36C24218B0568-007.pdf

PDF 14 KB Posted

Attached to
Mental Health AWE Corrections Bldg. 4 Federal contract opportunity
Solicitation number
36C24218B0568
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

36C24218B0568 010000 List of Drawings EDITED.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Mental Health AWE Corrections Bldg. 4, newest first.
File Type Posted
36C24218B0568-0001002.pdf PDF
36C24218B0568-0001000.docx DOCX document
36C24218B0568-0001001.pdf PDF
36C24218B0568-006.pdf PDF
36C24218B0568-002.zip ZIP file
36C24218B0568-009.docx DOCX document
36C24218B0568-004.zip ZIP file
36C24218B0568-005.pdf PDF
36C24218B0568-008.pdf PDF
36C24218B0568-003.zip ZIP file
36C24218B0568-001.docx DOCX document
36C24218B0568-000.docx DOCX document
Show all 12

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VAMC MONTROSE, NY

“MENTAL HEALTH AWE CORRECTIONS FOR BLDG.4 at FDR”

PROJECT NO. 620-17-204

00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

GENERAL

1. TP-01 COVER SHEET

ARCHITECTURAL

2. GS-01 GENERAL NOTES

3. AS-01 SYMBOLS LEGEND AND ABBREVIATIONS

4. SD-01 FIRST FLOOR SELECTIVE DEMOLITION – CEILING DEVICES

5. AD-01 FIRST FLOOR DEMOLITION PLAN

6. AC-01 FIRST FLOOR ARCHITECTURAL NEW WORK

7. AC-02 FIRST FLOOR ARCHITECTURAL PART PLANS

8. AC-03 INTERIOR ELEVATIONS

9. AC-04 MISCELLANEOUS DETAILS & SCHEDULES

10. AC-05 WALL, DOOR, AND CEILING DETAILS

11. RCD-01 FIRST FLOOR REFLECTED CEILING DEMOLITION

12. RC-01 FIRST FLOOR REFLECTED CEILING NEW WORK

PLUMBING

13. PS-01 PLUMBING SYMBOLS AND NOTES

14. PDG-01 GROUND FLOOR PLUMBING DEMO

15. PDG-02 GROUND FLOOR PLUMBING DEMO PART PLANS

16. PD1-01 FIRST FLOOR PLUMBING DEMO

17. PD1-02 FIRST FLOOR PLUMBING DEMO PART PLANS

18. PG-01 GROUND FLOOR & 1ST FLOOR PLUMBING NEW WORK

19. PG-02 GROUND FLOOR PLUMBING PART PLANS NEW WORK

20. P1-01 FIRST FLOOR PLUMBING NEW WORK

21. P1-02 FIRST FLOOR PLUMBING PART PLANS NEW WORK

HVAC

22. HD-01 FIRST FLOOR HVAC DEMOLITION & PART PLANS

23. H1-01 FIRST FLOOR HVAC MODIFICATIONS & PART PLANS

FIRE PROTECTION

24. FP-01 FIRST FLOOR SPRINKLER MODIFICATIONS

ELECTRICAL

25. ES-01 ELECTRICAL SYMBOLS AND NOTES

VAMC MONTROSE, NY

“MENTAL HEALTH AWE CORRECTIONS FOR BLDG.4 at FDR”

PROJECT NO. 620-17-204

00 01 15 - 2

26. ELD-01 FIRST FLOOR ELECTRICAL LIGHTING DEMOLITION PLAN

27. ELD-02 FIRST FLOOR ELECTRICAL LIGHTING DEMOLITION PLAN

28. EL-01 FIRST FLOOR LIGHTING PLAN & FIRE ALARM DEVICES

29. EPD-01 FIRST FLOOR POWER DEMOLITION PLAN

30. EPD-02 FIRST FLOOR POWER DEMOLITION PART PLANS

31. EP-01 FIRST FLOOR POWER PLAN

32. EP-02 FIRST FLOOR POWER PART PLANS

- - - END - - -

File details come from the government source that posted it.