This addendum modifies the solicitation for a modular office space project at the Canandaigua VA Medical Center. The scope has been reduced from 9,165 square feet to 7,050 square feet by eliminating three modular units, a conference room, and some workstations. The site demolition and grading plans have been updated to reflect less topsoil removal and gravel pavement. Mechanical, electrical, lighting, and power/systems layouts have been amended accordingly. Bids are due for installing utilities, renting the reduced-size modular offices, and performing interior buildout. The project budget is between $1-5 million. As a Service-Disabled Veteran-Owned Small Business set-aside, only SDVOSBs may bid.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24220B0033 Amendment 0002 Modular Office Space for Member Services.pdf | ||
| 36C24220B0033 0001 Modular Building Amendment.docx | DOCX document | |
| CHW-1 - Plan View (20200421).pdf | ||
| 36C24220B0033-001.docx | DOCX document | |
| 36C24220B0033-003.pdf | ||
| 36C24220B0033-004.pdf | ||
| 36C24220B0033-002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM #1
Design Modular Office Space Department of Veterans Affairs Canandaigua VA Medical Center Project Number: 585A5-19-533
May 29, 2020
The attention of all Bidders is called to the following Addendum. Addendum #1 is hereby included in and made a part of the Contract Documents. All requirements of the original Project Specifications and Drawings shall remain in force except as amended by this Addendum.
GENERAL:
1. Canandaigua VA Medical Center, Member Services has determined that they do not require the amount of square footage as originally designed and want to reduce the footprint of the temporary building.
SPECIFICATIONS AMENDED:
1. No specification sections have been amended.
DRAWINGS AMENDED:
1. AI-100 Floor Plan Modular Office: Three (3) of the 13 original “Modular Units” have been eliminated. The overall length of the building is decreased from 152’-9” ± to 117’-6” ±. The gross square footage is reduced from 9,165 ± SF to 7,050 ± SF.
a. Conference Room 111, the adjacent Printer/Fax area and a portion of Workstation Area 134 have been eliminated.
b. The cubicle workstations in Workstation Area 128 have been eliminated.
c. A sidewalk connecting the stair/ramp landing to the existing sidewalk has been added.
d. Refer to attached amended Floor Plan sheet AI-100, addendum #1.
2. CD-100 Site Demolition Plan Modular Office: The amount of topsoil removal has been reduced.
a. Refer to attached amended Site Demolition Plan sheet CD-100, addendum #1.
3. CS-100 Site Plan Modular Office: The amount of new gravel pavement has been reduced.
a. A new sidewalk connecting the stair/ramp landing to the existing sidewalk has been added.
b. Refer to attached amended Site Plan, CS-100, addendum #1.
4. CG-100 Grading Plan Modular Office: The spot elevations in the revised area have been updated. Refer to the attached amended Grading Plan, CG-100, addendum #1.
5. MH-100 Mechanical Plan Modular Office:
a. Remove HVAC equipment from scope for the three (3) office modules that were eliminated.
6. ES-100 Electrical Site Plan Modular Office:
a. Extend underground electrical feeder conduit and wiring an additional 40 ± feet.
b. Extend underground ground wiring from grounding ring to automatic transfer switch an additional 16 ± feet.
7. EP-100 Power and Systems Plan Modular Office:
a. Remove power and systems equipment and work associated from scope for the three (3) office modules that were eliminated.
b. Refer to attached amended Partial Power and Systems Plan, addendum #1 for revised power and systems layout.
8. EL-100 Lighting Plan Modular Office:
a. Remove light fixtures from scope from the three (3) office modules that were eliminated.
b. Revise ceiling grid and light fixture layout as shown on attached amended Partial Lighting Plan, addendum #1.
END OF ADDENDUM No. 1
The preceding items and attached amended drawings are hereby made part of the Contract Documents for the above work.
Tolman Engineering, Architecture & Surveying, PLLC, dba Patriot Design and Consulting 3610 Lawson Road Jamestown, NY 14701
File details come from the government source that posted it. Updated .