36C24222B0007 0002.docx
DOCX document 19 KB Posted
- Attached to
- Z1DA--528A8-21-815 CORRECT PARALLELING SWITCHGEAR DEFICIENCIES Federal contract opportunity
- Solicitation number
- 36C24222B0007
About this file
This document contains a federal contract solicitation and related questions and answers. The solicitation is for the Correct Paralleling Switchgear Deficiencies project at the Stratton VA Medical Center in Albany, New York. The scope of work involves correcting deficiencies in the Paralleling Switchgear to comply with the VA's Electrical Design Manual and replacing outdated equipment. The procurement is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses under NAICS code 236220 with a small business size standard of $39.5 million. The estimated value is between $250,000 and $500,000. The pre-solicitation notice states that the full solicitation will be posted on beta.SAM.gov in November 2021. The questions and answers provide additional details on load analysis responsibilities, testing requirements, and allowable outage windows.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24222B0007 0003.docx | DOCX document | |
| 36C24222B0007 0001.docx | DOCX document | |
| Specs - Correct Paralleling Switchgear Deficiencies.zip | ZIP file | |
| 36C24222B0007_1.docx | DOCX document | |
| SAM Wage determination.pdf | ||
| VAAR 819 219 77 VA Notice of Limitation on subcontracting.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 528A8-21-815 Department of Veterans Affairs Terry Fraser Contracting Specialist Network Contracting Office 2 20 Madison Ave. Ext.
Albany
NY
12203 Department of Veterans Affairs Terry Fraser Contracting Specialist Network Contracting Office 2 20 Madison Ave. Ext.
Albany
NY
12203 To all Offerors/Bidders
36C24222B0007 11-04-2021
X X X
The purpose of this amendment is to; Provide the answers to submitted RFI's. See continuing pages.
Bid due date remains unchanged.
Tony Clemente Contracting Officer Request For Information (RFI)
Stratton VA Medical Center Project Name: Correct Paralleling Switchgear Deficiencies Project #: 528A8-21-815 Solicitation#: 36C24222B0007 December 1, 2021
RFI #1
Q; This project requires the removal of the existing control platform from the Paralleling Switchgear. During the period of actual installation and testing of the new control platform, does the VA require the installation of a portable generator to support critical loads?
A: The SOW does not want independent portable generator(s) to be implemented. The SOW requires the Contractor to keep existing generators operational during the upgrade.
RFI #2
Q; What is the minimum required portable generator capacity to support critical loads during an emergency outage?
A: 2 MW
RFI #3
Q; Where will the VA require the portable generator to be placed in relation to the outdoor Paralleling Switchgear Housing?
A: N/A
RFI #4
Q; Will the VA be responsible for filling and maintaining the fuel level of the portable generator during service on-site?
A: N/A
RFI #5
Q; Does this project require the contractor to assess the loads of the emergency plant to correctly create a “Load Shed Scheme” or is the VA providing measured load data to the contractor for this portion of the new control sequence?
A: Please review the SOW. The VA provided a potential load shed scheme, however, it’s only a draft. The Contractor is responsible in reviewing the scheme in terms of compliance (with the VA’s Electrical Design Manual) and feasibility, to organize the loads with respect to the 3 emergency power branches.
RFI #6
Q; Does this project require “Third Party Testing” for confirmation of new control operations?
A: The Contractor is required to certify (their work and) the operation of the upgraded Paralleling Switchgear. Only qualified personnel who have experience with ISO switchgear can perform the work. Who are you proposing to perform the work?
RFI #7
Q; Is the Contractor allowed to perform outages during normal business hours? (Outage is defined as no Automated Emergency Plant Available)
A: Please review the SOW. The VA always requires the availability of emergency power.