TO THE DRAWINGS MUST PROCEED THROUGH THE ARCHITECT. OWNER / CONTRACTOR
REVISIONS MAY BE CONSIDERED INVALID.
20 ALL EXPOSED GYPSUM WALL BOARD EDGES TO HAVE METAL EDGE TRIM.
21 THE CONTRACTOR RESPONSIBLE FOR COMPARING AND COORDINATING ALL DRAWINGS FOR PROPER FIT AND ATTACHMENT OF ALL PARTS. DETAILS NOT SHOWN OR DESCRIBED IN THESE NOTES SHALL BE CONSTRUCTED TO SAME SIZE AND CHARACTER AS FOR SIMILAR CONDITIONS WHICH ARE SHOWN, SPECIFIED, OR COMMONLY CONSTRUCTED IN THE INDUSTRY.
22 NO STRUCTURAL MEMBER SHALL BE OMITTED, NOTCHED, CUT, BLOCKED OUT, OR RELOCATED WITHOUT
PRIOR APPROVAL BY THE ARCHITECT OR ENGINEER.
23 PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR TO PROTECT ADJACENT PROPERTY AT
ALL TIMES DURING CONSTRUCTION.
24 ALL TEMPORARY BRACING AND SHORING SHALL BE DESIGNED TO SUSTAIN ALL CONSTRUCTION LOADS, SOIL PRESSURE, LATERAL AND OTHER LOADS TO WHICH THE STRUCTURE MAY BE SUBJECTED.
25 CONTRACTOR SHALL COORDINATE LOCATIONS OF LIGHT FIXTURES, SPRINKLER HEADS, REGISTERS, ETC.
WITH THE REFLECTED CEILING PLAN LAYOUT.
26 ALL SPRINKLER HEADS, DIFFUSERS AND REGISTERS SHALL BE CENTERED WITH SUSPENDED
ACOUSTICAL PANELS, UNLESS NOTED OTHERWISE ON DRAWINGS.
27 ALL VOIDS IN MASONRY, CONCRETE AND OTHER ASSEMBLIES CREATED AROUND PENETRATIONS SHALL
BE FILLED / PATCHED WITH CONSTRUCTION TO MATCH SURROUNDING CONDITIONS.
28 CONTRACTOR IS RESPONSIBLE FOR PAINTING ALL EXPOSED STEEL, DECKING, PIPING, CONDUIT, SPRINKLER PIPING AND DUCTS WHICH ARE EXPOSED IN AREAS WITH NO CEILINGS AND SCHEDULED TO
RECEIVE PAINT FINISH AS INDICATED ON THE FINISH SCHEDULE.
22 22A
47B
26A
S00
E02
27A
29 29A 30
31 32
32B 32C47A
28A
18B
18A
E00
E00A
E00B
5B
5A
13A
S03
7A
1A
S02
42A
42B
35 37
37A
48C
S01
A000A
A000 A000C
AS000
A000E
31A
S04
A000B
A000K A000J A000I A000H A000G A000F
A000D
16B
SHR RM
41A
41A
41C
41D
SF
SF
SF
MECH RM ENG
SVC
ELEC SHOPENG
SVC
CHIEF
M&R
OFFICE
STOR
MACHINE SHOP
PLUMBING
SHOP
ENG
SVC
CARPENTER SHOP ENG
SVC
PLAN
RM
CORR
PAINT
SHOP
M TLT
EMS
STAIRS
MECH
RM
ELEV
LOBBY
MAIL ROOM
MAS
STOR
MAS
STORAGE
MAS
BIO-MED
SHOP
STOR
A&MM
FHC MCCORR
FHC
MECH RM ENG
SVC
CORR
STORAGE ENG
SVC
ELEV
ELEV
ELEV
A/C SHOP ENG
SVC
CORR
TELE
EC
FHC
STORAGE
VCS
STAIRS
OFFICE CRED
UN
CRED
UN
OFFICE CRED
UN
LOCKER
RM
CLO
OFFICE
EMS
CH OFF
VCS
RETAIL
STORE
RETAIL
STOR
STAIRS
TEL
TEL
CL
SIGN
SH
STOR
A&MM
MECH
RM
UNEXCAVATED
EC
ELEC
CL
HAC
CORR
HAC
STOR
STAIRS
PHARMACY
CACHE
STOR MECH
MECH
SHAFT
STAIRS
ELEC
UNEXCAVATED
EQ
STOR
ELEVATOR
ELEV. M/C
ROOM
MECH
PIT
POLICE TRAINING
ROOM
STAIRS
MECHANICAL
ROOM
HVAC
SHOP336
SF
OFFICE OFFICE OFFICE OFFICE OFFICE DATA
PANDEMIC
CORR
STOR
STOR
KITCHEN
STORAGE VCS
DINING RM VCS
17B
LOCKER ROOM
VESTIBULE
17A
TOILET ROOM
MENS
STORAGE
A&MM
STORAGE
A&MM
HSK
ROOM
COMPUTER
RM
CANTEEN
OFFICE
STORAGE
VCS
FD
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
KEY PLAN
3/
/2
3:
:4
P
M CORRECT AIR CONDITIONING
DEFICIENCIES IN BIOMEDICAL
SHOP AND MAILROOM
503-17-104
JG TP
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
A002
BASEMENT - CONTRACTOR WORK PATH
PLAN
MARCH 27, 2018
14-
BID DOCUMENTS
NORTH
TRUE NORTH
PROJECT
1" = 20'-0"
BASEMENT - CONTRACTOR WORK PATH PLAN
WORK AREA
BIOMED SHOP 31
MAIL ROOM MAS 29
CONTRACTOR(S) TO HAVE FULL ACCESS TO
FREIGHT ELEVATOR.
ELEVATOR IS ACCESSIBLE THROUGH THE
ON GRADE ENTRANCE AT SECOND FLOOR
RECEIVING W203 AND WAREHOUSE W202.
CONTRACTOR(S) PRIMARY STAGING AREA
TO BE LOCATED IN / AT THE PARKING
SPACE AT THE SOUTH END OF BUILDING 2.
NO STORAGE OF MATERIALS IS ALLOWED
IN BUILDING 1 OR IN THE MAILROOM OR IN
THE BIOMEDICAL SHOP.
LEGEND:
CONTRACTOR'S PRIMARY ENTRANCE/PATHWAY
CONTRACTOR(S) SHALL BE PERMITTED TO
PARK IN THIS LOT AT OR NEAR THE END OF
THIS ROW.
PARTIAL SITE MAP (No Scale)
BUILDING 2
BUILDING 1 (MAIN HOSPITAL)
8' - 0"
7' - 0"
8' - 0"
7' - 6"
8' - 0"
STOR A&MM
BIO-MED SHOP
EQ STOR
31A
MAIL ROOM MAS
MECH RM
ELEV
E02
OFFICE
29A
STORAGE MAS
LOBBY
27A
CORR
CORR
47A
STAIRS
S00
MECH RM ENG SVC
MECH RM ENG SVC
VESTIBULE
LOCKER ROOM
17B
SHR RM
16B
MENS TOILET ROOM
17A
STORAGE VCS
ELEV
E00
ELEV
E00A
ELEV
E00B
KITCHEN
TEL
42A
STAIRS
S02
TEL CL
42B
SIGN SH
CHIEF M&R OFFICE
ELEC SHOP
CORR
47B
LINE OF VERTICAL CEILING SOFFIT
INSTALL ACOUSTIC CEILING TILE AT
VERTICAL EDGE TO MATCH EXISTING
INSTALLATIONS. (TYPICAL)
8' - 0"
7' - 0"
8' - 0"
NEW CEILING GRID AND TILE TO BE INSTALLED
AS CLOSE TO THE EXISTING ALIGNMENT AS
POSSIBLE TO REDUCE THE MOVEMENT AND
RELOCATION OF SPRINKLER HEADS OR OTHER
CEILING MOUNTED DEVICES.
8' - 0"
WIRE HANGERS
DOUBLE WEB BEAM
LAY-IN ACOUSTICAL TILE DOUBLE WEB CROSS TEE
SUPPLY AIR DIFFUSER
RETURN AIR GRILLE
UNIT VENTILATOR/ CABINET HEATER
RADIANT CEILING PANEL
RECESSED LIGHT FIXTURE
SURFACE MOUNTED LIGHT FIXTURE
EXIT SIGN
CEILING MOUNTED OCCUPANCY SENSOR
REFLECTED CEILING PLAN SYMBOL LEGEND
2' X 4' LAY-IN ACOUSTICAL TILE CEILING SYSTEM.
SEE DRAWING NOTES FOR SPECIFIC TYPE
GYPSUM BOARD BULKHEAD/ SUSPENDED GYPSUM
BOARD SYSTEM
CEILING/ BULKHEAD HEIGHT A.F.F.
CURTAIN TRACK.
2' X 2' LAY-IN ACOUSTICAL TILE CEILING SYSTEM.
SEE DRAWING NOTES FOR SPECIFIC TYPE
CT
GENERAL NOTES:
REFLECTED CEILING PLAN SYMBOL LEGEND
X' - X"
1. REFLECTED CEILING PLANS SHOW CEILING MOUNTED ITEMS ONLY. ADDITIONAL
WALL MOUNTED LIGHTING, HVAC ITEMS, EXIT SIGNS, ETC. ARE INDICATED ON
INDIVIDUAL ELECTRICAL AND HVAC FLOOR PLAN SHEETS.
UV CUH
RP
OS
SEMI-RECESSED SPRINKLER HEAD
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
KEY PLAN
3/
/2
3:
:4
P
M CORRECT AIR CONDITIONING
DEFICIENCIES IN BIOMEDICAL
SHOP AND MAILROOM
503-17-104
JG TP
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
A130
BASEMENT CEILING PLANS
MARCH 27, 2018
14-
BID DOCUMENTS
NORTH
TRUE NORTH
PROJECT
1/8" = 1'-0"
00-BASEMENT REFLECTED CEILING PLAN
3" = 1'-0"
Acoustical Ceiling Tile Install Detail
GENERAL NOTES:
1. IN MAIL ROOM MAS 29, REMOVE EXISTING CEILING TILE AND GRID AS NECESSARY TO ALLOW FOR MEP WORK.
LIGHT FIXTURES TO REMAIN CONNECTED AND LOCATED AS IS. RE-INSTALL GRID AFTER COMPLETION OF MEP WORK. GRID SHALL BE RETURNED TO PRE-PROJECT CONDITIONS. RE-USE EXISTING ACOUSTIC CEILING TILE. REPLACE ANY DAMAGED TILES AS NECESSARY.
2. IN OFFICE 29A, REMOVE ACOUSTIC CEILING TILE & GRID. LIGHT FIXTURES TO REMAIN CONNECTED AND LOCATED AS-IS.
INSTALL NEW ACOUSTIC CEILING TILE AND GRID IN OFFICE 29A AFTER MEP WORK HAS BEEN COMPLETED.
CEILING TILE AND GRID TO BE ARMSTRONG FINE FISSURED 1810 TILE WITH PRELUDE XL GRID AS DIRECTED IN SPECIFICATIONS. TILE AND GRID TO BE WHITE.
5. IN BIO-MED SHOP 31, REMOVE ACOUSTIC CEILING TILE & GRID. UNDER BID ITEM 1, INSTALL NEW ACOUSTIC CEILING TILE AND GRID IN BIO-MED SHOP 31 AFTER MEP WORK HAS BEEN COMPLETED. NEW CEILING TILE AND GRID TO BE ARMSTRONG FINE FISSURED 1810 TILE WITH PRELUDE XL GRID AS DIRECTED IN SPECIFICATIONS. TILE AND GRID TO BE WHITE. UNDER BID ALTERNATE 1, REINSTALL THE EXISTING ACCOUSTIC CEILING TILE AND GRID. GRID SHALL BE RETURNED TO PRE-PROJECT CONDITIONS. RE-USE EXISTING ACOUSTIC CEILING TILE. REPLACE ANY DAMAGED TILES AS NECESSARY.
6. IN EQUIPMENT STORAGE ROOM 31A, DEMOLISH EXISTING CEILING. AFTER COMPLETION OF MEP WORK, INSTALL NEW TILE AND GRID.
CEILING TILE AND GRID TO BE ARMSTRONG FINE FISSURED 1810 TILE WITH PRELUDE XL GRID AS DIRECTED IN SPECIFICATIONS. TILE AND GRID TO BE WHITE.
7. CONTRACTOR TO APPLY TOUCH UP PAINT TO WORK AREAS AS NEEDED AFTER COMPLETION OF OTHER WORK. PAINT MANUFACTURER, COLOR, FINISH, ETC.
TO MATCH EXISTING ADJACENT AREAS OR AS APPROVED BY THE CONTRACTING OFFICER'S REPRESENTATIVE ASSIGNED TO THIS PROJECT.
8. REFER TO HVAC AND ELECTRICAL DRAWINGS FOR EXACT LOCATIONS AND QUANTITIES OF LIGHT FIXTURES, DIFFUSERS, RETURN AIR GRILLES, ETC.
ALL MAILROOM EQUIPMENT IS INTENDED TO REMAIN IN PLACE
THROUGH THE DURATION OF CONSTRUCTION. THE CONTRACTOR
SHALL PROVIDE MEANS TO PROTECT THE MAILROOM EQUIPMENT
INCLUDING IMPACT PROTECTION IN THE FORM OF HEAVY WEIGHT
CORRUGATED CARDBOARD OR FOAM AND INCLUDING DUST
PROTECTION IN THE FORM OF PLASTIC SHRINK WRAP. ADDITIONAL
PROTECTION METHODS SHALL BE REVIEWED AND APPROVED BY
THE COR PRIOR TO INSTALLATION.
DRAWING SYMBOLS
SYMBOLS DESCRIPTION
PIPELINE ABBREVIATIONS HVAC SYMBOLS
EQUIPMENT TAG ABBREVIATIONS
DESCRIPTIONSYMBOLS
PIPELINE SYMBOLS
DOUBLE LINE SHEETMETAL
SINGLE LINE - SHEET METAL
DESCRIPTIONSYMBOLS
DUAL TEMPERATURE WATER RETURN
DUAL TEMPERATURE WATER SUPPLY
HOT WATER HEATING RETURN
HOT WATER HEATING SUPPLY
INVERTED ECCENTRIC REDUCER
(VENTURI FLOW STATION)
TWO-WAY MODULATING
THREE-WAY MODULATING CONTROL VALVE
SAFETY VALVE OR PRESSURE RELIEF
PRESSURE REDUCING VALVE
BALANCING COCK
WATER FLOW MEASURING DEVICE
PIPING TURNED DOWN
TWO-WAY CONTROL VALVE
MOTORIZED VALVE
AUTOMATIC AIR VENT
PIPING TURNED UP
FUNNEL DRAIN
CONTROL VALVE
A
M
MANUAL AIR VENT
(TWO POSITION TYPE)
AQUASTAT
PRESSURE TAP
THERMOMETER
STRAINER
PRESSURE GAUGE
UNION
ECCENTRIC REDUCER
MANUAL VOLUME CONTROL DAMPER (VD)
RISE/DROP IN DUCTWORK
(ARROW SHOWS DIRECTION OF DROP)
SMOKE DAMPER/DETECTOR
PANEL IN DUCT AND CEILING)
EXHAUST AIR DUCT DN
SUPPLY AIR DIFFUSER
ACCESS DOOR ON SIDE OF DUCT
EXHAUST REGISTER
RETURN AIR REGISTER
ACCESS DOOR ON BOTTOM OF DUCT
DETECTOR BY E.C. DAMPER BY H.C.
FIRE DAMPER AT FIRE WALL (PROVIDE ACCESS
OR HORIZONTAL DUCT ABOVE CEILING (PROVIDE
FIRE DAMPER IN VERTICAL DUCT THRU FLOOR
ACCESS PANEL IN DUCT AND WALL OR CEILING)
SUPPLY AIR REGISTER (DUCT OR WALL)
EXHAUST/RETURN AIR REGISTER (DUCT OR WALL)
COMBINATION FIRE/SMOKE DAMPER
MOTORIZED DAMPER
SUPPLY DUCT DN
RETURN AIR DUCT DN
EXHAUST AIR DUCT UP
RETURN AIR DUCT UP
SUPPLY DUCT UP
ROUND SUPPLY, RETURN OR
OVAL SUPPLY, RETURN OR
RECTANGULAR SUPPLY, RETURN OR
DIRECTION OF AIR FLOW)
DUCT W/O TURNING VANES
DUCT MOUNTED SMOKE
BY EC, INSTALLED BY HC
RELIEF DUCT WIDTH (SHOWN)XDEPTH
RELIEF DUCT WIDTH (SHOWN)XDEPTH
LOW LOSS TAKE OFF (ARROW INDICATES
RADIUS ELBOW (DUCT WIDTH 17" AND LOWER)
(ARROW INDICATES AIR FLOW DIRECTION)
BOOT CONNECTION WITH MANUAL VD
DUCT W/TURNING VANES (DUCT WIDTH OVER 18")
WALL SWITCH
DUCT/SPACE STATIC PRESSURE SENSOR
DETECTOR PROVIDED
CONICAL SPIN-IN FITTING
24"X24"24"X24"
12"X12"
SD
S
WS
M
AD
REFRIGERANT LINE
REFRIGERANT SUCTION
RL
RS
HWHS
HWHR
DTS
DTR
THERMAL VAV DIFFUSERTF
CD CONDENSATE DRAIN LINE
MPS MEDIUM PRESSURE STEAM SUPPLY
MPCR MEDIUM PRESSURE CONDENSATE RETURN
PUMPED CONDENSATEPC
HRS ENERGY (HEAT) RECOVERY SUPPLY
HRR ENERGY (HEAT) RECOVERY RETURN
NAME PIPE TO BE REMOVED
NAME EXISTING PIPING TO REMAIN
TEE- OUTLET
SIDE CONNECTION
CAPPED OUTLET
TEE - OUTLET UP
12"X12"
12"/12"
RELIEF VALVE
BUTTERFLY VALVE
PLUG VALVE
GATE VALVE
GLOBE VALVE
PIPE BREAK (SINGLE LINE)
DIRECTION OF FLOW
FLEXIBLE CONNECTION
BACKFLOW PREVENTION DEVICE
DUCT END CAP
24X12
SQUARE ELBOW WITH
TURNING VANES
RADIUS TURN ELBOW
RETURN CROSS
SECTION DN
EXHAUST CROSS
SECTION UP
SUPPLY DUCT
CROSS SECTION DN
RETURN CROSS
SECTION UP
CROSS SECTION UP
SUPPLY DUCT
ROUND DUCT SIZE (DIAMETER)
FLEXIBLE DUCT (DIAMETER SIZE)
DUCT SIZE (WIDTH X DEPTH)
24"Ø
DUCT W/ TURNING VANES
CONDENSER WATER RETURN
CONDENSER WATER SUPPLYCWS
CWR
CTD COOLING TOWER DRAIN LINE
BALL VALVE
(HINGED & GASKETED)
(HINGED & GASKETED)
FD
F/SD
FDFD
LPS LOW PRESSURE STEAM SUPPLY
LPCR LOW PRESSURE CONDENSATE RETURN
HPS HIGH PRESSURE STEAM SUPPLY
HPCR HIGH PRESSURE CONDENSATE RETURN
BACKDRAFT DAMPER
B
DUCT/WALL TEMPERATURE SENSOR, ELECTRICT
24"Ø
12"Ø
DRAWING NUMBER WHERE DRAWN
H200
SECTION LETTER
DRAWING NUMBER WHERE DRAWNH100
DETAIL NUMBER
CONNECT TO EXISTING AT THIS POINT
DEMO/REMOVE TO THIS POINT
EQUIPMENT NUMBER1
AHU POWERED EQUIPMENT
EQUIPMENT NUMBER1
RHC NON-POWERED EQUIPMENT
CD-#
AIRFLOW QUANTITY
DIFFUSER/REGISTER/GRILLE TYPE
STAINLESS STEEL DUCTWORK
DUCT/WALL TEMPERATURE SENSOR, ELECTRICT
ACC AIR COOLED CHILLER
ACCU AIR COOLED CONDENSING UNIT
ACCUM ACCUMULATOR
AHU AIR HANDLING UNIT
ASHP AIR SOURCE HEAT PUMP
B BOILER
BB BASEBOARD HEATER
BD BAROMETRIC DAMPER
BDD BACK DRAFT DAMPER
CC CHILLED WATER COOLING COIL
CD CONDENSATE DRAIN
CIRC CIRCULATOR
CMPR COMPRESSOR
CONV CONVECTOR
CP CONDENSATE PUMP
CUH CABINET UNIT HEATER
DC DRY COOLER
EF EXHAUST FANS
ER EXHAUST REGISTER
ERW EXHAUST REGISTER WALL
ET EXPANSION TANK
ECUH ELECTRIC CABINET UNIT HEATER
EUH ELECTRIC UNIT HEATER
EWH ELECTRIC WALL HEATER
EVAP EVAPORATOR
FT FINNED TUBE RADIATION
FCU FAN COIL UNIT
FPB FAN POWERED BOX
FU FURNACE
GIV GRAVITY INTAKE VENTILATOR
GRV GRAVITY ROOF VENTILATOR
H HUMIDIFIER
HC HOT WATER HEATING COIL
HUH HORIZONTAL UNIT HEATER
P PUMP
PTAC PACKAGED TERMINAL AIR CONDITIONING UNIT
RG RETURN GRILLE
RR RETURN REGISTER
RAG RETURN AIR GRILLE
RCP RADIANT CEILING PANEL
RTU ROOF TOP UNIT
SF SUPPLY FAN
SSAC SPLIT SYSTEM AIR CONDITIONING UNIT
SSDC SECURITY SUPPLY DIFFUSER CEILING
SSEF SECURITY SMOKE EXHAUST FAN
SSGW SECURITY SUPPLY SUPPLY GRILLE WALL
SLSD SUPPLY LINEAR SLOT DIFFUSER
UH UNIT HEATER
UV UNIT VENTILATOR
UCD UNDER CUT DOOR
VAV VARIABLE AIR VOLUME
DRAWING KEYNOTE - DEMOLITION
DRAWING KEYNOTE - PLAN / ELEVATION NEW WORK
CONSULTANTS:
Drawing Title
Approved: Project Director
Project Title:
Location:
Date: Checked: Drawn:
Drawing Number
Building Number
Project Number
Office of Construction and Facilities Management
VA FORM 08-6231
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
FULLY SPRINKLERED
A
B
C
D
E
F
6 " o n e e ig h th i n c h o n e f o o t o n e q u a rt e r in c h o n e f o o t th re e e ig h th s i n c h o n e f o o t o n e h a lf i n c h o n e f o o t th re e q u a rt e rs i n c h o n e f o o t o n e i n c h o n e f o o t o n e a n d o n e h a lf i n c h o n e f o o t th re e i n c h e s o n e f o o t
209 SANDUSKY STREET
PITTSBURGH, PA 15212
PH: 412.287.7333
www.ae-works.com
AE WORKS PROJECT NUMBER:
ARCHITECTS/ENGINEERS:SEAL
Revision# Date
3/
/2
3:
:4
P
M CORRECT AIR CONDITIONING
DEFICIENCIES IN BIOMEDICAL
SHOP AND MAILROOM
503-17-104
JG JA
JAMES E. VAN ZANDT MEDICAL CENTER
ALTOONA, PA 16602
H001
HVAC SYMBOLS, ABBREVIATIONS AND
GENERAL NOTES
MARCH 27, 2018
17029
BID DOCUMENTS
SR SERVICE RECEPTOR
SS SOIL STACK
ST PR STATIC PRESSURE
ST STL STAINLESS STEEL
STD STANDARD
STER STERILIZER
STL STEEL
STOR STORAGE
STR STRAINER
STRUCT STRUCTURAL
SUSP SUSPENDED
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
SYM SYMMETRICAL TOP
T TOP
TA THROWAWAY
TAN TANGENT
TC TELECOMMUNICATIONS
CONTRACTOR
TCV TEMPERATURE CONTROL VALVE
TDV TRIPLE DUTY VALVE
TEL TELEPHONE
TEMP TEMPERATURE
TER TERRAZZO
TG TONGUE & GROOVE
TH THERMOMETER
THRES THRESHOLD
TR TEMPERATURE RISE
TRANS TRANSITION
TRANSR TRANSFORMER
TSTAT THERMOSTAT
TV TURNING VANES OR TELEVISION
TYP TYPICAL
UC UNDER CABINET OR UNDER CUT
UFD UNDER FLOOR DUCT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITER'S LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UPS UNINTERRUPTIBLE POWER SUPPLY
UTIL UTILITY
V VOLT
VAL VALVE
VD VOLUME DAMPER
VENT VENTILATION
VERT VERTICAL
VFS VENTURI FLOW STATION
VIF VERIFY IN FIELD
VL VENT LINE
VR VAPOR RETARDER
VS VENT STACK
VTR VENT THROUGH ROOF
W WATT
W/ WITH
W/O WITHOUT
WB WET BULB
WC WALL COVERING
WCL WATER CLOSET
WD WOOD
WF WIDE FLANGE
WFMD WATER FLOW MEASURING DEVICE
WG WALL GUARD OR WATER GAUGE
WHCH WHEEL CHAIR
WIN WINDOW
WMS WIRE MESH SCREEN
WP WEATHERPROOF
WPS WALL PROTECTION SYSTEM
WSCT WAINSCOT
WT WINDOW TREATMENT
WTD WATER TEMPERATURE DROP
WWF WELDED WIRE FABRIC
X DEMO
XN TO BE RELOCATED / NEW LOCATION
XR EXISTING TO REMAIN
ZVB ZONE VALVE BOX
ZVC ZONE VALVE CABINET
LB POUND
LDB LEAVING DRY BULB
LED LIGHT EMITTING DIODE
LF LINEAR FEET
LIN LINEAR
LOC LOCATION OR LOCATE
LPT LOW POINT
LSDC LINEAR SUPPLY DIFFUSER CEILING
LT LIGHT
LTG LIGHTING
LV LOW VOLTAGE
LVR LOUVER
LWB LEAVING WET BULB
LWC LINEAR WOOD CEILING
LWT LEAVING WATER TEMPERATURE
MAN MANUAL
MAT MIXED AIR TEMPERATURE
MATL MATERIAL
MAV MANUAL AIR VENT
MAX MAXIMUM
MBH ONE THOUSAND BTU / HOUR
MC MECHANICAL CONTRACTOR
MC METAL CLAD CABLE
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MEMB MEMBRANE
MET METAL
MFR MANUFACTURER
MH MANHOLE
MIN MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MO MASONRY OPENING
MOD MOTOR OPERATED DAMPER
MONO MONOLITHIC
MTD MOUNTED
MTG HT MOUNTING HEIGHT
MTL METAL
MTLH METAL HALIDE
MTR MOTOR
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
N/A NOT APPLICABLE
NEC NATIONAL ELECTRIC CODE
NEMA NATIONAL ELECTRICAL
MANUFACTURER ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NUMBER OR NORMALLY OPEN
NOM NOMINAL
NTS NOT TO SCALE
O OXYGEN
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER
OPER OPERATED
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
PB PULL BOX
PC PLUMBING CONTRACTOR
PD PUMP DISCHARGE
PG PRESSURE GAUGE WITH COCK
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRD PRESSURE DIFFERENTIAL VALVE
PRELIM PRELIMINARY
PRT PRESSURE TAP
PRV PRESSURE REDUCING VALVE
PT PAINT OR POTENTIAL
TRANSFORMER
RO ROUGH OPENING
QT QUARRY TILE
R RADIUS
RA RETURN AIR / RELIEF AIR
RB RUBBER BASE
RC REMOVE COMPLETELY
RD ROOF DRAIN
RE RELOCATE EXISTING
REC RECESSED
RECPT RECEPTACLE
REF REFERENCE
REFL REFLECTOR
REG REGISTER
REINF REINFORCING
REM REMOVE
REQD REQUIRED
RET RETURN
REV REVISE
REX REMOVE EXISTING
RF RESILIENT FLOOR
RFI REQUEST FOR INFORMATION
RGS RIGID GALVANIZED STEEL CONDUIT
RH ROOF HATCH
RM ROOM
RN REMOVE AND REPLACE WITH NEW
RR REMOVE AND REPLACE
RS RAPID START
RV RELIEF VALVE
RWC RAIN WATER CONDUCTOR
SA SUPPLY AIR
SAN SANITARY SEWER ABOVE GROUND
SAN-BXR SANITARY SEWER - BURIED
EXISTING TO REMAIN
SAN-XR SANITARY SEWER ABOVE GROUND -
EXISTING TO REMAIN
SCHED SCHEDULE
SD SMOKE DAMPER OR SMOKE
DETECTOR
SDISP SOAP DISPENSER
SF SQUARE FOOT
SHT SHEET
SHT MTL SHEET METAL
SHTG SHEATHING
SIM SIMILAR
SM SURFACE MOUNTED
SNC SANITARY NAPKIN CABINET
SND SANITARY NAPKIN DISPOSER
SP STANDPIPE OR STATIC PRESSURE
SPC SPECIMEN PASS-THRU CABINET
SPEC SPECIFICATIONS
SPS STATIC PRESSURE SENSOR
EIFS EXTERIOR INSULATION AND
FINISHING SYSTEM
EJ EXPANSION JOINT
EL ELEVATION
ELEC ELECTRICAL
ELEC CAB ELECTRICAL CABINET
ELEV ELEVATOR
EMER EMERGENCY
ENCL ENCLOSURE
ENTR ENTRANCE
EO ELECTRICAL OUTLET
EQ EQUAL
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EWB ENTERING WET BULB
EWC ELECTRIC WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX EXAUST AIR
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION
EXT EXTERIOR
XP EXPLOSION PROOF
F/S FIRE / SMOKE DAMPER
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FAT FINAL AIR TEMPERATURE
FB FIRE BLANKET
FC FLEXIBLE CONNECTION OR
FOOTCANDLE
FD FLOOR DRAIN OR FIRE DAMPER
FDN FOUNDATION
FDV FIRE DEPARTMENT VALVE
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FH FIRE HOSE
FHC FIRE HOSE CABINET
FHP FULL HEIGHT PARTITION
FHV FIRE HOSE VALVE
FIN FINISH
FIXT FIXTURE
FL FLOW LINE
FLA FULL LOAD AMPERES
FLASH FLASHING
FLEX FLEXIBLE
FLG FLANGE
FLG C FLANGE CONNECTION
FLR FLOOR
FLUOR FLUORESCENT
FP FIRE PROOFING
FRMG FRAMING
FS FLOOR SINK
FSTOP FIRESTOPPING
FT FOOT / FEET
FT HD FEET OF HEAD
FTC FOOTCANDLES
FTG FOOTING
FUR FURRING
G GAS OR ELECTRICAL GROUND
GA GAUGE
GAL GALLONS
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR
GEN GENERATOR
GENL GENERAL
GFCI GROUND FAULT CIRCUIT
INTERRUPTOR
GL GLASS
GLV GLOBE VALVE
GND GROUND
GPM GALLONS PER MINUTE
GR GRADE
GRAV GRAVITY
GRD BM GRADE BEAM
GV GATE VALVE
GWB GYPSUM BOARD
H HIGH
HB HOSE BIB
HC HEATING CONTRACTOR
HDCP HANDICAP
HDR HEADER
HDW HARDWARE
HID HIGH INTENSITY DISCHARGE
HM HOLLOW METAL
HORIZ HORIZONTAL
HP HORSE POWER
HPD HIGH PRESSURE DRIP
HPF HIGH POWER FACTOR
HR HANDRAIL
HSKP HOUSEKEEPING
HT HEIGHT
HTG HEATING
HTR HEATER
HV HIGH VELOCITY
HVAC HEATING, VENTILATING, AIR
CONDITIONING
HW HOT WATER
HWD HARD WOOD
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWS&R HOT WATER SUPPLY AND RETURN
HZ HERTZ
ID INSIDE DIAMETER
IER INVERTED ECCENTRIC REDUCER
IG ISOLATED GROUND
IME INSULATED METAL ENCLOSURE
IN INCH
INCAND INCANDESCENT
INCL INCLUDED
INSUL INSULATION
INT INTERIOR
INTERL INTERLOCK
INV INVERT
ISO ISOLATION
IVS ISOLATED VALVE STATION
J-BOX JUNCTION BOX
JST JOIST
JT JOINT
KO KNOCK OUT
kVA KILOVOLT AMPERE kVAR KILOVAR (REACTANCE) kW KILOWATT kWH KILOWATT HOUR METER
LAT LEAVING AIR TEMPERATURE
LAV LAVATORY
& AND
A AIR (CLINICAL)
AAP ALARM ANNUNCIATOR PANEL
AAV AUTOMATIC AIR VENT
AB ANCHOR BOLT
ABV ABOVE
ACC DR ACCESS DOOR
ACFL ACCESS
ACOUS ACOUSTICAL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN
ADA AMERICAN DISABILITIES ACT
ADD ADDENDUM
ADDL ADDITIONAL
ADJ ADJUSTABLE
ADMIN ADMINISTRATION
AFF ABOVE FINISH FLOOR
AFG ABOVE FINISHED GRADE
AFMD AIR FLOW MEASURING DEVICE
AHU AIR HANDLING UNIT
AL ALIGN
ALT ALTERNATE
ALUM ALUMINUM
AMP AMPERE
AP ACCESS PANEL
APC ARCHITECTURAL PRECAST
CONCRETE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASY ASYMMETRIC
ATC AUTOMATIC TEMPERATURE
CONTROL
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AWT AVERAGE WATER TEMPERATURE
BAT BATTERY
BC BALANCING COCK OR BARE
COPPER
BDD BACKDRAFT DAMPER
BFC BELOW FINISH CEILING
BFE BOTTOM FOOTING ELEVATION
BFG BELOW FINISHED GRADE
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT BORROWED LIGHT
BLW BELOW
BM BEAM
BO BY OWNER
BOF BY OWNER FUTURE
BOT BOTTOM
BR BRICK
BRG BEARING
BRKR BREAKER
BSMT BASEMENT
BTWN BETWEEN
BUR BUILT UP ROOFING
C CONDUIT
CAB CABINET
CANTL CANTILEVER
CAP CAPACITY
CATV CABLE TELEVISION
CCT CUBICLE CURTAIN TRACK
CCTV CLOSED CIRCUIT TELEVISION
CFH CUBIC FEET / HOUR
CFM CUBIC FEET / MINUTE
CH CHANNEL
CHK V CHECK VALVE
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CHWS&R CHILLED WATER SUPPLY AND
RETURN
CJ CONTROL JOINT
CKT CIRCUIT
CKT BRKR CIRCUIT BREAKER
CL CENTERLINE
CLG CEILING
CLG MTD CEILING MOUNTED
CLR CLR
CMU CONCRETE MASONRY UNIT
CO CLEAN OUT
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUE / CONTINUOUS
CONTR CONTRACTOR
CONV CONVECTOR
COORD COORDINATE
CORR CORRIDOR
CPT CARPET OR CONTROL POWER
TRANSFORMER
CT CERAMIC TILE
CTR CENTER
CU COPPER
CV CONTROL VALVE
CW COLD WATER
D DEPTH OR DEEP
DB DRY BULB
dB DECIBEL
DCW DOMESTIC COLD WATER
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAILS
DF DRINKING FOUNTAIN
DHW DOMESTIC HOT WATER
DIA DIAMETER
DIAG DIAGONAL OR DIAGRAM
DIFF DIFFUSER
DIM DIMENSION
DISC DISCONNECT
DISCH DISCHARGE
DISP DISPENSER
DIST DISTRIBUTION
DIV DIVISION
DL DOWN LIGHT
DN DOWN
DP DISTRIBUTION PANEL
DPR DAMPER
DR DRAIN
DS DOWNSPOUT
DWG DRAWING
DX DIRECT EXPANSION
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC ELECTRICAL CONTRACTOR
EDB ENTERING DRY BULB
EF EXHAUST FAN
ABBREVIATION LEGEND HVAC GENERAL NOTES
1 NOT ALL SYMBOLS ARE NECESSARILY USED.
2 COORDINATE FINAL LOCATIONS OF DIFFUSERS AND GRILLES WITH ARCHITECTURAL REFLECTED CEILING PLANS.
3 DRAWINGS ARE DIAGRAMMATIC. CONTRACTOR TO FIELD VERIFY DUCT AND PIPE ROUTING AND COORDINATE INTERFERENCE BETWEEN TRADES PRIOR TO
INSTALLATION.
4 ROOF OPENINGS, FLASHING, AND COUNTER FLASHING BY GENERAL CONTRACTOR. LOCATION OF OPENINGS BY HEATING CONTRACTOR.
5 DUCTWORK TO BE INSTALLED TIGHT TO UNDERSIDE OF STRUCTURE ABOVE UNLESS NOTED OTHERWISE.
6 PROVIDE ALL MATERIALS, EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE MECHANICAL SYSTEMS AS INDICATED ON THE
DRAWINGS, AS SPECIFIED AND AS REQUIRED BY CODE.
7 CONTRACT DOCUMENT DRAWINGS FOR MECHANICAL WORK ARE DIAGRAMMATIC AND ARE INTENDED TO CONVEY SCOPE AND GENERAL ARRANGEMENT ONLY.
CONTRACTOR SHALL BE RESPONSIBLE TO FIELD SURVEY ACTUAL SITE CONDITIONS AND ACCOMODATE ACTUAL SITE CONDITIONS AS PART OF SCOPE OF WORK AT
NO COST TO OWNER.
8 INSTALL ALL MECHANICAL EQUIPMENT AND APPURTENANCES IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS, CONTRACT DOCUMENTS, APPLICABLE BUILDING, STATE AND LOCAL CODES, SEISMIC REQUIREMENTS, ENERGY CODES AND INSURANCE UNDERWRITER REQUIREMENTS.
9 COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL, STRUCTURAL, CIVIL AND ELECTRICAL WORK, ETC. SHOWN ON OTHER CONTRACT
DOCUMENT DRAWINGS.
10 MAINTAIN A MINIMUM OF 6'-8" CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS, SUSPENDED EQUIPMENT, SUPPORTS, ETC., THROUGHOUT ACCESS ROUTES IN
MECHANICAL ROOMS.
11 ALL TESTS SHALL BE COMPLETED AND ACCEPTED BY THE INSPECTOR BEFORE ANY MECHANICAL EQUIPMENT OR PIPING INSULATION IS APPLIED.
12 LOCATE ALL TEMPERATURE, PRESSURE AND FLOW MEASURING DEVICES IN ACCESSIBLE LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UPSTREAM AND
DOWNSTREAM, AS RECOMMENDED BY THE MANUFACTURER FOR ACCURACY.
13 TESTING ADJUSTING AND BALANCING (TAB) AGENCY SHALL BE A MEMBER OF THE ASSOCIATED AIR BALANCING COUNCIL (AABC) OR THE NATIONAL ENVIRONMENTAL BALANCING BUREAU (NEBB). TAB FIRM SHALL HAVE A MINIMUM OF 5 YEARS EXPERIENCE ON SIMILAR PROJECTS. PERFORM TAB IN ACCORDANCE WITH THE REQUIREMENTS OF THE TAB PROCEDURAL STANDARD RECOMMENDED BY THE TAB TRADE ASSOCIATION THAT APPROVED THE TAB FIRM'S QUALIFICATIONS.
14 WHERE TWO OR MORE ITEMS OF THE SAME TYPE OF EQUIPMENT ARE REQUIRED, THE PRODUCTS OF A SINGLE MANUFACTURER SHALL BE USED.
15 COORDINATE ALL FINAL EQUIPMENT CONNECTIONS WITH THE MANUFACTURERS' CERTIFIED DRAWINGS. COORDINATE AND PROVIDE ALL DUCTWORK AND PIPING TRANSITIONS REQUIRED FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND COORDINATE ALL DUCTWORK AND PIPING DIMENSIONS
BEFORE FABRICATION.
16 ALL CONTROL WIRE AND CONDUIT SHALL COMPLY WITH THE NATIONAL ELECTRIC CODE, DIVISION 26 OF THE SPECIFICATIONS, ALL LOCAL CODES, AND OWNER'S
INSURANCE UNDERWRITER REQUIREMENTS.
17 THE LOCATIONS AND SIZES OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE ONLY. THE EXACT LOCATIONS AND SIZES NECESSARY TO SECURE THE BEST CONDITIONS AND RESULTS SHALL BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
18 PLAN DRAWINGS AND SECTIONS CUTS WHICH SPECIFICALLY IDENTIFY SERVICE ROUTE OFFSETS, ELEVATION CHANGES, OBSTRUCTIONS, ACCESS DOORS, BALANCING DEVICES, ETC. ARE SHOWN FOR CLARITY WHERE SPECIFIC KNOWN CONDITIONS EXIST. MECHANICAL CONTRACTOR SHALL COORDINATE EQUIPMENT, DUCTWORK, AND PIPING ROUTINGS WITH ALL OTHER TRADES. REQUIREMENTS NOT SPECIFICALLY IDENTIFIED SHALL NOT BE INTERPRETED AS EXCLUSION FROM CONTRACTOR'S SCOPE OF WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR ACTUAL SITE CONDITIONS AND SHALL INCLUDE SUCH CONDITIONS IN SCOPE OF WORK AT NO
ADDITIONAL COST TO THE OWNER.
19 ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND SUPPORT OF MECHANICAL WORK AS SHOWN IN DETAILS FOR PIPING, DUCTWORK AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR AT NO ADDITIONAL COST TO THE OWNER.
20 ALL EQUIPMENT, PIPING, DUCTWORK, ETC., SHALL BE SUPPORTED AS DETAILED, SPECIFIED AND AS REQUIRED TO PROVIDE A VIBRATION FREE INSTALLATION.
21 ALL OPENINGS IN FIRE RATED WALLS AND SMOKE PARTITIONS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE STOPPED WITH APPROVED FIRESTOPPING
MATERIALS.
22 REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING AND EQUIPMENT INSTALLATION.
23 UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS WITH TOP AT 48" ABOVE FINISHED FLOOR IN ACCORDANCE WITH ADA REQUIREMENTS. NOTIFY THE ENGINEER OF ANY ROOMS WHERE THE ABOVE LOCATION CAN NOT BE MAINTAINED OR WHERE THERE IS A QUESTION ON LOCATION. COORDINATE FINAL LOCATIONS
WITH OWNER.
24 LOCATE ALL MECHANICAL EQUIPMENT (VAV BOXES, CABINET HEATERS, UNIT HEATERS, ETC.,) FOR UNOBSTRUCTED ACCESS TO UNIT ACCESS PANELS, FILTERS, CONTROLS AND VALVING. DO NOT LOCATE FAN POWERED VAV BOXES ABOVE LIGHTING FIXTURES.
25 PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN AND EXHAUST) CONNECTED TO FANS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
26 ALL LOUVERS SHALL BE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR (UNLESS OTHERWISE NOTED). GENERAL CONTRACTOR SHALL COORDINATE SIZES, LOCATIONS, AND CONNECTIONS WITH MECHANICAL CONTRACTOR. DUCTWORK CONNECTIONS TO LOUVERS SHALL BE FURNISHED AND INSTALLED BY
MECHANICAL CONTRACTOR.
27 PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN HYDRONIC WATER PIPING SYSTEMS. ALL PIPING SHALL SLOPE TO LOW POINTS. PROVIDE HOSE END
DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND LOW POINTS.
28 INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES AND OTHER APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
29 ALL ISOLATION VALVES SHALL BE IN LOCATION AND ELEVATION WHICH ALLOWS FOR EQUIPMENT AND BRANCH PIPING REMOVAL, WHILE MAINTAINING SERVICE
UPSTREAM OF THE ISOLATION VALVE.
30 ALL BALANCING VALVES AND ISOLATION VALVES USED TO ADJUST FLOW RATES SHALL BE PROVIDED WITH POSITIONS INDICATORS AND MAXIMUM ADJUSTABLE
STOPS (MEMORY STOPS).
31 ALL ISOLATION VALVES (EXCEPT CONTROL VALVES), STRAINERS, AND PIPING SPECIALTIES SHALL BE FULL LINE SIZE BEFORE REDUCING SIZE TO MAKE CONNECTIONS
TO EQUIPMENT AND CONTROLS.
32 MECHANICAL JOINTS SUCH AS UNIONS, FLANGES, OR THREADED FITTINGS SHALL BE INSTALLED AT EACH EQUIPMENT CONNECTION, IN BYPASSES, AT FLOOR PENETRATIONS, AT CONTROL DEVICES, AND IN LONG PIPE RUNS (100 FEET OR MORE) TO PERMIT DISASSEMBLY FOR ALTERATION AND REPAIRS.
33 MEASURE, CUT AND INSTALL PIPE LENGTH ACCURATELY TO MINIMALIZE MISALIGNMENT. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
34 PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION (EXCEPT WATER COILS). FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE DRAWINGS.
35 PROVIDE VIBRATION INSULATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT VIBRATION TRANSMISSION TO BUILDING STRUCTURE.
36 CONCRETE HOUSEKEEPING PADS SHALL BE FURNISHED AND INSTALLED BY THE GENERAL CONTRACTOR. MECHANICAL CONTRACTOR SHALL PROVIDE EQUIPMENT WEIGHTS, SIZES AND LOCATION TO GENERAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL BE IN ACCORDANCE WITH STRUCTURAL DETAILS. PAD
SHALL EXTEND BEYOND THE EQUIPMENT FOOTPRINT A MINIMUM OF 6 INCHES ON EACH SIDE.
37 ALL DUCTWORK, PIPING, AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHEMENTS TO STEEL MEMBERS, BAR JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE APPROVED BY STRUCTURAL ENGINEER. WELDING TO STRUCTURAL MEMBERS SHALL NOT BE
PERMITTED.
38 MECHANICAL EQUIPMENT, DUCTWORK, AND PIPING SHALL NOT BE SUPPORTED FROM ROOF OR DECK ASSEMBLY. SUPPORTS SHALL ATTACH TO STRUCTURAL
MEMBERS. COORDINATE WITH STRUCTURAL DRAWINGS.
39 PROVIDE MANUFACTURER'S MATCHING ROOF CURBS FOR ALL ROOF MOUNTING EQUIPMENT. COORDINATE ACTUAL ROOF PITCH AND CONSTRUCTION DETAILS WITH GENERAL CONTRACTOR. PROVIDE SLOPED CURBS PER MANUFACTURER'S RECOMMENDATIONS. GENERAL CONTRACTOR SHALL INSTALL ROOF CURBS AND FLASHING
PER ROOFING MANUFACTURER'S INSTALLATION REQUIREMENTS.
40 UNLESS OTHERWISE NOTED, ALL PIPING AND DUCTWORK IF OVERHEAD, TIGHT TO UNDERSIDE OF STRUCTURE OR SLAB, WITH SPACE FOR INSULATION.
41 PROVIDE CHAINWHEEL OPERATORS FOR ALL EXPOSED VALVES MOUNTED GREATER THAN 8'-0" ABOVE FINISHED FLOOR LEVEL. CHAIN SHALL EXTEND
UNOBSTRUCTED TO 7'-0" ABOVE FLOOR LEVEL.
42 ALL PIPING AND DUCTWORK SHALL CLEAR DOORS, WINDOWS, EQUIPMENT CLEARANCES, MAINTENANCE REQUIREMENTS, CODE SETBACKS, ETC. TO ASSURE PROPER
OPERATION, INSPECTION AND MAINTENANCE.
43 ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
44 PROVIDE ALL 90 DEGREE SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS OTHERWISE INDICATED OR SPECIFIED. PROVIDE ACCESS DOORS
UPSTREAM OF ALL ELBOWS CONTAINING TURNING VANES.
45 ALL DUCTS SHALL BE BONDED ACROSS FLEXIBLE CONNECTIONS WITH FLEXIBLE COPPER GROUNDING STRAPS. GROUNDING STRAPS SHALL BE BOLTED OR SOLDERED
TO BOTH THE EQUIPMENT AND THE DUCT.
46 ALL EQUIPMENT SUBMITTALS AND SHOP DRAWINGS REQUIRED BY THE SPECIFICATIONS SHALL BE APPROVED BY THE ENGINEER PRIOR TO PURCHASE, FABRICATION
AND INSTALLATION.
47 ALL HEATING DEVICES AND SURFACES WITH ELEVATED TEMPERATURES WHICH CAN BE ACCESSED OR COME IN CONTACT WITH OWNER PERSONNEL SHALL BE
PROTECTED, INSULATED, OR CONTROLLED TO REMAIN BELOW 120º F.
48 PROVIDE MANUAL VOLUME DAMPERS IN ALL RUN-OUTS TO DIFFUSERS, BRANCH TAKE-OFFS FROM MAIN SUPPLY DUCT, AND IN ALL OTHER AREAS REQUIRED TO
PROVIDE PROPER SYSTEM AIRFLOW BALANCING.
HVAC GENERAL DEMOLITION NOTES
1 THE CONTRACTOR SHALL THOROUGHLY EXAMINE THE SITE PRIOR TO SUBMITTING THEIR BID. DUE TO THE NATURE OF THIS PROJECT AND THE STATE OF THE EXISTING BUILDING, IT IS IMPOSSIBLE TO COMPLETELY RELATE THE SCOPE OF THE DEMOLITION REQUIRED TO THE CONTRACTOR THROUGH THE CONTRACT DOCUMENTS. FAILURE TO VISIT THE SITE WILL NOT RELIEVE THE CONTRACTOR OF THEIR DEMOLITION RESPONSIBILITIES UNDER THIS CONTRACT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO DETERMINE AND COORDINATE THE EXACT EXTENT OF DEMOLITION NECESSARY TO PROVIDE A RENOVATED AND UPGRADED SPACE
TO FACILITATE NEW WORK.
2 INFORMATION REGARDING THE EXISTING CONDITIONS WAS GATHERED FROM AVAILABLE EXISTING DRAWINGS, SURVEY AND CORRESPONDENCE WITH UTILITY, STAFF AND FACILIITES PERSONNEL. THERE ARE NO GUARANTEES AS TO THE ACCURACY OF THIS
INFORMATION AND IT IS OFFERED FOR INFORMATION ONLY.
3 VERIFY EXISTING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING AND SYSTEM COMPONENTS PRIOR TO THE DEMOLITION. IF EXISTING CONDITIONS ARE DIFFERENT THAN WHAT IS INDICATED ON THE CONTRACT DOCUMENTS, THE CONTRACTOR SHALL
NOTIFY THE COR AND ARCHITECT PRIOR TO PROCEEDING WITH THE WORK.
4 MINIMIZE DISTURBANCE AND / OR DAMAGE TO EXISTING FINISHED SURFACES AND FINISHES. WHERE DEMOLITION OF MECHANICAL SYSTEM COMPONENTS DAMAGES EXISTING SURFACES TO REMAIN, RESTORE THOSE SURFACES TO THE SAME CONDITION AS THE ADJACENT SURFACES. RESTORATION MUST BE PERFORMED BY WORKMEN SKILLED IN PERFORMING SUCH WORK. ALL FIRE AND SMOKE RATINGS SHALL BE RETAINED AS PART OF THE REPAIRS. PATCH / SEAL HOLES WATERTIGHT. ALL PATCHES AND REPAIRS
ARE SUBJECT TO THE REVIEW AND APPROVAL OF THE ARCHITECT.
5 ALL AREAS OF EGRESS SHALL BE KEPT OPEN AND FREE FROM DEBRIS AT ALL TIMES.
6 DO NOT REMOVE ITEMS SUPPORTING OTHER ITEMS WITHOUT PROVIDING TEMPORARY OR PERMANENT SUPPORT. PROPERLY SUPPORT ALL EXISTING ITEMS TO REMAIN.