526-23-302 - CWP Replacement - RFI 20221212.pdf

PDF 76 KB Posted

Attached to
J043--526-23-302 Condenser Water Pump System Replacement Federal contract opportunity
Solicitation number
36C24222R0124
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This solicitation seeks replacement of condenser water pumps and motors at the James J. Peters VA Medical Center. The contractor will replace eight sets of 75HP motors and pumps, in groups of two, over a period of no more than 45 days from notice to proceed. The contractor must provide submittals for approval and replace the specified equipment, including couplings and performing laser alignment. Testing and ensuring proper operation with the building management system is required. The solicitation also requires any drainage line and VFD modifications, with verification of correct VFD parameters.

View the file

Other files for this federal contract opportunity

Other files attached to J043--526-23-302 Condenser Water Pump System Replacement, newest first.
File Type Posted
S04_SITE VISIT SIGN IN SHEET_REPLACE CONDENSER WATER PUMPS.pdf PDF
36C24222R0124 0001.docx DOCX document
Baldor Motor.jpg JPG image
36C24222R0124_2.docx DOCX document
Pump Picture2.jpg JPG image
Pump Picture4.jpg JPG image
Pump Picture3.jpg JPG image
Pump Picture1.jpg JPG image
Condenser Water Pumps Redlined.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

12/12/2022

Project: 526-23-302 – Condenser Water Pump Replacement RFIs COR: John Adeyeye

1. Will concrete repair and painting be part of the contract?

Answer: Yes, painting and concrete repair of the whole pad will be part of the contract. No major construction repair is needed, the repair being requested is specific to the small cracks and repainting the pad after repairing the cracks.

2. Speaking with the boiler plant staff, the pump VFD sequence may need to be adjusted to operate the pumps on a staging/ lead-lag algorithm rather than a overall speed algorithm to prevent the seal wearing issues the VA has been experiencing. Will VFD check-out and parameter adjustment be part of this contract?

Answer: Yes, the VFD check-out and parameter verification will be part of this contract. Checking the functionality with the BMS is also included.

3. The existing motors do not have AEGIS grounding rings. Adding these rings will prevent noise and premature motor bearing failures. Will these be part of the new motor specifications? The costing difference is approximately an additional 10% on the cost of the motor compared to without the devices.

Answer: Yes, AEGIS Grounding rings will help the motor’s longevity and prevent a future failure.