36C24218B0568-0001001.pdf
PDF 73 KB Posted
- Attached to
- Mental Health AWE Corrections Bldg. 4 Federal contract opportunity
- Solicitation number
- 36C24218B0568
About this file
36C24218B0568 0001 090600 Schedule of Finishes EDITED.pdf
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24218B0568-0001002.pdf | ||
| 36C24218B0568-0001000.docx | DOCX document | |
| 36C24218B0568-004.zip | ZIP file | |
| 36C24218B0568-005.pdf | ||
| 36C24218B0568-002.zip | ZIP file | |
| 36C24218B0568-009.docx | DOCX document | |
| 36C24218B0568-006.pdf | ||
| 36C24218B0568-007.pdf | ||
| 36C24218B0568-008.pdf | ||
| 36C24218B0568-003.zip | ZIP file | |
| 36C24218B0568-001.docx | DOCX document | |
| 36C24218B0568-000.docx | DOCX document |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAMC MONTROSE, NY
“MENTAL HEALTH AWE CORRECTIONS FOR BLDG.4 at
FDR”
PROJECT NO. 620-17-204
09 06 00 - i
SECTION 09 06 00
SCHEDULE FOR FINISHES
SECTION 09 06 00-SCHEDULE FOR FINISHES
VAMC: Hudson Valley Healthcare System – Montrose FDR Campus
Location: Montrose, NY
Project no. and Name: 620-17-204 “Mental Health AWE Corrections for
Bldg. 4 at FDR”
Submission Date:
“MENTAL HEALTH AWE CORRECTIONS FOR BLDG.4 at FDR”
09 06 00 - 2
SECTION 09 06 00
SCHEDULE FOR FINISHES
PART I – GENERAL
1.1 DESCRIPTION
This section contains a coordinated system in which requirements for materials specified in other sections shown are identified by abbreviated material names and finish codes in the room finish schedule or shown for other locations.
1.2 MANUFACTURERS
Manufacturer’s trade names and numbers used herein are only to identify colors, finishes, textures and patterns. Products of other manufacturer’s equivalent to colors, finishes, textures and patterns of manufacturers listed that meet requirements of technical specifications will be acceptable upon approval in writing by contracting officer for finish requirements.
1.3 SUBMITALS
Submit in accordance with SECTION 01 33 23, SHOP DRAWINGS, PRODUCT DATA, AND SAMPLES provide quadruplicate samples for color approval of materials and finishes specified in this section.
1.4 APPLICABLE PUBLICATIONS
A. Publications listed below form a part of this specification to the extent referenced. Publications are referenced in text by basic designation only.
B. MASTER PAINTING INSTITUTE: (MPI)
2001....................Architectural Painting Specification Manual
09 06 00 - 3
PART 2 EXECUTION
2.1 FINSIH SCHEDULE SYMBOLS
Symbol Definition P paint ACT Acoustical Ceiling Tile System CFT Ceramic Floor Tile CBT Ceramic base Tile CWT Ceramic Wall Tile
2.2 ROOM FINISH SCHEDULE
A. Match adjoining or existing similar surfaces colors, textures or patterns where disturbed or damaged by alterations or new work when not scheduled.
B. Provide finishes as specified in Room Finish Schedule below.
09 06 00 - 4
-- E N D---
ROOM NO. AND
NAME
FLOOR AREA
(SF)
PERIMETER
OF WALL
(LF)
CEILING
HEIGHT
(FT)
CEILING
AREA
(SF) FLOOR BASE WALLS CEILING REMARKS
103 CONFERENCE
ROOM
70 8'-6" 75 P ACT
P: PRIME (1 COAT) AND PAINT (2 COATS) ALL WALLS IN ENTIRE ROOM AFTER NEW PARTITIONS ARE CONSTRUCTED. PAINT
COLOR AND FINISH TO MATCH EXISTING.
ACT: INSTALL NEW ACCOUSTICAL CEILING TILE SYSTEM (75 SF) TO EXTEND EXISTING CEILING SYSTEM TO NEW WALL. COLOR, FINISH, AND CONSTRUCTION OF NEW CEILING GRID AND TILE TO MATCH EXISTING.
103A CLOSET
18 8'-3" 18 P P
P: TAPE, PATCH, SAND, PRIME (1 COAT), PAINT (2 COATS). WALL PAINT COLOR AND FINISH TO MATCH EXISTING. CEILING
PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
105 TOILET 45 24 8'-6" 45 CFT CBT CWT P
CFT: INSTALL 2" X 2" CERAMIC FLOOR TILE. CBT: INSTALL 2" X 2" CERAMIC COVE TILE. CWT: INSTALL 4" X 4" CERAMIC WALL TILE. CERAMIC FLOOR, COVE, AND WALL TILE SHALL BE DALTILE WHITE COLOR, MATTE FINISH. P: PRIME (1 COAT) AND PAINT (2 COATS). CEILING PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
106 NURSE
COMM CENTER
28 8'-6" 45 P P P: TAPE, PATCH, SAND, PRIME (1 COAT), PAINT (2 COATS). WALL PAINT COLOR AND FINISH TO MATCH EXISTING. CEILING
PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
141 DAY ROOM 4200 P
P: PRIME (1 COAT) AND PAINT (2 COATS) ENTIRE CEILING (NEW AND EXISTING) IN DAY ROOM (4200 SF). CEILING PAINT SHALL
BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
C1-10 NURSES
STATION
P P: PRIME (1 COAT) AND PAINT (2 COATS) ENTIRE CEILING (NEW AND EXISTING) IN NURSES STATION C1-10. CEILING PAINT
SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
144 BEDROOM 52 8'-3" 175 P P
P: PRIME (1 COAT) AND PAINT (2 COATS) ALL WALLS AND CEILING. WALL PAINT COLOR AND FINISH TO MATCH EXISTING.
CEILING PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
144A WOMEN'S
BATHROOM
55 38 8'-3" 55 CFT CBT CWT P
CFT: INSTALL 2" X 2" CERAMIC FLOOR TILE. CBT: INSTALL 2" X 2" CERAMIC COVE TILE. CWT: INSTALL 4" X 4" CERAMIC WALL TILE. CERAMIC FLOOR, COVE, AND WALL TILE SHALL BE DALTILE WHITE COLOR, MATTE FINISH. GWB: INSTALL GYPSUM WALL BOARD (USG WATER RESISTANT GREEN BOARD ON ALL WALLS AND USG FIRECODE X FOR CEILING).
P: PRIME (1 COAT) AND PAINT (2 COATS) CEILING. CEILING PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR
LATEX PAINT.
145 WOMEN'S
LOUNGE
71 8'-3" 240 P P P: PRIME (1 COAT) AND PAINT (2 COATS) ALL WALLS AND CEILING. WALL PAINT COLOR AND FINISH TO MATCH EXISTING.
CEILING PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
146B VESTIBULE 24 8'-3" 36 P P
P: PRIME (1 COAT) AND PAINT (2 COATS) ALL WALLS AND CEILING. WALL PAINT COLOR AND FINISH TO MATCH EXISTING.
CEILING PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
146C CLOSET 14 8'-3" 12 P P
P: PRIME (1 COAT) AND PAINT (2 COATS) ALL WALLS AND CEILING. WALL PAINT COLOR AND FINISH TO MATCH EXISTING.
CEILING PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
CORRIDOR 4200 P
P: PRIME (1 COAT) AND PAINT (2 COATS) ALL SHEETROCK CEILINGS (NEW AND EXISTING) IN CORRIDORS (4200 SF). CEILING
PAINT SHALL BE SHERWIN WILLIAMS PROMAR 200 FLAT INTERIOR LATEX PAINT.
AREAS WHERE
SPRINKLER
HEADS ARE
BEING REPLACED
IN EXISTING
SHEETROCK
CEILING TO
REMAIN
2500 P P: PRIME (1 COAT) AND PAINT (2 COATS) 5' X 5' PATCH AT EACH LOCATION (100) WHERE EXISTING SHEETROCK CEILING IS REPAIRED. CEILING PAINT SHALL BE SHERWIN WILLIAMS. COLOR AND FINISH SHALL MATCH EXISTING CEILING PAINT.
NOTE 1: ALL NEW METAL FRAMES FOR DOORS AND WINDOWS SHALL BE PRIMED AND PAINTED WITH SHERWIN WILLIAMS DTM PAINT WITH SEMI-GLOSS FINISH. ALL NEW ACCESS DOORS AND FRAMES SHALL BE PRIMED AND PAINTED WITH SHERWIN WILLIAMS DTM ACRYLIC PAINT. COLOR AND FINISH OF DTM PAINT FOR ACCESS DOOR AND FRAME IN CEILINGS SHALL MATCH COLOR AND PAINT OF NEW PAINT TO BE APPLIED TO CEILINGS BY CONTRACTOR. COLOR AND FINISH FOR ACCESS DOORS AND FRAMES IN WALLS SHALL MATCH COLOR AND FINISH OF NEW PAINT OR CERAMIC TILES TO BE APPLIED TO WALLS BY CONTRACTOR.
NOTE 2: ALL AREA NUMBERS ARE ESTIMATED FOR BIDDING PURPOSES. CONTRACTOR SHALL VERIFY ACTUAL CONDITIONS WHEN ORDERING MATERIAL.
File details come from the government source that posted it.