Roofing & Insulation Bldgs 1 & 19 Project 595-19-102 Federal contract opportunity
Solicitation number
36C24418B0065
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 4

About this file

36C24418B0065 REVISED Combined Specs Roofing and Insulation 595-19-102.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Roofing & Insulation Bldgs 1 & 19 Project 595-19-102, newest first.
File Type Posted
36C24418C0201-000.docx DOCX document
36C24418B0065-00003001.pdf PDF
36C24418B0065-00003000.docx DOCX document
36C24418B0065-00002001.pdf PDF
36C24418B0065-00002003.pdf PDF
36C24418B0065-00002000.docx DOCX document
36C24418B0065-00002002.pdf PDF
36C24418B0065-00001000.docx DOCX document
36C24418B0065-00001001.docx DOCX document
36C24418B0065-004.pdf PDF
36C24418B0065-005.pdf PDF
36C24418B0065-002.pdf PDF
36C24418B0065-006.pdf PDF
36C24418B0065-001.docx DOCX document
36C24418B0065-000.docx DOCX document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

S T E W A R T C C L U C K

A R C H I T E C T L L C

600 North Hartley St, Suite 152, York, PA 17404

Ph. 717 887-3847, FAX: 717 699-0205

Roofing and Insulation AE

A/E Contract Number VA-244-14-C-0060

Project Number 595-19-102

VA Medical Center, Lebanon, PA

Feb 15, 2018

Project Manual

Lebanon Veterans Affairs Medical Center Feb 15, 2018 Roofing and Insulation AE Bid Documents Lebanon, PA 17042 VA Project #595-19-102

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 10 Table of Contents 05-14 00 01 15 List of Drawing Sheets 09-11

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-13 01 01 11 Medical Center Requirements

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 04-13 01 33 23 Shop Drawings, Product Data, and Samples 11-08

01 33 23.01 SPREADSHEET FOR SHOP DRAWINGS,PRODUCT DATA, AND SAMPLES

01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 09-11 01 57 19 Temporary Environmental Controls 01-11 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 04-13 02 82 13.21 Asbestos Roofing Abatement 07-11 02 83 33.13 Lead-Based Paint Removal and Disposal 08-11

DIVISION 03 – CONCRETE (NOT USED)

DIVISION 04 – MASONRY

04 05 31 Masonry Tuck Pointing 08-11

DIVISION 05 – METALS

05 50 00 Metal Fabrications 09-11

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 09-11

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

Lebanon Veterans Affairs Medical Center July 25, 2014 Roofing and Insulation AE 100% Design Lebanon, PA 17402 VA Project #595-13-110

00 01 10-2

07 01 50.19 Preparation for Re-Roofing 10-10 07 21 13 Thermal Insulation 03-09 07 22 00 Roof and Deck Insulation 10-10 07 31 13 Asphalt Shingles 05-12 07 53 23 Ethylene-Propylene-Diene-Monomer Roofing 10-11 07 60 00 Flashing and Sheet Metal 12-13 07 71 00 Roof Specialties 07 71 00.01 Roof Specialties – Fall Restraint Systems 07 72 00 Roof Accessories 10-11 07 81 00 Applied Fireproofing 11-11 07 84 00 Firestopping 10-11 07 92 00 Joint Sealants 12-11

DIVISION 08 – OPENINGS

08 90 00 Louvers and Vents 10-11

DIVISION 09 – FINISHES

09 91 00 Painting 07-13

DIVISION 10 – SPECIALTIES (NOT USED)

DIVISION 11 – EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS (NOT USED)

DIVISION 13 - SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14– CONVEYING EQUIPEMENT (NOT USED)

DIVISION 21- FIRE SUPPRESSION (NOT USED)

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 04-11 22 13 00 Facility Sanitary and Vent Piping 12-09 22 14 00 Facility Storm Drainage 12-09

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 11-10 23 21 13 Hydronic Piping 09-12 23 31 00 HVAC Ducts and Casings 03-13

Lebanon Veterans Affairs Medical Center July 25, 2014 Roofing and Insulation AE 100% Design Lebanon, PA 17402 VA Project #595-13-110

00 01 10-3

DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 26 41 00.01 Facility Lighting Protection Bldg 1 26 41 00.02 Facility Lighting Protection Bldg 19

DIVISION 27 – COMMUNICATIONS (NOT USED)

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY (NOT USED)

DIVISION 31 – EARTHWORK (NOT USED)

DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)

DIVISION 33 – UTILITIES (NOT USED)

DIVISION 34 – TRANSPORTATION (NOT USED)

DIVISION 48 – Electrical Power Generation (NOT USED)

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

BUILDING 1

GENERAL

595.1.GI101 COVER SHEET

595.1.GI102 GENERAL INFORMATION

595.1.GI103 ABBREVIATIONS

595.1.GI104 OVERALL ATTIC & CUPOLA BASE ICRA PLANS

HAZARDOUS MATERIALS

595.1.HA101 BUILDING 1 – ASBESTOS CORE SAMPLES

ARCHITECTURAL

595.1.AD101 OVERALL ROOF DEMOLITION PLAN

595.1.AD102 OVERALL ATTIC & CUPOLA BASE DEMOLITION

PLANS

595.1.AE101 OVERALL ROOF PLAN

595.1.AE102 OVERALL ATTIC PLAN

595.1.AE301 DETAILS

595.1.AE302 DETAILS

595.1.AE303 DETAILS

595.1.AE304 DETAILS

595.1.AE305 DETAILS

595.1.AE306 DETAILS

595.1.AE307 DETAILS

MECHANICAL

595.1.RD100 ROOF DEMOLITION PLAN

595.1.RP100 ROOF PENETRATION PLAN

00 01 15 - 2

BUILDING 19

GENERAL

595.19.GI101 COVER SHEET

595.19.GI102 GENERAL INFORMATION

595.19.GI103 ABBREVIATIONS

595.19.GI104 OVERALL ATTIC ICRA PLAN

HAZARDOUS MATERIALS

595.19.HA101 BUILDING 19 - ASBESTOS CORE SAMPLES

595.19.HA102 BUILDING 19 – LEAD BASED PAINT

ARCHITECTURAL

595.19.AD101 OVERALL ROOF DEMOLITION PLAN

595.19.AD102 ATTIC DEMOLITION PLAN

595.19.AE101 OVERALL ROOF PLAN

595.19.AE102 OVERALL ATTIC PLAN

595.19.AE301 DETAILS

595.19.AE302 DETAILS

595.19.AE303 DETAILS

595.19.AE304 DETAILS

MECHANICAL

595.19.RD100 ROOF DEMOLITION PLAN

595.19.RP100 ROOF PENETRATION PLAN

- - - END - - -

Lebanon, PA 17042 VA Project #595-19-102

SECTION 01 00 00

GENERAL REQUIREMENTS (UPDATED TO 10-01-17)

TABLE OF CONTENTS

1.1 GENERAL INTENTION

1.2 STATEMENT OF BID ITEM(S)

1.3 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.4 CONSTRUCTION SECURITY REQUIREMENTS

1.5 FIRE SAFETY (SEE 01 35 26 SAFETY REQUIREMENTS)

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 INFECTION PREVENTION MEASURES (See 01 35 26 SAFETY REQUIREMENTS)

1.9 DISPOSAL AND RETENTION

1.10 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.11 RESTORATION

1.12 PHYSICAL DATA

1.13 PROFESSIONAL SURVEYING SERVICES

1.14 LAYOUT OF WORK

1.15 AS-BUILT DRAWINGS

1.16 USE OF ROADWAYS

1.17 COR'S FIELD OFFICE (NOT USED)

1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.19 TEMPORARY USE OF EXISTING ELEVATORS

1.20 TEMPORARY USE OF NEW ELEVATORS

1.21 TEMPORARY TOILETS

Lebanon, PA 17042 VA Project #595-19-102

1.22 AVAILABILITY AND USE OF UTILITY SERVICES

1.23 NEW TELEPHONE EQUIPMENT (NOT USED)

1.24 TESTS (NOT USED)

1.25 INSTRUCTIONS

1.26 GOVERNMENT-FURNISHED PROPERTY

1.27 RELOCATED // EQUIPMENT // ITEMS //

1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT

1.29 CONSTRUCTION SIGN

1.30 SAFETY SIGN

1.31 PHOTOGRAPHIC DOCUMENTATION

1.32 FINAL ELEVATION Digital Images

1.33 HISTORIC PRESERVATION (NOT USED)

1.34 ELECTRONIC SUBMITTAL

PROCEDURES……………………………………………………………………………………25

Lebanon, PA 17402 VA Project #595-19-102

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for repair and renovation operations, including demolition and removal of existing roofing and structures, and furnish labor and materials and perform work for reroofing and attic insulation and ventilation of buildings 1 and 19 as required by drawings and specifications.

B. A site visit will be held on the date and time specified in the solicitation, see FAR 52.236-27 in “Instructions, Conditions and Other

Statements to Bidders/Offerors.”

C. Offices of STEWART C CLUCK ARCHITECT LLC, 600 North Hartley St.,Suite

152, York, PA, 17404 (Ph: 717 887-3847), as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. Manufacturers’ representatives who inspect the work to validate warranties or advise the contractor in any manner shall be compensated by the contractor and not the VA.

E. All employees of general contractor and subcontractors shall comply with

VA security management program and obtain access permission of the VA police. Employee must carry identification credentials to be identified by project and employer, and indicate areas restricted from unauthorized access. See Section 01 01 11 MEDICAL CENTER REQUIREMENTS, for procedures.

01 00 00 -2

1.3 STATEMENT OF BID ITEM(S)

A. BASE BID:

1. Furnish all labor, tools, materials, equipment, and supervision for work as shown on drawings and in specifications for Buildings 1 and 19.

2. Work includes the following and work shown on contract drawings:

a. Replace roofing, insulation, flashing and roof accessories.

b. Provide metal parapet covering over existing cast stone parapets.

c. Provide closed cell water-based spray foam insulation under all steep-sloped roof decks to achieve increased insulation value.

d. Provide a passive ventilation system to the attics.

e. Remove asbestos-containing roofing materials.

(Building 19).

f. Mechanical, plumbing and electrical work associated with moving and raising RTU’s, moving and reattaching lightning protection systems, roof drains, gutters, piping and leaders.

g. Provide gutters, leaders, downspouts and splash blocks

h. Provide fall restraint systems,

i. Provide roof hatches.

B. ALTERNATE #1:

01 00 00 -3

Base bid minus all work associated with Building 19.

C. ALTERNATE #2:

Base bid minus all work associated with Building 1.

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

B. (NOT USED)

C. All ambiguities or inconsistencies in the specifications or drawings shall be brought to the attention of the COR prior to beginning work on this project.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. For working outside the “regular hours” as defined in the contract, The General Contractor shall give 3 working days notice to the

Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

01 00 00 -4

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards: (NOT USED)

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. (NOT USED)

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

01 00 00 -5

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. (NOT USED)

2. Separate permits shall be issued for General Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the

COR. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the

Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

01 00 00 -6

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as approved by the COR. The grassed areas that are close to a building may be used for short term storage of materials to facilitate daily work needs. Long term storage area is indicated on drawings (see 'staging area.'

E. Workmen are subject to rules of Medical Center applicable to their conduct. SEE SECTION 01 01 11 Medical Center Requirements.

F. Buildings will be occupied during construction. Execute work so as to interfere as little as possible with normal functioning of Medical

Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of

Veterans Affairs in quantities sufficient for not more than five work

01 00 00 -7 days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject COR’s approval and to fire and safety requirements.

G. (NOT USED)

H. (NOT USED)

I. Construction Fence : Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the “close-in” construction storage area approved by COR.

The intention of this ‘close-in’ area is to stage materials and waste close to the building for short term, i.e. for duration of one work week. Long-term storage area is called out in drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum

375mm (15 inches). Bottom of fence mesh shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR and restore area to original condition.

J. (NOT USED)

K. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be

01 00 00 -8 interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without the

Medical Center Director’s prior knowledge and written approval.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 48 hours in advance of proposed interruption.

Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

L. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

01 00 00 -9

M. To minimize interference of construction activities with flow of Medical

Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. (NOT USED)

N. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

O. Do not begin work operations on a roof area until all materials to complete the roof are on hand, in contractor’s storage areas or readily available. No delays in work will be allowed due to material shortages.

P. Provide at least two weeks’ notice to COR before starting work on a building or roof and attic area that is part of that building.

1.7 ALTERATIONS

(NOT USED)

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR. Remove such items in condition to be ready for re-installation. Relocate and anchor items that must remain in

01 00 00 -10 operation (e.g. antennae, security cameras) and maintain operability.

Coordinate new location and ‘means and methods’ of anchorage with COR and only with COR’s approval.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

4. (NOT USED)

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract

01 00 00 -11 or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR.

Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified. Re-attach ladders, antennae, ground wires and other metallic devices as shown on drawings or as near to existing location as possible. Use new stainless steel connection devices. Do not tighten threaded devices into precast masonry, concrete or stone. Use ‘epoxy’d’ anchors without transmitting lateral forces to the substrate.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire

01 00 00 -12 protection systems and communications systems (including telephone) which are indicated on drawings and which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4), “CONTRACT CHANGES – SUPPLEMENT,” (VAAR 852.236-88) and

"DIFFERING SITE CONDITIONS" (FAR 52.236-2).

1.11 PHYSICAL DATA (NOT USED)

1.12 PROFESSIONAL SURVEYING SERVICES (NOT USED)

1.13 LAYOUT OF WORK (NOT USED)

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR's review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings to the COR within 15 calendar days after each completed building and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

01 00 00 -13

1.16 COR'S FIELD OFFICE (NOT USED)

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. (NOT USED)

B. (NOT USED).

C. See the requirements of the mechanical and electrical specifications sections.

1.18 TEMPORARY USE OF EXISTING ELEVATORS

A. Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment. Additionally, the contractor’s personnel shall not use existing elevators.

1.19 TEMPORARY USE OF NEW ELEVATORS (NOT USED)

1.20 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner satisfactory to the COR, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of

01 00 00 -14 the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, and associated paraphernalia.

C. (NOT USED).

D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:

E. (NOT USED).

F. Water (for Construction and Testing):

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection. Water is available at no cost to the Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from

Medical Center's system.

1.22 NEW TELEPHONE EQUIPMENT (NOT USED)

1.23 TESTS (NOT USED)

1.24 INSTRUCTIONS

A. Contractor shall furnish Maintenance manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance manuals and one compact disc (four hard copies and one electronic copy each) for each roofing type shall be delivered to the COR.

C. Instructions: Contractor shall provide (at no expense to the VA) qualified, factory-trained manufacturers' representatives to give detailed instructions to assigned Department of Veterans Affairs personnel in the complete maintenance for each item of material and

01 00 00 -15 other items that are part of the VA’s maintenance responsibility. All such training will be at the job site. The Department of Veterans

Affairs reserves the right to request the removal of, and substitution for, any instructor who, in the opinion of the COR, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.

1.25 GOVERNMENT-FURNISHED PROPERTY (NOT USED)

1.27 REPOSITIONED OR RELOCATED GROUNDING SYSTEM, RTU’S OR OTHER ITEMS

A. Contractor shall disconnect, dismantle as necessary, remove and reinstall in current or new location, all existing equipment and items indicated by symbol "R" or otherwise shown to be repositioned or relocated by the Contractor. For example the addition of insulation on low-slope roofs, replacement or extension of curbs or the contractor’s insulation placement plan might cause an item or RTU to be repositioned to accommodate the re-roofing. When contractor determines that equipment should be repositioned in order to carry out the work, this shall be at the contractor’s expense.

B. Perform repositioning or relocation of equipment or items at such times and in such a manner as directed by the COR.

C. Suitably cap existing service lines, such as steam, condensate return, water, drain, gas, air, vacuum and/or electrical, whenever such lines are disconnected from equipment to be repositioned or relocated. Remove abandoned lines in finished areas and cap as specified under paragraph

"Abandoned Lines".

D. Provide all mechanical and electrical service connections, fittings, fastenings and any other materials necessary for assembly and installation of repositioned or relocated equipment; and leave such equipment in proper operating condition.

E. (NOT USED)

F. All service lines such as noted above for repositioned or relocated equipment shall be in place at point of relocation ready for use before

01 00 00 -16 any existing equipment is disconnected. Make relocated existing equipment ready for operation or use immediately after reinstallation.

1.28 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT (NOT USED)

1.29 CONSTRUCTION SIGN

A. Provide a Construction Sign where directed by the COR. All wood members shall be of framing lumber. Cover sign frame with 0.7 mm (24 gage) galvanized sheet steel nailed securely around edges and on all bearings.

Provide three 100 by 100 mm (4 inch by 4 inch) posts (or equivalent round posts) set 1200 mm (four feet) into ground. Set bottom of sign level at 900 mm (three feet) above ground and secure to posts with through bolts. Make posts full height of sign. Brace posts with 50 x 100 mm (two by four inch) material as directed.

B. Paint all surfaces of sign and posts two coats of white gloss paint.

Border and letters shall be of black gloss paint, except project title which shall be blue gloss paint.

C. Maintain sign and remove it when directed by the COR.

D. Detail Drawing of construction sign showing required legend and other characteristics of sign is attached hereto and made a part of this specification.

1.30 SAFETY SIGN

A. Provide a Safety Sign where directed by COR. Face of sign shall be 19 mm

(3/4 inch) thick exterior grade plywood. Provide two 100 mm by 100 mm

(four by four inch) posts extending full height of sign and 900 mm

(three feet) into ground. Set bottom of sign level at 1200 mm (four feet) above ground.

B. Paint all surfaces of Safety Sign and posts with one prime coat and two coats of white gloss paint. Letters and design shall be painted with gloss paint of colors noted.

C. Maintain sign and remove it when directed by COR.

01 00 00 -17

D. Standard Detail Drawing Number SD10000-02(Found on VA TIL) of safety sign showing required legend and other characteristics of sign is attached hereto and is made a part of this specification.

E. Post the number of accident free working days on a daily basis.

1.31 PHOTOGRAPHIC DOCUMENTATION

A. (NOT USED)

B. (NOT USED)

C. Images shall be taken and must show distinctly, at as large a scale as possible, all parts of work embraced in the picture.

D. Coordination of photo shoots is accomplished through COR. Contractor shall also attend construction team meetings as necessary. Contractor’s operations team shall provide regular updates regarding the status of the documentation, including photo shoots concluded, the availability of new Progressions or Exact-Builts viewable on-line and anticipated future shoot dates.

E. (NOT USED)

F. (NOT USED)

G. Upon completion of the project, final copies of the documentation (the

“Permanent Record”) with the indexing and navigation system embedded

(and active) shall be provided in an electronic media format, typically a DVD or external hard-drive.

1.32 FINAL ELEVATION DIGITAL IMAGES (NOT USED)

1.33 HISTORIC PRESERVATION (NOT USED)

1.34 ELECTRONIC SUBMITTAL PROCEDURES

A. Summary:

1. A/E Design Submissions, Shop drawing and product data submittals in addition to hardcopies shall also be transmitted to the Government (PDF) format using Submittal

01 00 00 -18

Exchange (www.submittalexchange.com) or equal pre-approved website service designed specifically for transmitting submittals between all construction team members.

2. The intent of electronic submittals is to expedite the construction process by reducing paperwork, improving information flow, and decreasing turnaround time.

3. The electronic submittal process is not intended for color samples, color charts, or physical material samples.

B. Procedures:

1. Use submittal spreadsheet (Specifications Section #01 33

23.01) provided by VA. This is a list of required submittals derived from the specifications. It is the minimum list of drawings, samples and product data and includes options or

‘equals’ listed in the associated sections.

2. Submittal Preparation - Contractor may use any or all of the following options:

a. Subcontractors and Suppliers provide electronic (PDF) submittals to Contractor via the [submittal software] website.

b. Subcontractors and Suppliers provide electronic (PDF) submittals to Contractor via email.

c. Subcontractors and Suppliers provide paper submittals to

Scanning Service which electronically scans and converts to PDF format.

3. Contractor shall review and apply electronic stamp certifying that the submittal complies with the requirements of the Contract Documents including verification of manufacturer / product, dimensions and coordination of information with other parts of the work.

01 00 00 -19

4. Contractor shall transmit each submittal to VA and to

Architect using the [contractor’s submittal software] website or the Architect’s FTP site.

5. The Government’s as well as design Architect/Engineer’s review comments will be made available on the [contractor’s submittal software] website or Architect’s FTP site for downloading. Contractor will receive email notice of completed review.

6. Distribution of reviewed submittals to subcontractors and suppliers is the responsibility of the Contractor.

7. Submit paper copies of any reviewed submittals not submitted electronically at project closeout for record purposes.

C. Costs:

1. Contractor shall include the full cost of [submittal software] subscription in their proposal. This cost is included in the Contract Amount.

2. The intent is for [software] cost to be in lieu of postage or shipping costs typically paid for paper submittals.

Service cost is a net cost savings to Contractor because submittals sent electronically do not need to be shipped physically.

3. After award of contract, training will be provided by

[contractor] regarding use of website and PDF submittals.

4. Internet Service and Equipment Requirements:

a. Email address and Internet access at Contractor’s main office.

b. Adobe Acrobat (www.adobe.com), Bluebeam PDF Revu

(www.bluebeam.com), or other similar PDF review software for applying electronic stamps and comments.

D. Products:

01 00 00 -20

1. Basis of specification is Submittal Exchange website system for electronic construction submittals

(www.submittalexchange.com) or equal.

2. Equal products shall meet the following requirements:

a. Independently hosted, web-based system for automated tracking, storage, and distribution of contract submittals, Requests For Information, and other contract related documents. FTP sites, e-mail exchanges, and server-based systems hosted from inside a contractor’s office will not be considered and are not acceptable.

b. Utilize 256-bit SSL encryption and host at SAS70 Type II compliant data centers.

c. Minimum five years documented experience of use on comparable commercial construction projects. “Comparable commercial construction projects” shall be defined as documented use on a minimum of five hundred governmental, public-entity, or private sector projects each of $1 million construction value or greater.

d. Minimum five years documented 99.5% website uptime.

e. Unlimited individual user accounts and system access for all project subcontractors, general contractor, owner staff, architect, design consultants, and sub-consultants, with no additional fees for those parties to access the system.

f. Separate locations for owner, architect, design consultant, and sub-consultant review comments with contractors restricted from viewing comments until final review or release by owner or primary design consultant.

g. Full version histories and dates of exchanges automatically tracked and available for viewing, searching, and reporting in a linear log format compatible with AIA G712.

01 00 00 -21

h. Functionality to group submittals as required on packages and apply forms and review comments to entire package simultaneously.

i. Functionality for integrated online PDF viewing and review, including graphical markups and stamps, for owner, architect, design consultants, sub-consultants, and general contractor without need for additional software purchase.

j. Automatic, configurable email notifications for each project team member for new and reviewed submittals and other items.

k. Automatic, configurable email reminders of past due items.

l. Customized, automated PDF form generation for submittals, RFIs, and other documents matching standard templates used by owner, design consultants, sub-consultants, and general contractor. Documentation and demonstration of automatic form generation using each entity’s templates must be submitted as part of any substitution request.

m. Use submittal listing (log) provided in the Project

Manual. Owner or primary design consultant shall have full control over required items list and access to edit, add, or remove items during project.

n. System vendor shall provide minimum one-hour live web meeting training sessions to contractors, design consultants, sub-consultants, and owner’s staff prior to project start.

o. System vendor shall make available minimum thirty-minute live web meeting training sessions for subcontractors at least twice weekly for the entire duration of the project.

p. System vendor shall provide access for owner, design consultants, sub-consultants, general contractor, and

01 00 00 -22 subcontractors to live technical support by phone and email minimum of 7 AM to 6 PM CST on standard business days at no additional cost.

q. Allowance for scanning and printing services provided by local third-party reprographic vendor to assist with obtaining documents electronically and online print ordering.

r. At completion of project closeout, system vendor shall provide minimum of four archival discs that include all documents and tracking logs, or the ability to download this information from the live website in a single complete archive package.

- - - E N D - - -

01 00 00 -23

01 00 00 -24

MEDICAL CENTER REQUIREMENTS

010111-1

SECTION 010111 – MEDICAL CENTER REQUIREMENTS

PART 1 GENERAL

1.1 GENERAL INTENTION

A. This section pertains to station policy for construction projects performed at the Veterans Affairs Medical Center, Lebanon, Pennsylvania. Safety and health concerns are taken seriously at this facility. Both our staff and yours are expected to adhere to the strictest requirements. This is exceedingly important, since we must be primarily concerned for the safety of our patients. In this regard, OSHA Standards may protect worker safety and health, but they have minimal benefit for protecting the safety and health of our patients, due primarily to their differing medical conditions. Please review this information as orientation with your personnel performing work on site.

B. Our medical center is committed to addressing those construction, protection and occupancy features necessary to minimize danger to life from fire, smoke, fumes and panic. The level of safety is achieved by the combination of prevention, protection, egress and other features. The level of life safety from fire is defined through requirements directed at: prevention, detection, control of development, confinement of effects, extinguishment, provision of refuge/evacuation and staff reaction. This medical center provides its minimum level of life safety by extensively applying the aforementioned measures using a defense in place strategy.

This strategy recognizes that our patients are both incapable of self-preservation and difficult to move, particularly vertically to other floors or to the exterior of the buildings. When any of the life safety measures are compromised by construction, an alternate or interim life safety measure must be put in place to maintain the level of safety required by NFPA 101, Life Safety Code.

1.2 REQUIREMENTS

A. Site Security:

1. Secure all areas of work including, but not limited to construction sites, attics, crawl spaces, mechanical and electrical rooms against entry of unauthorized individuals including patients. Erection of a non-flammable partition to secure the job site may be required. Close all windows at the end of each workday.

2. Notify the Contracting Officers Representative (COR) for permission to work after-hours and weekends.

010111-2

3. All contractor and subcontractor employees shall obtain from the VA Police Department an ID badge, and shall always prominently wear it.

B. Key Security:

1. The contractor will not be issued more than required sets of keys to complete this project.

2. The contractor's set(s) of keys will contain only those keys that the COR can issue without breaching the security of other areas of the medical center.

3. If the contractor loses a key, all areas that are keyed to that key will be rekeyed at the contractor's expense and all new keys required to be issued will be completed at the contractor's expense.

C. General Safety:

1. Follow all safety, fire safety and health requirements as per

CFR 29, Subtitle B, Chapter XVII (OSHA), Part 1926 including the submission of a Safety/Fire Safety Plan.

2. Maintain safety in the construction site/area in accordance with the provisions of the contract, which includes the OSHA Regulations, National Electrical Code NFPA 70, and NFPA 101, Life Safety Code.

3. Work in a safe manner and take all proper precautions while performing your work. Extra precautions shall be taken when working around persons occupying the building during construction. Submit a Core drilling & Firestopping Permit, supplied by the government for all penetrations. Take precautions when core drilling to protect persons and structural integrity of the building. Fire-stop all penetrations before the end of the workday. All Fire-stop material shall be RED in color.

4. All ceiling tile must be replaced whenever the work site is left unattended. If tiles are broken, the broken tile must be replaced before the end of the day. This applies to all areas outside of areas closed and labeled as a construction area.

5. Make safety inspections and submit weekly, on government supplied form, directly to Project Coordinator.

6. Provide Personal Protective Equipment (PPE) to your employees.

7. Post appropriate signs in specific hazardous areas.

010111-3

8. Keep tools, ladders, etc. away from patients to prevent injuries.

D. Safety Inspections:

Safety inspections of all contract operations will be performed on a regular frequency by the professional Occupational Safety & Health Staff at this facility. Written reports of unsafe practices or conditions will be reported to the Contracting Officers Representative (COR) and Contracting Officer for immediate attention and resolution.

E. Fire Alarms:

1. The fire alarm system connects all buildings at this facility, and is activated by various heat, duct, manual pull stations and smoke sensors. Manual pull stations are provided on each ward. Please survey the area in which you are working to locate the manual pull stations.

2. If in the event of a fire alarm sounding, you are instructed to remain in your area, unless medical center personnel (Safety, Nursing or Engineering) instruct otherwise, or unless a fire situation is in your area, in which case you should immediately evacuate.

3. The medical center operates an extensive patient evacuation program. A total of approximately 15-20 personnel initially respond to all alarms. Historically, false alarms are caused by contractors generating dust or other disturbances of sensors. When working in an area producing dust, you will cover all alarms with covers provided by Engineering Service.

These covers will be removed at the end of the work shift, upon leaving the area after dust has settled.

4. If an alarm is determined by the COR to have been activated by contractor’s work other than from or resulting in a fire situation, the contractor will be charged $300 per occurrence.

5. Any work involving the fire protection systems will require written permission to proceed from the COR.

DO NOT tamper with or otherwise disturb any fire alarm system components without prior written permission.

010111-4

F. Hazardous Materials:

1. Many of the operations you are scheduled to perform may involve the use of hazardous materials. Prior to locating hazardous materials on site, all Material Safety Data Sheets will be submitted through the COR for evaluation by the Facility Industrial Hygienist.

2. Storage of hazardous materials within buildings will be minimal with only enough on hand to perform daily work tasks.

Flammable materials will either be removed from buildings at the end of the work shift or stored in approved flammable storage containers.

3. Care must be taken to assure adequate ventilation to remove vapors from hazardous materials in use. Many of the patients being cared for in the facility are susceptible to environmental contaminants, even when odors seem minimal. The more effective method to reduce complaints is to close the work area and use adequate ventilation.

G. Airborne Dust and Fume Control During Construction:

1. Generation of dust is of major concern within staff and especially patient-occupied areas. Dust can be generated by either manual or mechanical cutting, sanding or drilling on surfaces. Where operations involve techniques, which may generate dust, all efforts will be directed at reducing airborne generated dust to the lowest level feasible. This may be accomplished by a number of methods. These include misting the area with water or use of tools attached to high efficiency particulate air (HEPA) filtering vacuums. Where large amounts of materials may be disturbed resulting in airborne dust, establishment of full ceiling to floor plastic barriers may be required.

2. Generation of metal fumes is also a concern to hospital patients and staff. Fumes generated as a result of welding, brazing, soldering and cutting must be controlled through the use of spot ventilation or fume extractors. If fumes are captured and filtered through HEPA filtered fume extractors, exhaust can be returned directly into the work area.

Unfiltered fume, like those collected by spot ventilators, shall be exhausted directly to the outside through exterior building openings. In addition to ventilation requirements, arc welding operations shall be shielded by noncombustible or flameproof screens to protect employees and patients from the direct rays of the arc.

3. If waste chutes are used to facilitate disposal of construction debris from upper building floors, cover all

010111-5 waste receptacles and dumpsters to help contain dust.

Additionally, cover all waste receptacles during brisk wind conditions to prevent debris from littering the medical center grounds.

4. Classification of Jobs.

a. (NOT USED)

b. Prior to the start of construction, the…