36C24219Q0254-001.pdf

PDF 167 KB Posted

Attached to
Laboratory Equipment PM Service Federal contract opportunity
Solicitation number
36C24219Q0254
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

36C24219Q0254 SOW - Laboratory Service Contract.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Laboratory Equipment PM Service, newest first.
File Type Posted
-16158.docx DOCX document
36C24219Q0254-0002000.docx DOCX document
36C24219Q0254-0001000.docx DOCX document
36C24219Q0254-002.pdf PDF
36C24219Q0254-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 1/23/2019 New York Harbor Healthcare System Brook lyn, New York

Statement of Work (SOW)

Background: The NYHHS in Brooklyn, New York is currently seeking a service contract for preventative and corrective maintenance of the following laboratory equipment:

• LabVision Auto Stainer 350 (Serial Number: AS1161A1205)

• Sakura Finetek Tissue Tek VIP 6 AI (SN: 60400220-0417),

• Leica Cryostat (SN: 5648/04.2008),

• Leica Cover Slipper (SN: 4292),

• Leica Embedding station (SN: 3204)

• Avantic Microtome (SN: S13109097).

The contract will be effective from Date of Award to 1/31/2020 with 4 Option Years.

This preventative maintenance full service contract is to include all necessary labor, full service, maintenance, tools, equipment, transportation and parts required to perform Preventive Maintenance (PM) and corrective maintenance on listed equipment. All equipment shall be maintained in proper operating condition as specified by the manufacturer. Vendor must have access to Original Equipment Manufacturers (OEM) parts, manuals and schematics to perform the service. Vendors must have their own schematics available on site at time of service.

A. Scope of Work:

1. Contractor is required to furnish all original equipment manufacturer (OEM) parts and labor to provide maintenance of the six listed devices, in accordance with OEM guidelines.

2. Contractor shall test the functionality of the equipment upon completion of corrective maintenance. If this is a test for repair, the Test should ensure that damaged parts have been successfully repaired and all functions including, but not limited to those related to repaired parts, are operational. If this is a test for a routine PM service, inspection, etc., then the test should just ensure that the equipment is functioning within the guidelines of the OEM or the applicable standards (OSHA, ASSE, JCAHO, NEFP, etc).

3. Corrective maintenance services will be provided, at the request of the VA, to diagnose and correct equipment malfunctions on a routine basis. All repairs shall be performed by a manufacturer-trained technician. Contractor will follow manufacturer's recommendations for PM, repair, calibration and modifications

4. Preventive maintenance: PMs will be scheduled in advance and conducted annually. It is the contractor's responsibility to schedule preventive maintenance as listed. PM procedures subscribed must follow manufacturer’s specifications, and must be documented and submitted in writing to biomedical engineering. Upon completion of

630-19-2-4454-0024 2 1/23/2019

PM procedures, an applicable label should be applied to the unit, indicating the date of PM performance, the next date following PM is due, as well as the initials of the individual that performed the PM. At inception of contract, PM shall include, at a minimum, electrical safety testing, lubrication adjustment, calibration, testing and replacement of faulty parts and/or parts which are likely to fail at no additional charge.

5. At the completion of each service call/PM, the contractor will provide a written service report to Biomedical Engineering. This report will clearly show the date of service, type of service performed, model and serial numbers, name of field technician(s) a description of the work performed, a list of any parts replaced, and the unit condition as left at the completion of said work. The contractor has the option of leaving the service report with Biomedical Engineering, building #4 after servicing equipment or of sending the service report with the invoice. Leaving service reports with a person in the vicinity may be performed in addition to the previously stated requirement, but is not to be used as a substitution. Certification of invoices is clearly dependent upon receipt of service reports as proof of services rendered. Payment may be delayed if proper documentation is not provided.

6. Response time: Contractor shall provide a phone call back by a qualified technician within 4 hours of a service request and an onsite response by a qualified technician within 24 hours of original request for service. Technical service personnel are required to sign in and out of engineering service, Bldg. #4.

7. The C&A requirements do not apply, and a Security Accreditation Package is not required

B. Safety Requirements

Contractor must present certification to demonstrate two (2) years of experience with maintaining the equipment in this requirement. Certified technicians are required for all service visits.

The Contracting Officer or his/her designee will notify the contractor of any noncompliance with the foregoing provisions and the action to be taken. The Contractor shall, after receipt of such notice, immediately correct the conditions to which attention has been directed.

Such notice, when served on the Contractor or his/her representative at the site of the work, shall be deemed sufficient for the purpose aforesaid. If the Contractor fails or refuses to comply promptly, the Contracting Officer may issue an order stopping all and any part of the work, and hold the Contractor in default.

C. Period of Performance

Contract hours will be 8:00AM-4:30PM, Monday-Friday, excluding Government Holidays

D. Place of performance

Pathology Lab Building 1, 3rd Floor rooms 3-301, 3-323; Dermatology Building 1 10th Floor, Room 10-323

630-19-2-4454-0024 3 1/23/2019

E. Inspection

If services do not include equipment, then an inspection shall be done by the VA COR/POC upon completion. (Window washing, Janitorial, tree cutting, snow removal, waste removal). The COR/POC will perform the inspection in the presence of the contractor personnel, prior to the contractor personnel leaving the facility. No invoices will be processed for payment prior to the completion of POC inspection. If the service is routine and/or performance based then inspections may not occur for every service date but may occur periodically as part of a Quality Assurance Surveillance Plan (QASP). If this is the case then a QASP will need to be provided as a separate document.

F. Drawings, and Other Attachments

N/A

G. Government Furnished Property

N/A

H. Other Related Services (Not Included in the Scope of Work)

Any services not expressly stated in this statement of work are not authorized. Services such as inspection, Original Equipment Manufacturer (OEM) required maintenance, or other maintenance and repair vital to the continued functioning of the systems may be added only after written modification from the contracting officer. No other person, including the COR or any other VA personnel are authorized to request additional work be performed by the contractor. Any additional services performed that are not authorized by the contracting officer will be considered inclusive.

File details come from the government source that posted it.